Heavy Duty Balanced Opposed Compressors - Ariel Corporation
Heavy Duty Balanced Opposed Compressors - Ariel Corporation Heavy Duty Balanced Opposed Compressors - Ariel Corporation
FOR MODELS: JGZ AND JGU SECTION 3 - START UP START-UP CHECK LIST - FORCE FEED LUBRICATION SYSTEM Description Date Checked Date Verified 1. Check and verify divider valve outlet ports against Ariel lube sheet to confirm correct routing of lines. Commissioning Agent: __________________ 2. Check and verify force feed lubricator box for proper oil level. 3. Prime the force feed lubrication system through the purge port at the force feed pump discharge manifold. Check and verify each tube connection for tightness 4. For independent oil supply, verify a separate lubricator tank overflow exists. 5. Check and verify operation of force feed lubrication system no flow shutdowns. 6. Record color of force feed blow out discs (see Customer Technical Bulletin CTB-137 for disc ratings). ________________ 7. Check, verify, and record recommended lube feed rates from lubricator data plate or “Parts Book” Cylinder Lubrication sheet. ________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ FINAL PRE-START CHECK LIST Description Date Checked Date Verified 1. Operate pre-lube system. 2. For engine driven units, disable the ignition and roll the engine with the starter to check and verify the compressor rolls freely. Check and verify oil pressure increases noticeably while rolling on the starter. Commissioning Agent: __________________ 3. For electric motors, bar the compressor over manually to check and verify it rolls freely. 4. For machines compressing a combustible gas, purge the entire system including the piping, by-pass, recycle line, and compressor cylinders of all air. 5. Check and verify correct position and operation of all valves. Check and verify operation of all compressor interfaces with the system. 6. Review start-up instructions for all other package components. 7. Complete the required review of the Start-Up and Operating Instructions for the unit with the unit operator. 8. Ensure compressor PLC logic is understood and approved. 9. Verify mechanical, electrical, and instrumentation completion and approval. Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ 7/09 PAGE 3 - 9
FOR MODELS: JGZ AND JGU SECTION 3 - START UP INITIAL POST START-UP CHECK LIST Description Date Checked Date Verified 1. Check and verify immediate oil pressure increase. Enable oil pressure shutdown and bearing temperature shutdowns. Record initial pressure at operating speed. ______________________ 2. Check and verify oil filter pressure gauges. Record initial differential. ___________________ 3. Check and verify the low oil pressure shutdown is active and set at 35 psig (2.4 bar g ). 4. Check and verify lube oil pressure set at 50 to 60 psig (3.5 to 4.2 bar g) at operating speed and temperature (see Technical Manual, Section 4). Record final setting. ______________________ 5. Record oil filter maximum differential reference value listed on the compressor top cover filter data plate. ___________________ 6. Listen and feel for any strange noises or vibration in the compressor or piping. Record any occurrences. ________________________________________ ________________________________________ ________________________________________ ________________________________________ 7. Check and verify high discharge gas temperature shutdowns are set about 10% above normal operating temperature (350 °F (177 °C) maximum) and functioning. 8. Check and verify gas pressure shutdowns are set as close as possible and establish them to protect the unit from over rod load and crosshead pin non-reversal. 9. Check and verify distribution block cycle time indicator and set lubricator pump for proper break-in rate. 10. For electric motor driven units, Check and verify the magnetic center position. Check and verify the coupling does not "hunt" during normal operation. 11. Check and verify the unit and piping is free from any gas or fluid leaks. Record any occurrences. ________________________________________ ________________________________________ ________________________________________ ________________________________________ 12. Check and verify scrubber high level shutdowns operation and check scrubber dumps operation and frequency. 13. Check, verify, and record tank levels that indicate the amount of liquids removed from the gas. __________________________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ Commissioning Agent: __________________ Distributor:___________ PAGE 3 - 10 7/09
- Page 7 and 8: FOR MODELS: JGZ AND JGU TABLE OF CO
