NTAMBANANA LOCAL<br />
MUNICIPALITY<br />
(KZ <strong>283</strong>)<br />
INTEGRATED<br />
DEVELOPMENT PLAN<br />
REVIEW<br />
2006/07<br />
Private Bag X 20066 Tel.: 035-792 7093<br />
Empangeni, 3880 Fax No.: 035-792 7098<br />
Page 1 of 114
Facilitating Consultants: Mthonjaneni <strong>Development</strong> Network<br />
Ground Suite Umsimbithi House<br />
1 Norman Tedder Lane<br />
Turnbull Street<br />
Empangeni<br />
Ph: 035 – 7721322<br />
Fax 035 – 772 1326<br />
E-mail mthonjdevnet @ telkomsa.net<br />
Table of Contents<br />
A. Introduction and Overview<br />
B. Structure of Document<br />
C. Process Plan as adopted by Council<br />
D. Process Report<br />
E. Draft IDP Review 2006/07<br />
E.1 Constitutional and Lega Framework<br />
E.2 Portfolio of Compliance Imperatives<br />
E.3 Organizational Arrangements<br />
E.4 Analysis<br />
E.5 Service Provider Inputs<br />
E.6 Strategies<br />
E.7 Sector Plans<br />
E.8 Project Review<br />
E.9 Performance Management System<br />
E.10 Financial Management Plans<br />
E. 11 Municipal Budget<br />
E.12 Implementation Plan<br />
E 13 Compliance With Ministerial Comments<br />
Page 2 of 114
E.14 Annexure<br />
E.14.1 Land Use Management System<br />
E.14.2 Working Draft Report of the Ntambanana Spatial <strong>Development</strong> Framework<br />
Plan<br />
E.14.3 Ntambanana SDF Progress Report<br />
E.14 4 Ntambanana Municipality Draft MEDIUM TERM BUDGET 2006/07 – 2008/09<br />
E.14.5 Municipal LED and Revenue Generation Programme of Action: Project<br />
Consolidate<br />
E.15 References<br />
A. Introduction and Overview<br />
Section 153 of the Constitution of the Republic of South Africa (1996) gives<br />
the development planning duties to municipalities, as follows:<br />
“ A <strong>municipality</strong> must -<br />
(a) Structure and manage its administration and budgeting and<br />
planning processes to give priority to the basic needs of the<br />
community, and promote the social and economic development of<br />
the community, and;<br />
(b) Participate in national and provincial development Programmes<br />
This section, and others in Chapter Seven of the Constitution, forms the<br />
Constitutional basis for the Municipal development planning.<br />
The Municipal Systems Act, (No. 32:2000), outlines a linkage between the<br />
Municipality, consisting of a political, an administrative and the community<br />
wings (in a partnership), and urges municipalities to establish an enabling<br />
frame-work for the core processes of planning, performance management,<br />
organization change, ect. It also visualizes <strong>local</strong> government as an “efficient,<br />
frontline development agency capable of integrating the activities of all<br />
spheres of government…”<br />
Chapter 5 (Sections 23 – 37) of the Municipal Systems Act outlines the<br />
conceptualization, drafting, approval and practice of Integrated <strong>Development</strong><br />
<strong>Planning</strong> at Municipal level. Section 23 (1)(c) of the same act prescribes that<br />
“developmentally oriented planning must be done together with other organs<br />
of state“ in order to contribute to the “progressive realization of the<br />
fundamental rights contained in Sections 24, 25, 26, 27 and 29 of the<br />
Constitution of the country.” Section 2 emphasizes that the above must be<br />
read together with the <strong>Development</strong> Facilitation Act, No. 67 of 1995. Section<br />
24(1) emphasizes giving effect to the principles of co-operative government<br />
as per Section 41 of the Constitution. Section 25 urges a newly elected<br />
Municipal Council to adopt a:(1) single, (2) inclusive and (3) strategic IDP, as<br />
an instrument that: (a) links, integrates, co-ordinate (b) aligns the resources<br />
(c) forms the policy framework for budgeting (d) is compatible with the<br />
chapter, and (e) is compatible with national and provincial development<br />
plans.<br />
Page 3 of 114
Section 34 provides for the IDP to be reviewed annually. The IDP guides <strong>local</strong><br />
government decision-making. It is not a project, which is an end in itself.<br />
The IDP Review Process is itself a collective exercise involving all affected<br />
parties.<br />
Thus, this IDP Review Process is in line with the Constitutional and legislative<br />
imperatives.<br />
B. Structure of the Document<br />
This section is presented to allow the reader to understand the document and read<br />
and understand it easily.<br />
The first Section is the table of contents, which by now the reader has gone through.<br />
Section A is an Introduction and Overview. Here the document looks at the<br />
Constitutional and Legal framework for IDP Review, and concludes that this<br />
document is in lie with the Constitutional, legal and policy framework.<br />
The Process Plan is included under C. The process Plan outlines the entire process to<br />
be undertaken during the IDP review Process .It is important to point out that due to<br />
the nature of work at <strong>local</strong> levels, the Process Plan becomes more a guide. Date are<br />
sometimes changed and adjusted. But ultimately compliance with it is guaranteed<br />
The Process Report outlines what actually has taken place due the IDP Review<br />
Process, outlining the processes, programmes, actions and events so far and still to<br />
take place in the IDP Review Process<br />
Items under E –Draft IDP Review 2006/2007 are presented in a tabular form under<br />
the titles<br />
1) Review Item= which actually gives the name of the item, based on the<br />
guidelines and compliance imperatives<br />
2) 2005/06 = the status of what was said or written in the last review is<br />
summarized, in no details just the core. Anyone seeking the full<br />
information can go to the previous IDPs.<br />
2006/07 Status /Procedure :Is an update of what has happened or has been done so<br />
far about the item .New information is added where necessary. Where there has<br />
been no change between 2005/06 and 2006/07 Reviews, this is indicated.<br />
Action Required: Summarizes the nature of the further action required on the item<br />
in order to turn it into a reality.<br />
Responsibility: Points at the actual person or body that is responsible for the action.<br />
This is repeated throughout the items under E-which are:<br />
E.1 Constitutional and Legal Framework<br />
E.2 Portfolio of Compliance<br />
E.3 Organizational arrangement<br />
E.4 Analysis<br />
4.1 Status Quo Report<br />
4.2 Social Analysis<br />
4.3 Municipal level Analysis<br />
Page 4 of 114
4.4 Economic Analysis<br />
4.5 Environmental Analysis<br />
4.6 Spatial Analysis<br />
4.7 Services<br />
4.8 Alignment of National<br />
Provincial, District and Local Priorities<br />
5) Is a summary of inputs that were made by the service Provider in the<br />
Alignment meeting, especially during November, 2005<br />
6) Looks at Municipal Strategies<br />
7) Looks at Sector Plans<br />
8)Looks at Project Review. Here we have concentrated only on those Projects<br />
which have been prioritized whose funding is cleared and are currently<br />
implemented.<br />
9) Performance Management System we have decided to include the Draft,<br />
which is currently being done together with the IDP Review. This is to give<br />
space for comparison and interpretation in term of alignment with IDP.<br />
Annexure are attached<br />
10) Financial Management Plans – We confined this to three-year plans. The item<br />
is to be completed with the Budget Process and once all grants and subsidies<br />
have been a wanted<br />
11) Municipal Budget - aligned with the IDP has been finalized during February<br />
2006 .It is attached as an Annexure. The Budget caters for IDP and LED<br />
Programmes. Implementation Plan outlines the steps to be followed over the<br />
next 18 months in order to implement the IDP<br />
12) Compliance with the last Ministerial /<strong>KZN</strong> Provincial IDP Forum Comments.<br />
We decided to place this towards the end of the document in order to give a<br />
self – assessment of the extent to which these comments have been complied<br />
with.<br />
13) Annexure are mainly those documents that we feel should be seen by the<br />
reader. Most are new and related specifically to Ntambanana Local<br />
Municipality and this current IDP Review Process<br />
14) References is a list of the Reference Material that informs the IDP Review<br />
We have avoided verbosity, and chose to present brief text that explains it all. The<br />
final IDP Review Document in June 2006 will be a perfection of this Draft.<br />
Page 5 of 114
C. PROCESS PLAN as adopted by Council<br />
According to the legislative requirement set out in the Municipal Systems Act<br />
of 2000, as well as the <strong>Planning</strong> and Performance Management Regulations,<br />
all municipalities must prepare and Integrated <strong>Development</strong> Plan. Such IDP<br />
must be prepared in a participatory manner. Such an IDP must be reviewed<br />
annually. The Review Process must be preceded by a PROCESS PLAN, which<br />
must be adopted by Council.<br />
The 2006 / 2007 Review Process will pay attention to the following:<br />
• Comments received from the various role – players and assessment do<br />
the last IDP review which could not be addressed during the Review;<br />
• MECs comments<br />
• Areas requiring additional in term of legislative requirements<br />
• Review of the Spatial <strong>Development</strong> Framework to achieve alignment<br />
with the SDF of the District Municipality and surrounding municipalities<br />
and reflect the progress made with LUMS.<br />
• Workshop with Service Providers and communities to achieve project<br />
alignment<br />
• Shortcoming and weakness identified through self assessment<br />
• The preparation and review of relevant sector plans and its alignment<br />
with IDP.<br />
• Review of Performance Management System (PMS) in terms of chapter<br />
6 of the MSA<br />
• The update of the 5-year Financial Plans as well as the list of projects<br />
inclusive of 3-year capital investment framework<br />
• Alignment with national and provincial MTEF<br />
• Preparation and finalization of the annual municipal budget in terms of<br />
the relevant legislations and<br />
• Alignment of the various important municipal processes such as the<br />
IDP review, Performance Management and Budget Process.<br />
PROCESS PLAN<br />
03 October 2005: Consultant is appointed and contracted<br />
12 October 2005: MANCO and Consultant meet, to outline the process<br />
Programmes and procedures required in the review<br />
process.<br />
21 October 2005: Council officials and Consultant attend IDP alignment<br />
meeting – various service providers – at Uthungulu<br />
District (EXCO Room). Meeting is addressed by<br />
DTLGA DOT, Telkom, GCIS, Uthungulu District and<br />
Ntambanana Local Municipality submits its progress<br />
report i.e. Draft Process Plan to the meeting.<br />
25 October 2005: MANCO meets Consultant to discuss and deliberate<br />
Draft Process Plan and to report back on the alignment<br />
meeting held at Uthungulu.<br />
Page 6 of 114
26 October 2005: Consultant briefs EXCO on draft Process Plan and<br />
report back on the alignment meeting. Draft Mayoral<br />
Speech for the budget process. MEC remarks are<br />
attended to. EXCO adopts Draft Process Plan, for<br />
tabling to full Council before 9 November 2005.<br />
1 November 2005: Attend IDP Review Meeting at the District Municipality.<br />
November 2005: - Adoption of Process Plan by Council<br />
- Review of Mission, Vision, Objects, Strategic,<br />
Framework.<br />
- Consult with the District with regard to:<br />
• Sector Plans<br />
• Spatial <strong>Development</strong> Framework<br />
• Departments’ (MTEF) / Service Provider Strategies<br />
• Review of previous Projects and Implementation<br />
• First Draft Budget<br />
• Review of existing Performance Management System<br />
• Form Representative Forum (chaired by Mayor) and Steering<br />
Committee (chaired by Municipal Manager)<br />
• Public consultation in the Amakhosi Administrative Centers – led by<br />
Mayor, Ward Councilors, Ward Committees, Municipal Manager, EXCO,<br />
MANCO<br />
• Attend District meetings at Uthungulu, to align the District IDP<br />
Framework with <strong>local</strong> IDP.<br />
December 2005: - Draft Review document is drafted<br />
- Council Adopts Draft Review Document<br />
- Draft IDP Review Document is Submitted to the<br />
District<br />
- Draft IDP Review is Submitted to DTLGA<br />
January 2006: Participate in District Municipality “Family of<br />
Municipalities” assessment of Draft IDP Framework.<br />
February 2006:<br />
Finalize internal Municipal Budget <strong>Planning</strong> Process.<br />
Finalization of:<br />
o Sector plans<br />
o Five-year Financial Plan<br />
o Draft Performance Management System<br />
o Meet with external private funders.<br />
March 2006:<br />
Further consultation with Uthungulu District in order to<br />
fine tune:<br />
o<br />
o<br />
o<br />
o<br />
The internal budget process<br />
Draft project business plans for priority projects<br />
Final alignment issues<br />
Submission of Draft IDP Review to DLGTA and<br />
DPLG<br />
Page 7 of 114
April 2006: - Consultation with Service Providers through the<br />
District, in order to receive their final inputs.<br />
- Workshops with community Stakeholder<br />
- Council adopts Draft Municipal IDP and calls for<br />
public comments via a published advertisement.<br />
- Receive public input into the Reviewed IDP<br />
District is approached to make further comments.<br />
-Draft IDP is Reviewed by DLGTA and DPLG<br />
May 2006: - Adjust to Reviewed IDP – if necessary – to<br />
accommodate Comments.<br />
- Draft IDP Review Process Report as attachment<br />
to IDP<br />
- Meet with external funders<br />
- Presentation of the Draft IDP to the Provincial<br />
Steering Committee<br />
June 2006: - Final Reviewed IDP is adopted by Council<br />
- Final Reviewed IDP is submitted to the MEC.<br />
PROCESS ENDS, PREPARE FOR THE NEXT ROUND<br />
Page 8 of 114
D. PROCESS REPORT outlining the processes, Programmes, actions<br />
and events undertaken so far in the IDP REVIEW Process,<br />
2006/07<br />
Process Report<br />
After the Consultant was appointed the following issues took place:<br />
-Hold meeting and discussions with Municipal Management, especially to look at<br />
compliance. The following were looked a;<br />
Ntambanana Local Municipality<br />
IDP review 2006/2007<br />
Meeting between the senior officials/Management of the Municipality and Consultant:<br />
Mthonjaneni <strong>Development</strong> Network cc.<br />
12 October 2005<br />
Ntambanana Municipal Offices<br />
1.Introduction<br />
Aim of this meeting is to agree on the processes to be followed during the 2006/07<br />
IDP Review Process. We need to define “Review” of the IDP as opposed to writing yet<br />
another IDP.<br />
The IDP that is being reviewed for last time is the 2002 IDP.<br />
2.Timeline<br />
03 October 2005: Consultant is appointed<br />
12 October 2005:Meeting 1 MANCO & CONSULTANT<br />
October 2005:the following documents are availed<br />
1) Copy of last IDP Review as adopted<br />
2) Comments by provincial IDP forum<br />
3) Ministerial Comments<br />
4) Copy of last District IDP-as Reviewed<br />
October 2005; Delimitation of issues to be Reviewed<br />
1) Legislative Imperatives<br />
2) Portfolio of Compliance<br />
3) Mission, Vision, Goals<br />
4) Analysis of the external environment of the Municipality<br />
5) Profile the Municipal area.<br />
6) Stakeholder Profile<br />
7) Assessment of the internal environment of the <strong>municipality</strong><br />
(Internal Resource Analysis)<br />
- Human Resources<br />
- Financial Situation<br />
- Performance Management<br />
- Compliance<br />
- Organ gram<br />
- Council structures<br />
Page 9 of 114
8) Assess the operational environment of the <strong>municipality</strong><br />
- Power and Functions<br />
- Current projects<br />
Outcome; Process plan –Approved by all levels of the <strong>municipality</strong>; Communicated<br />
to the District<br />
-Communicated to the DTLG<br />
End Phase 1<br />
Target: 26 October 2005<br />
Phase II<br />
Communication and Consultation /Participatory Democracy<br />
02 November 2005: Following stakeholders are informed about the IDP Review<br />
process<br />
1) Amakhosi<br />
2) Schools<br />
3) Churches<br />
4) The district <strong>municipality</strong><br />
5) Service Providers<br />
a) Provincial<br />
b) District Water Services<br />
c) Provincial Department of Transport<br />
d) Eskom<br />
e) Telkom<br />
f) SA Post Office<br />
g) Provincial Department of Housing<br />
h) Land Affairs<br />
i) Health<br />
j) Education<br />
k) CBOs<br />
l) NGOs<br />
m) Industry<br />
Mode of communication: Letters signed by municipal Manager Included:<br />
Process Plan, Invitation to next meeting (forum) Information that steering<br />
Committee (Mainly MANCO and representatives of council structure will be formed.<br />
Place a newspaper adverts.<br />
09 November: First IDP Review Forum Meeting issues:<br />
1) Process Plan<br />
2) Report on last IDP Review<br />
3) Report on progress on last IDP Projects<br />
4) Report on New Projects and <strong>Development</strong><br />
5) Explain constraints and challenges facing Municipal <strong>Planning</strong> and<br />
Implementation<br />
17 November 2005: Community Consultation at amakhosi Administrative Centres<br />
30 November 2005: Second IDP review Forum meets to assess Draft Process<br />
Report submitted by Consultant<br />
End of Phase Two<br />
Outcome<br />
Page 10 of 114
1) Community Consultation<br />
2) Steering Committee Meetings<br />
3) Forum Meetings<br />
4) Alignment<br />
Phase Three<br />
1-9 December 2005: Consultant in consultation with MANCO and steering Committee<br />
drafts the First 2005/2007 IDP review document<br />
Part I: Process plan<br />
Part II: Process Report<br />
Part III: Project Review<br />
Part IV: Sector Report<br />
Part V: Alignment<br />
Part VI: Implementation Plan<br />
Part VII: Recommendation, conclusion, way forward<br />
Part VIII: ANNEXURES: minutes of all input meetings<br />
12 December 2005: Draft 1 of the IDP Review 2006/07 is submitted to Manco,<br />
then to EXCO, then to Council.<br />
Draft must have enough quality to inform the 2006/07 Budget Process.<br />
Out come: Draft Reviewed IDP<br />
January - June 2006: Edit –tune, align with DTLG Imperatives, Submit to new<br />
Council (after elections) of adoption of amendment, submission to provincial<br />
assessment in line with provincial Guidelines. Mainly communication between<br />
Ntambanana Local Municipality with Uthungulu District and DPLG, DTLG, Potential<br />
Funder<br />
Outcome: Submit Final IDP Review Report to DTLG as per DTLG dates<br />
NB Some adjustments ensued, following meetings with stakeholders and role players.<br />
And the following was also discussed<br />
IDP Review Process/ 2006/07<br />
Meet with EXCO/MANCO - Ntambanana<br />
Compliance Issues: IDP Review<br />
AAA. Ministerial Letter: Last IDP Review<br />
1. Participatory Governance<br />
Municipal Systems Act<br />
Section 16 (a)<br />
(i)<br />
(ii)<br />
(iii)<br />
(IV)<br />
(V)<br />
Page 11 of 114
Section 28 (2), 28 (3)<br />
2. Alignment meetings<br />
Section 24, section 24<br />
3. Adoption of the IDP<br />
Section 25 (1)<br />
(2)<br />
4. Core components of the IDP<br />
Section 26<br />
5. Adopt a Process Plan<br />
Section 28 (1)<br />
6. Core Components of the Process Plan<br />
Section 29 (1)<br />
7. Management of the Drafting Process<br />
Section 30<br />
8. Provincial Monitoring: Section 31<br />
9. Submission to the MEC section 32<br />
10. Annual Review<br />
Section 34.<br />
Main term is AMEND<br />
11. Also consider Sections 35 (1), 35 (2)<br />
Page 12 of 114
CHAPTER 6<br />
Section 38 (a) (iii) - PMS – in line with …IDP<br />
1. PMS Managed by EXCO<br />
Delegated to MM<br />
Adopted by Community council<br />
2.Core Components of PMS Sections (41)<br />
a) KPIS (IDP)<br />
b) Measurable development targets<br />
c) Review performance every year<br />
d) Improvement steps<br />
e) Early warning indicators<br />
3. Community Involvement<br />
Section 42<br />
4. General KPI s- where are they<br />
MUNICIPAL FINANCE MANAGEMENT ACT<br />
Budget<br />
Chapter 4<br />
Chapter 5,Section 53<br />
-Attend Alignment meeting at Uthungulu District Council. Here various service<br />
providers made presentations about their plans, mainly in the Uthungulu DC<br />
Municipal area. The consultant had to sift for information relating to Ntambanana<br />
Local Municipality.<br />
It is the view of the Consultant, the Management of Ntambanana Local Municipality,<br />
