Heavy Duty Balanced Opposed Compressors - Ariel Corporation
Heavy Duty Balanced Opposed Compressors - Ariel Corporation Heavy Duty Balanced Opposed Compressors - Ariel Corporation
FOR MODELS: JGZ AND JGU SECTION 3 - START UP Unit Location Customer Name:_____________________________________________________________________ Project/Lease Name: __________________________________________________________________ Closest Town:__________________ State:_____ Country:__________________ Offshore: Yes No Directions to Location or GPS:______________________________________________________________ _______________________________________________________________________________ _______________________________________________________________________________ _______________________________________________________________________________ Customer Contact Person:__________________________________ Contact Phone:____________________ Contact Email:_________________________________________________ OK to contact: Yes No Driver Driver Manufacturer:_______________________________________ Driver Model:___________________ Driver Type:_____________________ Applied RPM:______________ Name Plate HP (kW):______________ Coupling Manufacturer:___________________________________ Coupling Model:___________________ Compressor Cylinders and Operating Conditions Cylinder Stage Throw Serial Bore Dia. Inlet Temp. Inlet Pres. Disc. Temp. Disc. Pres. Class Number Number Number In. (mm) °F (°C) psig (Barg) °F (°C) psig (Barg) ________ ________ ________ _____________ ________ ________ ________ ________ ________ ________ ________ ________ _____________ ________ ________ ________ ________ ________ ________ ________ ________ _____________ ________ ________ ________ ________ ________ ________ ________ ________ _____________ ________ ________ ________ ________ ________ ________ ________ ________ _____________ ________ ________ ________ ________ ________ ________ ________ ________ _____________ ________ ________ ________ ________ ________ Cylinder Lubricant Make and Grade:__________________________________________________________ Documentation and Accessories Check all items included in the shipment: Technical Manual Yes No Recommended Spares List Yes No Start-Up Spare Parts Yes No Unit Start and Stop Procedures Yes No Toolbox w/Ariel Tools Yes No Toolbox with Hydraulic Tools Yes No (Optional) Unit Parts List Yes No Toolbox with SAE Hand Tools Yes No (Optional) 7/09 PAGE 3 - 3
FOR MODELS: JGZ AND JGU SECTION 3 - START UP START-UP CHECK LIST - ITEMS TO CHECK IN THE FIELD AT COMMISSIONING Description Date Checked Date Verified 1. Confirm receipt of all Ariel supplied components and protection of all containers and parts against storage related damage. 2. Check and verify the top cover data plate of the compressor frame for compressor design limitations such as rod load, maximum and minimum speed, and maximum lube oil temperature. 3. Check and verify the availability of correct start-up spares, hand tools, special tools, compressor parts list and drawings, and technical manuals at installation. 4. Check and verify the Ariel lube sheet and Lubrication Specification matches the recommended oil grade and viscosity for the service. 5. Check and verify all lube oil piping cleanliness per Ariel lubrication specifications (see Technical Manual, Section 4). 6. Verify lube oil storage and supply line cleanliness per ER- 56.06. Verify crankcase oil supply isolation valve is open. 7. Verify prelube piping cleanliness per ER-56.06 and correct circuit operation. 8. Verify there is an oil cooler and high temperature shutdown for the oil into the compressor frame. 9. Verify whether the temperature control valve installation is blending or diverting (blending preferred). _____________ 10. Check compressor crankcase oil level controller for proper installation, operation, levelness, and venting. 11. If applicable, check cooling water circuit cleanliness for the oil cooler and cooled packing per Technical Manual. Verify correct routing and test pump rotation. Set pressure appropriately per Technical Manual and leak test. 12. Verify correct filter element installation. Prime the oil filter element and all lube oil piping with oil. 13. Verify proper compressor crankcase oil level before starting (about 7/8 full in site glass). 14. Verify correct installation of a low oil pressure shutdown tubed to the downstream side of the oil filter. 15. Operate pre-lube system. 16. Tighten frame hold down bolting (see Technical Manual, Section 2). 17. Record “out of plane” readings (pre-grout) - see ER-82. _________ _________ _________ _________ _________ _________ _________ _________ 18. If applicable, check compressor frame mounting grout or chocks for proper installation to top of base frame. Also check for cracks. Customer:___________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Commissioning Agent: __________________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ Distributor:___________ PAGE 3 - 4 7/09
- Page 1 and 2: ARIEL Heavy Duty Balanced Opposed C
- Page 3 and 4: FOR MODELS: JGZ AND JGU TABLE OF CO
- Page 5 and 6: FOR MODELS: JGZ AND JGU TABLE OF CO
- Page 7 and 8: FOR MODELS: JGZ AND JGU TABLE OF CO
