District heating for the future<br />

<strong>Henrik</strong> <strong>Forsgren</strong><br />

Director, Public Affairs


Göteborg Energi - figures<br />

• Owner City of Göteborg<br />

• Customers App. 300,000<br />

2011 (2010)<br />

• Employees 1,189 (1,164)<br />

• Profit 50 M€ (90)<br />

• Investments 150 M€ (140)<br />

• Turnover 825 M€ (865)


Göteborg Energi AB<br />

Vision – ”A sustainable society”


2000 2012 20302050:<br />

67<br />

>8 Another planet, please !


We would love to contribute to<br />

make Europe more sustainable.<br />

We see that we could help to<br />

save the world.


1980s Today<br />

Carbon dioxide emissions have decreased with 25% - 50% in 25<br />

years, while the use of district heating has grown rapidly. Emissions<br />

of nitrogen oxides have fallen by around 80-90% and emissions of<br />

sulphur are now almost negligible.


District heating is part of the solution for<br />

minimising the use of natural resources.


Fuel mix in Gothenburg’s District Heating system.<br />

Fossil energy 28%<br />

Cogeneration (natural gas)<br />

Boiler (natural gas, oil)<br />

Recycled energy 28%<br />

Cogeneration (waste incineration)<br />

Renewable energy 14%<br />

Cogeneration (biofuel)<br />

Boiler (biofuel)<br />

Electricity to waste water heating pump<br />

Auxiliary electricity (pumps etc.)<br />

Waste heat 30%<br />

Industry (refineries etc.)<br />

Waste water<br />

District heating mix 2011.


Stay sustainable – just use what is really needed.


Gothenburg:<br />

District heat production and emissions, 1973 - 2011<br />

5.000<br />

4.500<br />

4.000<br />

3.500<br />

3.000<br />

2.500<br />

2.000<br />

1.500<br />

1.000<br />

500<br />

0<br />

1973 1982 1986 1990 1994 1998 2002 2005 2006 2007 2008 2009 2010 2011<br />

S (ton) NOx (ton) CO2 (kton) Prod. FV (GWh)<br />

5.000<br />

4.500<br />

4.000<br />

3.500<br />

3.000<br />

2.500<br />

2.000<br />

1.500<br />

1.000<br />

500<br />

0


How the fuel mix in Gothenburg’s District<br />

Heating system has changed over the years.<br />

GWh<br />

Coal<br />

Oil<br />

Natural gas<br />

Electricity for Heat Pumps<br />

Bio fuels<br />

Waste heat, Other<br />

Waste heat, Sewage water<br />

Waste Heat, CHP<br />

Waste Heat, Preem refinery<br />

Waste Heat; Shell refinery<br />

Waste Heat, Incineration<br />

Year


Energy volume [GWh]<br />

District Cooling - Production mix 2011<br />

City Centre network<br />

6<br />

5<br />

4<br />

Fresh River Water 15%<br />

Absorption chillers 38%<br />

Electrical Chillers 47%<br />

3<br />

2<br />

1<br />

0<br />

Jan Feb Mar Apr Maj Jun Jul Aug Sep Okt Nov Dec


Preem refinery<br />

Kungälv Energi<br />

Angeredscentralen<br />

Shell refinery<br />

Sörred Energi<br />

We are everywhere in town.<br />

Gasendal<br />

Renova<br />

Rya heat pump plant<br />

Rya CHP<br />

Mölndal Energi<br />

Sävenäs plant<br />

Högsbo CHP<br />

Rosenlund plant


The District Heating system covers<br />

major parts of Gothenburg.<br />

> 1,000 km grid


The District Heating time line<br />

Start of the first district heating system in Gothenburg.<br />

GoBiGas first phase provides more waste heat<br />

Start to use waste heat from refineries<br />

Rya CHP inaugurated<br />

1953 1972 1980 1988 2006 2009 2013<br />

Waste heat from the Incineration plant is reused<br />

Natural gas introduced in Gothenburg<br />

Own forestry operations close to urban areas


Some facts about district heating<br />

• District heating grid length is over 1,000 km<br />

• 7,000 (app 90%) connections to corporate customers and<br />

• 12,000 (app. 20%) to private houses in Gothenburg + suburbs<br />

Partille, Ale and Falbygden


District heating could soon be<br />

everywhere.


New areas for district heating<br />

that reduce dependence on<br />

electricity.


Welcome to<br />

CELSIUS<br />

Headed by Gothenburg.<br />

Contracts soon to be signed !!


CELSIUS<br />

Why Celsius<br />

‣ Europe, and the entire world, will face thorough change<br />

in energy supply and energy policy.<br />

‣ Celsius – Within the EU-programme Smart Cities – is<br />

meant to contribute to reaching EU’s Energy Efficiency<br />

target: 20 % to 2020.<br />

Goals:<br />

‣ CELSIUS is one corner stone for the EU, to demonstrate<br />

and to promote roll-out of Smart District Heating and<br />

Cooling through-out Europe, by presenting Best practice<br />

to other European cities.<br />

‣ The target is that 50 European cities should be dedicated<br />

to the CELSIUS CITY- concept when project has ended.


