<strong>Whittier</strong> <strong>Bridge</strong>/I-<strong>95</strong> Improvement Project FEIR<br />

Chapter 2.0: Response to Comments on the <strong>Environmental</strong> Assessment/Draft <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong><br />

DC-2: And I also want to second Tom's motion about the rebuilding of the former train bridge.<br />

Response: As noted in the response to comment EEA-4 above, MassDOT has determined that the<br />

requested acquisition of the former railroad ROW under I-<strong>95</strong> to enable a future connection between<br />

the Powow River trail in Amesbury and the Ghost Trail in Salisbury is beyond the scope of the<br />

<strong>Whittier</strong> <strong>Bridge</strong> project. The proposed widening and reconstruction of the I-<strong>95</strong> bridges over the<br />

railroad ROW will not impede future development of a connection between Powow River and Ghost<br />

trails. The connection of the Powow River and Ghost Trails is an independent project that can be<br />

subsequently pursued by the municipalities through regular project development process and would<br />

not be precluded by this project.<br />

2-75