and the Council of Ntambanana Local Municipality that alignment meetings should<br />
consist more of dialogue, rather than service providers telling Municipalities about<br />
their plans, a kind of one- way flow of information. Municipalities should also be<br />
given space to tell service providers about their <strong>Development</strong> Plans.<br />
-A Public Consultation /Re-launch of the IDP representative Forum was held following<br />
this advert in the <strong>local</strong> newspapers:<br />
FOURTH REVIEW OF THE NTAMBANANA LOCAL MUNICIPALITY INTEGRATED<br />
DEVELOPMENT PLAN: PARTICIPATION, INVITATION TO REGISTER FOR<br />
REPRESENTATION ON THE IDP REPRESENTATIVE FORUM<br />
NTAMBANANA Local Municipality hereby informs all interested and affected parties<br />
that the Council has initiated the fourth review of its Integrated <strong>Development</strong> Plan<br />
Page 13 of 114
(IDP) in terms of the requirements of Chapter Five of the Municipal System Act No:<br />
32 of 2000.<br />
The IDP is a strategic plan through which the Local Municipality and relevant role<br />
players’ plan organize and implement their tasks and responsibility over a five –year<br />
period, with a review being undertaken each year. This is the fourth and last review<br />
in the Council’s current term of office.<br />
The NTAMBANANA Local Municipality once again invites all interested persons and<br />
organizations within its Municipal area to participate in the IDP review process. In<br />
order to participate in the Forum, your organisation is hereby invited to register<br />
as an interested / affected party of NTAMBANANA Integrated <strong>Development</strong><br />
<strong>Planning</strong> Processes. Further details of representative forum meeting will be<br />
forwarded to registered representatives /organizations. The next Representative<br />
Forum meeting, to which all stakeholders, viz., Councilors, Ward Committees, CBOs,<br />
NGOs, church representatives, the education and other sector, members of the<br />
public are invited, will take place on Monday 21 November, 2005.It is advisable to<br />
register first.<br />
In order to be considered as a member of the Ntambanana IDP Representative<br />
Forum, please forward your application with your organization’s profile, stipulating<br />
your area of interest by 18 November 2005 to: The Municipal Manager:<br />
Ntambanana Municipality/Bag x20066 or faxed to 035-792 7094.<br />
For further information kindly contact R.P.Mnguni (Municipal Manager) at the<br />
Municipal Offices at telephone number 035-792-7093.Assistance will be made<br />
available with the transcription of your comments, into English or IsiZulu.<br />
R.P.Mnguni<br />
MUNICIPAL MANAGER<br />
The following was the Agenda for the meeting.<br />
Ntambanana Local Municipality<br />
IDP Review 2006/07<br />
Representative Forum Meeting<br />
Date: 21 November 2005<br />
Time: 12h00<br />
Venue: Council Chambers<br />
Uhlelo<br />
1. Opening Prayer: Umthandazo<br />
2. Opening remarks: MC: Sizokwenzani namuhla<br />
3. Introduction of guests: Kwethulwa izihambeli<br />
4. Introduction of his worship the Mayor: Kwethulwa iMeya<br />
5. Speech by his Worship the Mayor: Inkulumo ye Meya<br />
6. The IDP Review Process: Ukubuyekezwa kwe-IDP- Consultants from<br />
Mthonjaneni <strong>Development</strong> Network -Empangeni.<br />
7. Discussion: Kuyaxoxiswana<br />
8. Inputs: Kufakwa imibono<br />
9. Inkulumo yokuvala: Speaker<br />
Page 14 of 114
10. Closing Prayer at 12h30<br />
-Encouraging was to see the Mayor the Municipal Manager, the Local amakhosi<br />
and/or their representatives, Councilors, Ward Committees, CBOs, NGOs all<br />
participating enthusiastically in IDP Review Process. There is a high level of public<br />
awareness of development issues at KZ <strong>283</strong><br />
Issues that mostly came from Public Participation include:<br />
1) Need for basic Services<br />
2) Need for employment<br />
3) Formation of Sector Stakeholder Forums especially around HIV/Aids, LED,<br />
Social Security<br />
Inkosi Cebekhulu raised issues around rural settlement, on the need for housing and<br />
the need for traditional type of rural settlement to be maintained because of the<br />
cultural issues that determine African settlements.<br />
The Municipality relies very much on national and provincial grants .It therefore has<br />
a limited capacity for development, unless it engages in looking for additional<br />
funding outside of the usual channels .As statistics show the Ntambanana Local<br />
Municipal area is characterized by high levels of poverty, unemployment and low<br />
levels of skills and education.<br />
There were views raised by such people as Justice Biyela that the IDP is<br />
inconsequential because provincial and national departments seem to be running<br />
their own parallel planning. Others like Velenkosini Mthembu felt that even the<br />
Uthungulu District Council is not listening to the Local Municipality, but is rather<br />
forging ahead with its own plans.<br />
Philemon Sangweni an artist felt that there are no plans for 2010 Soccer World Cup,<br />
yet art entrepreneurs are already buying their works in bulk, and cheaply so for<br />
storage, from the <strong>local</strong>s.<br />
Mrs. L M Shandu suggested that the area urgently need an HIV/Aids Centre, and that<br />
the current crop of HIV/Aids volunteers should be paid, and should be given more<br />
support by way of hand –gloves and capacity to couple their care with nutrition<br />
supplies.<br />
Stakeholder Forums for HIV/Aids, Arts, Culture, Sport; Transport; Tourism;<br />
Agriculture should be formed between January and June 2006,to serve as platform<br />
for all with similar interests to be organized under the Municipal umbrella.<br />
IDP materials were extracted in Summary from the 2005/06 Review, as well as from<br />
the most recent document on various sector plans almost all produced by the<br />
Uthungulu District Council .The most revealing of these documents is the Quality of<br />
Life Survey which is the base reference for most of the statistical information in the<br />
2006/07 Review. The significance of statistical information cannot be under –<br />
estimated because it forms the basis for the quantities that will inform any future<br />
development or project planning in KZ<strong>283</strong>.<br />
Although this is a First Draft, worked out at high speed, Council and EXCO were able<br />
to adopt it on 30 November 2005. The view is that, until a final IDP Review is<br />
finalized and submitted in June 2006, this DRAFT represents work in process.<br />
Page 15 of 114
New information will, therefore, be continually added, or even subtracted as the<br />
Review Process continues.<br />
Page 16 of 114
E.DRAFT IDP REVIEW 2006/2007<br />
Review Item 2005/06 Status 2006/07<br />
Status/Procedure<br />
1. Constitutional<br />
Legal Framework<br />
Overview<br />
Need for Annual Review<br />
MEC’s Comments<br />
Constitution Ch.7; Ch.3;<br />
Ch.8; Schedules 4&5; M.<br />
Structures Act; M. Systems<br />
Act; MFMA; <strong>Planning</strong><br />
Regulations; DFAct, etc.<br />
Action required<br />
Acquire Familiarity<br />
with the <strong>Planning</strong><br />
Constitutional and<br />
Legal Requirements<br />
Responsibility<br />
All Municipal<br />
Councillors<br />
All Municipal Staff<br />
All Service Providers<br />
2. Portfolio of<br />
Compliance<br />
Imperatives<br />
3.<br />
Organisational<br />
Arrangements<br />
4. Analysis<br />
4.1 Status Quo<br />
Report<br />
Not Treated Separately<br />
Vision, Principles<br />
Strategies, Financial<br />
Framework,<br />
Institutional Framework<br />
Institutional<br />
Framework, social<br />
Analysis, population<br />
size, male/Female<br />
Ratio, Age Distribution,<br />
Population Density,<br />
population, Educational<br />
Facilities, health<br />
Facilities, Social<br />
Services, Income<br />
Distribution and<br />
Employment, Economic<br />
Analysis,<br />
Environmental Analysis<br />
M Systems Act:<br />
Sections<br />
Checklist Drawn and<br />
adhered to.<br />
Workshops to revise<br />
mission, vision,<br />
organizational goals.<br />
Update Organogram.<br />
Update departmental<br />
functions.<br />
No change to the 2005/2006<br />
Status Report. Refer to<br />
Annexure E.14.6.<br />
Municipality is studying<br />
Heatonville for future growth<br />
Continuous<br />
interaction with<br />
checklist<br />
Implement new PMS<br />
early enough.<br />
Workshops on the<br />
implementation.<br />
Framework.<br />
Municipal KPIs<br />
Align with National<br />
and Provincial<br />
Priorities.<br />
Poverty Alleviation<br />
Program.<br />
Infrastructure<br />
Projects are needed.<br />
Capitalize on P700<br />
Staff<br />
Consultant<br />
Municipal Staff<br />
Municipal Councillors<br />
Municipal<br />
Management<br />
Council<br />
Service<br />
Providers<br />
Page 17 of 114
4.2 Social Analysis Population:<br />
84772(2001C.)<br />
Households:12282<br />
Male: 46%<br />
Female 54%<br />
Age Distribution:<br />
0-4, 13%;<br />
5-14,29%;<br />
15-34,34%;<br />
35-64. 20%;<br />
65+, 5%<br />
Education: Schools are<br />
inadequate. Gen. low<br />
level of schooling.<br />
Health, 2 clinics, 1<br />
hospital.<br />
Traditional Authority:<br />
4 Traditional Courts,<br />
Sports Facilities, 2;<br />
Community Centres,5;<br />
Post Office, 3;<br />
Emergency Call Points,<br />
13;<br />
Police Station,1<br />
4.3 Municipal Not treated<br />
Level Analysis<br />
4.4 Economic<br />
Analysis<br />
4.4.1 Mainly<br />
agricultural, game<br />
reserves, municipal<br />
employment, shops,<br />
small-scale traditional<br />
No change to 2005/06<br />
Status<br />
New Organogram<br />
PMS<br />
Full Municipal<br />
Operations<br />
Council and its structures<br />
meet regularly<br />
Primarily no change. UMD<br />
land identification and<br />
suitability for industrial<br />
<strong>Development</strong> – K2 <strong>283</strong><br />
implications: Buchanana is<br />
Departments of<br />
Welfare, Health, Post<br />
Office, Telkom, are<br />
urged to analyze this<br />
statistics, and re-act<br />
accordingly.<br />
Municipal<br />
management.<br />
Service Providers<br />
Municipal Manager<br />
Top Level<br />
Management<br />
Page 18 of 114
agriculture.<br />
4.4.2 Employed: 7395.<br />
Unemployed: 10416 No<br />
Economic activities:<br />
28083. Total labour<br />
force: 17811.Tourism:<br />
nodes at Mfule Game<br />
Ranch, Enyinini Lodge,<br />
Thula Thula Game<br />
Reserve – all private<br />
Generally low levels of<br />
economic activity.<br />
the main rural town or node.<br />
578 persons involved in the<br />
manufacturing sector. Little<br />
further prospect for<br />
manufacture economy.<br />
There is no short-term<br />
availability of property for<br />
industrial growth. There is a<br />
long-term availability of 187<br />
07981m². Intervention<br />
required for 5 000m² in<br />
short term. Establishment<br />
of Community Farms<br />
envisaged by Uthungulu<br />
EDFP Draft. Project<br />
implementation Plan has<br />
been compiled for Royal<br />
Zulu Game Reserve, which<br />
borders on R34, Southern<br />
boundary of Hluhluwe<br />
Umfolozi Game Reserve and<br />
capitalizes on the P700<br />
development. Shared with<br />
KwaMbonambi Municipality.<br />
Parts consist of Obuka Game<br />
Reserve, Royal Zulu<br />
Somopho Game Reserve,<br />
Royal Zulu Mhlana Game<br />
Reserve (Mbonambi) Royal<br />
Zulu Community Game<br />
Reserve (Ntambanana State<br />
Farms), Royal Zulu<br />
Ingonyama Game Reserve;<br />
Thula Thula Game Reserve.<br />
Incorporate a Zulu cultural<br />
Page 19 of 114
4.5 Environmental<br />
Analysis<br />
4.5.1 Geology: Karoo<br />
Sequence, Dwyka<br />
formation, Sandstone<br />
in various parts of<br />
Municipal area.<br />
4.5.2, Soils: shallow,<br />
hard weathered rock,<br />
Mispah forms, reddish<br />
soils in the West<br />
4.5.3,Topography:<br />
undulating, 200m asi –<br />
600m asi. Valleys.<br />
Main rivers White<br />
Umfolozi – north and<br />
Umhlathuze – South<br />
4.5.4, Climate:<br />
Average annual rainfall<br />
– 760mm to 846 mm.<br />
Rainy Summers. Hot<br />
Summers. Dry mild<br />
winters.<br />
4.5.5, Surface Water:<br />
Several small rivers<br />
flow through municipal<br />
area, in addition to<br />
White Umfolozi and<br />
Umhlathuze.<br />
center to showcase Zulu<br />
cultural heritage and the<br />
Rare and Endangered<br />
Wildlife Breeding and<br />
Rehabilitation Center.<br />
Municipal LED Project<br />
Consolidate study is<br />
attached<br />
No change. LUMS is<br />
attached as Annexure.<br />
Includes Indications for<br />
Geography, Powers and<br />
Functions between Local and<br />
District, Socio –Economic<br />
issues Infrastructure, Land<br />
reform, Environmental<br />
Analysis, key <strong>Development</strong><br />
Issues, District Spatial<br />
<strong>Development</strong> Vision, Spatial<br />
Location of the Municipality,<br />
<strong>Development</strong> Policies and<br />
Principles, Spatial<br />
Framework, Alignment with<br />
IDP.<br />
Working Draft Report of the<br />
Ntambanana Spatial<br />
<strong>Development</strong> Framework is<br />
attached as Annexure.<br />
Page 20 of 114
Umhlathuze water is<br />
bulk water supplier.<br />
4.5.6, Ground Water:<br />
Most fit for short-term<br />
use by animals and<br />
humans. Classes 1, 2,<br />
3 exist. Obuka rural<br />
area relies on<br />
boreholes. Water to<br />
the north not<br />
consumable.<br />
4.5.7, Aesthetics:<br />
Low levels of pollution<br />
and emissions. No<br />
industrial development.<br />
No major roads. Good<br />
air quality.<br />
4.5.8, Waste<br />
management: No<br />
formal programme.<br />
Informal dumping.<br />
4.5.9, Natural<br />
Vegetation: Moist<br />
Zululand Thornveld,<br />
moist hinterland<br />
African Ngongoni veld,<br />
Dry Zululand<br />
Thornveld.<br />
Bioresources Groups 3,<br />
19, 20 prevalent.<br />
4.5.10, Protected<br />
Species, See annexure.<br />
Source of Ref is <strong>KZN</strong><br />
Wildlife 2000<br />
4.5.11, Land<br />
Page 21 of 114
Potential: Sugarcane<br />
on south and east.<br />
Grazing potential +-1.9<br />
ha per animal Unit.<br />
West has lowest<br />
agricultural potential<br />
due to shallow soils.<br />
Central suitable for<br />
livestock and game<br />
farming.<br />
4.5.12 Land Use<br />
Management. No<br />
scheme. Information<br />
derived from UDM<br />
spatial <strong>Development</strong><br />
Initiative and LUMF.<br />
Only draft SF for<br />
Ntambanana. UDM SDI<br />
includes Agriculture,<br />
Traditional settlements,<br />
Environmental<br />
management,<br />
industrial, mining,<br />
ecological, settlement<br />
hierarchies of district,<br />
primary, secondary and<br />
tertiary nodes (ref<br />
Annexure ). LUMF<br />
focused on <strong>Planning</strong><br />
Scheme Continuum,<br />
via: rural <strong>Planning</strong><br />
Scheme – Traditional<br />
areas and Agricultural<br />
land; Elementary<br />
<strong>Planning</strong> Scheme –<br />
Page 22 of 114
4.6 Spatial<br />
Analysis<br />
Edwaleni; Primary<br />
Comprehensive<br />
<strong>Planning</strong> Scheme –<br />
Buchanana;<br />
Comprehensive<br />
<strong>Planning</strong> Scheme – not<br />
applicable to KZ<strong>283</strong><br />
KZ <strong>283</strong> or Ntambanana<br />
Local Municipality lies:<br />
North-West of<br />
Umhlathuze City, East<br />
of Mthonjaneni, West of<br />
Mbonambi North-East<br />
of Umlalazi <strong>local</strong><br />
Municipalities,<br />
Agricultural<br />
development. Low<br />
density settlement<br />
Buchanana is major<br />
settlement, Municipal<br />
offices at Buchanana.<br />
Population<br />
Concentration at<br />
Buchanana, Somopho,<br />
Obizo, Mambuka,<br />
Obuka. Road network<br />
is poor. Access to<br />
municipal offices is<br />
generally poor. Service<br />
delivery is expensive<br />
due to scattered<br />
settlement. Traditional<br />
culture determines<br />
settlement patterns in<br />
traditional areas. Few<br />
No change. Updated by<br />
LUMS and Draft SDF. See<br />
Annexure. Provincial DoT<br />
has compiled Road network<br />
Plan for KZ <strong>283</strong><br />
Management<br />
Page 23 of 114
privately owned land.<br />
Mostly state land.<br />
4.7 Services 4.7.1 Service Levels<br />
Backlogs:<br />
Water: 52.7%<br />
Sanitation: 70.7%<br />
Telecoms: Generally<br />
poor<br />
Electricity: Slow<br />
Refuse/Waste<br />
Management: No Plan<br />
for Healthcare:<br />
Underserved<br />
Roads: Need upgrading<br />
68% have access to street<br />
taps/stand pipes, while only<br />
8.65% depend on<br />
borehole/rainwater/tank/well<br />
and 15.38% on<br />
dam/river/stream/springs.<br />
Only 26% households are<br />
dissatisfied with water<br />
provisioning. 37% of<br />
households have access to<br />
sanitation while 41% have<br />
access to pit latrines. There<br />
are low levels of free<br />
electricity 61.23% of<br />
households are either very<br />
satisfied or satisfied with<br />
electricity supply. 97% of<br />
all refuse is burnt in pit new<br />
property. 12.84% of<br />
households have access to a<br />
public round, 0.0% have<br />
access to a library, 30.28%<br />
to a clinic; 19.27% to a<br />
sports ground; 24.77% to a<br />
community hall; 0% to a<br />
community park; 77.06% to<br />
water and only 4.59% to a<br />
Police Station. Most are<br />
however, more than 5 km<br />
away from a service point.<br />
Municipality has advertised<br />
for compilation of Waste<br />
Management Plan and<br />
Page 24 of 114
4.8 Alignment of<br />
National,<br />
Provincial,<br />
District and <strong>local</strong><br />
Priorities<br />
National KPA’s:<br />
Democracy and<br />
Governance<br />
Institutional<br />
Transformation<br />
Financial management<br />
Infrastructure and<br />
Services<br />
Social and Economic<br />
development, were all<br />
acknowledged.<br />
Provincial Growth<br />
and <strong>Development</strong><br />
Strategy Good<br />
Governance<br />
Transformation<br />
Competitive<br />
Investments<br />
Local Economic<br />
<strong>Development</strong><br />
Sustainable<br />
Communities<br />
Basic Income<br />
Opportunities<br />
Were acknowledged<br />
Uthungulu District<br />
Economically sound<br />
District<br />
Effective Infrastructure<br />
People Empowerment<br />
Integrated<br />
Environment<br />
Disaster management Plan<br />
No change Management<br />
Page 25 of 114
Leadership Excellence<br />
Were acknowledged<br />
Local KZ <strong>283</strong><br />
Institutional<br />
Transformation:<br />
LUMS IDP Review<br />
Democracy and<br />
Governance<br />
Public Participation in<br />
IDP<br />
Financial Management:<br />
Strategic Financial<br />
Framework; MTEF;<br />
Projected revenue<br />
2004-2008<br />
Infrastructure:<br />
Water: Uthungulu,<br />
DWAF<br />
Electricity: ESKOM<br />
Water, Waste,<br />
Sanitation:<br />
WSDP.DWAF, refuse:<br />
Municipal Waste<br />
Removal<br />
Cemeteries: Local<br />
Scale Facilities<br />
Municipal Roads:<br />
Maintenance National<br />
Roads: <strong>KZN</strong><br />
DOT/SANRA<br />
Integrated Transport<br />
Plan: Uthungulu<br />
Communications:<br />
Telkom Post Office<br />
Primary Health:<br />
Page 26 of 114
4.9 Financial<br />
Analysis<br />
prioritize<br />
Nomponjwana Clinic<br />
LED: Consider<br />
Heatonville Industrial<br />
Park<br />
Local Tourism:<br />
Prioritize Ntambanana<br />
Community Reserve<br />
Project<br />
Housing: Prioritize<br />
Somopho, Buchanana<br />
Ogelweni, Njomelwane,<br />
Bhiliya/Mambuka,<br />
Obizo Land Reform:<br />
Mostly Ingonyama trust<br />
land Buchanana state<br />
land; Heatonville<br />
Private land<br />
Community and Social<br />
Facilities: Public<br />
Participation identified<br />
needs for Community<br />
Halls, MPCC’s<br />
Income: mainly grants<br />
and Equitable share<br />
Expenditure: more than<br />
60% on salaries<br />
New budget 2006/07 is<br />
available. Income =95%<br />
grants;4% Interest;1%<br />
operational.<br />
Expenditure=salaries,<br />
Wades,<br />
Allowances,32%;Council<br />
Remuneration,12%;IDP<br />
Generated<br />
Projects,27%;LED,6%,<br />
However, <strong>municipality</strong><br />
continues to have no tax<br />
Page 27 of 114
ase and depends on grants<br />
and subsides for income.<br />
REVIEW ITEM<br />
5. Service<br />
Provider Inputs<br />
2006/07<br />
5.1 <strong>KZN</strong> DOT<br />
5.2 GCIS<br />
SERVICE PROVIDER<br />
INPUT<br />
Want to enter into<br />
protocol agreements<br />
with DC and KZ.<br />
Toestablish roles and<br />
responsibilities i.t.o.road<br />
maintenance, planning,<br />
traffic policing, road<br />
safety, public transport,<br />
new housing, game<br />
reserves, land reform.<br />
Municipalities must<br />
approach MiG. Road<br />
infrastructure Projects:<br />
P700<br />
Sees <strong>local</strong> govt as<br />
