27.01.2015 Views

Final Environmental Impact Report - Whittier Bridge/I-95 ...

Final Environmental Impact Report - Whittier Bridge/I-95 ...

Final Environmental Impact Report - Whittier Bridge/I-95 ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Whittier</strong> <strong>Bridge</strong>/I-<strong>95</strong> Improvement Project FEIR<br />

Chapter 2.0: Response to Comments on the <strong>Environmental</strong> Assessment/Draft <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong><br />

Table 2-1:<br />

Stormwater Outfalls (continued)<br />

Description of<br />

Discharge<br />

Salisbury (cont’d)<br />

Sheet flow on west side<br />

7<br />

of SB<br />

8 Existing 12" Outfall<br />

9<br />

24" Outfall from Wet<br />

Basin 7B<br />

10 Existing 48" Outfall<br />

Baseline<br />

Station<br />

Reference<br />

ST 28 to ST<br />

33 Left<br />

ST 31+50<br />

Right<br />

Nearest Down<br />

Gradient<br />

Resource Area<br />

Wetland L<br />

Wetland R<br />

Comments<br />

Existing drainage pattern to remain, BVW<br />

immediately adjacent to roadway<br />

Existing outfall will be diverted into proposed Wet<br />

Basin 7B<br />

ST 32 Right Wetland R Treatment provided in Basin<br />

ST 34+50<br />

Right<br />

Wetland R<br />

11 Existing 24" Outfall ST 40 Right Wetland R<br />

12 Proposed 15" Outfall<br />

13<br />

Sheet flow on east side<br />

of NB<br />

ST 42+50<br />

Right<br />

ST 33 To ST<br />

52 Right<br />

Wetland R<br />

Wetland R<br />

14 Existing 12" Outfall ST 45 Right Wetland R<br />

15 Existing 18" Outfall<br />

16 Existing 12" Outfall<br />

17 Existing 24" Outfall<br />

18 Existing 12" Outfall<br />

ST 47+50<br />

Right<br />

ST 47+49<br />

Right<br />

ST 49+75<br />

Right<br />

ST 49+80<br />

Right<br />

Wetland R<br />

Wetland R<br />

Wetland R<br />

Wetland R<br />

19 Existing 24" Outfall ST 52 Right Wetland R<br />

20 Existing 12" Outfall<br />

21<br />

Sheet flow on west side<br />

of SB<br />

ST 52+50<br />

Right<br />

ST 39 to ST<br />

52 Left<br />

Wetland R<br />

Wetland X<br />

22 Existing 12" Outfall ST 47+50 Left Wetland X<br />

23 Existing 12" Outfall ST 49+75 Left Wetland X<br />

24<br />

25<br />

Sheet flow on west side<br />

of SB<br />

Sheet flow on east side<br />

of NB<br />

26 Existing 15" Outfall<br />

ST 52 to ST<br />

62 Left<br />

ST 55 to ST<br />

68 Right<br />

ST 60+25<br />

Right<br />

Wetland W<br />

Wetland S<br />

Wetland S<br />

27 Existing 48" Outfall ST 67 Right Wetland S<br />

Discharge contains a mix of existing and proposed<br />

flows. Portion of flow includes storm water discharges<br />

from Wet Basin 7A and treatment provided in median<br />

swale.<br />

Discharge contains a mix of existing and proposed<br />

flows. Portion of flow includes treatment provided in<br />

median swale.<br />

Treatment provided in Median Swale and Sed<br />

Forebay<br />

Existing drainage pattern to remain, BVW<br />

immediately adjacent to roadway<br />

Existing outfall to remain, BVW located immediately<br />

adjacent to discharge.<br />

Treatment provided in Median Swale<br />

Existing outfall to remain, BVW located immediately<br />

adjacent to discharge.<br />

Treatment provided in Median Swale<br />

Existing outfall to remain, BVW located immediately<br />

adjacent to discharge.<br />

Discharge contains a mix of existing and proposed<br />

flows. Portion of flow includes treatment provided in<br />

median swale.<br />

Discharge Point is immediately up gradient of BVW<br />

Existing drainage pattern to remain, BVW<br />

immediately adjacent to roadway<br />

Existing outfall to remain, BVW located immediately<br />

adjacent to discharge.<br />

Existing outfall to remain, BVW located immediately<br />

adjacent to discharge.<br />

Existing drainage pattern to remain, BVW<br />

immediately adjacent to roadway<br />

Existing drainage pattern to remain, BVW<br />

immediately adjacent to roadway<br />

Discharge contains a mix of existing and proposed<br />

flows. Portion of flow includes treatment provided in<br />

median swale.<br />

Discharge contains a mix of existing and proposed<br />

flows. Portion of flow includes treatment provided in<br />

BMP 9, and treatment provided in median swale.<br />

2-20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!