DRAFT PROGRAMME
DRAFT PROGRAMME
DRAFT PROGRAMME
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Seminar on the Lead Partner Principle<br />
Riga, 15-16 June 2006<br />
<strong>DRAFT</strong> <strong>PROGRAMME</strong><br />
17.20-17.50 PLENARY<br />
Programme presentation on Lead Partner project application and assessment or LP project<br />
contracting – TBD<br />
NB: The programme presenting probably needs to choose one of the two topics as the presentation should be<br />
no more than 10 minutes<br />
On the basis of the information the programme asks for in the application, how do you assess to what<br />
extent the project:<br />
o Has been jointly developed<br />
o Will be jointly implemented<br />
o Will have a cross-border impact<br />
Contracting LP projects:<br />
o Which are the contracting procedures Who has to sign the contract from the side of the<br />
programme, apart from the project LP How long does it usually take from project approval<br />
until the subsidy contract has been signed by all relevant parties<br />
o Which information is included in the subsidy contract Particularly relevant is if the following is<br />
included and arguments for why/ why not: information on partnership members and designated<br />
LP, eligibility period for project expenditure, ERDF grant rate, reporting requirements, annual<br />
spending targets, conditions for withholding funds if spending does not meet annual targets,<br />
audit provisions both from the side of the programme and of the project and provisions for<br />
repayment of funds in case of irregularities.<br />
17.50-18.30 WORKSHOPS<br />
Lead Partner project application and assessment, selection and contracting<br />
Dinner for continued networking and exchange