<strong>Whittier</strong> <strong>Bridge</strong>/I-<strong>95</strong> Improvement Project FEIR<br />

Chapter 2.0: Response to Comments on the <strong>Environmental</strong> Assessment/Draft <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong><br />

Response: This comment has been investigated. The stormwater improvements proposed within<br />

the SHLO, west of the Martignetti parcel will include a sediment forebay, detention basin (3B), and<br />

infiltration basin (3A). Access for construction of the basins will be from the SHLO to the west.<br />

Access for the operation and maintenance of the basins will be served through the Shared-<br />

Use_Path. The existing topography of the SHLO for this portion of the project varies in elevation<br />

between EL=57 to EL=40. As further described below, a majority of the relocated NB roadway and<br />

adjacent stormwater facilities will require a significant earth excavation and will primarily be<br />

constructed at an elevation that is much lower than the subject property.<br />

The sediment forebay proposed at station 221+75 will require an earth excavation of approximately<br />

15 feet (bottom of forebay EL=42 vs existing grade EL=57). Removal of large boulders and bedrock<br />

is anticipated for the construction of the forebay and adjacent NB roadway. The elevation of the<br />

Matignetti property is approximately EL=50 at this location resulting in a proposed forebay that is<br />

approximately 8 feet lower in elevation than the subject property.<br />

The detention basin proposed between ST 222 and ST 224+50 will require an earth excavation of<br />

approximately 10 feet for a majority of the basin, and an excavation of 15 feet at its southern limits<br />

adjacent to the interface with the forebay. The bottom of the proposed basin is EL=39 whereas the<br />

adjacent subject property ranges in elevation between EL=46 to EL=48, resulting in a basin bottom<br />

that will be atleast 7 feet below the subject. The primary purpose of the detention basin is provide for<br />

the temporary storage of stormwater during large storm events. It is intended to drain completely<br />

through an outlet control structure within 24 hours of any major storm event. It is anticipated that the<br />

installation of the detention basin will require the removal of rock and or shallow bedrock. Under the<br />

scenario of existing shallow bedrock at this location, consequently a strong potential for a perched<br />

water table; removal of the bedrock under this condition to the elevations previously described would<br />

likely result in the lowering of the groundwater table in the immediate vicinity.<br />

The infiltration basin that is proposed between ST 225 and ST 226 will require an earth excavation of<br />

10 feet at its southern limits to an earth excavation of 2 feet at its northern limits. The bottom of the<br />

proposed infiltration basin is EL=37.5, the adjacent subject property ranges in elevation between<br />

EL=45 to EL=47. The basin bottom is proposed at least 7.5 feet below the subject. The primary<br />

purpose of the infiltration basin is to provide water quality treatment and groundwater recharge<br />

consistent with the stormwater management performance standards. The basin is designed to stage<br />

up with approximately 2.2 feet of stormwater for precipitation events that contain at least ½ inch of<br />

rainfall. Based on the subsurface explorations that have been completed to date, we understand that<br />

the seasonal high groundwater at this location is approximately 2 feet below the basin.<br />

Conservatively speaking, assuming that the groundwater mound as a result of the proposed<br />

infiltration basin reaches an elevation EL=39.7 in a uniform direction around the basin, the mound<br />

would be 5 feet lower in elevation than the surface elevations of the adjacent subject. The public<br />

records available through the municipal website indicted that the building does not have a full cellar<br />

foundation which leads us to conclude that even under a worst case mound scenario the impacts to<br />

the groundwater condition should not have a negative impact to the subject.<br />

The stormwater improvements proposed as part of the project should be constructed in a manner as<br />

to not impact adjacent properties. The conclusions drawn in this response are based on a<br />

combination of limited subsurface explorations, existing survey, and assumptions previously stated.<br />