22.01.2015 Views

Distribution Zones Implementation and Pressure ... - Iwa-waterloss.org

Distribution Zones Implementation and Pressure ... - Iwa-waterloss.org

Distribution Zones Implementation and Pressure ... - Iwa-waterloss.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Diego LUCENTE<br />

Suez Environment<br />

Water Losses 2012 - Manila<br />

<strong>Distribution</strong> <strong>Zones</strong> <strong>Implementation</strong> <strong>and</strong><br />

<strong>Pressure</strong> Management<br />

An Advanced <strong>Distribution</strong> Solution for the<br />

City of Jeddah


Agenda<br />

Introduction & Context of Jeddah – Saudi Arabia<br />

Suez Environment Offers for the NRW Reduction & Network<br />

Management Improvement<br />

Advanced Network <strong>Distribution</strong> Solution for Jeddah<br />

Description of the project & Results<br />

Conclusions<br />

06/03/2012 > SUEZ ENVIRONNEMENT - 2


Introduction<br />

National Water Company awarded in 2008 a<br />

Management Contract to a JV formed by<br />

Acwa Power & Suez Environment<br />

establishing the Jeddah City Business Unit to<br />

provide water <strong>and</strong> waste water services for<br />

the 3,5 M of inhabitants of Jeddah.<br />

JCBU operates a network of 5,500 km of<br />

network for water <strong>and</strong> 1,400 km for waste<br />

water.<br />

30/03/2011 06/03/2012 > SUEZ ENVIRONNEMENT - 3


Context of Jeddah<br />

Operational & Infrastructure<br />

• Water supply of 650 000 m3/day (65 %<br />

through the network <strong>and</strong> 35 % by water<br />

tankers)<br />

• 5.500 km of network (80 % in plastic<br />

pipes), only 5% with an average pressure<br />

of 0.5 Bars<br />

• Lack of sectorization <strong>and</strong> operational data<br />

like flow measurement, pressure,<br />

hydraulic behavior,<br />

Internal Processes & Communication<br />

• Absences of reliable Call Center <strong>and</strong><br />

Operation Center.<br />

• No communication between Operational<br />

<strong>and</strong> Customer Services Departments.<br />

• No process, resources or systems to<br />

follow up leak detection <strong>and</strong> repairs<br />

activities.<br />

06/03/2012 > SUEZ ENVIRONNEMENT - 4


Context of Jeddah<br />

• Supply frequency : 23 days<br />

• Poor quality of service<br />

•35% water supply by water tanks<br />

•Growing population & rapid economic development<br />

•Lack of natural resources <strong>and</strong> high water production cost = desalination<br />

• Insufficient <strong>and</strong> poorly-maintained infrastructure (~ 40% water losses,<br />

2/3 population not connected to sewers)<br />

• Weak <strong>org</strong>anization <strong>and</strong> public discontentment<br />

06/03/2012 > SUEZ ENVIRONNEMENT - 5


Suez Environment Solution<br />

NRW<br />

Diagnosis,<br />

Forecast &<br />

Action Plan<br />

Advanced<br />

Network<br />

<strong>Distribution</strong><br />

Effective &<br />

Real Time<br />

Leakage<br />

Detection<br />

<strong>and</strong> Repairs<br />

Advanced<br />

Asset<br />

Management<br />

Advanced<br />

Real Losses<br />

Reduction<br />

28/02/2012 > SUEZ ENVIRONNEMENT - 6


Advanced Network <strong>Distribution</strong><br />

Solution<br />

Advanced<br />

Network<br />

<strong>Distribution</strong><br />

Solution<br />

Study of the hydraulic system, network conditions<br />

& hydraulic model to define a <strong>Distribution</strong> <strong>Zones</strong><br />

Project<br />

<strong>Distribution</strong> <strong>Zones</strong> Project implementation<br />

Definition <strong>and</strong> set up of a measurement network<br />

(flow & pressure) connected to the SCADA<br />

Advanced <strong>Pressure</strong> Management Systems<br />

<strong>Implementation</strong><br />

SCADA system <strong>and</strong> related software to monitor the<br />

network operation (flow & pressure)<br />

NRW automatic calculation once an AMR project is<br />

implemented<br />

O&M of the implemented solution<br />

28/02/2012 > SUEZ ENVIRONNEMENT - 7


Advanced Network <strong>Distribution</strong><br />

Solution for Jeddah<br />

Creation <strong>and</strong> <strong>Implementation</strong> of 51 <strong>Distribution</strong> <strong>Zones</strong><br />

