may be directly applied to the Emergency Closure Systems Condition Index-Based Alternatives<br />
table.<br />
Table 44 – Emergency Closure Systems Condition Index-Based Alternatives<br />
Condition Index<br />
≥ 7.0 and ≤ 10 (Good)<br />
≥ 3.0 and < 7 (Fair)<br />
OR<br />
Condition Indicators #2 or #3 with<br />
weighted scores of 1 or less<br />
≥ 0 and < 3.0 (Poor)<br />
OR<br />
Condition Indicators #2 or #3 with<br />
weighted scores of 0<br />
Suggested Course of Action<br />
Continue O & M without restriction. Repeat Tier 1<br />
assessment during next outage.<br />
Continue operation but reevaluate O & M practices.<br />
Schedule Tier 2 assessment within < 4 years.<br />
Consultation with experts. Adjust O & M as<br />
prudent. Schedule Tier 2 assessment within < 2<br />
years.<br />