21.01.2015 Views

Final Adopted IDP - KZN Development Planning

Final Adopted IDP - KZN Development Planning

Final Adopted IDP - KZN Development Planning

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TRAINING AND DEVELOPMENT<br />

On an annual basis a percentage of the operational budget approved for the Municipality<br />

is set aside for skills development in accordance with the Workplace Skills Plan.<br />

Because the Municipality has experienced cash flow constraints on a regular basis, the<br />

training and development budget has not been fully expended; it is proposed that the<br />

training budget be ring fenced annually to prevent this situation from reoccurring.<br />

Based on the skills audit conducted at the Municipality the training contracted should be<br />

a reflection of the skills gaps identified rather than implementing a situation where<br />

course availability is the criteria and individuals are nominated to attend without due<br />

cognisance being given as to whether the training course is able to adequately build the<br />

capacity to address the identified need. Courses offered by service providers<br />

accredited with the Local Government SETA only are considered for training and<br />

development purposes – the Municipality is then able to claim a percentage of the course<br />

fee back from the SETA.<br />

PROMOTION OF EQUITY<br />

The Municipality has developed an Employment Equity Plan as required by the legislation;<br />

the Plan is reviewed on an annual basis in terms of the legislation. At present, however,<br />

the provisions of the Employment Equity Plan have not been implemented by the<br />

Municipality; each of the Directorates is required to review its situation with regard to<br />

the employment equity imperatives. With the filling of vacant posts during the 2012 /<br />

2013 financial year, one of the prime factors in the recruitment and selection process<br />

will be addressing the employment equity imperatives; this will continue throughout the<br />

remainder of the third generation <strong>IDP</strong>.<br />

MUNICIPAL TURNAROUND STRATEGY<br />

The national Department of Co-operative Governance and Traditional Affairs, late in the<br />

2009 calendar year, published the Local Government Turnaround Strategy, developed as<br />

a consequence of an assessment of all of the municipalities in South Africa and following<br />

an extraordinary sitting of the three spheres of government involving the entire Cabinet<br />

on 20 October 2009 in Khayelitsha, Cape Town. As part of the implementation of the<br />

national strategy, each municipality was required to develop its own turnaround strategy<br />

by 31 March 2010. In this regard the national strategy noted that the different<br />

municipalities within South Africa have different capacities and are faced with<br />

different social and economic challenges. The Ulundi Municipality developed its own<br />

turnaround strategy utilizing the situation as at 31 March 2010 as the baseline and<br />

setting a number of targets to be achieved. In this regard it is noted that the<br />

Municipality prepares half yearly reports in terms of the turnaround strategy, at the<br />

96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!