27.01.2015 Views

Final Environmental Impact Report - Whittier Bridge/I-95 ...

Final Environmental Impact Report - Whittier Bridge/I-95 ...

Final Environmental Impact Report - Whittier Bridge/I-95 ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Deval L. Patrick<br />

GOVERNOR<br />

rJJie Commonwea[tli of9vfassacliusetts<br />

t£~ecutive<br />

Office oft£nergg andt£nmronmenta[J1Lffairs<br />

100 Cambridge Street l Suite 900<br />

t]3oston l :MJI. 02114<br />

Timothy P. Murray<br />

LIEUTENANT<br />

GOVERNOR<br />

Richard K. Sullivan. Jr.<br />

SECRETARY<br />

Tel: (617) 626-1000<br />

Fax: (617) 626-1181<br />

http://www.mass.gov/envir<br />

December 30, 2011<br />

CERTIFICATE OF THE SECRETARY OF ENERGY AND ENVIRONMENTAL AFFAIRS<br />

ON THE<br />

DRAFT ENVIRONMENTAL IMPACT REPORT<br />

PROJECT NAME<br />

PROJECT MUNICIPALITY<br />

PROJECT WATERSHED<br />

EEANUMBER<br />

PROJECT PROPONENT<br />

DATE NOTICED IN MONITOR<br />

: <strong>Whittier</strong> <strong>Bridge</strong> 1-<strong>95</strong> Improvement Project<br />

: Newburyport, Amesbury, and Salisbury<br />

: Merrimack<br />

: 14427<br />

: Massachusetts Department ofTransportation<br />

: November 23, 2011<br />

Pursuant to the Massachusetts <strong>Environmental</strong> Policy Act (MEPA) (M.G.L. c. 30, ss. 61­<br />

621) and Section 11.08 of the MEPA regulations (301 CMR 11.00), I hereby determine that the<br />

Draft <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong> (DEIR) submitted on this project adequately and properly<br />

complies with MEPA and its implementing regulations. The Proponent should prepare a <strong>Final</strong><br />

<strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong> (FEIR) as detailed in the Scope below.<br />

Project Description<br />

As described in the DEIR, the proposed project involves the replacement ofthe existing<br />

structurally deficient six-lane John Greenleaf<strong>Whittier</strong> Memorial <strong>Bridge</strong> (<strong>Whittier</strong> <strong>Bridge</strong>) on<br />

Interstate <strong>95</strong> (1-<strong>95</strong>) over the Merrimack River. The project will include the construction of two<br />

new four-lane bridges and the widening of4.25 miles of1-<strong>95</strong> to eight lanes from north of the 1­<br />

<strong>95</strong>1R0ute 113 Interchange to just north ofthe 1-4<strong>95</strong> entrance ramp in Newburyport, Amesbury,<br />

and Salisbury. The project proposes to add two lanes to 1-<strong>95</strong> and the bridge crossing to provide a<br />

consistent eight-lane configuration along the 1-<strong>95</strong> corridor within the project area. As stated in<br />

the DEIR, the purposes ofthe project are: to replace the structurally deficient bridge and provide

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!