Hydro Plant Risk Assessment Guide
Hydro Plant Risk Assessment Guide
Hydro Plant Risk Assessment Guide
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
EMERGENCY CLOSURE SYSTEM<br />
TIER 2 CONDITION ASSESSMENT SUMMARY<br />
Date: _________________________________ Location: _______________________________<br />
Unit: ___________________ Type of Gate: __________________________________<br />
Part I: Determine Adjustment to Tier 1 Emergency Closure System Condition Index.<br />
Emergency Closure System – Gates with Electric Operators<br />
Adjustment to<br />
Tier 1<br />
No. Tier 2 Test (Table No.) Condition Index<br />
Gates (Structural Integrity and Functional Operation):<br />
T2.1.1 Corrosion (11)<br />
T2.1.2 Yielding, Fracture, Fatigue, and Fabrication Discontinuities (12)<br />
T2.1.3 Improper Field Repair and/or Modifications (13)<br />
T2.1.4 Raising/Lowering Performance (14)<br />
T2.1.5 Slots, Seals, and Sealing Surfaces (15)<br />
T2.1.6 Wheels, Rollers, Roller Chains, Bearings, and Bushings (16)<br />
Electric Operators (Structural Integrity and Functional Operation):<br />
T2.3.1 Corrosion (23)<br />
T2.3.2 Anchoring (24)<br />
T2.3.3 Yielding, Fracture, Fatigue, and Fabrication Discontinuities (25)<br />
T2.3.4 Improper Field Repair and/or Modifications (26)<br />
T2.3.11 Actuation Performance (32)<br />
T2.3.12 Electric Controls (33)<br />
T2.3.13 Electric Motors (34)<br />
T2.3.14 Electric Brakes (35)<br />
T2.3.15 Wire Ropes and Chains (36)<br />
T2.3.16 Power Screws (37)<br />
T2.3.17 Drums and Sheaves (38)<br />
T2.3.18 Gearboxes, External Gearing, and Chain Sprockets (39)<br />
T2.3.19 Bearings and Bushings (40)<br />
Miscellaneous Tests and Conditions:<br />
T2.4 Miscellaneous Deficiencies (41)<br />
T2.5 Annunciation (42)<br />
T2.6 Maintenance Escalation (43)<br />
T2.7 Other Specialized Diagnostic Tests<br />
E11-41