Hydro Plant Risk Assessment Guide
Hydro Plant Risk Assessment Guide
Hydro Plant Risk Assessment Guide
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Emergency Closure System Condition Index-Based Alternatives<br />
Condition Index<br />
≥ 7.0 and ≤ 10 (Good)<br />
≥ 3.0 and < 7 (Fair)<br />
OR Condition Indicators #2 or #3 with<br />
weighted scores of 1 or less<br />
≥ 0 and < 3.0 (Poor)<br />
OR Condition Indicators #2 or #3 with<br />
weighted scores of 0<br />
Suggested Course of Action<br />
Continue O & M without restriction. Repeat Tier 1<br />
assessment during next outage.<br />
Continue operation but reevaluate O & M practices.<br />
Schedule Tier 2 assessment within < 4 years.<br />
Consultation with experts. Adjust O & M as<br />
prudent. Schedule Tier 2 assessment within < 2<br />
years.<br />
E11-38