Water Division<br />
• Passed Water Department inspection and audit from California Department <strong>of</strong> Public Health.<br />
• Met and complied with Valley Air Resources Board inspections for stand by generators.<br />
• Rehabilitated Water Well #11, including installation <strong>of</strong> an updated electronic motor control to<br />
regulate the start-up and shut-down to minimize water hammer in the system<br />
• Maintained the compliance with Federal and State water quality monitoring schedules<br />
• Created and delivered 2011 Consumer Confidence Report (CCR) to the citizens <strong>of</strong> <strong>Reedley</strong><br />
• Installed 2 Seatrain storage units to create additional storage in the Water Division Yard<br />
• Provided detailed spreadsheet and information regarding Metron water meters to consultant.<br />
• Properly abandoned 3 wells; (Well #1-removed from service; Well #2-shallow, open bottom<br />
well, #4-shallow, open bottom, standby well struck by vehicle-not a viable candidate for<br />
rehab).<br />
• Maintained Water System compliance with State and Federal Regulations.<br />
• Created and linked monthly reporting spreadsheets to help reduce time expended on<br />
monthly reporting.<br />
• Created standby generator testing spreadsheet to comply with Valley Air Board regulations.<br />
• Replaced 80 feet <strong>of</strong> 4 inch steel water main with new 6 inch C900, including 5 new water<br />
valves. The project spanned 15 th street from alley to alley.<br />
• Completed new water main installation for Health Care Clinic on Washington Ave, including<br />
over 200 feet <strong>of</strong> new water main, 5 mainline valves, 2 services and 1 fire hydrant.<br />
• Researched and purchased new backhoe for water division.<br />
• Completed 2011 CCR/DWR Report/CDPH Annual report.<br />
• Provided Orange Cove with emergency water from a designated fire hydrant. Water Division<br />
staff purchased and installed an approved backflow device in order to facilitate water<br />
deliveries via tanker trucks for Orange Cove.<br />
• Processed over 700 Underground Service Alerts (USA’s) to mark Water, Sewer and Storm<br />
Drain locations throughout the <strong>City</strong>.<br />
• Complied with Unregulated Contaminant Monitoring Regulations 3 (UCMR3). This is the third<br />
stage <strong>of</strong> federal regulations directed at monitoring <strong>of</strong> new constituents that may be harmful<br />
to the public.<br />
Solid Waste Division<br />
• Extended the Street Sweeping Contract for an additional three years.<br />
• Organized and executed a successful city wide clean-up event.<br />
• Implemented AB341 along with Sunset Recycling Services.<br />
• Continued to improve and implement the city wide Leaf Clean-up and Christmas Tree<br />
Program.<br />
• Continued to implement the city wide replacement <strong>of</strong> bins and beautification plan.<br />
• Installed scales on existing disposal trucks.<br />
• Installed rear view cameras on disposal trucks.<br />
• Updated routing schedules.<br />
• Initiated a commercial account audit.<br />
• Worked with the AB939 Committee to renew and/or modify the existing MOU and move<br />
forward with the permitting and design plan <strong>of</strong> a Regional Household Hazardous Waste<br />
Facility.<br />