stakeholder. Focus on<br />
MPCCs. No financial<br />
support. Local,<br />
Provincial and national<br />
communication must<br />
align. MPCCs should<br />
eventually be in each<br />
LM. Ntambanana has<br />
identified sites for<br />
MPCCs.<br />
ACTION /<br />
ALIGNMENT<br />
MTEF not yet supplied<br />
by DOT despite promise<br />
To draw plans for<br />
MPCCs.<br />
RESPONSIBILITY<br />
<strong>KZN</strong> DOT/Uthungulu<br />
KZ <strong>283</strong><br />
Provided details of To identify Municipal Manager<br />
ACTION<br />
Page 28 of 114
5.3 DLGTA grants to DC and KZ in<br />
next three years. PMS<br />
must use starter-pack<br />
model. Top up amounts<br />
are available should KZ<br />
want additional funds<br />
for development<br />
planning. Can assist<br />
with PMS if approached.<br />
Concern at lack of<br />
alignment between<br />
sector departments.<br />
Assistance of the<br />
Premier has been<br />
requested.<br />
Has spent R3.2 m in<br />
5.4 TELKOM<br />
UDM this year. Want to<br />
be advised on all<br />
developments esp.<br />
housing. EIA take too<br />
long to approval.<br />
5.5 ESKOM<br />
projects/programmes<br />
needing top-up.<br />
KZ <strong>283</strong><br />
Summary and<br />
Conclusion<br />
Page 29 of 114
REVIEW ITEM 2005 / 06 STATUS 2006/07 STATUS /<br />
PROCEDURE<br />
6. Strategies<br />
ACTION REQUIRED<br />
RESPONSIBILITY<br />
6.1 Basic Services<br />
Services<br />
General Lack of basic<br />
services provisioning<br />
Refer to service Analysis<br />
in 4.7<br />
Develop services<br />
plan<br />
KZ <strong>283</strong><br />
6.2 Water Supply<br />
6.3 Local Economic<br />
<strong>Development</strong><br />
6.4 Sanitation<br />
This is a responsibility<br />
of Uthungulu District<br />
Municipality<br />
Agriculture, tourism<br />
Infrastructure HR<br />
Capacity<br />
Effective and productive<br />
municipal area.<br />
Assist SMME’s.<br />
Encourage private<br />
investment. Mobilize<br />
public. Private,<br />
community resources<br />
Focus on dev. OF P700<br />
Support emerging small<br />
farmers. Develop<br />
markets.<br />
Crime Prevention.<br />
Uthungulu<br />
Responsibility<br />
Refer to services<br />
Analysis in 4.7.<br />
Refer to Economic<br />
Analysis in 4.4.<br />
Refer to services<br />
Analysis in 4.7.<br />
Need more<br />
interaction between<br />
DC and KZ<br />
Develop LED Plan<br />
For KZ <strong>283</strong><br />
Same as 6.2<br />
DC/KZ<br />
KZ <strong>283</strong><br />
DC/KZ<br />
6.5 Institutional<br />
Clustering and<br />
integration across all<br />
sectors. Strategic<br />
Management. Visionary<br />
Staffs have held<br />
workshops to attend to<br />
institutional issues.<br />
Refer to attached Draft<br />
More Capacity<br />
building<br />
opportunities<br />
Management<br />
Page 30 of 114
6.6 Poverty<br />
Alleviation and<br />
Gender Equity<br />
6.7 Financial<br />
Strategies<br />
Leadership. Align<br />
planning with<br />
budgeting. Multi<br />
dimensional<br />
Programmes. Division<br />
of powers and functions,<br />
District and <strong>local</strong><br />
Socio-economic and<br />
Gender Specific<br />
Programmes. Identify<br />
poverty groups.<br />
Encourage participation<br />
through the IDP.<br />
Include Gender and<br />
Poverty issues in project<br />
proposals.<br />
Focus on provisioning of<br />
basic services. Access<br />
additional outside<br />
sources of funding.<br />
Establish Municipal<br />
Valuation Roll. Apply<br />
stringent financial<br />
controls. Formulate<br />
Credit and Debt<br />
Management Policy.<br />
Introduce Asset<br />
Management Policy.<br />
Formulate Policy for<br />
Long term loan<br />
financing by<br />
Municipality. Move<br />
funds around to priority<br />
projects.<br />
PMS<br />
Will identify projects<br />
that address poverty<br />
and sender issues.<br />
Business plans will be in<br />
place by 30 June 2006.<br />
This is work in progress<br />
as most depends on<br />
economic situation of<br />
the municipal area. The<br />
<strong>municipality</strong> is to<br />
engage private funders<br />
for development<br />
projects.<br />
Source funding for<br />
Poverty Alleviation<br />
Projects<br />
Source funding from<br />
other sources<br />
Management<br />
Management<br />
Page 31 of 114
6.8 Environmental<br />
Strategies<br />
Acknowledge Local<br />
Agenda 21 – 7 Broad<br />
International Principles<br />
Acknowledge NEMA<br />
No changes<br />
Implement new<br />
LUMS<br />
Management<br />
Page 32 of 114
REVIEW ITEM 2005 / 06 STATUS 2006/07 STATUS /<br />
PROCEDURE<br />
ACTION REQUIRED<br />
RESPONSIBILITY<br />
7. Sector Plans<br />
7.1 LED and<br />
Agricultural<br />
<strong>Development</strong> Plan<br />
7.2 Integrated<br />
Environmental<br />
LED is the development<br />
of a <strong>local</strong> economic<br />
strategy. Includes<br />
collection of rates,<br />
efficient planning,<br />
sustainable<br />
development, provision<br />
of services diverse land<br />
uses. Focus on Tourism<br />
and Agriculture. Guiding<br />
Principles: strong<br />
dynamic, balanced<br />
economy. Build HR<br />
capacity for residents.<br />
Create a productive and<br />
effective municipal area.<br />
SMME development.<br />
Focus on specific<br />
economic sectors.<br />
Encourage private<br />
investment. Moblise<br />
Community Resources.<br />
Expand Local Tourism<br />
industry. Support<br />
emerging farmers.<br />
Develop markets.<br />
Crime Prevention. No<br />
Plan or Policy.<br />
Municipality must<br />
facilitate and manage<br />
private and public<br />
Refer to Economic<br />
Analysis under 4.4<br />
Source is Uthungulu LED<br />
Framework and<br />
Uthungulu Land<br />
Identification and<br />
suitability Analysis for<br />
Industrial <strong>Development</strong><br />
study Local <strong>municipality</strong><br />
has eyes on Heatonville<br />
for further industrial and<br />
SMME economic<br />
development. A study is<br />
being carried out in<br />
November 2005.Project<br />
Consolidate LED and<br />
Revenue Strategy<br />
Document is attached.<br />
Application for funding<br />
has been forwarded to<br />
DBSA<br />
LUMS has been<br />
development. Plans to<br />
conduct a <strong>local</strong><br />
Develop Business<br />
Plans<br />
Finalize LUMS<br />
Start <strong>local</strong><br />
Environment Forum<br />
Management<br />
Management<br />
Page 33 of 114
Programme<br />
development initiatives.<br />
<strong>Development</strong>al impacts<br />
are: increased demand<br />
for natural resources –<br />
land, water energy.<br />
Municipal <strong>Planning</strong> must<br />
be aligned with<br />
environmental<br />
management issues.<br />
LUMS, EIP, EMP.<br />
Observe provisions of<br />
NEMA & White Paper.<br />
Define the process of<br />
dealing with natural<br />
environment Include<br />
ENV. In Public<br />
Participation.<br />
Mainstream ENV. In<br />
Municipal IDP process<br />
NO <strong>local</strong> ENV. Plan<br />
existed.<br />
environmental<br />
management plan, and<br />
to start a <strong>local</strong><br />
environment forum.<br />
Page 34 of 114
7.3 HIV/Aids<br />
7.4 Disaster<br />
Management<br />
7.5 Water Services<br />
<strong>Development</strong> Plan<br />
7.6 Integrated<br />
Public<br />
Transportation Plan<br />
No <strong>local</strong> plan existed.<br />
Generic issues of social<br />
and economic impact f<br />
aids were treated. The<br />
Municipality said it<br />
planned to play a<br />
supportive role due to<br />
lack of funds<br />
Shared responsibility.<br />
Ref. part A of Schedule<br />
B of Constitution. Part B<br />
of Schedule 4 & 5 of<br />
Constitution. Role of<br />
national and province.<br />
Section 152(1) (b) of<br />
the Constitution. There<br />
is no <strong>local</strong> plan. Laid<br />
broad generic principles<br />
for the plan.<br />
Cited the Water<br />
Services Act. What the<br />
Act says in relation to<br />
the Uthungulu Water<br />
Services <strong>Development</strong><br />
Plan. Cited the broad<br />
objectives of the<br />
Uthungulu Water<br />
Services <strong>Development</strong><br />
Plan<br />
Looked at the staged<br />
Process of developing a<br />
public transportation<br />
plan.<br />
Uthungulu PLAN is not<br />
yet in place.<br />
No change. Issue was<br />
raised sharply in public<br />
participation meetings.<br />
Plans to establish Local<br />
Forum. Plans to<br />
establish an HIV/Aids<br />
stakeholders forum<br />
No change. Local Plan is<br />
being drafted<br />
Establish Local<br />
HIV/Aids Forum<br />
DC to supply LM<br />
Plan with <strong>local</strong><br />
implications<br />
Management<br />
DC<br />
DC has developed WSDP DC function DC<br />
UMD has developed an<br />
Integrated Public<br />
Transportation Plan for<br />
the District P253<br />
between P393 and<br />
Buchanana is a major<br />
Follow-through on<br />
<strong>local</strong> implications.<br />
Form <strong>local</strong> Transport<br />
Forum<br />
Management<br />
DC<br />
<strong>KZN</strong> DoT<br />
Page 35 of 114
public transport route.<br />
Forms part of the<br />
proposed ARUPP road<br />
between Buchanana and<br />
Ulundi. To improve<br />
accessibility to Ulundi<br />
upgrade to all weather<br />
surface. Proposed<br />
studies are for upgrade<br />
of P253, Public<br />
Transport Corridor study<br />
4. ITP based the<br />
National Land Transport<br />
Transition Act (2000).<br />
DoT has developed Local<br />
Road network Plan for<br />
KZ <strong>283</strong>.<br />
Page 36 of 114
7.7 Tourism Plan Concentrated on generic<br />
Uthungulu District<br />
Vision. UDM sees itself<br />
as co-coordinator on<br />
behalf of the six <strong>local</strong><br />
municipalities. Vision<br />
includes: Create,<br />
develop and manage<br />
the district to become a<br />
preferred tourism<br />
destination for both<br />
domestic and foreign<br />
tourists. Offers wildlife<br />
and cultural tourism<br />
attractions in an<br />
economically and<br />
environmentally<br />
sustainable manner.<br />
Local projects include<br />
Ntambanana<br />
Community Reserve. KZ<br />
does not want to leave<br />
all of tourism to District.<br />
No DC or <strong>local</strong> Plan is<br />
complete.<br />
Refer to Economic<br />
Analysis in 4.4. there is<br />
no <strong>local</strong> tourism plan in<br />
place<br />
Develop a Tourism<br />
Plan for KZ <strong>283</strong><br />
Form <strong>local</strong> CTA<br />
Management<br />
7.8 Integrated<br />
Poverty Reduction<br />
and Gender Equity<br />
Programme<br />
88% live in poverty<br />
conditions. Gender<br />
issues must align with<br />
infrastructure<br />
development,<br />
provisioning of social<br />
services, health,<br />
education, and LED<br />
No change<br />
Form Gender Desk<br />
at Municipality.<br />
Source Funding for<br />
poverty Alleviation<br />
Management<br />
<strong>KZN</strong> Welfare<br />
<strong>KZN</strong> Economic<br />
<strong>Development</strong><br />
Page 37 of 114
opportunities. Poverty<br />
Alleviation must feature<br />
in all development. No<br />
<strong>local</strong> plan existed.<br />
Generic Policy principles<br />
include: Improvement<br />
of living conditions,<br />
infrastructure<br />
improvement. Improve<br />
social facilities, health<br />
facilities, education<br />
facilities, and housing<br />
development. Focus on<br />
ENV. Conservation.<br />
Page 38 of 114
7.9 Energy Sector<br />
Plan<br />
7.10 Cemeteries<br />
and Crematoria<br />
Sector Plan<br />
Prepared by uThungulu<br />
in four<br />
phases.1.Information<br />
and Strategy<br />
Assessment 2.Develop<br />
the plan together with<br />
electrification<br />
plan.3.Financial<br />
assessment<br />
4.Implementation<br />
Strategy<br />
No <strong>local</strong> KZ Plan<br />
Cited the 2003 UDM<br />
Resolution. District<br />
initiative resulted in<br />
appointment of<br />
consultants Messrs<br />
Engecon. Ntambanana<br />
has no existing<br />
cemetery. Buchanana<br />
with a population of<br />
4080 is preferred for a<br />
<strong>local</strong> cemetery<br />
development.<br />
No change<br />
Municipality has its eyes<br />
in Buchanana for a<br />
public cemetery<br />
development<br />
Follow-through on<br />
<strong>local</strong> implications<br />
Conduct intense<br />
study at Buchanana<br />
Management<br />
Management<br />
The following issues have been raised through National IDP Assessment in April and May 2006:<br />
Project Consolidate Not attended to Base document has<br />
been drafted<br />
Follow through on<br />
draft document<br />
Operational Plan Nil Nil Municipality to draft<br />
the Plan<br />
Disaster Management Nil Draft Plan has been<br />
Management<br />
Page 39 of 114
Plan<br />
compiled<br />
LUMS Draft Plan is in Place Commence<br />
implementation<br />
GIS This is a District level<br />
responsibility<br />
Follow through with<br />
District<br />
Natural Resources and<br />
its Life Cycle<br />
Nil Nil Resources are being<br />
sought to draft the<br />
plan<br />
Budget Plan to ensure<br />
that all households<br />
have access to basic<br />
sanitation by 2010<br />
Various Section Plans<br />
NIl NIl This is a district level<br />
responsibility<br />
Municipality has<br />
compiled most sector<br />
plans<br />
same same<br />
EPWP Nil NIl Municipality to engage<br />
the Department of<br />
Public Works<br />
ASGISA priorities Nil Skills Plan for the Finalise Skills Plan<br />
Municipality is being<br />
drafted<br />
HR Issues NIl Organogram is<br />
Fill all vacancies<br />
attached<br />
IGRF Act Nil Municipality maintains<br />
close link with<br />
Province and amakhosi<br />
Page 40 of 114
8.PROJECT REVIEW<br />
The following Projects were prioritized:<br />
NTAMBANANA LED PROJECTS BUDGET<br />
2005/2006<br />
WARD<br />
PRIOTIRIZED MAYORAL<br />
PRJECTS<br />
AMOUNT<br />
BUDGETED<br />
Ward 1 1.Community gardens. 15,518<br />
Ward 2 1.Community Gardens. 15,518<br />
Ward 3 Agricultural Projects 15,518<br />
Ward 4 Community Gardens 15,518<br />
Ward 5 1.Agriculture projects 15,518<br />
Ward 6 1.Fence around community garden. 15,518<br />
Ward 7 1.Sports facilities 15,518<br />
Ward 8 1.Poultry projects 51,518<br />
TOTAL (LED Projects) 124,144<br />
NTAMBANAN IDP PROJECTS BUDGET<br />
2005/2006<br />
DBSA 200,000<br />
DTLGA 700,000<br />
National Treasury Finance Management 250,000<br />
Page 41 of 114
Municipal System Improvement 734,000<br />
Fire Station (UDM) 220,000<br />
Total IDP Projects 2,104,000<br />
Uthungulu District Municipal Projects 2005/2006<br />
Water and Sanitation R 12,109,310.00<br />
8.PROJECT REVIEW<br />
The following Projects were prioritized:<br />
NTAMBANANA LED PROJECTS BUDGET<br />
2005/2006<br />
WARD<br />
PRIOTIRIZED MAYORAL<br />
PRJECTS<br />
AMOUNT<br />
BUDGETED<br />
Ward 1 1.Community gardens. 15,518<br />
Ward 2 1.Community Gardens. 15,518<br />
Ward 3 Agricultural Projects 15,518<br />
Ward 4 Community Gardens 15,518<br />
Ward 5 1.Agriculture projects 15,518<br />
Ward 6 1.Fence around community garden. 15,518<br />
Ward 7 1.Sports facilities 15,518<br />
Ward 8 1.Poultry projects 51,518<br />
Page 42 of 114
TOTAL (LED Projects) 124,144<br />
NTAMBANAN IDP PROJECTS BUDGET<br />
2005/2006<br />
DBSA 200,000<br />
DTLGA 700,000<br />
National Treasury Finance Management 250,000<br />
Municipal System Improvement 734,000<br />
Fire Station (UDM) 220,000<br />
Total IDP Projects 2,104,000<br />
Uthungulu District Municipal Projects 2005/2006<br />
Water and Sanitation R 12,109,310.00<br />
Page 43 of 114
8.PROJECT REVIEW<br />
1. Projected Revenue –internal and external 2004-2005<br />
Three Years<br />
2005/6 2006/7 2007/8<br />
Income<br />
Grants and<br />
R10, 147,000 R11, 161, 700 R 12,277,870<br />
Subsidies<br />
Operational Income R97, 930 R107, 7 23 R118, 495<br />
Interest R608, 000 R668, 800 R 735,680<br />
IDP Projects R 2,820,000 R3, 102,000 R3, 412,200<br />
LED Projects R 896,000 R 985,600 R1, 084,160<br />
PROJECT SPECIFIC<br />
FUNDS<br />
UDM Water R11, 006,391 R7, 228,345 R9, 588, 264<br />
UDM Sanitation R4, 595,479 R3.551 759 R3 804, 009<br />
Department of<br />
Transport<br />
R0, 00 R30, 000, 000 R30, 000,000<br />
2. Strategic allocation for the 2005/8 period<br />
Strategic outcomes Rand million % Allocation<br />
Program One: Democracy and Governance R 1,200,000 0,36<br />
Program Two: Transformation R1, 020,000 0,30<br />
Program Three: Financial Management R100, 000 0,03<br />
Program Four: Infrastructure and Service R114, 521,247 34,10<br />
Program five: Social Economic <strong>Development</strong> R219, 080,000 65,20<br />
Page 44 of 114
Total R 335 921,247 100<br />
PROJECT-3 YEAR<br />
Revenue and<br />
expenditure<br />
R’000<br />
Total Revenue own<br />
Project sources<br />
Funding<br />
source<br />
and<br />
comment<br />
s<br />
2005/2008 funding sources<br />
A-Committed B-to be sourced Total<br />
Ntamb<br />
anana<br />
Project<br />
s<br />
Grants<br />
Project<br />
Specific<br />
Additio<br />
nal<br />
Interna<br />
l<br />
2005/2008 and three Totals<br />
External 2005/6 2006/7 2007/8 Total Three<br />
year Rand<br />
Programme one<br />
R820, 000 R720, 000 R100, 00 R100, 00 R1, 020,00<br />
:Institutional<br />
Transformation<br />
IDP Review<br />
<strong>KZN</strong><br />
R50 000 R50, 000 R50, 000 R50, 00 R150, 000<br />
DTLGA<br />
IDP Review DPLG R50, 000 R50, 000 R50, 000 R50, 00 R150, 00<br />
LUMS DBSA R200, 000 R0, 00 R0, 00 R0, 00 R200.00<br />
LUMS NM R150, 000 R150, 000 R0, 00 R0, 00 R150, 000<br />
DPCB NM R120, 000 R120, 000 R0, 00 R0, 00 R120, 000<br />
DPCB DBSA R250, 000 R250, 000 R0, 00 R0, 00 R250, 000<br />
Programme two:<br />
R500, 000 R500, 000 R400, 00 R300, 00 R1, 200,000<br />
Democracy and<br />
Governance<br />
Mentorship<br />
DBSA R500, 000 R500, 00 R400, 00 R300, 00 R1, 200,000<br />
Administration<br />
&Finance<br />
Performance<br />
Management Project<br />
Management<br />
Programme3:<br />
R 50,00 R50, 000 R0, 00 R100, 000<br />
Financial<br />
Management<br />
Financial<br />
Management Plan<br />
PIMMS R50, 000 R50, 00 R0, 00 R100, 00<br />
Page 45 of 114
Projects Funding 2005/2006 Funding<br />
source<br />
and<br />
REVENUE AND<br />
comments<br />
EXPENDITURE<br />
R’000<br />
Programme four<br />
:Infrastructure and<br />
service<br />
Upgrade p700 to<br />
blacktop standard<br />
Water: Survival<br />
Programme<br />
Water: Hlabathini<br />
Bulk<br />
Water: new capital<br />
Upper Encaenia<br />
Phase1<br />
Water: Greater<br />
Mthiyane phase 4<br />
Water Upper<br />
Enseleni phase 2<br />
Water: Greater<br />
Mthiyane phase 5<br />
Sanitation: ward<br />
4,3 & 5<br />
Sanitation: Ward 6<br />
7,8<br />
Ward 7:Mid Band<br />
Repeater<br />
DOT<br />
(ARUP)<br />
A-committed B-to be sourced<br />
Ntambanana<br />
Project<br />
Grants<br />
project<br />
specific<br />
Additional<br />
Internal<br />
Total<br />
2005/2008 and Three year Total<br />
External 2005/6 2006/7 2007/8 Total Three<br />
Year Rand<br />
R20,<br />
520,870<br />
R43, 945,354 R49, 409,023 R114,<br />
512,247<br />
CMIP R30,<br />
R0, 00 R30,<br />
R30,<br />
R60,<br />
000,000<br />
000,000 000,000 000,000<br />
MIG R396, 000 R396, 000 R0, 00 R792, 000<br />
MIG R3, 500,00 R0, 00 R0, 00 R3, 500,00<br />
MIG R5, 116,099 R0, 00 R0, 00 R5, 116,099<br />
MIG R1, 994,292 3163938 R7, 464,310 R12,<br />
622,540<br />
MIG R0, 00 R3, 668,407 R0, 00 R3, 668,407<br />
MIG R0, 00 R0, 00 R2, 123,954 R2, 123,954<br />
MIG R4, 184,551 R0, 00 R0, 00 R4, 184,551<br />
MIG R409, 928 R3, 551,759 3804009 R7, 765,696<br />
External R16, 000 R0, 00 R 0,00 R16, 000<br />
Heatonville land DLA R2, R2, 000,000 R0, 00 R0, 00 R2, 000,000<br />
Page 46 of 114
acquisition and<br />
development<br />
Ward 1: Road<br />
project<br />
000,000<br />
To R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 1 Obuka Eskom R250, 000 R25, 000 R0, 00 R0, 00 R250, 000<br />
Ward 1Sanitation To be<br />
R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
sourced<br />
Ward 1: water To be<br />
R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
sourced<br />
Ward1 Bridges To be<br />
R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
sourced<br />
Ward 1 Mawanda Eskom R25, 000 R250, 000 R0, 00 R0, 00 R250, 000<br />
PS<br />
Ward 1 Obuka<br />
/Kwamawanda<br />
Electricity<br />
Ward 1 Debe<br />
Electricity<br />
Ward 1:<br />
Qalukuvuka CP<br />
Eskom R250, 000 R250, 000 R0, 00 R0, 00 R250, 000<br />
Eskom R150, 000 R0, 00 R0, 00 R0, 00 R150, 000<br />
Eskom R200, 00 R200, 000 R0, 00 R200, 000<br />
PROJECTS –<br />
3YEARS<br />
REVENUE &<br />
EXPENDITU<br />
RE R’000<br />
Funding<br />
source<br />
and<br />
commen<br />
ts<br />
2005/2008 Funding sources 2005/8 and three Totals<br />
A-Committed<br />
Ntamban<br />
ana<br />
Project<br />
Grants<br />
Project<br />
specific<br />
B-To be sourced<br />
Additi<br />
onal<br />
intern<br />
al<br />
External<br />
Total<br />
2005/6 2006/7 2007/8 Total<br />
three<br />
