EMERGENCY CLOSURE SYSTEM<br />

TIER 2 CONDITION ASSESSMENT SUMMARY<br />

Date: _________________________________ Location: _______________________________<br />

Unit: ___________________ Type of Valve: __________________________________<br />

Part I: Determine Adjustment to Tier 1 Emergency Closure System Condition Index.<br />

Emergency Closure System – Valves with Hydraulic Operators<br />

Adjustment to<br />

Tier 1<br />

No. Tier 2 Test (Table No.) Condition Index<br />

Valves (Structural Integrity and Functional Operation):<br />

T2.2.1 Corrosion (17)<br />

T2.2.2 Yielding, Fracture, Fatigue, and Fabrication Discontinuities (18)<br />

T2.2.3 Improper Field Repair and/or Modifications (19)<br />

T2.2.4 Actuation Performance (20)<br />

T2.2.5 Seals, Sealing Surfaces, and Packing (21)<br />

T2.2.6 Bearings and Bushings (22)<br />

Hydraulic Operators (Structural Integrity and Functional Operation):<br />

T2.3.1 Corrosion (23)<br />

T2.3.2 Anchoring (24)<br />

T2.3.3 Yielding, Fracture, Fatigue, and Fabrication Discontinuities (25)<br />

T2.3.4 Improper Field Repair and/or Modifications (26)<br />

T2.3.5 Actuation Performance (27)<br />

T2.3.6 Pistons (28)<br />

T2.3.7 Hydraulic Systems (29)<br />

T2.3.8 Electric Motors (30)<br />

T2.3.9 Electric Controls (31)<br />

Miscellaneous Tests and Conditions:<br />

T2.4 Miscellaneous Deficiencies (41)<br />

T2.5 Annunciation (42)<br />

T2.6 Maintenance Escalation (43)<br />

T2.7 Other Specialized Diagnostic Tests<br />

Tier 2 Adjustments to Condition Index<br />

(Sum of individual Adjustments)<br />