EMERGENCY CLOSURE SYSTEM<br />
TIER 2 CONDITION ASSESSMENT SUMMARY<br />
Date: _________________________________ Location: _______________________________<br />
Unit: ___________________ Type of Gate: __________________________________<br />
Part I: Determine Adjustment to Tier 1 Emergency Closure System Condition Index.<br />
Emergency Closure System – Gates with Hydraulic Operators<br />
Adjustment to<br />
Tier 1<br />
No. Tier 2 Test (Table No.) Condition Index<br />
Gates (Structural Integrity and Functional Operation):<br />
T2.1.1 Corrosion (11)<br />
T2.1.2 Yielding, Fracture, Fatigue, and Fabrication Discontinuities (12)<br />
T2.1.3 Improper Field Repair and/or Modifications (13)<br />
T2.1.4 Raising/Lowering Performance (14)<br />
T2.1.5 Slots, Seals, and Sealing Surfaces (15)<br />
T2.1.6 Wheels, Rollers, Roller Chains, Bearings, and Bushings (16)<br />
Hydraulic Operators (Structural Integrity and Functional Operation):<br />
T2.3.1 Corrosion (23)<br />
T2.3.2 Anchoring (24)<br />
T2.3.3 Yielding, Fracture, Fatigue, and Fabrication Discontinuities (25)<br />
T2.3.4 Improper Field Repair and/or Modifications (26)<br />
T2.3.5 Actuation Performance (27)<br />
T2.3.6 Pistons (28)<br />
T2.3.7 Hydraulic Systems (29)<br />
T2.3.8 Electric Motors (30)<br />
T2.3.9 Electric Controls (31)<br />
Miscellaneous Tests and Conditions:<br />
T2.4 Miscellaneous Deficiencies (41)<br />
T2.5 Annunciation (42)<br />
T2.6 Maintenance Escalation (43)<br />
T2.7 Other Specialized Diagnostic Tests<br />
Tier 2 Adjustments to Condition Index<br />
(Sum of individual Adjustments)<br />
E11-39