Rand<br />
Page 47 of 114
Ward2: Roads To be<br />
R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
sourced<br />
Ward 2:Water To be<br />
R0, 00 R0, 00 R0, 00 R0, 00<br />
scheme project sourced<br />
Ward2: water To be<br />
R0, 00 R0, 00 R0, 00 R0, 00<br />
supply<br />
community<br />
garden<br />
sourced<br />
Ward 2 Ziboni PS ESKOM R300, 000 R300, 00 R0, 00 R0, 00<br />
Ward 2<br />
ESKOM R50, 00 R50, 00 R0, 00 R0, 00<br />
Inselenyana<br />
Ward 2:<br />
ESKOM R100, 00 R0, 00 R100, 000 R0, 00<br />
Mabhensa<br />
Ward 2<br />
ESKOM R100, 00 R0, 00 R100, 000 R0, 00<br />
Mkhombisi<br />
Ward 2<br />
ESKOM R250, 000 R0, 00 R0, 00<br />
Emkhandlwini<br />
Ward 2<br />
Manzimhlophe<br />
ESKOM R250, 000 R0, 00 R25,<br />
0000<br />
Ward2<br />
Emkhandlwini<br />
ESKOM R300, 000 R0, 00 R300,<br />
000<br />
Electricity<br />
Ward3:<br />
ESKOM R150, 000 R150, 000 R0, 00<br />
Hlabathini Water<br />
pump<br />
Ward 3<br />
ESKOM R50, 000 R50, 000 R0, 00<br />
Esiqhomaneni<br />
Ward 3 Dumani ESKOM R50, 000 R50, 000 R0, 00<br />
Ward 3 Isithinta ESKOM R100, 00 R0, 00 R0, 00<br />
Ward Mvundlana ESKOM R200, 000 R0, 00 R0, 00<br />
Page 48 of 114
Projects –3<br />
years<br />
REVENUE & EXPENDITURE<br />
R,000<br />
Funding<br />
source and<br />
comment<br />
2005/2008 funding sources Total<br />
2005/8 & three year Total<br />
A-committed B-To be sourced 2005/6 2006/7 2007/8 Total<br />
Three<br />
year<br />
Rand<br />
Ntam Grant Additio C. Ex<br />
bana s nal<br />
ter<br />
na proje interna<br />
Proje ct l<br />
na<br />
ct speci<br />
l<br />
fic<br />
Ward3: Ubuqhawebethu Eskom R200,<br />
000<br />
R0, 00 R0, 00 R200,<br />
000<br />
R200,<br />
00<br />
Ward Ngqungqu Eskom R200,<br />
000<br />
R0, 00 R0, 00 R200, 00 R200,<br />
00<br />
Ward 3:Encayini Eskom R200,<br />
000<br />
R0, 00 R0, 00 R200, 00 R200,<br />
00<br />
Ward3: Water for consumption To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward3: electricity project To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward3: Gobihlahla: Sanitation To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
Ward3: kwaMbiza Sanitation<br />
project<br />
Ward 3: Njomelwana: Sanitation<br />
project<br />
Ward 3 Ofankomo: Sanitation<br />
project<br />
Ward 3: Mnqobansizwa<br />
Sanitation project<br />
Ward3: kwaBhadaza: Sanitation<br />
project<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 3 Ndevu Sanitation project To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Page 49 of 114
Ward3: Dlomodlomo: Sanitation<br />
project<br />
Ward 3: Kwatiki: Sanitation<br />
project<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Project-3 years<br />
2005/2008 Funding sources 2005/2008 and three year<br />
Funding source<br />
and comments<br />
Total<br />
Revenue &<br />
expenditure<br />
R’000<br />
A-Committed<br />
Ntamban<br />
ana<br />
Project<br />
Grant<br />
s<br />
proje<br />
ct<br />
B-to be sourced<br />
Additio<br />
nal<br />
Interna<br />
l<br />
Total<br />
External 2005/6 2006/8 2007/8 Total Three<br />
year Rand<br />
Ward 3: Esihinta To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 3 Maqhela: To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Sanitation<br />
Ward3: Nozika<br />
Sanitation<br />
Ward 3 Qgabhiyeni<br />
Project<br />
Ward 3 water to<br />
community garden<br />
Ward3 Empempeni<br />
cause way<br />
Ward 3 water<br />
scheme project<br />
Ward3 Road<br />
project<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 4 Sibekezele ESKOM R50, 000 R50, 000 R0, 00 R0, 00 R50, 000<br />
Page 50 of 114
Ward 4 Enhlubeni ESKOM R100,<br />
000<br />
Ward 4 Estabo ESKOM R150,<br />
Ward 4<br />
Kwelabantu<br />
Ward 4<br />
Emasangweni<br />
electricity<br />
Ward 4 Mpemvu<br />
electricity<br />
Ward 4<br />
Nomponjwana<br />
Ward 4 Wambaza<br />
electricity<br />
Ward 4 Bhokolo<br />
electricity<br />
Ward4 Nkwenkwe<br />
electricity<br />
000<br />
ESKOM R250,<br />
000<br />
ESKOM R297,<br />
000<br />
R100,<br />
000<br />
R0, 00 R0, 00 R100,<br />
000<br />
R150, R0, 00 R0, 00 R150,<br />
000<br />
000<br />
R0, 00 R250, R0, 00 R250,<br />
000<br />
000<br />
R0, 00 R297, R0, 00 R297,<br />
000<br />
000<br />
ESKOM R117,<br />
000<br />
R0, 00 R0, 00 R117,<br />
000<br />
R117,<br />
000<br />
ESKOM R157, R0, 00 R0, 00 R157, R157,<br />
500<br />
500 500<br />
ESKOM R405, R0, 00 R0, 00 R405, R405,<br />
000<br />
000 000<br />
ESKOM R369, R0, 00 R0, 00 R369, R369,<br />
000<br />
000 000<br />
ESKOM R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
PROJECT-3 YEARS Funding source 2005/2008 Funding sources<br />
And comments<br />
A-Committed B-To be sourced<br />
REVENUE AND<br />
EXPENDITURE<br />
R’000<br />
Ntamba<br />
nana<br />
Project<br />
Grants<br />
Project<br />
Specific<br />
Addition<br />
al<br />
internal<br />
Total<br />
2005/8 & three totals<br />
External 2005/6 2006/7 2007/8 Total<br />
three year<br />
Rand<br />
Ward 4 Kwelentaba<br />
ESKOM R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Electricity<br />
Ward 4 Mpempeni Electricity ESKOM R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 4 Water Kwelentaba To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
scheme project<br />
Ward 4 Water: to<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
community garden<br />
Ward 4 Roads P534 to P571 To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Page 51 of 114
Ward 4 Sanitation: Nhlube2 To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 4 Sanitation<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Nsimbakazi<br />
Ward4 Sanitation<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Emasangweni<br />
Ward 4 Ikhwelethu<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
/Nkwenkwe<br />
Ward 4 Sanitation Nduna To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 4 sanitation Wambaza To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 4 Bridge<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Mkhwakhweni<br />
Ward 4 Nhlube Bridge To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 4 Ncwane bridge To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 4 Esigcingini bridge To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 4 Sanitation: Eringini To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 4 Nhlube bridge To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
2005/2008 Funding sources<br />
2005/2008 and Three Year Total<br />
Project –3 years Funding<br />
sources and A-committed<br />
Revenue and comments<br />
To be sourced<br />
Total<br />
expenditure R’000<br />
Ntamban<br />
ana<br />
Project<br />
Grants<br />
Project<br />
specific<br />
Additional<br />
Internal<br />
External 2005/6 2006/7 2007/8 Total<br />
three<br />
year Rand<br />
Ward 4 Esigcingini To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
bridge<br />
Ward 5 Bridge at To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Nsimbakazi<br />
Ward 5 Water scheme To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 5 Sanitation To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
scheme<br />
Ward Thandinkosi ESKOM R50, 000 R50, 000 R0, 00 R0, 00 R50, 00<br />
Ward 5Qondindlela<br />
Electricity<br />
ESKOM R100, 00 R100, 000 R0, 00 R0, 00 R100, 000<br />
Page 52 of 114
Ward 5 Nsimbakazi ESKOM R297, 000 R277, 000 R0, 00 R0, 00 R279, 000<br />
Electricity<br />
Ward 5 Mabhensa 2: ESKOM R99, 000 R0, 00 R99, 00 R0, 00 R99, 00<br />
Electricity<br />
Ward 5: Qunebe ESKOM R297, 000 R0, 00 R297, R0, 00 R279,00<br />
Electricity<br />
000<br />
Ward 5 Electricity ESKOM R369, 000 R0, 00 R369, R0, 00 369,000<br />
Ncamane project<br />
000<br />
Ward 5 Buchanan<br />
electricity<br />
ESKOM R1, 687,500 R0, 00 R0, 00 R1,<br />
687,500<br />
R1,<br />
687,5000<br />
Ward 5 Electricity To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
Ward 5 Road project To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward6 Water scheme To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 6 Agriculture To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
water scheme<br />
Ward 6Sanitation To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
scheme<br />
Ward 6 Mandlazini ESKOM R50, 00 R50, 000 R0, 00 R0, 00 R50, 00<br />
PROJECT 3<br />
YEARS<br />
REVENUE AND<br />
EXPENDITURE<br />
R’000<br />
Funding<br />
sources and<br />
comments<br />
2005/2006 Funding sources<br />
A-Committed B-to be sourced Total<br />
Ntamban<br />
ana<br />
Project<br />
Grants<br />
project<br />
specifi<br />
c<br />
Additiona<br />
l Internal<br />
2005/2008 And three year<br />
Total<br />
External 2005/6 2006/7 2007/8 Total<br />
three<br />
Rand<br />
Ward 8: Dams for To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
bulk water<br />
Ward 8: water To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
consumption<br />
Ward8 Telephone TELKOM R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Page 53 of 114
Ward8: water<br />
scheme<br />
Ward 8:sanitation<br />
project<br />
Ward<br />
8:Mabuka<br />
Ward8 road<br />
project<br />
Ward: bridge<br />
at<br />
kwaNjenzomu<br />
ngu<br />
Ward 8 bridge<br />
at Ukholweni<br />
Ward 8<br />
Mission<br />
electricity<br />
Ward 8<br />
Mathunzini<br />
electricity<br />
Qhomanine<br />
electricity<br />
Mvazane<br />
electricity<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
ESKOM R0, 00 R50,<br />
000<br />
R0, 00 R0, 00 R0, 00<br />
To be sourced R50, 000 R0, 00 R0, 00 R0, 00 R0, 00<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0,00<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
ESKOM R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
ESKOM R81, 000 R0, 00 R81,<br />
000<br />
R0, 00 R81, 00<br />
ESKOM R702, 000 R0, 00 R0, 00 R702, 000 R702, 000<br />
ESKOM R90, 000 R0, 00 R0, 00 R90, 000 R90, 000<br />
ESKOM R666, 000 R0, 00 R0, 00 R666, 000 R666, 000<br />
Page 54 of 114
D. PROJECT-<br />
3YEARS<br />
REVENUE AND<br />
EXPENDITURE R’000<br />
Funding source and<br />
comments<br />
A Total<br />
Ntam<br />
anana<br />
projec<br />
t<br />
Grants –<br />
project<br />
specific<br />
Additi<br />
onal<br />
intern<br />
al<br />
2005/2008 and three year Total<br />
external 2005/6 2006/7 2007/8 Total<br />
three<br />
year<br />
Rand<br />
Ward 8: Obizo Water pr To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 8: Obizo: water To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
extension<br />
Ward eNdondwane: To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
water extension<br />
Ward 8:Hlaza: water To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
extension<br />
Ward 8 Umzini: water To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
extension<br />
Ward 8 Mkholwasi: To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
water extension<br />
Water8 Obuka PS ESKOM R50, 00 R50, 000 R0, 00 R0, 00 R50, 000<br />
Ward8 Cebekhulu PS ESKOM R100, 000 R100, 000 R0, 00 R0, 00 R100, 000<br />
Ward 8 Nkoninga PS ESKOM R100, 000 R0, 00 R100, 000 R0, 00 R100, 000<br />
Ward8 Mdlodala ESKOM R85, 500 R0, 00 R85, 500 R0, 00 R85, 500<br />
Programme five:<br />
Socio and Economic<br />
<strong>Development</strong><br />
R62,<br />
800,000<br />
R100,<br />
000.000<br />
Isithinta Department of education N/A N/A R0, 00 R0, 00 R0, 00<br />
Majanani Department of education N/A N/A R0, 00 R0, 00 R0, 00<br />
Dumanikahle Department of education R1, 000,000 R1, 100,000 R0, 00 R0, 00 R1, 100,000<br />
Mambuka Department of education R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Gobihlahla Department of education R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Thandinkosi Department of education R700, 000 R0, 00 R0, 00 R0, 00 R700, 000<br />
Salpine Department of education R800, 000 R800, 000 R0, 00 R0, 00 R0, 00<br />
R50,<br />
000,00<br />
R219,<br />
080,00<br />
Page 55 of 114
PR0JECT-3YEARS 2005/2008 FUNDING SOURCES<br />
REVENUE AND<br />
EXPENDITURE<br />
R’000<br />
FUNNDING<br />
SOURCES AND<br />
COMMENTS<br />
A-Committed<br />
B-To be<br />
sourced total<br />
Ntam<br />
bana<br />
na<br />
Proje<br />
ct<br />
Grants<br />
Project<br />
Addit<br />
ional<br />
inter<br />
nal<br />
extern<br />
al<br />
2005/6 2006/7 2006/8 Total three<br />
year Rand<br />
MandlanziniuPs Department of education R0, 00 R0, 00 R0, 00 R0, 00 R800, 00<br />
Ngogodo Department of education R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Qalukuvuka Department of education R1, 100,00 R0, 00 R0, 00 R0, 00 R1, 100,000<br />
Ward Sport field DPW R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 1 Multi –purpose DPW R0, 00 R0, 00 R0, 00 R0, 00<br />
centre<br />
Ward1 Creches DE R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward Informal To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward1 informal market DPW R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 1 community hall DPW R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 1 Sewing centre DH R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward1 Clinic DE R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward2 Secondary PDW R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
School<br />
Ward 2 Sport facilities To be sourced R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward3 Community hall PDW R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward3 Multi-purpose PDW R0, 00 R0, 00 R0, 00 R0, 00<br />
centre<br />
Ward3 Sport facilities To be sourced R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 3 Crèche DE R0, 00 R0, 00 R0, 00<br />
Page 56 of 114
PROJECTS –3 YEARS<br />
REVENUE AND<br />
EXPENDITURE<br />
R’000<br />
FUNDING<br />
SOURCE<br />
AND<br />
COMMENT<br />
S<br />
2005/2006 Funding<br />
sources<br />
Ntambanan<br />
a<br />
Project<br />
Grants<br />
Project<br />
B-To be sourced<br />
Additional<br />
Exter<br />
nal<br />
Total<br />
2005/2008 and Three Year Total<br />
2005/6 2006/7 2007/8 Total Three year<br />
Rand<br />
Ward3: Police station DSC R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward3: Secondary DE R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
school<br />
Ward3: Sport facilities To be<br />
R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
sourced<br />
Ward 3 Pension payout DPW R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
(shelter<br />
Ward 3:clinic DH R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 4:Clinic<br />
DH R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Emasangweni<br />
Ward 4 Care centre DH R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 4 Technical<br />
DE R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
college<br />
Ward 4 Nomponjwana DE R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
secondary<br />
Ward 4 primary fencing DE R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
and toilet<br />
Ward 4 Nomponjwana DH R2, 400,000 R2, 400,000 R0, 00 R0, 00 R2, 400,000<br />
clinic<br />
Ward 4 clinic Nkwenkwe DH R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 4 Clinic<br />
DH R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Kwelentaba<br />
Ward 4Early chills DE R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
school<br />
Ward 4 Pension payout To be<br />
R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
shelter<br />
sourced<br />
Ward 4 Fish point<br />
project<br />
To be<br />
sourced<br />
R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Page 57 of 114
PROJECT 3 YEARS Funding 2005/2008 Funding sources<br />
sources and<br />
comments<br />
REVENUE AND<br />
EXPENDITURE R’000<br />
A-committed<br />
B-to be<br />
sourced<br />
Total<br />
2005/2008 and Three year<br />
Total<br />
Ntam<br />
bana<br />
na<br />
proje<br />
ct<br />
Grants<br />
project<br />
specific<br />
Addit<br />
ional<br />
inter<br />
nal<br />
exter<br />
nal<br />
2005/<br />
6<br />
2006/7 2007/8 Total<br />
Three<br />
year<br />
Rand<br />
Ward 5 clinic DH R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 5 sport facilities To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 5 care centre DH R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward6 mult-porpuse PDW R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward6 Sport facilities To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward6 clinic DH R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward7 Multi-purse DPW R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
centre<br />
Sport facilities To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward7 pension pay To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
point<br />
Ward8 Mabuka: Pre DE R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
school<br />
Mabuka: Tech college DE R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 8 Plaza pension DPW R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
shelter<br />
Ward8 police station DSC R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward8 Mabuka clinic DH R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
need for upgrade<br />
Ward 8 Clinic DH R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 8:Multi –purpose<br />
hall (Obizo)<br />
DPW R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Page 58 of 114
PROJECT –3 YEARS<br />
REVENUE AND EXPENDITURE<br />
Funding<br />
source and<br />
comments<br />
2005/2008 funding sources<br />
A-COMMITED B-To be sourced Total<br />
Ntamban<br />
ana<br />
Project<br />
Grants<br />
project<br />
specific<br />
Addition<br />
al<br />
Extern<br />
al<br />
2005/2008 and three year<br />
totals<br />
2005/6 2006/7 2007/8 Total<br />
Three<br />
year<br />
Rand<br />
Ward 8: Ndondwane; pension payout DPW R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
point<br />
Ward8: Obizo: Ndondwane DPW R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 8:ndondwane: sport complex To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward8: Hlaza sport field To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward8 Mzini: sport field To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 8 Sport facilities To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward8: clinic To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward8 crèches DH R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 1 Fencing camp for cattle DE R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward1community garden To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 2 community garden To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward3 poultry project To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward3 Dams for To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
bulk water<br />
Ward3: community garden To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward4: Nomponjwana: poultry To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
Ward4 Nomponjwana: Bakery To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 4 Nomponjwana: market To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Page 59 of 114
PROJECT3<br />
REVENUE AND<br />
EXPENDITURE R000<br />
2005/2006 Funding source<br />
YEARS Funding A-committed B-To be<br />
source and<br />
sourced<br />
comments<br />
Ntamban<br />
ana<br />
Project<br />
Grants<br />
project<br />
Specifi<br />
c<br />
Addit<br />
ional<br />
Extern<br />
al<br />
Total<br />
2005/2008 and Three year<br />
Total<br />
2005/6 2006/7 2007/8 Total<br />
three<br />
year<br />
Rand<br />
Ward4 Nomponjwana:<br />
Sewing project<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward4 community To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
garden<br />
Ward4 siyethemba To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
market<br />
Ward4 siyethemba To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
sewing project<br />
Ward4 Mpevu poultry To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward4mpevu bakery To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward4 Mpevu market To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward4 Mpevu sewing To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
Ward4bhonkolo Poultry To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
Ward4 Bhonkolo Bakery To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
Ward4Bhokolo sewing To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
Ward4 Nkwenkwe: To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
poultry project<br />
Ward4Nkwenkwe To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Bakery project<br />
Ward4Masangweni: To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Poultry Project<br />
Ward4Masangweni To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Bakery project<br />
Ward4Masangweni<br />
Market<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Page 60 of 114
2005/2008 and three year Total<br />
PROJECTS 3 YEAR<br />
REVENUE AND<br />
EXPENDITURE<br />
R’000<br />
Funding source<br />
and comments<br />
2005/2006 Funding sources<br />
A-committed<br />
To be sourced<br />
Total<br />
Ntambana<br />
na<br />
Grants project<br />
Additiona<br />
l<br />
Externa<br />
l<br />