(Euro Heat Cool)


How <br />

CELSIUS<br />

‣ IMPACT focus = Market, Acceptance, Behavior, Policy, Demonstrators, Financing and<br />

Technology.<br />

‣ The Project is headed by the City of Gothenburg and Gothenburg Energy.<br />

‣ 21 welknown partners in the project (London School of Economics, Imperial College, Tech. University<br />

in Delft….)<br />

‣ Participating cities: London, Rotterdam, Genoa, Cologne, + 7 cities that already have shown interest.<br />

‣ Financing: EU’s single largest Smart City project, supported by EIB.


What’s in it …:<br />

CELSIUS<br />

…For EU:<br />

‣ Replicability of district heating / cooling concepts.<br />

‣ 13 new demonstrators to be built within the project.<br />

‣ 50 dedicated cities in 2016.<br />

‣ Vision: Fully deployed 100TWh reduced energy consumption in<br />

EU.<br />

‣ Vision: 100 dedicated CELSIUS cities in 2026.<br />

‣ One tool for reaching the energy efficiency targets.<br />

…For Gothenburg:<br />

‣ To coordinate an interesting project and to become the Smart<br />

reference City in EU regarding District Heating and Cooling.


CELSIUS City<br />

Summary CELSIUS<br />

27. ROT<br />

Datacenter 1<br />

and 2<br />

In operation<br />

End-user<br />

Sewage plant<br />

ROT 2014/2015<br />

Sust. Prod.<br />

Existing<br />

buildings and<br />

bus depot<br />

ROT 2016<br />

Dist./Infra struc.<br />

Meneba<br />

Industrial<br />

Connection<br />

ROT 2017<br />

End-user<br />

Waste<br />

Incineration<br />

ROT In op<br />

Sust. Prod.<br />

Heating hub<br />

ROT 2014/15<br />

Syst. Integr.<br />

/Storage/Dist./<br />

Infra struc.<br />

Cooling from<br />

river<br />

ROT In op<br />

Sust. Prod<br />

Vertical city<br />

ROT 2013/14<br />

Sust. Prod. Syst<br />

Integr.<br />

Aquifer storage<br />

for heating and<br />

cooling<br />

ROT In op Sust.<br />

Prod.<br />

28 and 29. ROT<br />

Datacenter 1<br />

and 2<br />

In operation<br />

End-user<br />

Small DH ICT<br />

LON 2012-2015<br />

Syst. Interg./<br />

Distr./ Infra<br />

struc.<br />

2.GOT<br />

Integration with<br />

other municipalities<br />

In operation<br />

System integration<br />

DH to ships<br />

GOT 2013<br />

End-user<br />

Total prod. and<br />

distr. Syst.<br />

GOT In op<br />

Dist./infra struc.<br />

Syst. Integ.<br />

Climate<br />

agreement<br />

GOT In op<br />

End-user<br />

Industrial waste<br />

heat<br />

GOT In op<br />

Sust. Prod.<br />

Short term<br />

Storgage<br />

GOT 2014<br />

Storage<br />

DH to<br />

whitegoods<br />

GOT 2013<br />

End-user<br />

Long term<br />

storage<br />

GOT 2016<br />

Storage<br />

Solar heat<br />

connected to<br />

DH system<br />

GOT In op<br />

Sust. Prod<br />

• A project within EU’s 7th Framework<br />

Programme, “Smart Cities” headed by DG<br />

ENERGY.<br />

• “IMPACT” focus<br />

• 50 new CELSIUS cities<br />

• Vision:100TWh reduction in primary<br />

energy<br />

• Gothenburg to coordinate the project,<br />

consisting of 21 internationally leading<br />

partners.<br />

• EU’s largest Smart City project: Budget: 21M€<br />

whereof 14M€ EU support<br />

Consumer<br />

Control<br />

GEN 2015<br />

Syst. Integr.<br />

Turbogenerator.<br />

gasgrid<br />

GEN 2015<br />

Sust. Prod.<br />

ThermoSolar<br />

plants for<br />

heating<br />

CGN<br />

Syst. Integr.<br />

Biogas heating<br />

residential area<br />

Stammheim<br />

CGN<br />

Sust. Prod.<br />

existing demonstrator, to be improved in CELSIUS city<br />

planned to be build in CELSIUS City with FP7 funding<br />

12x sewage<br />

water HP<br />

CGN 2013/14<br />

Sust. Prod.<br />

”KlimaKreisKöln”<br />

Funding local<br />

EE-initiatives<br />

CGN<br />

End User<br />

Cooling from<br />

river<br />

GOT In op<br />

Sust. Prod<br />

Absorption<br />

cooling<br />

GOT In op<br />

Sust. Prod<br />

Biofuel CHP<br />

GOT In op<br />

Sust. Prod.<br />

Waste<br />

Incineration<br />

GOT In op<br />

Sust. Prod.<br />

• Start in Q1 2013, planned ending Q4 2016.<br />

• Demonstrators:<br />

• +20 existing demonstrators<br />

• 13 new to be built<br />

• Contract negotiations ongoing.


Can we make a difference<br />

Yes we can!<br />

Thank you for the attention.