ups and mega load-outs<br />
Angel Platform assembly and jack-up<br />
The platform was constructed at 5.5 meters<br />
above ground level and about 170 meters<br />
from the quayside. <strong>Mammoet</strong>’s challenge<br />
was to bring the deck to the quayside and<br />
place it on top of a 22.5 meter high load-out<br />
frame. As the deck was not suitable for lift ing<br />
by cranes we had to skid it and jack it up.<br />
Jurong<br />
“14,000 tons”<br />
As the assembly method was only decided<br />
on at a late stage <strong>Mammoet</strong> had to move the<br />
deck in a number of operations in almost<br />
every direction: up, down, north, east and<br />
west. This was where there flexibility of our<br />
skidding and jack-up system really paid<br />
off. <strong>Mammoet</strong> also provided cranes and<br />
trailers for all other heavy lifting and transport<br />
operations for this project.<br />
SuTuVang<br />
“ All three<br />
projects went<br />
extremely<br />
smoothly”<br />
Offshore