- Page 9 and 10: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 11 and 12: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 13 and 14: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 15 and 16: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 17 and 18: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 19 and 20: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 21 and 22: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 23 and 24: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 25 and 26: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 27 and 28: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 29 and 30: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 31 and 32: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 33 and 34: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 35 and 36: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 37 and 38: FOR MODELS: JGZ AND JGU SECTION 2 -
- Page 39 and 40: FOR MODELS: JGZ AND JGU SECTION 2 -
- Page 41 and 42: FOR MODELS: JGZ AND JGU SECTION 2 -
- Page 43 and 44: FOR MODELS: JGZ AND JGU SECTION 2 -
- Page 45 and 46: FOR MODELS: JGZ AND JGU SECTION 2 -
- Page 47 and 48: FOR MODELS: JGZ AND JGU SECTION 2 -
- Page 49 and 50: FOR MODELS: JGZ AND JGU SECTION 2 -
- Page 51 and 52: FOR MODELS: JGZ AND JGU SECTION 3 -
- Page 53 and 54: FOR MODELS: JGZ AND JGU SECTION 3 -
- Page 55 and 56: FOR MODELS: JGZ AND JGU SECTION 3 -
- Page 57: FOR MODELS: JGZ AND JGU SECTION 3 -
- Page 61 and 62: FOR MODELS: JGZ AND JGU SECTION 3 -
- Page 63 and 64: FOR MODELS: JGZ AND JGU SECTION 3 -
- Page 65 and 66: FOR MODELS: JGZ AND JGU SECTION 3 -
- Page 67 and 68: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 69 and 70: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 71 and 72: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 73 and 74: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 75 and 76: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 77 and 78: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 79 and 80: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 81 and 82: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 83 and 84: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 85 and 86: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 87 and 88: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 89 and 90: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 91 and 92: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 93 and 94: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 95 and 96: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 97 and 98: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 99 and 100: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 101 and 102: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 103 and 104: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 105 and 106: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 107 and 108: FOR MODELS: JGZ AND JGU SECTION 4 L
FOR MODELS: JGZ AND JGU SECTION 3 - START UP<br />
INITIAL POST START-UP CHECK LIST<br />
Description Date Checked Date Verified<br />
1. Check and verify immediate oil pressure increase. Enable<br />
oil pressure shutdown and bearing temperature shutdowns.<br />
Record initial pressure at operating speed.<br />
______________________<br />
2. Check and verify oil filter pressure gauges. Record initial<br />
differential.<br />
___________________<br />
3. Check and verify the low oil pressure shutdown is active<br />
and set at 35 psig (2.4 bar g ).<br />
4. Check and verify lube oil pressure set at 50 to 60 psig (3.5<br />
to 4.2 bar g) at operating speed and temperature (see Technical<br />
Manual, Section 4). Record final setting.<br />
______________________<br />
5. Record oil filter maximum differential reference value listed<br />
on the compressor top cover filter data plate.<br />
___________________<br />
6. Listen and feel for any strange noises or vibration in the<br />
compressor or piping. Record any occurrences.<br />
________________________________________<br />
________________________________________<br />
________________________________________<br />
________________________________________<br />
7. Check and verify high discharge gas temperature shutdowns<br />
are set about 10% above normal operating temperature<br />
(350 °F (177 °C) maximum) and functioning.<br />
8. Check and verify gas pressure shutdowns are set as close<br />
as possible and establish them to protect the unit from over<br />
rod load and crosshead pin non-reversal.<br />
9. Check and verify distribution block cycle time indicator and<br />
set lubricator pump for proper break-in rate.<br />
10. For electric motor driven units, Check and verify the magnetic<br />
center position. Check and verify the coupling does<br />
not "hunt" during normal operation.<br />
11. Check and verify the unit and piping is free from any gas or<br />
fluid leaks. Record any occurrences.<br />
________________________________________<br />
________________________________________<br />
________________________________________<br />
________________________________________<br />
12. Check and verify scrubber high level shutdowns operation<br />
and check scrubber dumps operation and frequency.<br />
13. Check, verify, and record tank levels that indicate the<br />
amount of liquids removed from the gas.<br />
__________________________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
Commissioning Agent:<br />
__________________ Distributor:___________<br />
PAGE 3 - 10 7/09