Final Environmental Impact Report - Whittier Bridge/I-95 ...
Final Environmental Impact Report - Whittier Bridge/I-95 ... Final Environmental Impact Report - Whittier Bridge/I-95 ...
Patel. Purvi~ _ From: Sent: To: Cc: Subject: Attachments: thomasp@resilientsocieties.org Thursday, December 22, 2011 11 :41 AM dsantiago@dot.gov; Patel, Purvi (EEA); james.cerbone@dot.state.ma.us wm.r.harris@gmail.com Comments on the Whittier Bridgell-95 Improvement Project Foundation Comments on U.S. _DOT_and=Mass_DOT-='whittier_Bridge_Replacement_&_1-95_Widening_Project_Final. pdf via electronic mail Pamela S. Stephenson, Division Administrator Federal Highway Administration 55 Broadway, 10th Floor Cambridge, MA 02142 Attn: Damaris Santiago Richard K. Sullivan, Jr. Secretary Massachusetts Environmental Policy Act (MEPA) Office 100 Cambridge Street, 9th Floor Boston, MA 02114 Attn: Purvi Patel Thomas F. Broderick, P.E., Acting Chief Engineer Mass DOT Highway Division 10 Park Plaza Boston, MA 02116 Attn: James Cerbone Ms. Stephenson, Mr. Sullivan, and Mr. Broderick: Attached please find our comments on the Whittier Bridge/l-95 Improvement Project. Thomas Popik Director Foundation for Resilient Societies 1
COl\1MENTS BY THE ·FOU·NDATION FOR RESlLIEoNT SOCIETIES ON WHITTIER. BRIDGE /1-95 IMPROVEMENT PROJECT .PROJECT FILE NO. 601096 Submitted December 21, 2011 PROTECTING EVACUATION CORRIDORS DURING CONCURRENT WHITTIER BRIDGE AND OTHER BRIDGE REPLACEMENTS AND ELEVATED RISKS OF SOLAR GEOMAGNETIC STORMS IN THE PERIOD 2013 - 2016 COMMENT SUMMARY Studies on the efficacy of emergency evacuations anticipating hurricanes since the year 1998 demonstrate that one of the primary impediments to reliable regional evacuation involves the abandonment of construction equipment and the blockage of lanes on Interstate Highways. These interstate highways are relied upon as emergency evacuation corridors for contraflow evacuations during emergencies. The Project to replace the Whittier Bridge and four other Interstate 95 bridges south of the New Hampshire border is scheduled for years 2013-2016. This is a period with above average risks of solar geomagnetic storms and related-risks to Seabrook Nuclear Station. Ifaugmented on-site backUp electric power and protections for an extra high voltage transformer are not installed at Seabrook Station before a severe solar geomagnetic storm, there will be an elevated risk of mandatory regional evacuation along Interstate 95. It is essential that highway and bridge contractors, their employees, and subcontractors and their employees receive training in the reliable clearance of construction-related lane closures, including removal of all obstructing equipment, and reopening of all Interstate 95 lanes so they are effective as emergency evacuation corridors. 1
- Page 189: EEA#I4427 DEIR Certificate December
- Page 192 and 193: Thank you for the opportunity to co
- Page 194 and 195: Thank you for the opportunity to co
- Page 196 and 197: ESSEX NATIONAL HERITAGE COMMISSION
- Page 198 and 199: In the period leading up to the sub
- Page 200 and 201: construction is not adequate to ens
- Page 202 and 203: to limit turbidity impact from dewa
- Page 204 and 205: For infiltration basin and trench s
- Page 206 and 207: not acceptable to meet regulatory r
- Page 208 and 209: ide lot that is also being expanded
- Page 210 and 211: MassWi/d/ile December 20, 2011 Comm
- Page 212 and 213: Patel, Purvi {_E_EA .... } _ From:
- Page 214 and 215: process. Ifthe project avoids simul
- Page 216 and 217: THE COMMONWEALTH OF MASSACHUSETTS E
- Page 218: imack Valley ning Commission plan *
- Page 227 and 228: Mayor Thatcher w. Kezer III Town Ha
- Page 229 and 230: are connected are there any other p
- Page 231 and 232: Revised 12/19/11 Town ofSalisbury's
- Page 233 and 234: Neil J. Harrington Town Manager Tow
- Page 235 and 236: Secretary Richard K. Sullivan, Jr.
- Page 237 and 238: Coastal Trails Coalition December 2
- Page 242 and 243: 1. The Whittier Bridge Replacement
- Page 244 and 245: Whittier Bridge and 1-95 reconstruc
- Page 246 and 247: forested and open character, though
- Page 248: Thank you for the opportunity to co
- Page 252 and 253: On the cost front, we are in an eco
- Page 254 and 255: 42 Prospect Street Newburyport, Mas
- Page 256 and 257: 12-~:TII ~~.. MASSACHUSETTSHIGHWAYD
- Page 258 and 259: Patel. Purvi~ _ From: Sent: To: Cc:
- Page 260 and 261: argument or disagreement. We have p
- Page 262 and 263: Patel. Purvi (.... E_EA .... ) _ Fr
- Page 264 and 265: TO: Pamela S. Stephensen, Division
- Page 266 and 267: Patel, Purvi ~ ...... _ From: Sent:
- Page 268 and 269: TO: Pamela S. Stephenson, Division
- Page 272 and 273: PUBLIC MEETING WEDNESDAY, DECEMBER
- Page 274 and 275: 3 SPEAKER INDEX Name Page Karen Eme
- Page 276 and 277: 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 278 and 279: 7 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 280 and 281: 9 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 282 and 283: 11 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 284 and 285: 13 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 286 and 287: 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14
- Page 288 and 289: 17 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Patel. Purvi~<br />
_<br />
From:<br />
Sent:<br />
To:<br />
Cc:<br />
Subject:<br />
Attachments:<br />
thomasp@resilientsocieties.org<br />
Thursday, December 22, 2011 11 :41 AM<br />
dsantiago@dot.gov; Patel, Purvi (EEA); james.cerbone@dot.state.ma.us<br />
wm.r.harris@gmail.com<br />
Comments on the <strong>Whittier</strong> <strong>Bridge</strong>ll-<strong>95</strong> Improvement Project<br />
Foundation Comments on U.S.<br />
_DOT_and=Mass_DOT-='whittier_<strong>Bridge</strong>_Replacement_&_1-<strong>95</strong>_Widening_Project_<strong>Final</strong>. pdf<br />
via electronic mail<br />
Pamela S. Stephenson, Division Administrator<br />
Federal Highway Administration<br />
55 Broadway, 10th Floor<br />
Cambridge, MA 02142<br />
Attn: Damaris Santiago<br />
Richard K. Sullivan, Jr. Secretary<br />
Massachusetts <strong>Environmental</strong> Policy Act (MEPA) Office<br />
100 Cambridge Street, 9th Floor<br />
Boston, MA 02114<br />
Attn: Purvi Patel<br />
Thomas F. Broderick, P.E., Acting Chief Engineer<br />
Mass DOT Highway Division<br />
10 Park Plaza<br />
Boston, MA 02116<br />
Attn: James Cerbone<br />
Ms. Stephenson, Mr. Sullivan, and Mr. Broderick:<br />
Attached please find our comments on the <strong>Whittier</strong> <strong>Bridge</strong>/l-<strong>95</strong> Improvement Project.<br />
Thomas Popik<br />
Director<br />
Foundation for Resilient Societies<br />
1