2005/6 2006/7 2007/8 Total three<br />
year Rand<br />
Ward 4:Emdeni (Celimpilo) To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
community project<br />
Ward 4: Madlakuzenzele To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
community project<br />
Ward 4 Sizani (masangweni) To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Community project<br />
Ward4 Ebusana community To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
Ward4 Vikamavila community To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
Ward4 Ncwane community To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
Ward4: Makhulakancane To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Community<br />
Ward6 Sewing centre To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward6 Informal market To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward6 Ntuzuma: Poultry To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
Ward6 Khanyanjalo sewing To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
Ward6: Mlondo: Brick making To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward6 Community garden To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward6Ukukhanya Africa: To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Youth project<br />
Ward6 Masibambane To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Page 61 of 114
Community<br />
Garden<br />
Ward6 Elingini community<br />
garden<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Projects 3 years<br />
REVENUE AND EXPENDITURE<br />
R’000<br />
Funding<br />
source and<br />
comments<br />
2005/2006 Funding source<br />
A-<br />
committe<br />
d<br />
Ntamban<br />
ana<br />
Project<br />
B-to be sourced<br />
Grantsproject<br />
Specific<br />
Additional<br />
internal<br />
Total<br />
2005/2006 and three year Total<br />
External 2005/6 2006/7 2007/8 Total three<br />
year Rand<br />
Ward 6: Qalakabusha garden To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 7:poulty To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward7: Ntabanamasi sewing To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Project<br />
Ward7: Sizumphakathi garden To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 8:Siyaphambili:<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Community<br />
Ward 8:Khanyanjalo: Sewing To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Project<br />
Ward8: Community garden To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
: Ndondwane<br />
Ward8: community garden: To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Plaza<br />
Ward 8:community garden To be sourced R0,00 R0,00 R0, 00 R0, 00 R0, 00<br />
Qutshi<br />
Ward8: Community garden To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Obizo<br />
Ward 8:community garden To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Mzini<br />
Ward8: community garden To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Mkunzankunzi<br />
Ward8: community garden To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Mingi<br />
Ward8: To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
Page 62 of 114
Ward8: community fares in<br />
each sub-project<br />
Ward8: Ndondwane: blocks<br />
project<br />
Ward8: Fish farm (youth<br />
project<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
PROJECT –3 YEAR<br />
REVENUE & EXPENDITURER’000<br />
Fundin<br />
g<br />
source<br />
And<br />
comme<br />
nts<br />
2005/2006 Funding sources<br />
A- Committed B. B-to be<br />
sourced<br />
Ntamban<br />
ana<br />
Project<br />
Grants<br />
project<br />
Additio<br />
nal<br />
Interna<br />
l<br />
TOTAL<br />
External 2005/6 2006/<br />
7<br />
2005/2008 and three Year<br />
Total<br />
2007/<br />
8<br />
Total<br />
Three<br />
year Rand<br />
Ward 1 Debe Community garden Mayoral R80, 000 R80, 000 R0, 00 R0, 00 R80, 000<br />
Ward2Mabhensa community garden Mayoral R20, 000 R20 000 R0, 00 R0, 00 R20, 000<br />
Ward2 kwaMbiza community garden Mayoral R10, 000 R10, 000 R0, 00 R0, 00 R10, 000<br />
Ward2 Esidakaneni Community garden Mayoral R12, 000 R12, 000 R0, 00 R0, 00 R12, 000<br />
Ward2 Emgodlane community project Mayoral R12, 000 R12, 000 R0, 00 R0, 00 R12, 000<br />
Ward2 Esisingeni: Community Mayoral R12, 000 R12, 000 R0, 00 R0, 00 R12, 000<br />
Ward2Emkhandlini community Mayoral R20, 000 R20, 000 R0, 00 R0, 00 R20, 000<br />
Ward2Gobihlahla community farm Mayoral R10, 000 R10, 000 R0, 00 R0, 00 R10, 000<br />
Ward2 youth project poultry farm Mayoral R10, 000 R10, 000 R0, 00 R0, 00 R10, 000<br />
Ward2: Edanyini community block Mayoral R20, 000 R20, 000 R0, 00 R0, 00 R20, 000<br />
maker<br />
Ward2Khwalini poultry farm Mayoral R40, 000 R40, 000 R0, 00 R0, 00 R40, 000<br />
Ward2 garden dam Mayoral R20, 000 R20, 000 R0, 00 R0, 00 R20, 000<br />
Ward3 Gamu: community garden Mayoral R39, 000 R39, 000 R0, 00 R0, 00 R39, 000<br />
Ward3; Dlodlomo: community Mayoral R28, 000 R28, 000 R0, 00 R0, 00 R28, 000<br />
Ward3Gqabhiyeni community garden Mayoral R27, 000 R27, 000 R0, 00 R0, 00 R27, 000<br />
Ward 3 Ngqungqu: community Mayoral R28, 000 R28, 000 R0, 00 R0, 00 R28, 000<br />
Page 63 of 114
Ward3 Mbiza: Community Mayoral R27, 000 R27, 000 R0, 00 R0, 00 R27, 000<br />
Ward3 Mfeceni: Community garden Mayoral R28, 000 R28, 000 R0, 00 R0, 00 R28, 000<br />
Mayoral R28, 000 R28, 00 R0, 00 R0, 00 R28.000<br />
PROJECTS –3 YEARS Funding<br />
source<br />
2005/2006 FUNDING SOURCES<br />
And<br />
comments A-Committed<br />
REVENUE AND<br />
EXPENDITURE<br />
B-To be<br />
sourced<br />
TOTAL<br />
2005/2008 and Three Total<br />
R’000<br />
Ntam<br />
bana<br />
na<br />
Proje<br />
ct<br />
Grant-project<br />
specific<br />
Additi<br />
onal<br />
Intern<br />
al<br />
External 2005/6 2006/7 2007/8 Total Three Year<br />
Rand<br />
Ward8: Community To be sourced R0, 00 R0, 00 R0, 00 R0, 00 R0, 00<br />
garden<br />
Ward1: Tourism project To be sourced R0, 00 R0, 00 R0, 00 R0, 00<br />
Ward 8:Art & culture To be sourced R0, 00 R0, 00 R0, 00 R0, 00<br />
project<br />
Ward4: Arts and crafts To be sourced R0, 00 R0, 00 R0, 00 R0, 00<br />
Royal Zulu Feasibility UDM R500, 000 R500, 000 R0, 00 R0, 00 R500, 00<br />
Ntambanana<br />
DLA R6, 000,000 R6, 000, 000 R0, 00 R0, 00 R6, 000,000<br />
community Reserve<br />
Ward7: Somopho Rural<br />
R12, 500,000 R12, 500,000 R12, 500,000 R0, 00 R25, 000,000<br />
housing project (100)<br />
Ervin<br />
Ward 5 Buchanana DH R12, 500,000 R12, 500,000 R12, 500,000 R0, 00 R25, 000,000<br />
Rural housing.<br />
Ward 1 Obuka Rural DH R12, 500,000 R12, 500,000 R12, 500,000 R0, 00 R25, 000,000<br />
housing project (100<br />
even)<br />
Ward2 Oelwein Rural DH R12, 500,000 R12, 500,000 R12, 500,000 R0, 00 R25, 000,000<br />
housing project (100<br />
even)<br />
Ward3: Njomelwane DH R12, 500,000 R0, 00 R12, 500,000 R12, 500,000 R25, 000,000<br />
Page 64 of 114
Rural housing 1000<br />
even)<br />
Ward 6 Bhiliya<br />
/mambuka rural<br />
housing project<br />
Ward8 Obizo Rural<br />
housing project<br />
Ward4 Nompinjwana<br />
Rural housing project<br />
(1000 erven)<br />
DH R12, 500,000 R0, 00 R12, 500,000 R12, 500,000 R25, 000,000<br />
DH R12, 500,000 R0, 00 R12, 500,000 R12, 500,000 R25, 000,000<br />
DH R12, 500,000 R0, 00 R12, 500,000 R12, 500,000 R25, 000,000<br />
PROJECT –3 YEARS<br />
REVENUE AND EXOPENDITURE<br />
FUNDING<br />
SOURCE AND<br />
COMMENTS<br />
2005/2006 FUNDING SOURCES<br />
A- Committed<br />
NTAMB<br />
ANANA<br />
PRIJEC<br />
T<br />
GRANTS-<br />
PROJECT<br />
B-To be sourced<br />
ADDITIO<br />
NAL<br />
INTERNA<br />
EXTERNA<br />
L<br />
TOTAL<br />
2005/2008 AND YEAR TOTAL<br />
2005/6 2006/7 2007/8 TOTAL<br />
THREE YEAR<br />
RAND<br />
Ward 3:Oveceni: community Mayoral fund R28, 000 R28, 000 R0, 00 R0, 00 R28, 000<br />
Ward3: Bhadaza: community garden Mayoral fund R28, 000 R28, 000 R0, 00 R0, 00 R28, 000<br />
Ward3: Njomelwane: Community<br />
Mayoral fund R28, 000 R28, 000 R0, 00 R0, 00 R28, 000<br />
garden<br />
Ward 4:Makhulakancane: Poultry project Mayoral fund R20, 000 R20, 000 R0, 00 R0, 00 R20, 000<br />
Ward 4 Mpevu: Community garden Mayoral fund R10, 000 R10, 000 R0, 00 R0, 00 R10, 000<br />
Ward4bhonkolo: community garden Mayoral fund R10, 000 R10, 000 R0, 00 R0 , 00 R10, 000<br />
Ward4: Kwelentaba: community garden Mayoral fund R10, 000 R10, 00 R0, 00 R0, 00 R10, 000<br />
Ward 4 Isiyethemba: community garden Mayoral fund R10, 000 R10, 000 R0, 00 R0, 00 R10, 000<br />
Ward 4 Nompinjwana : Community Mayoral fund R150, 000 R10, 000 R0, 00 R0, 00 R10, 000<br />
garden<br />
Ward 4 Market stalls Mayoral fund R50, 000 R15 0, 000 R0, 00 R0, 00 R150, 000<br />
Ward 5 Qunebe: community garden Mayoral fund R50, 00 R50, 000 R0, 00 R0, 00 R50, 000<br />
Ward 5 Qondindlela /<br />
Nsimbakazi: poultry project<br />
Mayoral fund R50, 000 R50, 00 R0, 00 R0, 00 R50, 00<br />
Page 65 of 114
Ward5:Ncemane community garden Mayoral fund R10, 000 R10, 00 R0, 00 R0 , 00 R10, 00<br />
Ward5 Bhukanana: poultry project Mayoral fund R25, 000 R25, 000 R0, 00 R0, 00 R25, 00<br />
Ward5 Mancence: community garden Mayoral fund R25, 000 R25, 000 R0, 00 R0, 00 R25, 000<br />
Ward 6 Maqwabe: community garden Mayoral fund R50, 000 R50, 00 R0, 00 R0, 00 R50, 000<br />
Ward 6Mningi: community garden R50, 000 R50, 00 R0, 00 R0, 00 R50, 000<br />
Ward6 Sangoyana: community garden R30, 000 R30, 00 R0, 00 R0, 00 R30, 000<br />
Ward 6 Dam R20, 000 R20, 00 R0, 00 R0, 00 R20, 000<br />
PROJECT 3 YEARS<br />
REVENUE AND EXPENDITURE<br />
R’000<br />
FUNDING<br />
SOURCES AND<br />
COMMENTS<br />
2005/2006 Funding sources<br />
A- to be committed<br />
NTAMBA<br />
NANA<br />
PROJ-<br />
ECT<br />
GRANTSS<br />
PROJECT<br />
B-To be sourced<br />
ADDITIO<br />
NAL<br />
INTERNA<br />
L<br />
EXTER<br />
NAL<br />
Total<br />
2005/2008 and three year<br />
Total<br />
2005/6 2006/7 2007/8<br />
Total<br />
three<br />
year<br />
Rand<br />
Ward 7:Makhwela: Community Mayoral fund R20, 00 R20, 00 R0, 00 R0, 00 R20, 00<br />
Ward 7: ubuhle bamazimela Mayoral fund R20, 00 R20, 00 R0, 00 R0, 00 R20, 00<br />
Ward 7 :Isihuzu: Ntathakusa<br />
Mayoral fund R20, 00 R20, 00 R0, 00 R0, 00 R20, 00<br />
Community garden<br />
Ward7 Qedidlala community garden Mayoral fund R20, 00 R20, 00 R0, 00 R0, 00 R20, 00<br />
Ward7: Zithombothi :khula community Mayoral fund R20, 00 R20, 00 R0, 00 R0, 00 R20, 00<br />
Garden<br />
Ward 7: Esitezi: thubalethu poultry Mayoral fund R20, 00 R20, 00 R0, 00 R0, 00 R20, 00<br />
Project<br />
Ward 7 Mancekane : Phumosizini Mayoral fund R20, 00 R20, 00 R0, 00 R0, 00 R20, 00<br />
Community garden<br />
Ward7: Heatnville Sewing garden Mayoral fund R20, 00 R20, 00 R0, 00 R0, 00 R20, 00<br />
Ward7: Hlanganani block makers Mayoral fund R30, 00 R30, 00 R0, 00 R0, 00 R30, 00<br />
Ward Mquzankuzi: Community garden Mayoral fund R50, 00 R50, 00 R0, 00 R0, 00 R50, 00<br />
Ward 8:Makholwase: Community Mayoral fund R50, 00 R50, 00 R0, 00 R0, 00 R50, 00<br />
garden<br />
Hlaza community garden Mayoral fund R50, 00 R50, 00 R0, 00 R0, 00 R50, 00<br />
Page 66 of 114
The following Projects were prioritized:<br />
NTAMBANANA LED PROJECTS BUDGET<br />
2005/2006<br />
WARD<br />
PRIOTIRIZED MAYORAL<br />
PRJECTS<br />
AMOUNT<br />
BUDGETED<br />
Ward 1 1.Community gardens. 15,518<br />
Ward 2 1.Community Gardens. 15,518<br />
Ward 3 Agricultural Projects 15,518<br />
Ward 4 Community Gardens 15,518<br />
Ward 5 1.Agriculture projects 15,518<br />
Ward 6 1.Fence around community garden. 15,518<br />
Ward 7 1.Sports facilities 15,518<br />
Ward 8 1.Poultry projects 51,518<br />
TOTAL (LED Projects) 124,144<br />
NTAMBANAN IDP PROJECTS BUDGET<br />
2005/2006<br />
DBSA 200,000<br />
DTLGA 700,000<br />
National Treasury Finance Management 250,000<br />
Municipal System Improvement 734,000<br />
Page 67 of 114
Fire Station (UDM) 220,000<br />
Total IDP Projects 2,104,000<br />
Uthungulu District Municipal Projects 2005/2006<br />
Water and Sanitation R 12,109,310.00<br />
Priority Projects 2006/07<br />
Council has prioritized the following projects<br />
Ward 1 Ward 5<br />
(a) Ntombokazi Sewing Centre (a) Nsimbakazi Mr Phones<br />
(b) Maphukanqola Poultry (b) Dark City sewing<br />
(c) Lumbi block making (c) Nselenyana block making<br />
Ward 2 Ward 6<br />
(a) Hawaii pay point (a) Mningi Sewing<br />
(b) Danyini Poultry (b) Mlondo Block making<br />
(c) Esidakeni Poultry (c) Bhiliya Community garden<br />
Page 68 of 114
Ward 3 Ward 7<br />
(a) Bhadaza Market Stalls (a) Ntambinamasi Pension<br />
Pay point<br />
(b) Ogqabhiyeni Poultry (b) Makhwela sewing<br />
(c) Dlomodlomo Phones container (c) Heatonville midband radio<br />
Station<br />
Ward 4 Ward 8<br />
(a) Nomponjwana Bakery (a) Obizo Community farm<br />
(b) Nomponjwana Sewing (b) Mathunzi Community garden<br />
(c) Nomponjwana Poultry (c) Sibonelo Youth Centre<br />
(Mquzankunzi)<br />
The following projects were raised by community structures and Amakhosi leadership structures during<br />
annual IDP Review consultations since 2001. They form the pool for which annual prioritization is done by<br />
Council.<br />
The following additional projects have been identified by Ward Committees, and will be included in the MTEF Table before the<br />
finalization of 2005/6 Review as they still need to be prioritised.<br />
Ward 1 New Projects required<br />
1. Water………………………………………………………………………………………………………………… ……………… Ward 01<br />
2. Electricity…………………………………………………………………………………………………………………………… Ward 01<br />
3. Tourism (Debe new project required)………………………………………………………………………………. Ward 01<br />
4. Mult-porpuse Centre (Mawanda)…………………………………………………………………………………………Ward 01<br />
5. Community Garden (Sundu/Mawanda)………………………………………………………………………………Ward 01<br />
6. Community Hall (Debe /Maphukanqolo)…………………………………………………………………………….Ward 01<br />
7. Creche (Maphukanqolo)……………………………………………………………………………………………………….Ward 01<br />
Page 69 of 114
8. Clinic (Mawanda and Maphukanqolo)…………………………………………………………………………………..Ward 01<br />
9. Dams (Ntombokazi,Lumbi and Debe new dams required)………………………………………………….Ward 01<br />
10. Sport field (Two sport field Mawanda and One Debe)………………………………………………………….Ward 01<br />
11. Secondary School (Ntombokazi, Debe and Lumbi)……………………………………………… …………….Ward 01<br />
12. Police Station (Debe )…………………………………………………………………………………………………………….Ward01<br />
13. Sanitation (Ntombokazi, Debe,Lumbi, Mawanda and Ntombokazi……………………………………….Ward 01<br />
14. Art Centre (Debe)……………………………………………………………………………………………………………………Ward 01<br />
15. Fencing Camps (Debe, Ntombokazi and Lumbi)…………………………………………………… ……………..Ward01<br />
16. Sawing Centres (Three project required Ntombokazi)………………………………………………………….Ward 01<br />
17. Poultry (Maphukanqola)…………………………………………………………………………………………………………Ward 01<br />
18. Block Making (Ntombikazi)…………………………………………………………………………………………………… Ward 01<br />
19. Lumbi Tourism ……………………………………………………………………………………………………………………….Ward 01<br />
20. Kweleni memorial Tombstone and Donda Royal Kraal…………………………………………………………..Ward01<br />
21. Pension payout point Debe and Mawanda …………………………………………………………………………….Ward 01<br />
22. Mawanda……………………………………………………………………………………………………………………………………Ward 01<br />
C. Ward 2:New projects required<br />
Sanitation project required<br />
1. Mabhensa …………………………………………………………………………………………………………………….Ward 02<br />
2. KwaMbiza………………………………………………………………………………………………………………………Ward 02<br />
3. Esdakeni………………………………………………………………………………………………………………………..Ward 02<br />
4. Esisingeni………………………………………………………………………………………………………………………Ward 02<br />
5. Ezigqebaneni…………………………………………………………………………………………………………………Ward 02<br />
6. Mgodlane……………………………………………………………………………………………………………………….Ward02<br />
7. Emkhandlni…………………………………………………………………………………………………………………..Ward 02<br />
8. Edanyini…………………………………………………………………………………………………………………………Ward02<br />
9. Gobihlahla……………………………………………………………………………………………………………………..Ward 02<br />
10. Keteza……………………………………………………………………………………………………………………………Ward 02<br />
11. Maduma………………………………………………………………………………………………………………………….Ward 02<br />
D. Water extension pipe project<br />
1. Mabhensa ………………………………………………………………………………………………………………….Ward 02<br />
2. Kwa Mbiza……………………………………………………………………………………………………………………ward 02<br />
3. Esidakeni……………………………………………………………………………………………………………………….ward 02<br />
4. Esisingeni………………………………………………………………………………………………………………………ward 02<br />
5. Ezigqebaneni………………………………………………………………………………………………………………..ward 02<br />
Page 70 of 114
6. Mgodlane……………………………………………………………………………………………………………………..ward 02<br />
7. Emkhandlwini……………………………………………………………………………………………………………….ward 02<br />
8. Edanyini…………………………………………………………………………………………………………………………Ward 02<br />
9. Gobihlahla……………………………………………………………………………………………………………………. Ward 02<br />
10. Keteza…………………………………………………………………………………………………………………………….Ward 02<br />
11. Maduma………………………………………………………………………………………………………………………….Ward 02<br />
New Electricity project required<br />
1. Mabhensa…………………………………………………………………………………………………………………………Ward 02<br />
2. Kwa Mbiza………………………………………………………………………………………………………………………..Ward 02<br />
3. Esdakeni……………………………………………………………………………………………………………………………Ward 02<br />
4. Mgodlane…………………………………………………………………………………………………………………………..Ward 02<br />
5. Esisingeni…………………………………………………………………………………………………………………………..Ward 02<br />
6. Emkhandlini……………………………………………………………………………………………………………………….Ward 02<br />
7. Edanyini………………………………………………………………………………………………………………………………Ward 02<br />
8. Gobinhlanhla……………………………………………………………………………………………………………………….Ward 02<br />
E. Housing Project<br />
1. Ogelweni……………………………………………………………………………………………………………………………….Ward 02<br />
2. Mabhensa……………………………………………………………………………………………………………………………..Ward 02<br />
3. Esdakeni………………………………………………………………………………………………………………………………..Ward 02<br />
4. Mgodlane……………………………………………………………………………………………………………………………….Ward 02<br />
5. Esaiqgebaneni……………………………………………………………………………………………………………………….Ward 02<br />
6. Edayini…………………………………………………………………………………………………………………………………..Ward 02<br />
7. Maduna………………………………………………………………………………………………………………………………….Ward 02<br />
8. Esisingeni……………………………………………………………………………………………………………………………….Ward 02<br />
9. Gobinhlahla…………………………………………………………………………………………………………………………….Ward 02<br />
F. Roads and bridge causeway project<br />
1 Mabhensa to Emkhandlwini A235 to A326 (New bridge required)………………………………………Ward 02<br />
2. Upper Nseleni via Gobihlahla Keteza to Ezibone (new bridge required………………………………..Ward 02<br />
Youth car wash /polish projects<br />
Page 71 of 114
1. Mabhensa…………………………………………………………………………………………………………………………………Ward 02<br />
2. Hawai………………………………………………………………………………………………………………..…………………….Ward 02<br />
3. Emkhandlini…………………………………………………………………………………………………………………………….Ward 02<br />
4. Port Natal………………………………………………………………………………………………………………………………..Ward 02<br />
New Sport field and facilities required<br />
1. Emkhandlwini sport complex …………………………………………………………………………………………………Ward 02<br />
2. Eskakeni sport field ……………………………………………………………………………………………………………….Ward 02<br />
3. Mabhensa sport ………………………………………………………………………………………………………………………Ward 02<br />
4. Gobinhlanhla……………………………………………………………………………………………………………………………Ward 02<br />
5. Maduna sport field ………………………………………………………………………………………………………………….Ward 02<br />
6. Kwambiza sport field……………………………………………………………………………………………………………….Ward 02<br />
7. Mgodlanesport field…………………………………………………………………………………………………………………Ward 02<br />
8. Esisingeni sport filed ………………………………………………………………………………………………………………Ward 02<br />
New Informal market required<br />
1. Emkhandlini sport complex………………………………………………………………………………………………….Ward 02<br />
2. Esdakeni sport field………………………………………………………………………………………………………………Ward 02<br />
3. Mabhensa sport field ………………………………………………………………………………………………………….Ward 02<br />
4. Maduma sport field……………………………………………………………………………………………………………..Ward 02<br />
5. Gobinhlahla sport field ……………………………………………………………………………………………………….Ward 02<br />
6. Kwambiza sport field…………………………………………………………………………………………………………….Ward 02<br />
7. Esisingeni sport field…………………………………………………………………………………………………………...Ward 02<br />
New Informal market required<br />
1. Maduma /port Natal……………………………………………………………………………………………………………….Ward 02<br />
2. Emkhandlwini………………………………………………………………………………………………………………………...Ward 02<br />
3. Esisingeni/ Ziphambanweni……………………………………………………………………………………………………Ward 02<br />
4. Esidakeni /Mgodlane/Hawai……………………………………………………………………………………………………Ward 02<br />
5. Mabhensa………………………………………………………………………………………………………………………………..Ward 02<br />
6. Edayisi sport field (Facilities,tennis, netball, volley ball………………………………………………………..Ward 02<br />
New Multi-purpose centre required<br />
1. Emkhandwini…………………………………………………………………………………………………………………………..Ward 02<br />
2. Mabhensa community hall……………………………………………………………………………………………………..Ward 02<br />
3. Esdakeni community hall………………………………………………………………………………………………………..Ward 02<br />
4. Gobihlahla community hall……………………………………………………………………………………………………..Ward 02<br />
Page 72 of 114
New Sewing centre project (Needed to be build )<br />
1. Encenaneni :New sewing centre…………………………………………………………………………………………….Ward 02<br />
