Page: 201<br />

offered by Mr. Fillmore is part of a continuing course of conduct where the Regional Office is<br />

attempting to shift blame for its failures. Moreover, in the first paragraph of the document quoted<br />

above, Mr. Fillmore makes a blatant misstatement of fact. The Plaintiffs had been asking DIAND<br />

about access to wood for a long time before February 3, 1999.<br />

[774] Mr. Kennedy, Head Policy and Industry Forester, wrote to his supervisor, Mr. Monty, on<br />

2010 FC 495 (CanLII)<br />

June 18, 2000. This memorandum was entered as Exhibit P-45. Mr. Kennedy identified his<br />

concerns with the THA process.<br />

[775] In this memorandum, Mr. Kennedy explained that, on March 13, 2000, he had been asked to<br />

prepare a strategy to get the THA process back on the timetable. He proposed three options to get<br />

the process back on track. With respect to the shifting THA timelines he noted:<br />

The first modifications to the process were to the time line prior to<br />

the publishing of “The Development of Yukon Timber Harvest<br />

Agreements, A Framework for THA’s in the Yukon” where we<br />

pushed the time frame back to September, 2000. The workshop that<br />

was held April 4 and 5, 2000 was to bring all the stakeholders<br />

together to consult on a reasonable process, then, to proceed with the<br />

Request for Proposal, on a given land base in South East Yukon, in a<br />

timely manner. Commitments were made to senior levels to meet the<br />

time frames given. As a result of a Joint Yukon and DIAND meeting<br />

in early January, 2000, we were directed to proceed with the<br />

knowledge that the forest management planning process would be<br />

part of the development of the criteria required of the proponent, and<br />

not precede the selection process. This does not seem to be clear to<br />

all members of the working group, and leaves me wondering if with<br />

the changes to Yukon Government, and the internal changes in<br />

management, if we are under the same direction given that January<br />

day.<br />