<strong>Whittier</strong> <strong>Bridge</strong>/I-<strong>95</strong> Improvement Project FEIR<br />

Chapter 2.0: Response to Comments on the <strong>Environmental</strong> Assessment/Draft <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong><br />

throughout the work area and will be maintained on all temporary alignments during construction.<br />

Traffic crossovers will be designed to provide safe operating conditions at posted speeds.<br />

Construction of the new bridges and the realigned and widened I-<strong>95</strong> alignment will occur outside the<br />

existing travelled way. Specific provisions to be included in the TMP include measures such as<br />

advanced signage prior to the work zone, traffic controls (lights, cones, variable message signs),<br />

detailed public information, (including Smart Routes traveler reports, press releases, information on<br />

the project website), and the presence of police details and roadway traffic flaggers within the work<br />

zone. MassDOT believes safe operating conditions will be provided for all traffic.<br />

Project construction will be completed within the limits of the existing I-<strong>95</strong> ROW and will not intrude<br />

on the <strong>Whittier</strong> Point Condominium property. One exception is the need to access the property to<br />

construct a new retaining wall on the eastern edge of the I-<strong>95</strong> ROW. Temporary construction<br />

easements would be required for construction of the wall. These easements will be finalized after the<br />

completion of the environmental review process, and in advance of construction. This activity will be<br />

limited in duration and will be closely coordinated with the condominium association to minimize<br />

adverse impacts. A MassDOT ROW representative will assess the impacts and contact property<br />

owners directly once the impacts are determined. All MassDOT ROW activities are governed by the<br />

federal Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as<br />

amended (Uniform Act).<br />

As described in the response to Comment CST-1 above, MassDOT will construct a large snow fence<br />

along the edge of the ROW adjacent to the <strong>Whittier</strong> Point Condominiums, as described in section 6.2<br />

of the DEIR. This fence will provide an adequate measure of safety to the property, preventing<br />

damage to the building from snow and ice clearing operations along the highway. Jersey barriers<br />

and a snow fence extending 12-feet above the roadway will be installed along the eastern edge of<br />

the relocated roadway and will ensure safe traffic operations during construction when the I-<strong>95</strong><br />

northbound traffic will be running along the eastern edge of the ROW. After project completion in a<br />

safe configuration, northbound traffic will be separated from the edge of the ROW be a full 10-foot<br />

breakdown lane, the jersey barrier and fence between the roadway and the 16-foot Shared-Use<br />

Path, and the jersey barrier and the snow fence along the eastern edge of the shared use path.<br />

CST-4: There are five families who will be most affected by the changes to the <strong>Whittier</strong> <strong>Bridge</strong>, and we have put forth<br />

a proposal to sell our properties, allowing them to be used by the project team during construction and potentially<br />

ultimately be developed as a park or other public venue. We have put forth this proposal because of the untenable<br />

situation we are facing with the bridge project. There are many benefits for the project itself, as well as for the<br />

residents most affected by this project. We ask that you please do whatever you can to facilitate the sale of our<br />

properties so that we do not have to experience the negative side effects of the construction and so that the project<br />

can continue unimpeded.<br />

Response: The comment is noted.<br />

2.6.9 Kempton E. Webb<br />

Kempton E. Webb submitted a letter dated December 22, 2011.<br />

KW-1: The discussion of permanent and temporary easements on p. 3-29 stresses that de jury “no fee takings would<br />

be required for this alternative" (the Preferred <strong>Bridge</strong> Design Alternative). Our point is that MassDOT, by locating the<br />

2-66