2. Maduma ………………………………………………………………………………………………………………………………….Ward 02<br />
3. Edanyini…………………………………………………………………………………………………………………………………..Ward 02<br />
4. Gobihlahla……………………………………………………………………………………………………………………………….Ward 02<br />
5. Keteza……………………………………………………………………………………………………………………………………..Ward 02<br />
6. Esisingeni………………………………………………………………………………………………………………………………..Ward 02<br />
7. Mgodalne…………………………………………………………………………………………………………………………………Ward 02<br />
8. Mabhensa………………………………………………………………………………………………………………………………..Ward 02<br />
9. Esdakeni…………………………………………………………………………………………………………………………………..Ward 02<br />
10. Mbiza (1)…………………………………………………………………………………………………………………………………..Ward 02<br />
New Clinic required<br />
1. Mabhensa (new building required)…………………………………………………………………………………………Ward 02<br />
2. Emkhandlwini (new building required)…………………………………………………………………………………..Ward 02<br />
New Mobile Police station required<br />
1. Emkhwandlwini……………………………………………………………………………………………………………………….Ward 02<br />
2. Hawai……………………………………………………………………………………………………………………………………….Ward 02<br />
New Youth block making project required<br />
1. Maduma……………………………………………………………………………………………………………………………………Ward 02<br />
2. Nselenyana………………………………………………………………………………………………………………………………Ward 02<br />
3. Nseleni…………………………………………………………………………………………………………………………………….Ward 02<br />
New Youth public telephone projects<br />
1. Port Natal………………………………………………………………………………………………………………………………Ward 02<br />
2. Emkwandlwini………………………………………………………………………………………………………………………Ward 02<br />
3. Hawai…………………………………………………………………………………………………………………………………..Ward 02<br />
4. Mabhensa…………………………………………………………………………………………………………………………….Ward 02<br />
New Schools and Creches need to be build<br />
Page 73 of 114
1. Gobihlahla secondary………………………………………………………………………………………………………….Ward 02<br />
2. Esdakeni Mvuseni secondary (New building )…………………………………………………………………….Ward 02<br />
3. Esdakeni pre school……………………………………………………………………………………………………………..Ward 02<br />
4. Eketeza pre school……………………………………………………………………………………………………………….Ward 02<br />
5. Gobihlahla crèche………………………………………………………………………………………………………………..Ward 02<br />
6. Keteza crèche………………………………………………………………………………………………………………………..Ward 02<br />
7. Endayini crèche (New Building required)……………………………………………………………………………..Ward 02<br />
8. Emkhandlwini crèche (New Building required)…………………………………………………………………….Ward 02<br />
9. Esdakeni crèche (New Building required)………………………………………………………………………………Ward 02<br />
10. Mgodlane crèche (New Building required)…………………………………………………………………………….Ward 02<br />
11. Esisageni crèche (New Building required)……………………………………………………………………………..Ward 02<br />
12. Eziqgebaneni crèche (New Building required)……………………………………………………………………….Ward 02<br />
13. Esisingeni crèche (New Building required)…………………………………………………………………………….Ward 02<br />
Youth ten /Chair hire New projects<br />
1. Gobihlahla……………………………………………………………………………………………………………………………….Ward 02<br />
2. Maduma…………………………………………………………………………………………………………………………………..Ward 02<br />
3. Edanyini……………………………………………………………………………………………………………………………………Ward 02<br />
4. Ezigqebaneni……………………………………………………………………………………………………………………………Ward 02<br />
5. Esisingeni…………………………………………………………………………………………………………………………………Ward 02<br />
6. Kwa Mbiza……………………………………………………………………………………………………………………………….Ward 02<br />
7. Mgodlane…………………………………………………………………………………………………………………………………Ward 02<br />
8. Esdakeni………………………………………………………………………………………………………………………………….Ward 02<br />
9. Mabhensa………………………………………………………………………………………………………………………………..Ward 02<br />
Childcare centre (New projects)<br />
1. Mabhensa………………………………………………………………………………………………………………………………..Ward 02<br />
2. Hawai……………………………………………………………………………………………………………………………………...Ward 02<br />
3. Emkhandwini……………………………………………………………………………………………………………………………Ward 02<br />
Care centre for HIV/AIDS affected (New projects)<br />
1. Mabhensa……………………………………………………………………………………………………………………………….Ward 02<br />
2. Hawai………………………………………………………………………………………………………………………………………Ward 02<br />
3. Emkhandlini…………………………………………………………………………………………………………………………….Ward 02<br />
Pension payout hall (New project required)<br />
1. Emkhandlwini (New building required)………………………………………………………………………………….Ward 02<br />
Page 74 of 114
2. Keteza…………………………………………………………………………………………………………………………………..Ward 02<br />
3. Hawai…………………………………………………………………………………………………………………………………….Ward 02<br />
4. Mabhensa (New building required)………………………………………………………………………………………Ward 02<br />
Technical College (New project required)<br />
1.Emkhandlini (eg welding, plumbing, bricklayer, carpentry, painting, mechanical, ect…<br />
Community garden and dams<br />
1. Mabhensa………………………………………………………………………………………………………………………………Ward 02<br />
2. Esdakleni……………………………………………………………………………………………………………………………….Ward 02<br />
3. Kwambiza………………………………………………………………………………………………………………………………Ward 02<br />
4. Mgodlane……………………………………………………………………………………………………………………………….Ward 02<br />
5. Esisingeni……………………………………………………………………………………………………………………………...Ward 02<br />
6. Ezigqebaneni………………………………………………………………………………………………………………………….Ward 02<br />
7. Gobihlahla……………………………………………………………………………………………………………………………….Ward 02<br />
8. Danyini……………………………………………………………………………………………………………………………………Ward 02<br />
9. Maduma………………………………………………………………………………………………………………………………….Ward 02<br />
Community Poultry (New project required and extension)<br />
1. Gobihlahla (Need extension)……………………………………………………………………………………………………Ward 02<br />
2. Maduma…………………………………………………………………………………………………………………………………..Ward 02<br />
3. Mgodlane…………………………………………………………………………………………………………………………………Ward 02<br />
4. Esdakeni………………………………………………………………………………………………………………………………….Ward 02<br />
5. Mabhensa………………………………………………………………………………………………………………………………..Ward 02<br />
6. Kwambiza (1)…………………………………………………………………………………………………………………………..Ward 02<br />
7. Esingeni…………………………………………………………………………………………………………………………………..Ward 02<br />
8. Edanyini…………………………………………………………………………………………………………………………………..Ward 02<br />
Salon And Barber shop(New project required )<br />
1. Emkhandlwini /Madu and Partner………………………………………………………………………………………….Ward 02<br />
2. Hawai Qini and partners……………………………………………………………………………………………………….Ward 02<br />
3. Mabhensa youth………………………………………………………………………………………………………………………Ward 02<br />
Welding and Mechanical projects<br />
Page 75 of 114
1. Emkhandwini workshop………………………………………………………………………………………………………….Ward 02<br />
2. Hawai workshop……………………………………………………………………………………………………………………..Ward 02<br />
3. Mabhensa workshop……………………………………………………………………………………………………………….Ward 02<br />
4. Port natal workshop……………………………………………………………………………………………………………….Ward 02<br />
5. Mbiza (1) workshop, (All work shops to do the following: Mechanical, Panel beating spray painting, Seat cover, Carpentry, aluminum, Glass cut and<br />
Fixed, etc<br />
Fruit Juice project<br />
1. Mabhensa………………………………………………………………………………………………………………………………Ward 02<br />
2. Hawayi……………………………………………………………………………………………………………………………………Ward 02<br />
3. Emkhandwini…………………………………………………………………………………………………………………………Ward 02<br />
4. Port Natal………………………………………………………………………………………………………………………………Ward 02<br />
Bakery: Community project<br />
1. Mabhensa……………………………………………………………………………………………………………………………….Ward 02<br />
2. Hawai………………………………………………………………………………………………………………………………………Ward 02<br />
3. Emkhandlini……………………………………………………………………………………………………………………………Ward 02<br />
4. Port natal…………………………………………………………………………………………………………………………………Ward 02<br />
5. Edayini…………………………………………………………………………………………………………………………………….Ward 02<br />
Disabled catering project<br />
1. Maduma……………………………………………………………………………………………………………………………………Ward 02<br />
2. Emkhandlini…………………………………………………………………………………………………………………………….Ward 02<br />
3. Ekhandlwini…………………………………………………………………………………………………………………………….Ward 02<br />
4. Hawai………………………………………………………………………………………………………………………………………Ward 02<br />
5. Mabhensa……………………………………………………………………………………………………………………………….Ward 02<br />
Community day land crafting farmers project<br />
1. Mabhensa……………………………………………………………………………………………………………………………..Ward 02<br />
2. Kwambiza……………………………………………………………………………………………………………………………..Ward 02<br />
3. Esdakeni……………………………………………………………………………………………………………………………….Ward 02<br />
4. Mgodlane……………………………………………………………………………………………………………………………..Ward.02<br />
5. Esisingeni……………………………………………………………………………………………………………………………..Ward 02<br />
6. Mabhensa………………………………………………………………………………………………………………………………Ward 02<br />
Community Fish farm project<br />
1. Maduma…………………………………………………………………………………………………………………………………Ward 02<br />
2. Gobihlahla……………………………………………………………………………………………………………………………..Ward 02<br />
Page 76 of 114
3. Emkhandwini…………………………………………………………………………………………………………………………Ward 02<br />
4. Eziphambanweni……………………………………………………………………………………………………………………Ward 02<br />
5. Hawai……………………………………………………………………………………………………………………………………..Ward 02<br />
6. Ezigqaneni……………………………………………………………………………………………………………………………..Ward 02<br />
7. Gobihlahla………………………………………………………………………………………………………………………………Ward 02<br />
8. Maduma………………………………………………………………………………………………………………………………….Ward 02<br />
Live stock farmers and fence land<br />
1. Maduma…………………………………………………………………………………………………………………………………..Ward 02<br />
2. Edanyini…………………………………………………………………………………………………………………………………..Ward 02<br />
3. Gobihlahla……………………………………………………………………………………………………………………………….Ward 02<br />
4. Ezigqebaneni…………………………………………………………………………………………………………………………..Ward 02<br />
Local Tourism<br />
1. Ingwe, Leopard Art/Craft, Cultural village, Ubuhlalu (Maduma)………………………………………………Ward 02<br />
2. Art/Craft cultural Ubuhlalu(Hawai)…………………………………………………………………………………………Ward 02<br />
3. Art/Craft cultural ubuhlalu (Mabhensa)………………………………………………………………………………….Ward 02<br />
4. Art/craft cultural ubuhlalu (Gobihlahla)………………………………………………………………………………….Ward 02<br />
5. Art/craft cultural ubuhlalo Emkhandwini)……………………………………………………………………………..Ward 02<br />
6. Art/ craft cultural ubuhlalu Ezimphambanweni)……………………………………………………………………Ward 02<br />
Nkweleni and Partners project (Esdakeni)<br />
1. Aluminum……………………………………………………………………………………………………….………………………Ward 02<br />
2. Glass cutting and fixing………………………………………………………………………………………………………….Ward 02<br />
3. Carpentry………………………………………………………………………………………………………………………………..Ward 02<br />
4. Plumbing………………………………………………………………………………………………………………………………….Ward 02<br />
LED Projects<br />
1. Dayisi community garden(Danyini)……………………………………………………………………………………….Ward 02<br />
2. Vukuzithathe community garden (Maduma)………………………………………………………………………..Ward 02<br />
3. Thubalethu community garden (Mbiza)………………………………………………………………………………….Ward 02<br />
4. Xoshubuphofu community garden (Esisingeni)……………………………………………………………………..Ward 02<br />
5. Nozalela community garden (Eziqgebaneni)………………………………………………………………………..Ward 02<br />
6. Gijimani community garden (Mabhensa)……………………………………………………………………………….Ward 02<br />
7. Zamokuhle community garden (Esidakeni)…………………………………………………………………………….Ward 02<br />
8. Vulizandla community garden (Mgodlane)……………………………………………………………………………..Ward 02<br />
9. Sukumani community garden (Keteza)………………………………………………………………………………….Ward 02<br />
Page 77 of 114
LED Projects<br />
1. Maduma: Youth club block making………………………………………………………………………………………….Ward 02<br />
2. Gobihlahla: Thuthukani hire…………………………………………………………………………………………………….Ward 02<br />
3. Nselenyana: Youth block making…………………………………………………………………………………………..Ward 02<br />
4. Catering:Sibonginhlahla………………………………………………………………………………………………………….Ward 02<br />
Dipping Tank<br />
1. Nselenyana water supply……………………………………………………………………………………………………….Ward 02<br />
2. Maduma water supply………………………………………………………………………….…………………………………Ward 02<br />
Ward 3:New project required<br />
1. Water (consumption)…………………………………………………………………………………………………………..Ward 03<br />
2. Bulk water for gardening……………………………………………………………………………………………………..Ward 03<br />
3. Dams and Dip Tanks (Njomelwane and Mpumalanga)……………………………………………………….Ward 03<br />
4. Njomelwane (New Catering)………………………………………………………………………………………………..Ward 03<br />
5. Art and Culture projects (Gqabhiyeni,Njomelwane and Dlomodlo)…………………………………..Ward 03<br />
6. Upper Nseleni (Multi-purpose centre require completion…………………………………………………..Ward 03<br />
7. Rural Housing project…………………………………………………………………………………………………………..Ward 03<br />
8. Creches………………………………………………………………………………………………………………………………….Ward 03<br />
9. Sport facilities (Sport field is required in each of sub-ward……………………………………………….Ward 03<br />
10. Community garden and Fish farms project……………………………………………………………………….Ward 03<br />
11. Roads…………………………………………………………………………………………………………………………………..Ward 03<br />
12. Clinics…………………………………………………………………………………………………………………………………. Ward 03<br />
13. Njomelwano (Senzakahle Sewing project and poultry project)………………………………………..Ward 03<br />
14. Gqabhiyeni/Dlomodlomo(Blocks making)…………………………………………………………………………..Ward 03<br />
15. Community Shelter (Each sub-ward)………………………………………………………………………………….Ward 03<br />
16. Upper Nseleni sport field (Required completion)………………………………………………………………….Ward 03<br />
17. Pension Payout Point (Each sub-ward)…………………………………………………………………………………Ward 03<br />
18. Bed and Break fast (Upper Nseleni)……………………………………………………………………………………Ward 03<br />
Review and expenditure projects<br />
1. Guma community garden……………………………………………………………………………………………………..Ward 03<br />
2. Dlomodlomo community garden…………………………………………………………………………………………..Ward 03<br />
3. Gqabhiyeni community garden…………………………………………………………………………………………….Ward 03<br />
4. Ngqungqu community garden……………………………………………………………………………………………..Ward 03<br />
5. Mbiza community garden…………………………………………………………………………………………………….Ward 03<br />
6. Mfeceni community garden…………………………………………………………………………………………………Ward 03<br />
7. Oviceni community garden………………………………………………………………………………………………..Ward 03<br />
Page 78 of 114
8. Bhadaza community garden ……………………………………………………………………………………………..Ward 03<br />
9. Njomelwane community garden…………………………………………………………………………………………Ward 03<br />
1.Community farmers in each sub-ward……………………………………………………………………………….Ward 03<br />
2.Fencing camp for cattle………………………………………………………………………………………………………Ward 03<br />
3.Upper Nseleni sewing project…………………………………………………………………………………………….Ward 03<br />
4.Bambanani sewing club Eningwini…………………………………………………………………………………….Ward 03<br />
5.Sukumani ubuhlalu project Eningwini………………………………………………………………………………Ward 03<br />
6.Upper Nseleni poultry youth club………………………………………………………………………………………Ward 03<br />
G. Sanitation projects<br />
1. Gobihlahla sanitation project………………………………………………………………………………………Ward 03<br />
2. Mbiza sanitation project………………………………………………………………………………………………Ward 03<br />
3. Njomelwane sanitation project…………………………………………………………………………………. Ward 03<br />
4. Ofankomo sanitation project……………………………………………………………………………………….Ward 03<br />
5. Mnqobansizwa sanitation project…………………………………………………………………………………Ward 03<br />
6. Kwabhadaza sanitation project…………………………………………………………………………………….Ward 03<br />
7. Mpevu sanitation project……………………………………………………………………………………………..Ward 03<br />
8. Kwatiki sanitation project……………………………………………………………………………………………..Ward 03<br />
9. Mfeceni sanitation project…………………………………………………………………………………………….Ward 03<br />
10. Esithinta sanitation project…………………………………………………………………………………………..Ward 03<br />
11. Magwehe sanitation project ………………………………………………………………………………….……..Ward 03<br />
12. Nozika sanitation project……………………………………………………………………………………………….Ward 03<br />
13. Oveceni sanitation project…………………………………………………………………………………………….Ward 03<br />
14. Ngqungqu sanitation project………………………………………………………………………………………….Ward 03<br />
15. Plant Memorial sanitation project…………………………………………………………………………………..Ward 03<br />
16. Ogqabhiyeni sanitation project……………………………………………………………………………………….Ward 03<br />
Electricity Projects<br />
1. Gobihlahla…………………………………………………………………………………………………………………………Ward 03<br />
2. Mbiza…………………………………………………………………………………………………………………………………Ward 03<br />
3. Fankomo…………………………………………………………………………………………………………………………..Ward 03<br />
4. Mnqobasiwa……………………………………………………………………………………………………………………..Ward 03<br />
5. Kwabhadaza……………………………………………………………………………………………………………………..Ward 03<br />
6. Ndevu………………………………………………………………………………………………………………………………..Ward 03<br />
7. Dlomodlomo………………………………………………………………………………………………………………………Ward 03<br />
8. Kwatiki………………………………………………………………………………………………………………………………Ward 03<br />
9. Njomelwano……………………………………………………………………………………………………………………..Ward 03<br />
Page 79 of 114
10. Mfeceni……………………………………………………………………………………………………………………………..Ward 03<br />
11. Esithinta…………………………………………………………………………………………………………………………….Ward 03<br />
12. Maqweha……………………………………………………………………………………………………………………………Ward 03<br />
13. Nozika………………………………………………………………………………………………………………………………..Ward 03<br />
14. Oviceni……………………………………………………………………………………………………………………………….Ward 03<br />
15. Ngqungqu …………………………………………………………………………………………………………………………..Ward 03<br />
16. Ogqabhiyeni…………………………………………………………………………………………………………………………Ward 03<br />
17. Plant Memorial…………………………………………………………………………………………………………………….Ward 03<br />
Ward 4: Electricity project required<br />
New Electricity project required<br />
1. Nkwenkwe……………………………………………………………………………………………………………………………….Ward 04<br />
2. Bhonkolo…………………………………………………………………………………………………………………………………Ward 04<br />
3. Masangweni…………………………………………………………………………………………………………………………….Ward 04<br />
4. Mpemvu…………………………………………………………………………………………………………………………………..Ward 04<br />
5. Nomponjwana………………………………………………………………………………………………………………………….Ward 04<br />
6. Nkwenkwe……………………………………………………………………………………………………………………………….Ward 04<br />
7. Siyethemba……………………………………………………………………………………………………………………………..Ward 04<br />
8. Noziphiva…………………………………………………………………………………………………………………………………Ward 04<br />
9. Dlomodlomo sanitation project………………………………………………………………………………………………Ward 04<br />
New Poultry Projects<br />
1. Bhonkolo (Building required ………………………………………………………………………………………………Ward 04<br />
2. Nomponjwana (Chicks required)………………………………………………………………………………………..Ward 04<br />
3. Nkwenkwe (Building required)……………………………………………………………………………………………Ward 04<br />
4. Siyethemba Chicks)……………………………………………………………………………………………………………..Ward 04<br />
5. Kwelentaba (Building required)…………………………………………………………………………………………..Ward 04<br />
6. Masangweni (Building required)………………………………………………………………………………………….Ward 04<br />
7. Mpemvu (Building required)…………………………………………………………………………………………………..Ward 04<br />
Education Projects<br />
1. Siyethemba Secondary (New additional classrooms required)………………………………………Ward 04<br />
2. Madubane Primary school (Need Registration to the Department of Education)……………Ward 04<br />
3. Kwelentaba Secondary School (New schools)……………………………………………………………….Ward 04<br />
4. Nomponjwana Secondary (New school required)…………………………………………………………..Ward 04<br />
Page 80 of 114
H. Early child school New Project required<br />
1. Emasangweni……………………………………………………………………………………………………………Ward 04<br />
2. Bhonkolo…………………………………………………………………………………………………………………..Ward 04<br />
3. Siyethemba …………………………………………………………………………………………………………….Ward 04<br />
4. Nomponjwana(Material required)…………………………………………………………………………..Ward 04<br />
5. Nkwenkwe (New project)………………………………………………………………………………………..Ward 04<br />
6. Kwelentaba (New project)……………………………………………………………………………………….Ward 04<br />
New water projects and extension<br />
1. Nkwenkwe (extension)…………………………………………………………………………………………………Ward 04<br />
2. Kwelentaba (New project)……………………………………………………………………………………………..Ward04<br />
3. Mpempeni (Extension)…………………………………………………………………………………………………..Ward 04<br />
4. Esithinta (Extension)……………………………………………………………………………………………………..Ward 04<br />
Community Projects<br />
1. Nomponjwana (fish pond project)………………………………………………………………………………..Ward 04<br />
2. Nomponjwana bakery (Material required)…………………………………………………………………..Ward 04<br />
3. Pension payout shelter…………………………………………………………………………………………………Ward 04<br />
4. Emasangweni (market stalls)………………………………………………………………………………………Ward 04<br />
5. Bhokolo (market stalls)…………………………………………………………………………………………………Ward 04<br />
6. Mpemvu (Market stalls)…………………………………………………………………………………………………Ward 04<br />
7. Nomponjwana (market stores………………………………………………………………………………………Ward 04<br />
8. Siyethemba (Market stalls)……………………………………………………………………………………………Ward 04<br />
9. Nkwenkwe bakery (New building and material required)…………………………………………….Ward 04<br />
10. Masangweni bakery (New building and material required)………………………………………….Ward 04<br />
11. Youth project…………………………………………………………………………………………………………………Ward 04<br />
12. Block marking……………………………………………………………………………………………………………….Ward 04<br />
13. Dams………………………………………………………………………………………………………………………………Ward 04<br />
14. Cemetery……………………………………………………………………………………………………………………….Ward 04<br />
15. Sport field……………………………………………………………………………………………………………………..Ward 04<br />
17 Tent and toilets…………………………………………………………………………………………………………….Ward 04<br />
16. Bridge……………………………………………………………………………………………………………………………Ward 04<br />
17. Arts and Culture centre………………………………………………………………………………………………Ward 04<br />
18. Fencing Camps……………………………………………………………………………………………………………Ward 04<br />
19. Sport field changing rooms…………………………………………………………………………………………Ward 04<br />
