Final Adopted IDP - KZN Development Planning
Final Adopted IDP - KZN Development Planning
Final Adopted IDP - KZN Development Planning
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
TRAINING AND DEVELOPMENT<br />
On an annual basis a percentage of the operational budget approved for the Municipality<br />
is set aside for skills development in accordance with the Workplace Skills Plan.<br />
Because the Municipality has experienced cash flow constraints on a regular basis, the<br />
training and development budget has not been fully expended; it is proposed that the<br />
training budget be ring fenced annually to prevent this situation from reoccurring.<br />
Based on the skills audit conducted at the Municipality the training contracted should be<br />
a reflection of the skills gaps identified rather than implementing a situation where<br />
course availability is the criteria and individuals are nominated to attend without due<br />
cognisance being given as to whether the training course is able to adequately build the<br />
capacity to address the identified need. Courses offered by service providers<br />
accredited with the Local Government SETA only are considered for training and<br />
development purposes – the Municipality is then able to claim a percentage of the course<br />
fee back from the SETA.<br />
PROMOTION OF EQUITY<br />
The Municipality has developed an Employment Equity Plan as required by the legislation;<br />
the Plan is reviewed on an annual basis in terms of the legislation. At present, however,<br />
the provisions of the Employment Equity Plan have not been implemented by the<br />
Municipality; each of the Directorates is required to review its situation with regard to<br />
the employment equity imperatives. With the filling of vacant posts during the 2012 /<br />
2013 financial year, one of the prime factors in the recruitment and selection process<br />
will be addressing the employment equity imperatives; this will continue throughout the<br />
remainder of the third generation <strong>IDP</strong>.<br />
MUNICIPAL TURNAROUND STRATEGY<br />
The national Department of Co-operative Governance and Traditional Affairs, late in the<br />
2009 calendar year, published the Local Government Turnaround Strategy, developed as<br />
a consequence of an assessment of all of the municipalities in South Africa and following<br />
an extraordinary sitting of the three spheres of government involving the entire Cabinet<br />
on 20 October 2009 in Khayelitsha, Cape Town. As part of the implementation of the<br />
national strategy, each municipality was required to develop its own turnaround strategy<br />
by 31 March 2010. In this regard the national strategy noted that the different<br />
municipalities within South Africa have different capacities and are faced with<br />
different social and economic challenges. The Ulundi Municipality developed its own<br />
turnaround strategy utilizing the situation as at 31 March 2010 as the baseline and<br />
setting a number of targets to be achieved. In this regard it is noted that the<br />
Municipality prepares half yearly reports in terms of the turnaround strategy, at the<br />
96