<strong>Whittier</strong> <strong>Bridge</strong>/I-<strong>95</strong> Improvement Project FEIR<br />

Chapter 2.0: Response to Comments on the <strong>Environmental</strong> Assessment/Draft <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong><br />

ROW 15 feet from our property, with all the horrible effects of their project, is de facto taking our property and<br />

therefore making our living conditions unbearable, especially during the 4 year construction period.<br />

Response: The I-<strong>95</strong> ROW directly borders the <strong>Whittier</strong> Point Condominium property; the<br />

condominium building was constructed within 15-feet of the 1<strong>95</strong>1 state highway layout. The<br />

design/build contractor will be required to prepare a Construction Management Plan (CMP)<br />

describing project activities and their schedule and sequencing, site access and truck routing, and<br />

BMPs that will be used to avoid and minimize adverse environmental impacts. The CMP will address<br />

potential construction period impacts (including, but not limited to, land disturbance, noise, vibration,<br />

dust, odor, nuisance, vehicle emissions, construction and demolition debris, and construction-related<br />

traffic) and analyze and outline feasible measures that can be implemented to eliminate or minimize<br />

these impacts. The construction period is scheduled to occur starting in early 2013 and will be<br />

completed by the end of September 2016.<br />

KW-2: …the EIR report does not include a sound recording of the noises of actual construction which are listed in<br />

detail on page 5-88. Under section 5.18.3 on that page we learn that the daytime work interval extends from 7 am to<br />

10 pm! The report also states that “blasting is not anticipated for this project.” Elsewhere in the report are many<br />

statements about mitigation being required, as if that solves the problem.<br />

Response: The comment is noted. Construction noise levels are expected to comply with criteria<br />

guidelines during limited nighttime activities (e.g., final work to enable traffic crossovers), but may<br />

exceed criteria guidelines during the daytime for receptors at <strong>Whittier</strong> Point Condominiums (an<br />

estimated exceedence of 3 dBA above the daytime limit of 75 dBA) due to the expected use of pile<br />

drivers to set new bridge piers in the Merrimack River. Noise threshold levels are reduced for the<br />

overnight hours. MassDOT will require that particularly noisy activities, such as pile driving, hoe<br />

ramming, rock drilling, and pneumatic tools to operate only during the day. Blasting is not anticipated<br />

for the project.<br />

KW-3: I was surprised to note the distance of the new ROW from the edge of the <strong>Whittier</strong> point property as 150 feet<br />

on page 4-1, and as 15 feet on page 5-8!<br />

Response: MassDOT regrets the inadvertent typographical error. The correct distance to the<br />

building from the edge of the ROW is 15 feet.<br />

KW-4: A general problem concerns the cartographic integrity of numerous maps in the report. For example, Figure 3-<br />

6 does not include key features in the Legend, namely ROW boundaries, Wetlands, etc. In Figure 5-8E the Legends'<br />

yellow dashed line showing the ROW is invisible.<br />

Response: MassDOT regrets any errors contained in the EA/DEIR.<br />

2.6.10 Gary Peters<br />

Gary Peters submitted a letter dated December 22, 2011.<br />

GP-1: The EA/DEIR identifies two fish species that enjoy special status, the short nose sturgeon and the Atlantic<br />

Sturgeon. Also, anadromous fish migrate up the river to spawn. Blueback Herring have shown a steady decline.<br />

When they were counted at the Essex Dam, they found 51 in1996, 24,576 in 2000 and 517 in 2010. This species is<br />

being proposed as endangered. Shad and Rainbow Smelt spawn in the Merrimack and are sensitive to silting, noise<br />