20. Electricity………………………………………………………………………………………………………………………Ward 04<br />
21. Sanitation………………………………………………………………………………………………………………………Ward 04<br />
22. Market stalls……………………………………………………………………………………………………………………Ward 04<br />
23. Multipurpose centre………………………………………………………………………………………………………….Ward 04<br />
Page 81 of 114
24. Pension payout point………………………………………………………………………………………………………..Ward 04<br />
25. Causeways ……………………………………………………………………………………………………………………….Ward 04<br />
I. Community Gardens<br />
1. Mpemvu community garden (pump require)………………………………………………………………….Ward 04<br />
2. Masangweni (Fencing and Dams)……………………………………………………………………………………Ward 04<br />
3. Bhonkolo (Fencing)…………………………………………………………………………………………………………Ward 04<br />
4. Nkwenkwe(Fencing )………………………………………………………………………………………………………Ward 04<br />
5. Community garden…………………………………………………………………………………………………………Ward 04<br />
Ward 5: Buchanana project (New projects required)<br />
1. Mondini crèche………………………………………………………………………………………………………………….Ward 05<br />
2. Top City crèche………………………………………………………………………………………………………………..Ward 05<br />
3. Dark City…………………………………………………………………………………………………………………………..Ward 05<br />
4. Mancence Crèche………………………………………………………………………………………………………………Ward 05<br />
5. Mary Go round (Buchanana)…………………………………………………………………………………………….Ward 05<br />
6. Top city (Community garden)…………………………………………………………………………………………..Ward 05<br />
7. Mondini Community garden)……………………………………………………………………………………………Ward 05<br />
8. Thandinkosi (Community garden)……………………………………………………………………………………Ward 05<br />
9. Clinic………………………………………………………………………………………………………………………………….Ward 05<br />
1. Buchanana multi –purpose………………………………………………………………………………………………..Ward 05<br />
2. Buchanana pay point…………………………………………………………………………………………………………Ward 05<br />
3. Buchanana school (Top city New school required)……………………………………………………………Ward 05<br />
4. Buchanana water………………………………………………………………………………………………………………..Ward 05<br />
5. Buchanana sewing (Duck city)…………………………………………………………………………………………….Ward 05<br />
6. Buchanana block makers (Nselenyama Boxing)………………………………………………………………..Ward 05<br />
7. Tare road from Heatonville to Buchanana……………………………………………………………………………Ward 05<br />
8. Buchanana Bakery……………………………………………………………………………………………………………..Ward 05<br />
9. Buchanana factory (shoes)…………………………………………………………………………………………………Ward 05<br />
10. Sanitation (Manitation)……………………………………………………………………………………………………….Ward 05<br />
Ncemane projects (New projects and Extension<br />
1. Ncemane crèche (Ensimbani require new building)……………………………………………………………Ward 05<br />
2. Ncemane community hall (New project required)……………………………………………………………..Ward 05<br />
3. Ncemane sport field (New project)……………………………………………………………………………………….Ward 05<br />
4. Ncemane (Water)………………………………………………………………………………………………………………….Ward 05<br />
5. Ncemane sewing……………………………………………………………………………………………………………………Ward 05<br />
6. Induna multi –purpose centre(New project)………………………………………………………………………..Ward 05<br />
Page 82 of 114
7. Nduna Electricity…………………………………………………………………………………………………………………….Ward 05<br />
8. Nduna /Qunebe Sanitation…………………………………………………………………………………………………….Ward 05<br />
9. Nduna payout point……………………………………………………………………………………………………………….Ward 05<br />
J. Nsimbakazi projects<br />
1. Nsimbakazi crèche…………………………………………………………………………………………………………………Ward 05<br />
2. Nsimbakazi community hall………………………………………………………………………………………………….Ward 05<br />
3. Nsimbakazi water………………………………………………………………………………………………………………….Ward 05<br />
4. Nsimbakazi sewing……………………………………………………………………………………………………………….Ward 05<br />
5. Nsimbakazi block makers…………………………………………………………………………………………………….Ward 05<br />
WARD 6 (New project required)<br />
New Electricity project required<br />
1. Mvazane……………………………………………………………………………………………………………………………...Ward 06<br />
2. Ntuzuma……………………………………………………………………………………………………………………………….Ward 06<br />
3. Donda……………………………………………………………………………………………………………………………………Ward 06<br />
4. Mningi…………………………………………………………………………………………………………………………………….Ward 06<br />
5. Mvazane…………………………………………………………………………………………………………………………………Ward 06<br />
6. Magwetshana…………………………………………………………………………………………………………………………Ward 06<br />
7. Sangoyana……………………………………………………………………………………………………………………………..Ward 06<br />
8. Bhiliya……………………………………………………………………………………………………………………………………..Ward 06<br />
Sanitation project required<br />
1. Mvazane…………………………………………………………………………………………………………………………………Ward 06<br />
2. Ntuzuma…………………………………………………………………………………………………………………………………Ward 06<br />
3. Donga……………………………………………………………………………………………………………………………………..Ward 06<br />
4. Mningi……………………………………………………………………………………………………………………………………..Ward 06<br />
5. Mvazane…………………………………………………………………………………………………………………………………..Ward 06<br />
6. Magwetshane…………………………………………………………………………………………………………………………..Ward 06<br />
7. Sangoyana……………………………………………………………………………………………………………………………….Ward 06<br />
8. Bhiliya………………………………………………………………………………………………………………………………………Ward 06<br />
New Pay Points required<br />
1. Sangoyana……………………………………………………………………………………………………………………………….Ward 06<br />
2. Mningi………………………………………………………………………………………………………………………………………Ward 06<br />
3. Donga………………………………………………………………………………………………………………………………………Ward 06<br />
Page 83 of 114
4. Bhiliya……………………………………………………………………………………………………………………………………..Ward 06<br />
K. New Sport field required<br />
1. Endoda (Sport field)……………………………………………………………………………………………………………Ward 06<br />
2. Dwaleni Sport field)…………………………………………………………………………………………………………….Ward 06<br />
L. Education project required<br />
1. Emagxengwini (New crèche required)………………………………………………………………………………..Ward 06<br />
2. Ezwenilethu (New crèche required)…………………………………………………………………………………….Ward 06<br />
3. Care Centre…………………………………………………………………………………………………………………………….Ward 06<br />
M. New Catchments required<br />
1. Mvazane (catchments)……………………………………………………………………………………………………………Ward 06<br />
2. Mpolomba (Catchments)…………………………………………………………………………………………………………Ward 06<br />
3. Mahedla (Catchments)…………………………………………………………………………………………………………….Ward 06<br />
Brides required upgrading<br />
1. Nseleni and Nselenyana (Bridge require upgrading)…………………………………………………………….Ward 06<br />
2. Bhiliya (New Clinic required)…………………………………………………………………………………………………Ward 06<br />
Youth project required<br />
1. Ntuzuma (Youth information centre required)……………………………………………………………………..Ward 06<br />
2. KwaMlondo (Youth information centre required)………………………………………………………………….Ward 06<br />
Roads required upgrading<br />
1 Heatoville to Mabhuka, Fuyeni, Bhiliya ,Sangoyane, Bhuchanana (upgrade required )<br />
Community Hall required<br />
1.Bhiliya Community Hall……………………………………………………………………………………………………………….Ward 06<br />
Page 84 of 114
Ward 7 New projects required<br />
1. Somopho Multi-purpose hall…………………………………………………………………………………………………..Ward 07<br />
2. Pay point………………………………………………………………………………………………………………………………….Ward 07<br />
3. Sewing club……………………………………………………………………………………………………………………………..Ward 07<br />
4. Block making…………………………………………………………………………………………………………………………..Ward 07<br />
5. Factory shoes………………………………………………………………………………………………………………………….Ward 07<br />
6. Fish point…………………………………………………………………………………………………………………………………Ward 07<br />
7. Poultry project…………………………………………………………………………………………………………………………Ward 07<br />
8. Merry go round……………………………………………………………………………………………………………………….Ward 07<br />
Ward 8 New Project required<br />
1. Ntambanana Textile factory (Mabuka)…………………………………………………………………………………..Ward 08<br />
2. Obizo community farm (Obizo)………………………………………………………………………………………………Ward 08<br />
3. Mabuka Poultry project…………………………………………………………………………………………………………..Ward 08<br />
4. Siyaphambili community garden …………………………………………………………………………………………..Ward 08<br />
5. Khanyanjalo sewing project ………………………………………………………………………………………………….Ward 08<br />
6. Ndondwane community garden……………………………………………………………………………………………..Ward 08<br />
7. Mzini community garden…………………………………………………………………………………………………………Ward 08<br />
8. Hlaza community garden ……………………………………………………………………………………………………….Ward 08<br />
9. Nqutshini community garden………………………………………………………………………………………………….Ward 08<br />
10. Obizo community garden ………………………………………………………………………………………………………Ward 08<br />
11. Mqhuzankuzi community garden……………………………………………………………………………………………Ward 08<br />
12. Nigizimu community garden…………………………………………………………………………………………………..Ward 08<br />
13. Community farmers in each sub-ward ………………………………………………………………………………….Ward 08<br />
14. Ndondwane block project……………………………………………………………………………………………………….Ward 08<br />
15. Poultry project (Agriculture project)………………………………………………………………………………………Ward 08<br />
16. Community gardens……………………………………………………………………………………………………………….Ward 08<br />
17. Sibonelo centre youth project (Mquzankuzi)………………………………………………………………………..Ward 08<br />
New Sanitation projects required<br />
1. Obizo…………………………………………………………………………………………………………………………………….Ward 08<br />
2. Mathunzini…………………………………………………………………………………………………………………………...Ward 08<br />
3. Mquzankuzi……………………………………………………………………………………………………………………………Ward 08<br />
4. Ndondwane ………………………………………………………………………………………………………………………….Ward 08<br />
5. Ningizimu………………………………………………………………………………………………………………………………Ward 08<br />
6. Maqedipuleti………………………………………………………………………………………………………………………….Ward 08<br />
7. Hlaza……………………………………………………………………………………………………………………………………..Ward 08<br />
8. Nqutshini……………………………………………………………………………………………………………………………….Ward 08<br />
Page 85 of 114
9. Mzini……………………………………………………………………………………………………………………………………….Ward 08<br />
10. Makholwase…………………………………………………………………………………………………………………………….Ward 08<br />
11. Mabuka …………………………………………………………………………………………………………………………………..Ward 08<br />
N. New Water projects required<br />
1. Obizo ……………………………………………………………………………………………………………………………………Ward 08<br />
2. Ndondweni…………………………………………………………………………………………………………………………… Ward 08<br />
3. Mambuka ………………………………………………………………………………………………………………………………Ward 08<br />
O. New Water project required<br />
1. Obizi (Mission)………………………………………………………………………………………………………………………Ward 08<br />
2. Mathuzini………………………………………………………………………………………………………………………………Ward 08<br />
3. Mquzankuzi…………………………………………………………………………………………………………………………..Ward 08<br />
P. Dipping Tanks Renovations<br />
1. Obizo …………………………………………………………………………………………………………………………………….Ward 08<br />
2. Ondomdwa…………………………………………………………………………………………………………………………….Ward 08<br />
3. Mambuka………………………………………………………………………………………………………………………….…..Ward 08<br />
Q. Sport facilities<br />
1. Merry –go-round……………………………………………………………………………………………………………………..Ward 08<br />
2. Tennis courts……………………………………………………………………………………………………………………………Ward 08<br />
3. Swimming pools………………………………………………………………………………………………………………………Ward 08<br />
4. Sport fields………………………………………………………………………………………………………………………………Ward 08<br />
R.<br />
Priority project<br />
Priority projects for War 01<br />
1. Debe (block making)<br />
2. Mphukanqola (Poultry<br />
3. Mawanda (Poultry project)<br />
Page 86 of 114
4. Ntombokazi sewing centre project<br />
Priority project for Ward 2<br />
1. Container public telephone<br />
2. Markets stores<br />
3. Poultry project<br />
Priority project Ward 3<br />
1. Mobile phone Containers (Qgabhiyeni, Dlomodlomo)<br />
2. Poultry projects (Gqabhiyeni, Dlomodlomo)<br />
3. Market stall (Gqabhiyeni ,dlomodlomo)<br />
Priority project for Ward 4<br />
1. Poultry project<br />
2. Bakery project<br />
3. Sewing project<br />
Priority project for Ward 5<br />
1. Dark city (sewing project)<br />
2. Nselenyama (Block makers)<br />
3. Nsibakazi (Mr phone)<br />
Priority project for Ward 6<br />
1. Sewing projects<br />
2. Gardens project<br />
3. Block Makers<br />
Page 87 of 114
Priority project for Ward 7<br />
1. Midband radio<br />
2. Somopho (poultry project)<br />
3. Ntambanana (Sewing project)<br />
S. Priority Project for Ward 8<br />
1. Isibonelo Sentsha youth project (Poultry and Block project)<br />
2. Mathunzini (Garden)<br />
3. Ningizimu(Community garden)<br />
Page 88 of 114
9. PERFORMANCE MANAGEMENT SYSTEM<br />
A Draft PMS is currently being improved. Herein follows draft 1:<br />
1. INTRODUCTION<br />
1.1 Legal Framework<br />
Our legal mandate as the <strong>municipality</strong> is derived from:<br />
• The Constitution of the Republic of South Africa, Act No106of 1996<br />
• White Paper on Local Government (1998)<br />
• Municipal Demarcation Act No 27 of 1998<br />
Priority Projects 2006/07<br />
Council has prioritized the following projects<br />
Ward 1 Ward 5<br />
(d) Ntombokazi Sewing Centre (a) Nsimbakazi Mr Phones<br />
(e) Maphukanqola Poultry (b) Dark City sewing<br />
(f) Lumbi blockmaking (c) Nselenyana block making<br />
Ward 2 Ward 6<br />
(d) Hawaii pay point (a) Mningi Sewing<br />
(e) Danyini Poultry (b) Mlondo Block making<br />
(f) Esidakeni Poultry (c) Bhiliya Community garden<br />
Ward 3 Ward 7<br />
(d) Bhadaza Market Stalls (a) Ntambinamasi Pension<br />
Pay point<br />
(e) Ogqabhiyeni Poultry (b) Makhwela sewing<br />
(f) Dlomodlomo Phones container (c) Heatonville midband radio<br />
Station<br />
Page 89 of 114
Priority Projects 2006/07<br />
Council has prioritized the following projects<br />
Ward 1 Ward 5<br />
(g) Ntombokazi Sewing Centre (a) Nsimbakazi Mr Phones<br />
(h) Maphukanqola Poultry (b) Dark City sewing<br />
(i) Lumbi blockmaking (c) Nselenyana block making<br />
Ward 2 Ward 6<br />
(g) Hawaii pay point (a) Mningi Sewing<br />
(h) Danyini Poultry (b) Mlondo Block making<br />
(i) Esidakeni Poultry (c) Bhiliya Community garden<br />
Ward 3 Ward 7<br />
(g) Bhadaza Market Stalls (a) Ntambinamasi Pension<br />
Pay point<br />
(h) Ogqabhiyeni Poultry (b) Makhwela sewing<br />
(i) Dlomodlomo Phones container (c) Heatonville midband radio<br />
Station<br />
Ward 4 Ward 8<br />
(d) Nomponjwana Bakery (a) Obizo Community farm<br />
(e) Nomponjwana Sewing (b) Mathunzi Community garden<br />
(f) Nomponjwana Poultry (c) Sibonelo Youth Centre<br />
(Mquzankunzi)<br />
Page 90 of 114
9. PERFORMANCE MANAGEMENT SYSTEM<br />
A Draft PMS is currently being improved. Herein follows draft 1:<br />
1. INTRODUCTION<br />
1.1 Legal Framework<br />
Our legal mandate as the <strong>municipality</strong> is derived from:<br />
• The Constitution of the Republic of South Africa, Act No106of 1996<br />
• White Paper on Local Government (1998)<br />
• Municipal Demarcation Act No 27 of 1998<br />
• Local Government: Municipal Finance Management Act No 56 of 2003<br />
• Disaster Management Act No 57 of 2002<br />
• Municipal Property Rates Act No 6 of 2004<br />
• Traditional Leadership and Governance Framework Act No 41 of 2003<br />
• Local Government: Municipal Structures Act No 117 of 1998<br />
• Local Government: Municipal Systems Act No 32 of 2000<br />
The <strong>municipality</strong>, as a <strong>local</strong> sphere of government has the constitutional mandate to:<br />
• Provide democratic and accountable government for <strong>local</strong> communities<br />
• Ensure the provision of services to communities in a sustainable manner<br />
• Promote social and economic development<br />
• Promote a safe and healthy environment; and<br />
• Encourage the involvement of communities and community organizations in the matters of<br />
<strong>local</strong> government<br />
In fostering developmental <strong>local</strong> government, Chapter 5 of the Municipal Systems Act 42 of 2000<br />
stipulates that each <strong>municipality</strong> must prepare and adopts an Integrated <strong>Development</strong> Plan (IDP)<br />
for its area of jurisdiction. Integrated development planning is done in line with the municipal<br />
boundaries as per Local Government Municipal Demarcation Act 27 of 1998. Minimum<br />
requirements of the IDP must include but not limited to the following:<br />
• Municipal council's vision for long- term development, with special emphasis on the<br />
<strong>municipality</strong>’s most critical development and internal transformation needs.<br />
• An assessment of the existing level of development in the <strong>municipality</strong>, including<br />
identification of communities who do not have access to basic services.<br />
• Priorities and objectives for the term of office of the council, including <strong>local</strong> economic<br />
development strategies.<br />
• <strong>Development</strong> strategies aligned with national, provincial and basic principles of planning<br />
requirements.<br />
• Spatial <strong>Development</strong> Framework which must include the provision of basic guidelines for<br />
the land use management system<br />
• Disaster Management Plan<br />
• Financial Plan which must include budget projections for at least three years<br />
• Waste Management Plan<br />
• Water Service <strong>Development</strong> Plan<br />
Page 91 of 114
• Key Performance indicators (KPI) and performance targets determined in terms of Section<br />
41 of the Municipal Systems Act<br />
Section 34 of the Municipal Systems Act and the Municipal <strong>Planning</strong> and Performance<br />
Management Regulations (2001), stipulates that a municipal council-<br />
a) Must review its integrated development plan: -<br />
i. Annually in accordance with an assessment of its performance<br />
Measurements in terms of Section 4 1; and<br />
ii. To the extent that changing circumstances so demand; and<br />
b) may amend its IDP in accordance with a prescribed process<br />
During its annual review, each <strong>municipality</strong> must review:<br />
• The needs of the community<br />
• Its priorities in meeting those needs<br />
• Its processes for involving the community<br />
• Its organizational and delivery mechanisms for meeting the community needs; and<br />
• Its overall performance in achieving the set objectives<br />
SUMMARY OF KEY DEVELOPMENT PRIORITIES<br />
• Poverty alleviation and job creation<br />
• Building capacity and Skills development<br />
• Sustainable economic growth and development<br />
• Safe and healthy environment (safety and security)<br />
• Provision of Physical infrastructure and services<br />
• Institutional and corporate development of the <strong>municipality</strong><br />
• Spatial integration and sustainable development<br />
• Addressing the impact of HIV/AIDS<br />
• Provision of Social facilities and services<br />
• Viable and Financially sustainable Municipality<br />
In assessing the municipal performance, the above challenges have been addressed in line with<br />
the Five National Key Performance Areas (KPA):<br />
• Social-economic development (including environment)<br />
• Institutional transformation<br />
• Infrastructure services<br />
• Democracy and governance<br />
• Financial management<br />
Social <strong>Development</strong><br />
• Addressing the impact of HIV/AIDS<br />
• Providing a safe and healthy environment<br />
• Provision of social services and facilities<br />
Economic <strong>Development</strong><br />
• Poverty alleviation and job creation<br />
Page 92 of 114
• Local Economic <strong>Development</strong> Programme<br />
Environmental <strong>Development</strong><br />
• Spatial integration and sustainability)<br />
Infrastructure and Services<br />
• Provision of infrastructure, namely Water and Sanitation, Electricity, Regional Waste<br />
Management and Cemetery/ Crematoria/ District Roads and Storm Water Drainage Public<br />
Works Programme/ Sports and Recreation facilities/ Services provision to housing projects<br />
Institutional Transformation<br />
• Institutional and corporate development of the <strong>municipality</strong><br />
• Building capacity and Skills <strong>Development</strong><br />
Democracy and Governance<br />
• Integrated <strong>Development</strong> <strong>Planning</strong><br />
• Performance Management System<br />
Financial Management<br />
• Viability and Financial sustainability of the Municipality<br />
Page 93 of 114
PERFORMANCE MANAGEMENT SYSTEM (PMS)<br />
OUR VISION<br />
To improve the general quality of life by providing basic services and to create a safe<br />
environment and job opportunities available to the people of Ntambanana through <strong>local</strong><br />
economic development for Ntambanana Municipality.<br />
T. OUR MISSION<br />
We are determined to ensure both short and long term growth of the community by ensuring<br />
good governance in all aspects of service delivery whilst being aware of the needs of the<br />
community and treating each member of the community with respect.<br />
OUR VALUES<br />
The values underpinning the delivery of our mandate are as follows:<br />
• Good Governance<br />
• Respect<br />
• Service excellence<br />
• Openness<br />
• Transparency<br />
Ntambanana PMS Model<br />
The Municipality has recently appointed the services of a management consultant to assist in the<br />
development and implementation of a Performance Management System. The first draft for<br />
2005/6 financial years will be incorporated into the IDP review for 2006/07 to be tabled at the<br />
EXCO meeting for adoption by the Council.<br />
The model followed is in line with the provisions of Municipal Systems Act and was informed by<br />
