ups and mega load-outs<br />

Angel Platform assembly and jack-up<br />

The platform was constructed at 5.5 meters<br />

above ground level and about 170 meters<br />

from the quayside. <strong>Mammoet</strong>’s challenge<br />

was to bring the deck to the quayside and<br />

place it on top of a 22.5 meter high load-out<br />

frame. As the deck was not suitable for lift ing<br />

by cranes we had to skid it and jack it up.<br />

Jurong<br />

“14,000 tons”<br />

As the assembly method was only decided<br />

on at a late stage <strong>Mammoet</strong> had to move the<br />

deck in a number of operations in almost<br />

every direction: up, down, north, east and<br />

west. This was where there flexibility of our<br />

skidding and jack-up system really paid<br />

off. <strong>Mammoet</strong> also provided cranes and<br />

trailers for all other heavy lifting and transport<br />

operations for this project.<br />

SuTuVang<br />

“ All three<br />

projects went<br />

extremely<br />

smoothly”<br />