- Page 9 and 10: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 11 and 12: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 13 and 14: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 15 and 16: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 17 and 18: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 19 and 20: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 21 and 22: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 23 and 24: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 25 and 26: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 27 and 28: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 29 and 30: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 31 and 32: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 33 and 34: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 35 and 36: FOR MODELS: JGZ AND JGU SECTION 1 -
- Page 37 and 38: FOR MODELS: JGZ AND JGU SECTION 2 -
- Page 39 and 40: FOR MODELS: JGZ AND JGU SECTION 2 -
- Page 41 and 42: FOR MODELS: JGZ AND JGU SECTION 2 -
- Page 43 and 44: FOR MODELS: JGZ AND JGU SECTION 2 -
- Page 45 and 46: FOR MODELS: JGZ AND JGU SECTION 2 -
- Page 47 and 48: FOR MODELS: JGZ AND JGU SECTION 2 -
- Page 49 and 50: FOR MODELS: JGZ AND JGU SECTION 2 -
- Page 51: FOR MODELS: JGZ AND JGU SECTION 3 -
- Page 55 and 56: FOR MODELS: JGZ AND JGU SECTION 3 -
- Page 57 and 58: FOR MODELS: JGZ AND JGU SECTION 3 -
- Page 59 and 60: FOR MODELS: JGZ AND JGU SECTION 3 -
- Page 61 and 62: FOR MODELS: JGZ AND JGU SECTION 3 -
- Page 63 and 64: FOR MODELS: JGZ AND JGU SECTION 3 -
- Page 65 and 66: FOR MODELS: JGZ AND JGU SECTION 3 -
- Page 67 and 68: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 69 and 70: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 71 and 72: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 73 and 74: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 75 and 76: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 77 and 78: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 79 and 80: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 81 and 82: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 83 and 84: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 85 and 86: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 87 and 88: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 89 and 90: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 91 and 92: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 93 and 94: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 95 and 96: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 97 and 98: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 99 and 100: FOR MODELS: JGZ AND JGU SECTION 4 L
- Page 101 and 102: FOR MODELS: JGZ AND JGU SECTION 4 L
FOR MODELS: JGZ AND JGU SECTION 3 - START UP<br />
START-UP CHECK LIST - ITEMS TO CHECK IN THE FIELD AT COMMISSIONING<br />
Description Date Checked Date Verified<br />
1. Confirm receipt of all <strong>Ariel</strong> supplied components and protection<br />
of all containers and parts against storage related<br />
damage.<br />
2. Check and verify the top cover data plate of the compressor<br />
frame for compressor design limitations such as rod<br />
load, maximum and minimum speed, and maximum lube<br />
oil temperature.<br />
3. Check and verify the availability of correct start-up spares,<br />
hand tools, special tools, compressor parts list and drawings,<br />
and technical manuals at installation.<br />
4. Check and verify the <strong>Ariel</strong> lube sheet and Lubrication<br />
Specification matches the recommended oil grade and viscosity<br />
for the service.<br />
5. Check and verify all lube oil piping cleanliness per <strong>Ariel</strong><br />
lubrication specifications (see Technical Manual, Section<br />
4).<br />
6. Verify lube oil storage and supply line cleanliness per ER-<br />
56.06. Verify crankcase oil supply isolation valve is open.<br />
7. Verify prelube piping cleanliness per ER-56.06 and correct<br />
circuit operation.<br />
8. Verify there is an oil cooler and high temperature shutdown<br />
for the oil into the compressor frame.<br />
9. Verify whether the temperature control valve installation is<br />
blending or diverting (blending preferred). _____________<br />
10. Check compressor crankcase oil level controller for proper<br />
installation, operation, levelness, and venting.<br />
11. If applicable, check cooling water circuit cleanliness for the<br />
oil cooler and cooled packing per Technical Manual. Verify<br />
correct routing and test pump rotation. Set pressure appropriately<br />
per Technical Manual and leak test.<br />
12. Verify correct filter element installation. Prime the oil filter<br />
element and all lube oil piping with oil.<br />
13. Verify proper compressor crankcase oil level before starting<br />
(about 7/8 full in site glass).<br />
14. Verify correct installation of a low oil pressure shutdown<br />
tubed to the downstream side of the oil filter.<br />
15. Operate pre-lube system.<br />
16. Tighten frame hold down bolting (see Technical Manual,<br />
Section 2).<br />
17. Record “out of plane” readings (pre-grout) - see<br />
ER-82.<br />
_________ _________ _________ _________<br />
_________ _________ _________ _________<br />
18. If applicable, check compressor frame mounting grout or<br />
chocks for proper installation to top of base frame. Also<br />
check for cracks.<br />
Customer:___________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Commissioning Agent:<br />
__________________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
Distributor:___________<br />
PAGE 3 - 4 7/09