������ ����������<br />

“Required<br />

some careful<br />

maneuvering”<br />

Creating Connection<br />

Teamwork<br />

<strong>Mammoet</strong> Deutschland was commissioned<br />

to install a pipe bridge across the harbor<br />

entrance at HKM in Duisburg. The bridge<br />

weighed 290 tons and had a length of 120<br />

meters and a height and width of 5.5<br />

meters.<br />

The bridge was assembled on the quay<br />

and then lifted up by BTS sheerleg the<br />

“Amsterdam” and cranebarge the “Ibis”,<br />

turned around and placed on its supports.<br />

This was quite a challenge as the clearance<br />

to existing plant on site was quite small<br />

and as BTS’ equipment had little space to<br />

work in. However, the preparations paid<br />

off and the work went exactly as planned.<br />

LOCATION: DUISBURG, GERMANY<br />

JOB: INSTALLING A PIPE BRIDGE<br />

CHALLENGE: RESTRICTED SPACE<br />

BTS installed a new bridge across the<br />

lock at Terneuzen. This lock connects<br />

the inland waterways to the sea. At the<br />

building yard the bridge (approx. 61 by<br />

18 meters, 472 tons) was loaded onto the<br />

BTS “Krammer” barge by two sheerlegs.<br />

The bridge was then transported to<br />

Terneuzen where it was installed by<br />

the “Amsterdam” and “Ajax” sheerlegs.<br />

The installation required some careful<br />

manoeuvering by the crew as the lock<br />

chamber was quite narrow and provided<br />

little width for the sheerlegs to operate in.<br />

Impressive Lock Doors<br />

BTS was commissioned to replace two vertically moving doors and two ship<br />

impact resisting structures of the Bernhardsluis navigation lock at Tiel. The<br />

scope included transporting the components from the fabricator’s yard to the<br />

site and installing them. The 235 ton lock doors were quite impressive, with a<br />

length of 25 meters, a height of 17 meters and a thickness of 3 meters.<br />

The impact structures had the same dimensions and weighed 150 tons each.<br />

Installing the outer lock door was a fairly straightforward job for the BTS<br />

sheerlegs “Amsterdam” as there was enough space to operate in. However,<br />

to install the inner door the “Amsterdam’ had to work from within the lock<br />

chamber as there were road and rail bridges on the other side of the lock.<br />

BTS completed all the work according to schedule and the customer was very<br />

satisfied.<br />

LOCATION: TIEL, THE NETHERLANDS<br />

JOB: REPLACING NAVIGATION LOCK<br />

COMPONENTS<br />

CHALLENGE: RESTRICTED SPACE<br />

Marine<br />

LOCATION: TERNEUZEN,<br />

THE NETHERLANDS<br />

JOB: INSTALLING A BRIDGE<br />

CHALLENGE: RESTRICTED SPACE<br />

IN THE LOCK