<strong>Whittier</strong> <strong>Bridge</strong>/I-<strong>95</strong> Improvement Project FEIR<br />

Chapter 2.0: Response to Comments on the <strong>Environmental</strong> Assessment/Draft <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong><br />

The Shared-Use Path segment on the I-<strong>95</strong> northbound bridge will include ―viewing areas‖ where<br />

path users will be able to enjoy views of the river corridor, including observation of Bald Eagles in the<br />

area.<br />

2.7.12 Tom Horth, Newburyport – Coastal Trails Coalition<br />

Tom Horth, Newburyport – Coastal Trails Coalition<br />

TH-1: We’d like to congratulate you in including the shared use path. This is going to be an incredible amenity to our<br />

area and eventually to general bicycle transportation up and down the east coast.<br />

Response: The comment is noted.<br />

TH-2: We'd also like to reinforce and support the points that Andy Port made about Newburyport, and in particular we<br />

very strongly support the building of a better sound barrier for the Laurel Road people. They really deserve it. And<br />

frankly, Mass. Highway's standards in this regard are inadequate.<br />

Response: The project will relocate the existing articulated noise barrier within the limits of the I-<strong>95</strong><br />

ROW in order to accommodate the construction of the shared use path.<br />

TH-3: <strong>Final</strong>ly, I'd like to make sure that you – at least when you re-build the old bridge over the old railroad north of<br />

the northern end, that you don't do anything that would make it more difficult to connect the Ghost Trail to the Powow<br />

Riverwalk in the future.<br />

Response: The proposed widening and reconstruction of the I-<strong>95</strong> bridges over the railroad ROW will<br />

not impede future development of a connection between Powow River and Ghost trails.<br />

2.7.13 Deb Carey, Amesbury – Coastal Trails Coalition<br />

DC-1: I would like to express my personal concern, the concern of many people I spoke with about the connection of<br />

Evans Place. I understand and sympathize with the fact that there is more than a little difficulty in making any<br />

connection there given the requirements of ADA, and also I understand there's also some wetlands in that area, and<br />

to get this built you need to get it built fast.<br />

Response: The comment refers to the requested connection from Main Street/Evans Place to the<br />

Shared-Use Path in the vicinity of the existing Visitor Information Center at 520 Main Street. The<br />

visitor center, the former Smith‘s Chain <strong>Bridge</strong> Filling Station No. 3, has been determined by the<br />

State Historic Preservation Officer to be eligible for individual listing in the National Register of<br />

Historic Places. As such, any construction on its lot or modifications of the building would trigger<br />

review under Section 106 of the National Historic Preservation Act and would require modification of<br />

the project‘s Section 106 Memorandum of Agreement. If determined to be an adverse impact under<br />

Section 106, Section 4(f) would be triggered. Additionally, the limited space available at the 520<br />

Main Street location and the difference in elevation between the visitor center parcel and the<br />

Shared-Use Path (approximately 40 feet) would make the connection infeasible, require a large<br />

ramp structure with grades in excess of handicapped accessibility requirements, and result in<br />

additional wetland impacts to Wetland I, located behind the visitor center building. Additional wetland<br />

impacts in excess of 40 square feet at Wetland I would result in the need for wetlands Variance for<br />

the project, the timeline for which would push the project outside of the Accelerated <strong>Bridge</strong> Program<br />

funding schedule.<br />

2-74