ROADS AND STORM WATER The construction and rehabilitation of roads within the Ulundi Municipality was identified as a high priority in the compilation of a Comprehensive Infrastructure Plan (CIP) for the Municipality. The priority of the construction and rehabilitation of roads in the CIP was prompted by the need for improved transport routes, improved access to the central business district and the provision of better quality roads for use by the communities in the Municipality. Responsibility for the compilation of the CIP vests in the Zululand District Municipality and a draft thereof is awaited by the Ulundi Municipality. Road Network The Ulundi Municipality is traversed by four main routes namely the R68 which connects Babanango to Nquthu in the west and Mthonjaneni in the east; the R34 which traverses the Municipality from Makhosini in the south east to Ngongweni and Geluckstadt in the north west; the R66 stretchinh in a north south direction connecting Ulundi Town to Nongoma in the north and the R34 and Melmoth in the south; and the P700 which connects Ulundi town to the Hluhluwe Umfolozi Park in the west. Only the main thoroughfares and Ulundi Town have blacktop roads; the remainder of the Municipality is serviced by gravel roads. Most of the settlement areas within the Municipality are reached via gravel roads extending from the R34, the R66 and the P700. 46
The National Department of Transport has commenced with the rollout of a programme to determine and provide clarity on the expected roles of each sphere of Government with regard to road management and maintenance. In KwaZulu-Natal, this process is driven by the Provincial Department of Roads. Responsibility for the road network within the service area of the Municipality is vested in two entities – the Ulundi Municipality and the KZN Department of Transport. While the Technical Services Directorate of the Municipality is mainly focused on the Ulundi Town and Township access roads, the KZN Department of Transport takes responsibility for the maintenance and upgrading of rural roads within the Municipality. In total the Technical Services Directorate maintains 100 kilometres of road, of which 74.5% are tarred (blacktop surface) and 25.5% are gravel roads. The responsibility of the KZN Department of Transport covers main roads (the “P” roads), district roads (the “D” roads) and local roads (the “L” roads). The “P” roads within the municipal area comprise a total of 449.88 kilometres of which 34% are blacktop surfaced roads and the remaining 66% are gravel roads. Of the 304.33 kilometres of district roads for which the Department is responsible, only 6% are tarred while the remaining 94% are gravel roads. The entire network of 45.92 kilometres of local roads for which the KZN Department of Transport is responsible consists of gravel roads. Funding of Road Construction and Maintenance The primary source of funding for the construction of roads is the Municipal Infrastructure Grant (MIG); in the 2012 / 2013 financial year an amount of R 13 162 700 has been provided for the rehabilitation of access roads in Unit B South. However, the KZN Department of Transport also has an allocation for the construction and rehabilitation of rural roads – for the 2012 / 2013 financial year (commencing on 1 April 2012) it plans to construct six new gravel roads totalling 13.8 kilometres from the budgetary provision of R 8.4 million approved for the construction of these roads. In addition the Department has budgeted to undertake the regravelling of 61.4 kilometres of rural roads at an estimated cost of R 23.65 million during the course of the 2012 / 2013 financial year. Municipal Maintenance of Roads and Storm Water Most of the formal town areas within the Municipality have storm water drainage on an internal collector system discharging directly into some of the tributaries of the White Umfolozi River. The Municipality has two maintenance teams that follow a quarterly maintenance programme patching roads and cleaning catch pits. While each of the maintenance teams has a quarterly programme to follow, their activities can be varied at any time to address issues flowing from an emergency situation or in response to a customer complaint. 47
- Page 1 and 2: ULUNDI MUNICIPALITY REVIEW OF THE I
- Page 3 and 4: OVERVIEW OF THE ULUNDI MUNICIPALITY
- Page 5 and 6: provides opportunities for developm
- Page 7 and 8: Based on the information provided b
- Page 9 and 10: Population Density Population densi
- Page 11 and 12: VISION, MISSION AND VALUES A strate
- Page 13 and 14: Threats o o o o o o o o o o o o Une
- Page 15 and 16: (b) (c) binds the municipality in t
- Page 17 and 18: Provincial Spatial Economic Develop
- Page 19 and 20: progress made. In this regard the P
- Page 21 and 22: Social Development Fighting Crime a
- Page 23 and 24: Provincial Spatial Development Fram
- Page 25 and 26: • Ensure that all development und