• To manage the evolution from rationing to continuous supply<br />

• To operate the network through an advanced system with<br />

pressure control <strong>and</strong> flow measurement linked to the SCADA<br />

• Water balance assessment <strong>and</strong> NRW actions by priorities<br />

06/03/2012 > SUEZ ENVIRONNEMENT - 8


OCC <strong>Implementation</strong> & SCADA<br />

<strong>Implementation</strong> of the Operation<br />

Control Center (OCC)<br />

• using SCADA <strong>and</strong> LTDB<br />

• 240 pressure transmission points<br />

• 75 flow measurement points<br />

Development <strong>and</strong> implementation<br />

of an innovative tool for rationing<br />

improvement (awarded with an SE<br />

innovation trophies)<br />

06/03/2012 > SUEZ ENVIRONNEMENT - 9


<strong>Distribution</strong> <strong>Zones</strong><br />

<strong>Implementation</strong><br />

• 8 DZ<br />

implemented by<br />

the end of 2011<br />

• 28 DZ<br />

implemented by<br />

the end of 2012<br />

06/03/2012 > SUEZ ENVIRONNEMENT - 10


<strong>Distribution</strong> Zone Results<br />

HH Example<br />

06/03/2012 > SUEZ ENVIRONNEMENT - 11


Flow (m3/hr)<br />

<strong>Pressure</strong> (m)<br />

1200<br />

Flow & <strong>Pressure</strong> Mointoring of DZ-HH<br />

Flow of H10P32 HH-PRV-Down stream HH-HP HH-LP<br />

Before PRV After PRV<br />

60<br />

1000<br />

50<br />

800<br />

40<br />

600<br />

30<br />

400<br />

Average flow is 18000 m3/D<br />

Average flow is 16000<br />

m3/D<br />

Estimated WD is 14,688 m3/D<br />

20<br />

200<br />

10<br />

14 Leaks<br />

4 Leaks<br />

0<br />

0<br />

06/03/2012 > SUEZ ENVIRONNEMENT - 12


<strong>Distribution</strong> Zone Results<br />

<strong>Pressure</strong> Management<br />

• The average flow reduction by DZ is estimated in 2000<br />

m3/d after PRV implementation, around 11 % of the water<br />

dem<strong>and</strong><br />

• 2 systems are being tested going to be tested to optimize<br />

the pressure following the consumption 24/24 to increase<br />

water savings <strong>and</strong> reduce leakage (i2O system & Sofrel<br />

system)<br />

i2O System<br />

Sofrel System<br />

06/03/2012 > SUEZ ENVIRONNEMENT - 13


<strong>Pressure</strong> Management Pilot<br />

1 Controller<br />

2 APV<br />

3 PRV


<strong>Distribution</strong> Zone HH Results<br />

•Entry Point PRV 300m CLA-VAL<br />

•Number of HC : 3204<br />

•Length of network 80 km<br />

Further <strong>Pressure</strong> Reduction by i2O: 14 %<br />

Additional flow saved 601 m3/d


<strong>Distribution</strong> Zone HE Results<br />

•Entry Point PRV 300m CLA-VAL<br />

•Number of HC : 922<br />

•Length of network 23 km<br />

Further <strong>Pressure</strong> Reduction by i2O: 20 %<br />

Additional flow saved 2600 m3/d<br />

Large P1<br />

& P2<br />

Delta;<br />

headloss<br />

P3<br />

=5M


Conclusions<br />

Global offer adapted to changing environments <strong>and</strong> through<br />

different type of contract<br />

Segmentation by Business Solutions, more versatility<br />

Advanced Network <strong>Distribution</strong> Solution implemented in Jeddah,<br />

Quickly identification of the problems <strong>and</strong> tailored solution<br />

decided <strong>and</strong> implemented<br />

OCC & SCADA with the measurement network gives enough<br />

elements to start the DZ project<br />

<strong>Implementation</strong> of DZ on going, 8 finalized by the end of 2011<br />

& 28 by 2012<br />

Quickly improvement on the Operation of the rationing after<br />

the identification of the DZ<br />

<strong>Pressure</strong> reduction allow to save around 10 to 15% of the<br />

daily water supply (1Mm3/day > 100 000 m3/day available<br />

fro other customers)<br />

<strong>Pressure</strong> management shows further reduction of 14 to 20 %<br />

on the daily water supply to the zones.<br />

06/03/2012 > SUEZ ENVIRONNEMENT - 17


Conclusions<br />

September 2008<br />

620,000 m 3 /day<br />

ASF = 22,9 d<br />

January 2012<br />

1050000 m 3 /day<br />

ASF = 7,45 d<br />

06/03/2012 > SUEZ ENVIRONNEMENT - 18


Thank you for<br />

your attention !!<br />

More questions,<br />

diego.lucente@suez-env.com<br />

06/03/2012 > SUEZ ENVIRONNEMENT - 19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!