(b) We intend to diversify our income base<br />

While we will continue to remain focused on our M&E services to the residential sector, we<br />

intend to diversify our income base to include other sectors. Currently, approximately 98% of<br />

our turnover is derived from the residential property sector. We intend to expand our operations<br />

into commercial, industrial and institutional building sectors. For example, in March and June<br />

2000, we secured two contracts for the provision of M&E services for two educational institutions.<br />

We also intend to provide M&E services to the light-flatted industries. As at the date of this<br />

Prospectus, we have been awarded one such project for the supply and installation of plumbing<br />

& sanitary and electrical systems to an industrial building at Jalan Kilang Barat with a contract<br />

value of approximately $1.3 million.<br />

(c) We intend to expand our scope of M&E services<br />

We anticipate that home automation, safety, security and Internet readiness would likely become<br />

an increasingly common feature for new premises. Structured cabling forms the backbone to<br />

these intelligent features. A high degree of competency is required for the installation of the<br />

fibre optic cable networks and UTP, which constitutes the structured cabling system.<br />

We currently are able to provide M&E services for the installation of the essential structured<br />

cabling system that supports intelligent-building architectures. We plan to further increase our<br />

current scope of activities in this aspect to include additional new areas such as safety and<br />

security systems. Structure cabling systems is similar to the conventional telecommunications<br />

system and we have secured a $2.8 million contract in June 2000 to provide plumbing &<br />

sanitary, electrical, air-conditioning and mechanical ventilation and fire protection systems<br />

installation, including computer cabling and wiring, for a primary school along Thomson Road.<br />

We commenced work on this project in June 2000 and expect to complete the project in August<br />

2001. In June 2000, we commenced training our staff through external training programmes<br />

such as those conducted by Infocomm Development Authority of Singapore and Singapore<br />

Telecommunication Ltd to enhance their competency and knowledge in the design and installation<br />

of such systems. We believe that entry into this market will increase our range of M&E services.<br />

(d) We intend to increase our activity in design-and-build projects<br />

We believe that there will be an increasing trend towards “design-and-build” construction projects<br />

as opposed to the conventional “design-bid-build” construction projects. In a conventional “designbid-build”<br />

project, we provide only the M&E systems installation services. In contrast, for “designand-build”<br />

projects, we provide higher value added services such as detailed design and<br />

recommend cost saving modifications in addition to the M&E systems installation services.<br />

Design-and-build construction projects require co-operation and collaboration among consultants,<br />

contractors and developers that would result in a more efficient construction activity where<br />

labour and cost saving modifications have been integrated into the design of the project.<br />

Between April 1993 and September 2000, we have completed the M&E installations works for<br />

three HDB design-and-build projects and have four on-going HDB design-and-build projects. In<br />

the private residential sector, we have completed the M&E installation works for two designand-build<br />

projects and have three on-going private sector design-and-build projects. We intend<br />

to build on our design-and-build experience to increase our business in this area.<br />

Quality Control and Assurance<br />

We place strong emphasis on the quality work and services performed for our projects. We have in<br />

place a quality management system for our M&E services and mobile toilet services and were<br />

awarded the ISO 9002 certification by the European Quality Assurance Limited in January 1999. ISO<br />

9002 requires that we have a quality control system for all activities affecting the quality of works<br />

and services performed. Examples of such activities are training, purchasing of materials, inspection<br />

and quality control, documentation and data control.<br />