- Page 27 and 28: CATALYTIC PROJECTS IDENTIFIED The f
- Page 29 and 30: PROCESS PLAN The Ulundi Municipalit
- Page 31 and 32: Community Consultation As specified
- Page 33 and 34: ULUNDI MUNICIPALITY REVIEW OF THE I
- Page 35 and 36: Okhukho substation project has expe
- Page 37 and 38: exception of one substation, batter
- Page 39 and 40: from the households to be served wh
- Page 41 and 42: The Water Services Development Plan
- Page 43 and 44: the future demands. The following t
- Page 45: Solid Waste Disposal The Municipali
- Page 49 and 50: In terms of public transportation,
- Page 51 and 52: CEMETERIES AND CREMATORIA The St Fr
- Page 53 and 54: SOCIAL AND COMMUNITY DEVELOPMENT AN
- Page 55 and 56: clarity as to whether any of the ou
- Page 57 and 58: The KwaZulu-Natal Department of Art
- Page 59 and 60: access to primary health care servi
- Page 61 and 62: premises. The location of the prima
- Page 63 and 64: community through the offices of th
- Page 65 and 66: communities including poverty, unem
- Page 67 and 68: Women The Community Survey conducte
- Page 69 and 70: Taking a view on economic growth an
- Page 71 and 72: The table above depicts the ranking
- Page 73 and 74: the Municipality. In addition to as
- Page 75 and 76: Inside the Ondini Museum The Grave
- Page 77 and 78: Ondini Battlefields This is the sit
- Page 79 and 80: The Spirit of eMakhosini Ceza Cave
- Page 81 and 82: Kwagqokli Hill The battle of kwaGqo
- Page 83 and 84: sustainable energy services. The Ie
- Page 85 and 86: ensure cost-effectiveness. The depi
- Page 87 and 88: settlements of Mpungamhlophe, Nhlaz
- Page 89 and 90: Providing an overview of the enviro
- Page 91 and 92: Rehabilitation of Landfill Site The
- Page 93 and 94: ORGANISATIONAL STRUCTURE The Counci
- Page 95 and 96: each financial year - Council is sc
The National Department of Transport has commenced with the rollout of a programme<br />
to determine and provide clarity on the expected roles of each sphere of Government<br />
with regard to road management and maintenance. In KwaZulu-Natal, this process is<br />
driven by the Provincial Department of Roads. Responsibility for the road network<br />
within the service area of the Municipality is vested in two entities – the Ulundi<br />
Municipality and the <strong>KZN</strong> Department of Transport. While the Technical Services<br />
Directorate of the Municipality is mainly focused on the Ulundi Town and Township<br />
access roads, the <strong>KZN</strong> Department of Transport takes responsibility for the<br />
maintenance and upgrading of rural roads within the Municipality.<br />
In total the Technical Services Directorate maintains 100 kilometres of road, of which<br />
74.5% are tarred (blacktop surface) and 25.5% are gravel roads. The responsibility of<br />
the <strong>KZN</strong> Department of Transport covers main roads (the “P” roads), district roads (the<br />
“D” roads) and local roads (the “L” roads). The “P” roads within the municipal area<br />
comprise a total of 449.88 kilometres of which 34% are blacktop surfaced roads and<br />
the remaining 66% are gravel roads. Of the 304.33 kilometres of district roads for<br />
which the Department is responsible, only 6% are tarred while the remaining 94% are<br />
gravel roads. The entire network of 45.92 kilometres of local roads for which the <strong>KZN</strong><br />
Department of Transport is responsible consists of gravel roads.<br />
Funding of Road Construction and Maintenance<br />
The primary source of funding for the construction of roads is the Municipal<br />
Infrastructure Grant (MIG); in the 2012 / 2013 financial year an amount of R 13 162<br />
700 has been provided for the rehabilitation of access roads in Unit B South.<br />
However, the <strong>KZN</strong> Department of Transport also has an allocation for the construction<br />
and rehabilitation of rural roads – for the 2012 / 2013 financial year (commencing on 1<br />
April 2012) it plans to construct six new gravel roads totalling 13.8 kilometres from the<br />
budgetary provision of R 8.4 million approved for the construction of these roads. In<br />
addition the Department has budgeted to undertake the regravelling of 61.4 kilometres<br />
of rural roads at an estimated cost of R 23.65 million during the course of the 2012 /<br />
2013 financial year.<br />
Municipal Maintenance of Roads and Storm Water<br />
Most of the formal town areas within the Municipality have storm water drainage on an<br />
internal collector system discharging directly into some of the tributaries of the White<br />
Umfolozi River. The Municipality has two maintenance teams that follow a quarterly<br />
maintenance programme patching roads and cleaning catch pits. While each of the<br />
maintenance teams has a quarterly programme to follow, their activities can be varied at<br />
any time to address issues flowing from an emergency situation or in response to a<br />
customer complaint.<br />
47