Skidding 5% Downhill<br />

A Chinese yard had to move a<br />

Floating Production Storage and<br />

Offloading module (FPSO) across<br />

its slipway and appointed <strong>Mammoet</strong><br />

Singapore as the skidding contractor.<br />

What was special about this project<br />

was that the slipway had a downwards<br />

slope of 5%. Hence it was a<br />

real challenge to control the movement<br />

of the 5,200 ton module.<br />

Basically, we had to make sure that<br />

the module did not slide down the<br />

incline uncontrollably. After some<br />

careful experiments and adjustments<br />

to the push-pull units<br />

the multinational <strong>Mammoet</strong> crew<br />

developed an effective procedure.<br />

Even so, they could only move the<br />

module at half the normal speed.<br />

Return to Caspian Sea<br />

“ It was a real<br />

challenge to<br />

control the<br />

movement of the<br />

5,200 ton module”<br />

After the cold winter, <strong>Mammoet</strong> returned to the Caspian Sea. As the equipment<br />

<strong>Mammoet</strong> had left on site had been specially treated for winter storage, <strong>Mammoet</strong> first<br />

had to prepare it for use.<br />

The first lift was of a module with a weight of 3,480 tons. Moving the module between<br />

the piles (which we had installed before winter), connecting it to the strand jacks and<br />

raising it up took thirteen hours. This was the fifth of a series of fourteen modules which<br />

<strong>Mammoet</strong> will be installing.<br />

<strong>Mammoet</strong> used their special containerized strand jacks for this project. Each unit<br />

consists of two containers, one with two strand jacks and the power pack, and one<br />

with drums for the wire rope. These containers are placed on the piles and then pull the<br />

modules up and hold them in position while they are welded to the piles.<br />

Offshore<br />

LOCATION: NANTONG, JIANGSU, CHINA<br />

JOB: SKIDDING A FPSO<br />

CHALLENGE: GOING DOWN AN INCLINE<br />

“ Special<br />

containerized<br />

strand jacks for<br />

this project”<br />

LOCATION: CASPIAN SEA,<br />

KAZAKHSTAN<br />

JOB: INSTALLING OFFSHORE MODULES<br />

CHALLENGE: DIFFICULT ENVIRONMENT