the guidelines provided by the Department of Traditional and Local Government Affairs (DPLGA).<br />
A workshop was conducted to familiarise Section 57 employee (Municipal Manager and the Heads<br />
of Department).<br />
The model is aligned to the 5 National Key Performance Areas (KPA) as advised by the DTLGA.<br />
The Municipality has added the sixth <strong>local</strong> KPA: Behavioral KPA …to focus on instilling an<br />
appropriate behaviour aimed at ensuring effective delivery of services by the <strong>municipality</strong>.<br />
PMS Audit Committee has been appointed and is aligned to the Finance Audit Committee. The<br />
Municipality approach to Performance Management System implementation is gradual<br />
…introducing it firstly to the Section 57 Employees, getting them to internalise the system and<br />
Page 94 of 114
thereafter cascading it down to all employees once the required buy-in has been secured with all<br />
stakeholders within the Municipality. This is to ensure that there is stability and sustainability<br />
within the Municipality …PMS becomes an integral part in the execution of the Municipal mandate.<br />
The rollout in terms of conducting workshop to all employees will be conducted before the end of<br />
the financial year so that in 2006/7 financial year the cascade process will be introduced in terms<br />
of Section 38 of the Municipal Systems Act.<br />
Through the process of PMS, the challenges outlined above were clustered in line with the 5<br />
National Key Performance Areas and the sixth <strong>local</strong> KPA: Behavioral KPA:<br />
• Infrastructure and Services<br />
• Social-economic development<br />
• Environmental <strong>Development</strong><br />
• Institutional transformation<br />
• Democracy and governance<br />
• Financial Management<br />
• Behavioural Competencies<br />
SUMMARY OF PERFORMANCE PER KEY PERFORMANCE AREA<br />
Key Performance Area<br />
1. Social an Economic<br />
<strong>Development</strong><br />
Achievements<br />
U. 1. Industrial hub<br />
The establishment of an industrial hub is being<br />
pursued. R3.m funding has been secured to<br />
acquire private land – 8km from the current<br />
offices. The consultants will be tasked with the<br />
valuation of land and doing feasibility studies.<br />
The plan is to ensure that the first installment<br />
the acquisition of land is completed by the end<br />
of June 2006.<br />
V. 2. Poverty Alleviation<br />
61 co-operatives have been formed with 48<br />
focusing in agriculture and 13 in other sectors<br />
like block-making, sewing etc. There were ~<br />
close to 610 people who were self employed as a<br />
result of this initiative…a lot of them benefiting<br />
women and the youth. The Jabulani Centre for<br />
the disabled will benefit from the Partnership<br />
between the Municipality, Ticor and Mondi in<br />
creating job opportunities in the centre. There<br />
are currently 50 people who are resident at this<br />
centre. The project is due for implementation in<br />
January 2006.<br />
2. Finance W. 1. Appointment of Audit Committee<br />
The Audit committee has been appointed in the<br />
month of November 2005. The committee will<br />
assist in reducing the number of queries and<br />
Page 95 of 114
ensuring compliance with MFMA, GAMAP and<br />
other municipal internal control procedures.<br />
2. Financial Policy Review<br />
A consultant has been contracted to review all<br />
financial policies and ensure compliance with<br />
MFMA. The exercise is expected to be completed<br />
by the 31 January 2005.<br />
3. Governance 1. Corporate Governance<br />
Capacity building programmes have been<br />
conducted for Staff and Councillors on MFMA and<br />
GAMAP.<br />
2. Quality Improvement in Meetings<br />
Ongoing emphasis on the attendance of meeting<br />
and improving effectiveness of meeting; forming<br />
quorums has been favorable over the last six<br />
months.<br />
4.Institutional<br />
<strong>Development</strong><br />
1. Review of policies and procedures<br />
Corporate services department has secured the<br />
services of a consultant to review policies and<br />
procedures. The exercise will be complete by the<br />
end of June 2006.<br />
2. Develop and implement PMS<br />
Corporate services department has secured the<br />
services of a consultant to develop and<br />
implement Performance Management System for<br />
the Municipality. The exercise will be completed<br />
by the 30 June 2006.<br />
3. Strategic <strong>Planning</strong> Session<br />
The session was held and a number of initiatives<br />
were identified, amongst others, the Skills<br />
<strong>Development</strong> for the Municipality. This exercise<br />
will be critical for developing individuals through<br />
training and development interventions aimed at<br />
capacitating them to better deliver the services.<br />
Page 96 of 114
5. Infrastructure and<br />
services<br />
1. Solid Waste<br />
A consultant has been appointed to implement<br />
solid waste management. Site identification has<br />
also been completed …awaiting Eskom to clear<br />
the site before commissioning.<br />
2. Cemetery<br />
Site has been identified, however the<br />
Department of Health wants to build a health<br />
centre in the vicinity…an impact assessment will<br />
be conducted and the final decision expected by<br />
the end of June 2006.<br />
3. Sports field Upgrade<br />
The Dept of Sports and recreation have<br />
committed an amount of R1.5m to the upgrade<br />
of a soccer field.<br />
4. Community reserve<br />
This is in progress …final decision with regard to<br />
ownership expected within the next six months.<br />
5.Disaster management<br />
The disaster management strategy is about to<br />
be started and will be completed by the end of<br />
April 2006.<br />
Page 97 of 114
MUNICIPAL SCORECARD: 2005/2006 TARGETS<br />
Ntambanana Municipal Scorecard will be submitted for adoption by EXCO on the 30 th of November<br />
2005. The Municipal scorecard is seen as a management tool that will assist the <strong>municipality</strong> to<br />
track its performance and take corrective actions timeously. The Audit Committee will use the<br />
Municipal Scorecard as a basis for performance measurement and investigation where<br />
appropriate.<br />
Public participation will be encouraged in setting municipal targets to ensure participation during<br />
the review of performance. Different communications channels will be used to involve the public<br />
at different levels e.g. ward committee meetings, IDP Forum workshops and road shows targeting<br />
all 4 tribal authorities under the Municipality. Measurement will focus on issues relating to service<br />
delivery per KPA. The table below outlines the municipal targets with key performance indicators<br />
(KPI) per development objective based on priority issues.<br />
1. Social and Economic <strong>Development</strong> KPA<br />
Key Objectives<br />
Key Performance<br />
Indicator<br />
Performance Target for<br />
2005/2006 Responsibil<br />
ity<br />
1. LOCAL ECONOMIC<br />
DEVELOPMENT<br />
Municipal<br />
Manager<br />
• Ensuring that the<br />
Industrial hub is<br />
established<br />
• To ensure land<br />
processes towards<br />
establishment of<br />
Industrial hub is<br />
undertaken.<br />
o Valuation of land<br />
o Land Audit<br />
o Feasibility Study<br />
First installment towards the<br />
acquisition of land paid by June<br />
2006<br />
o Valuation certificate<br />
o Spatial <strong>Development</strong> Framework<br />
Tourism Awareness campaign by<br />
May 2006<br />
• To create<br />
awareness of the<br />
are as a tourism<br />
destination<br />
• To coordinate<br />
and implement<br />
programmes on<br />
poverty<br />
alleviation<br />
• Tourism awareness<br />
= R20k<br />
• Promotion of Arts &<br />
Culture = R50k<br />
• Promotion of Sports<br />
=R50K<br />
Promotion of Ward<br />
Committees<br />
Cultural activity – Zulu Dance<br />
Kwanaloga Games<br />
No of Meetings = 4 per year<br />
Youth awareness on voter education<br />
– March 2006<br />
Page 98 of 114
Promotion of Youth<br />
Activities<br />
80% of the registered Co-ops<br />
operational by 30 June 2006 per<br />
category.<br />
2. POVERTY<br />
ALLEVIATION<br />
• To coordinate<br />
and implement<br />
programmes on<br />
poverty<br />
alleviation<br />
o<br />
o<br />
Number of Co-ops<br />
registered through<br />
IDP led projects<br />
480 jobs - self<br />
employed people –<br />
10 per cooperative in<br />
agriculture<br />
o 130 jobs created –<br />
self-employed youth<br />
in other nonagricultural<br />
sectors –<br />
sewing, block<br />
making etc.<br />
o<br />
20 jobs created at<br />
Jabulani Centre for<br />
the disabled people<br />
January 2006 – Partnership with<br />
Ticor, Mondi and the Municipality.<br />
28 Feb 2005<br />
28 Feb 2005<br />
3. CRIME<br />
PREVENTION<br />
• To reduce crime<br />
level in the area<br />
4. HIV/AIDS<br />
INTERVENTION<br />
• To reduce the<br />
HIV/AIDS<br />
infection in the<br />
area<br />
o<br />
o<br />
To establish<br />
Community Policing<br />
Forums<br />
To establish an<br />
Aids/HIV desk within<br />
the Municipality<br />
Page 99 of 114
2. FINANCIAL KPA<br />
Key Objectives Key Performance<br />
Indicator<br />
1. To ensure<br />
effective financial<br />
and revenue<br />
management<br />
1. % Variance against<br />
municipal budget<br />
2. Quarterly<br />
3. Compliance with the<br />
MFMA<br />
4. Ensure variance of Plan<br />
versus Actual
3. GOVERNANCE KPA<br />
Key Objectives Key Performance<br />
Indicator<br />
1. To improve public No of IDP Road shows<br />
participation in 06/07 budget<br />
Municipal<br />
Processes<br />
Performance Target<br />
for 2005/2006<br />
4 x road shows per<br />
tribal authority<br />
Responsibility<br />
Corporate<br />
Services<br />
Manager<br />
2. To establish the<br />
Batho Pele<br />
Customer service<br />
principles<br />
3. To ensure<br />
corporate<br />
governance of the<br />
<strong>municipality</strong><br />
4. To improve<br />
function of ALL<br />
committees<br />
<strong>Development</strong><br />
of<br />
Customer Service Index<br />
Workshop on Batho Pele<br />
Develop Questionnaire<br />
Level of function of the<br />
audit committee<br />
Number of meeting<br />
Attendance at meetings<br />
–minimum to form a<br />
quorum<br />
Exco<br />
Manco<br />
Portfolio Committees<br />
CSI questionnaire<br />
March 2006<br />
100% functionality by<br />
the end of June 2006.<br />
Achieve minimum in<br />
80% of the meetings<br />
Minimum of 5 attending<br />
80% of the meetings<br />
Page 101 of 114
4. INSTITUTIONAL DEVELOPMENT KPA<br />
Key Objectives<br />
• To ensure<br />
proper<br />
management<br />
and utilisation<br />
of staff within<br />
the Dept so<br />
that they are<br />
able to meet<br />
their objectives<br />
Key Performance<br />
Indicator<br />
• Compliance with all<br />
HR policies and<br />
procedures<br />
• Ensure performance<br />
from all staff in the<br />
Department<br />
Performance Target for<br />
2005/2006<br />
• On going staff training<br />
• Attendance Reg.<br />
• Compliance with code<br />
of conduct<br />
Responsibility<br />
•<br />
• Implementation<br />
of Dept’s skills<br />
development<br />
plan so that<br />
each staff<br />
member has an<br />
active and<br />
updated<br />
training plan<br />
• To implement<br />
Performance<br />
Management in<br />
the Municipality<br />
• Achievement of<br />
Dept’s Skills<br />
<strong>Development</strong> Plan<br />
• Updated Training<br />
plan for the<br />
Department<br />
• Regular capacity<br />
building to all staff<br />
• Internal skills audit<br />
and skills<br />
• All staff members<br />
trained in PMS<br />
• Regular performance<br />
feedback meetings<br />
• Interdepartmental<br />
information sharing<br />
• To create an<br />
enabling<br />
environment<br />
for staff to<br />
perform at<br />
their best at all<br />
times.<br />
• Workshops on PMS<br />
• Monitoring of<br />
performance of<br />
consultants<br />
according to agreed<br />
performance<br />
milestones<br />
• Adherence to PMS<br />
processes<br />
• Performance of<br />
consultants as per<br />
agreed milestones<br />
• Written progress<br />
report before payment<br />
is effected<br />
• Submission/quarterly<br />
performance report<br />
• Reduce absenteeism<br />
by 10% -Jun ’06<br />
• Reduce staff turnover<br />
by 10% - June ’06<br />
Page 102 of 114
• To ensure<br />
coordinated<br />
municipal<br />
planning<br />
• Level of absenteeism<br />
• Staff Turnover<br />
• Submission of Plans<br />
as per agreed<br />
timetable<br />
o IDP, PMS,<br />
BUDGET<br />
• Participation in IDP<br />
Plans, PMS and<br />
Budget<br />
Page 103 of 114
5. INFRASTRUCTURE KPA<br />
Key Objectives<br />
1. To provide basic<br />
infrastructure and<br />
service<br />
• Free basic<br />
electricity<br />
• Alternative<br />
energy<br />
• Cemetery<br />
2. To ensure water<br />
and sanitation is<br />
provided to the<br />
Community.<br />
Key Performance<br />
Indicator<br />
• To ensure that shared<br />
services towards<br />
establishment of solid<br />
waste are followed<br />
• No of Households<br />
• No of Households<br />
• Site identification<br />
• No of Households<br />
Performance Target<br />
for 2005/2006<br />
Completed by June<br />
2006<br />
>100 households<br />
>4000 households<br />
Processes to secure<br />
land completed by<br />
June 2006<br />
DC Function<br />
Responsibility<br />
3. To reduce the<br />
impact of disaster<br />
within the<br />
Municipality<br />
• Disaster management<br />
strategy formulated<br />
April 2006<br />
Page 104 of 114
6. BEHAVIOURAL KPA<br />
Key Performance<br />
Key Objectives<br />
Indicator<br />
To ensure effective<br />
and acceptable<br />
behaviour within<br />
the organization.<br />
1. To develop<br />
municipal<br />
competencies<br />
underpinning<br />
service delivery.<br />
2. Customer service<br />
questionnaires.<br />
3. 360 Assessment:<br />
Internal<br />
• Teamwork<br />
• Decisiveness<br />
• Focus<br />
• Understanding<br />
customers<br />
• Time management<br />
• Etc<br />
Performance<br />
Target for<br />
2005/2006<br />
June 2006<br />
June 2006<br />
June 2006<br />
Responsibility<br />
Corporate<br />
Services<br />
Manager<br />
Page 105 of 114
10. FINANCIAL MANAGEMENT PLANS – 3 YEAR PROJECTIONS<br />
PREVIOUS 2005/6<br />
10. (i)<br />
Vote No.<br />
Description<br />
NTAMBANANA MUNICIPALITY<br />
INCOME<br />
Budget<br />
2004/05<br />
Budget<br />
2005/06<br />
GRANTS AND SUBSIDIES<br />
111 National Treasury-LG Financial Management Grant 250,000 250,000<br />
115 LED projects 0 0<br />
127 DTLG – Financial Structure 0 0<br />
134 DTLG – Capacity Support 320,000 0<br />
136 DBSA 450,000 200,000<br />
147 DTLGA 0 700,000<br />
148 Projects: Dept. of Public Works 0 0<br />
150 Equitable share 6,157,000 8,209,000<br />
163 Municipal System improvement 0 734,000<br />
165 Project Anti-Corruption Consolidate 0 134,500<br />
7,177,000 10,227,500<br />
SALARIES REIMBURSEMENTS<br />
154 Government – Ex R 293 0 0<br />
500 IEC 0 0<br />
501 Housing Department 0 0<br />
502 Salary Reimbursement – Other 0 0<br />
0 0<br />
OPERATIONAL INCOME<br />
190 Discount Received 0 200<br />
191 Penalties – Rate 0 0<br />
192 Telephone Costs Recovered 0 1,500<br />
194 Rent – Internal 22,800 17,780<br />
195 Rent – External 21,600 27,850<br />
197 Miscellaneous / Sundry Income 0 50,000<br />
199 Rent 0 0<br />
200 Tender monies 600 4,800<br />
45,000 102,130<br />
INTEREST<br />
200 -Current & General 165,363 270,000<br />
201 -Investments 1,554,099 338,000<br />
202 -Late Payment 0 0<br />
203 -Loans: External 0 0<br />
204 -Loans: Internal 0 0<br />
1,719,462 608,000<br />
Page 106 of 114
TOTAL INCOME 8,941,462 10,937,630<br />
10. (ii) EXPENDITURE<br />
EXPENDITURE<br />
Salaries, Wages & allowances 4,013,896 3,422,348<br />
Council Remuneration 897,941 826,463<br />
General Expenses 3,320,644 2,453,761<br />
Repairs & Maintenance 258,750 222,580<br />
Contributions 198,255 188,305<br />
Contributions to Capital Outlay 20,000 15,000<br />
8,709,486 7,128,457<br />
LED & IDP Projects<br />
LED Projects 124,144 918,185<br />
IDP Projects 2,104,000 2,118,000<br />
Total LED & IDP Projects 2,228,144 3,036,185<br />
Total Expenditure 10,937,630 10,164,642<br />
Surplus/(Deficit) -0 -0<br />
Page 107 of 114
11. MUNICIPAL BUDGET 2006 / 07<br />
REFER to Annexure E.14.4<br />
Page 108 of 114
11.1 ASSESS LEVEL OF ALIGNMENT WITH IDP PRIORITIES<br />
Refer to Annexure E.14. 4<br />
Page 109 of 114
12. IMPLEMENTATION PLAN<br />
1. January –June 2006<br />
Implement Balance of Process Plan including:<br />
- Any presentation to the Province<br />
- Compilation of Business Plans for specific IDP prioritized projects<br />
- Liaison with individual provincial and national departments<br />
- Liaison with private funders<br />
- <strong>Development</strong> of <strong>local</strong> Sector Plans and Sector Stakeholder Forums<br />
- Formation of Local Sector Stakeholder Forums in order to boost public participation.<br />
- Public Consultations in the Amakhosi Traditional areas<br />
- Implement PMS<br />
- Finalise 2006/07 Budget, aligned with the IDP<br />
- Finalise three year Financial Management Plan, aligned with Budget and IDP<br />
July 2006-June 2007<br />
-Implement all projects identified and prioritized with the current IDP Review.<br />
-Engage in 2007/2008 IDP process<br />
-Implement PMS<br />
Page 110 of 114
13. COMPLIANCE WITH MINISTERIAL / <strong>KZN</strong> PROVINCIAL IDP FORUM COMMENTS 2005<br />
/ 2006 REVIEW<br />
Provincial comments were issued on 13 June 2005 and were received by Ntambanana Local<br />
Municipality on 21 July, 2005<br />
Page 111 of 114
COMMENT<br />
2.1 No Process Plan was submitted<br />
2.2 Alignment with Sector Department<br />
-IDP Component<br />
- Water Sector Plan<br />
- Disaster Management Plan<br />
- Transportation Plan<br />
- Housing Plan and Gender Equity Plan<br />
- Spatial <strong>Development</strong> Strategies<br />
- PMS<br />
- Capacity Building<br />
- <strong>Development</strong> Projects<br />
- MTEF<br />
- Public Participation<br />
- Content, Quality and structure<br />
- Traditional Leadership<br />
- Engage with Service Providers<br />
- 1 March 2006 Local Government<br />
elections<br />
COMPLIANCE<br />
Process Plan is attached in this Draft<br />
Several meetings were held .Due to the<br />
difficulty of meeting with provincial sector<br />
department, Municipality plans one-on-one<br />
meeting between January & June 2006<br />
Catered for in the new Organogram<br />
DC has completed one<br />
DC<br />
DC has completed one, with <strong>local</strong> implications<br />
In process. Funds are being sought for this<br />
function<br />
In process. Funds are being sought<br />
A draft PMS is a component of this Draft<br />
Workshops for staff are being held.<br />
This has been pruned to only those with specific<br />
funding<br />
To be included in the final IDP Review, as<br />
budgeting process is still being worked out<br />
Read Process Report. More is envisaged for<br />
January – June 2006, when inter alia Business<br />
Plans are drawn and Sector stakeholder Forums<br />
will be formed.<br />
This is now in tabular form so as to compact<br />
information.<br />
Are participating, see the process report<br />
Municipality is planning one-on-one meeting<br />
between January 2006 and June 2006<br />
The Municipality is taking cognizance of this,<br />
which is why Draft has been approved in<br />
December, 2005, before the holiday period,<br />
which often sets tone for heightened spirits<br />
before elections .As this is work in the Process<br />
the Municipality will continue to work on the<br />
IDP especially incorporating Business Plan and<br />
Interacting with Service Providers the result of<br />
which mist be incorporated.<br />
Page 112 of 114
13. ANNEXURES<br />
E.14.1 Land Use Management System<br />
E.14.2 Working Draft Report of the Ntambanana SDF Plan<br />
E.14.3 Ntambanana SDF Progress Report<br />
E.14.4 Medium Term Budget: 2006/07 – 2008/09<br />
E.14.5 Municipal LED and Revenue Generation Programme of Action: Project Consolidate<br />
E.14.6 Organogram of the Municipality<br />
Page 113 of 114
14. REFERENCES<br />
Constitution of the Republic of South Africa, Act 108, 1996<br />
<strong>Development</strong> Facilitation Act, No, 67, 1995<br />
Guidelines on IDP Review, DLGTA, 2002<br />
Local Government, Municipal Systems Act, No. 32 2000<br />
Local Government Municipal Structures Act<br />
Municipal Finance Management Act<br />
Municipal Property Rates Act<br />
Municipal Demarcation Act<br />
Various Sector Plans Drafted by Uthungulu as Quoted or referred<br />
Legislations, Policies, guidelines related to development planning as per Annexure A<br />
Page 114 of 114