13.11.2012 Views

Download - Mammoet BV

Download - Mammoet BV

Download - Mammoet BV

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Offshore<br />

28 29<br />

“Manoeuvering a<br />

huge drilling rig in<br />

confi ned quarters”<br />

Drilling Rig Turned Round<br />

In 2008 <strong>Mammoet</strong> USA started the roll-on<br />

operation of the 8,000 ton Tarzan 4 offshore<br />

drilling rig in Orange, Texas, USA. <strong>Mammoet</strong><br />

used 226 lines of SPMTs and 56 lines of<br />

Goldhofers.<br />

The rig was supported on stands which<br />

had to be removed as each trailer row was<br />

positioned underneath the rig. Once all the<br />

trailers had been positioned, the rig was<br />

driven to a less congested part of the client’s<br />

yard where it was turned 180 degrees so<br />

that it could be rolled onto the barge. The<br />

rig was then manoeuvered around existing<br />

structures, while simultaneously dealing<br />

with areas of poor ground preparation.<br />

The roll-on took approximately eight hours<br />

until the rig was set down on the barge.<br />

LOCATION: ORANGE, TEXAS, USA<br />

JOB: ROTATION AND ROLL-ON OF A RIG<br />

CHALLENGE: CONGESTED SITE,<br />

POOR GROUND

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!