ntambanana local municipality (kz 283) - KZN Development Planning
ntambanana local municipality (kz 283) - KZN Development Planning
ntambanana local municipality (kz 283) - KZN Development Planning
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
REVIEW ITEM 2005 / 06 STATUS 2006/07 STATUS /<br />
PROCEDURE<br />
6. Strategies<br />
ACTION REQUIRED<br />
RESPONSIBILITY<br />
6.1 Basic Services<br />
Services<br />
General Lack of basic<br />
services provisioning<br />
Refer to service Analysis<br />
in 4.7<br />
Develop services<br />
plan<br />
KZ <strong>283</strong><br />
6.2 Water Supply<br />
6.3 Local Economic<br />
<strong>Development</strong><br />
6.4 Sanitation<br />
This is a responsibility<br />
of Uthungulu District<br />
Municipality<br />
Agriculture, tourism<br />
Infrastructure HR<br />
Capacity<br />
Effective and productive<br />
municipal area.<br />
Assist SMME’s.<br />
Encourage private<br />
investment. Mobilize<br />
public. Private,<br />
community resources<br />
Focus on dev. OF P700<br />
Support emerging small<br />
farmers. Develop<br />
markets.<br />
Crime Prevention.<br />
Uthungulu<br />
Responsibility<br />
Refer to services<br />
Analysis in 4.7.<br />
Refer to Economic<br />
Analysis in 4.4.<br />
Refer to services<br />
Analysis in 4.7.<br />
Need more<br />
interaction between<br />
DC and KZ<br />
Develop LED Plan<br />
For KZ <strong>283</strong><br />
Same as 6.2<br />
DC/KZ<br />
KZ <strong>283</strong><br />
DC/KZ<br />
6.5 Institutional<br />
Clustering and<br />
integration across all<br />
sectors. Strategic<br />
Management. Visionary<br />
Staffs have held<br />
workshops to attend to<br />
institutional issues.<br />
Refer to attached Draft<br />
More Capacity<br />
building<br />
opportunities<br />
Management<br />
Page 30 of 114