Power<br />

16 17<br />

Power Plant Neurath<br />

<strong>Mammoet</strong> was awarded a contract to supply<br />

a PTC-DS for the construction of a<br />

power station in Neurath, Germany, with<br />

two blocks of 1,100 MW capacity each.<br />

Because of the height of the structures,<br />

<strong>Mammoet</strong> had to modify the PTC-DS specially<br />

for this project and test it on site. It<br />

was rigged with a 134.6 meter main boom<br />

and 69.3 meter jib, for a capacity of 1,600<br />

tons and 33,705 ton-meters. The crane<br />

itself weighed 1,500 tons and was fitted<br />

with 1,500 tons of counterweight. The PTC<br />

had an overall height of 207.7 meters.<br />

Bruce “A” Restart Project<br />

<strong>Mammoet</strong> Canada Eastern was contracted<br />

to provide a ring crane (PTC), smaller<br />

cranes, site transportation and offloading<br />

services for the replacement of sixteen<br />

steam generators in a nuclear power<br />

station. The scale of the project, safety<br />

standards, numerous site contractors and<br />

unpredictable weather conditions meant<br />

that extensive coordination was required.<br />

The heaviest lifts were the steam drums<br />

located directly above the steam generators.<br />

These drums, weighing over 400 tons each.<br />

It took 110 shipping containers to deliver<br />

the PTC to the site.<br />

<strong>Mammoet</strong> had only planned to move the<br />

PTC once between the two blocks of the<br />

power station. However, a problem which<br />

affected one of the blocks meant that<br />

<strong>Mammoet</strong> actually had to move the crane<br />

twice. It had a transport weight of 2,080<br />

tons and was moved using 100 lines of<br />

SPMTs.<br />

Definitely a challenging, large-scale<br />

<strong>Mammoet</strong> job!<br />

The tight clearances within the facility<br />

made it quite exciting to bystanders. The<br />

plant, which is subject to snowstorms and<br />

high winds, required a modified load chart<br />

for the PTC.<br />

LOCATION: TIVERTON, ONTARIO, CANADA<br />

JOB: REPLACING SIXTEEN STEAM<br />

GENERATORS<br />

CHALLENGE: COORDINATION<br />

LOCATION: NEURATH, GERMANY<br />

JOB: BUILDING A POWER STATION<br />

CHALLENGE: PTC-DS MODIFICATION