21.01.2015 Views

Final Adopted IDP - KZN Development Planning

Final Adopted IDP - KZN Development Planning

Final Adopted IDP - KZN Development Planning

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PROCESS PLAN<br />

The Ulundi Municipality commenced its third generation Integrated <strong>Development</strong> Plan<br />

(<strong>IDP</strong>) with effect from the 2011 / 2012 financial year. As a consequence the 2012 /<br />

2013 financial year represents the first review of the third generation <strong>IDP</strong> of the<br />

Municipality. The Process Plan is a tool used to guide the <strong>IDP</strong> process and this review.<br />

It is in this document that the important areas of the <strong>IDP</strong> are highlighted in order to<br />

promote coordination and alignment by setting out the timeframes, role players,<br />

milestones and responsibilities included in the final product produced. The Process Plan<br />

has been prepared in line with the <strong>IDP</strong> Framework set out by the Zululand District<br />

Municipality; the Process Plan was approved by the Council of the Municipality to initiate<br />

the <strong>IDP</strong> process. A copy of the approved Process Plan is attached as Annexure A to this<br />

<strong>IDP</strong> review document.<br />

FORMAT OF THE <strong>IDP</strong><br />

To ensure consistency throughout and ensure linkage between its components, the <strong>IDP</strong><br />

Review has been prepared in accordance with the national Key Performance Areas as<br />

outlined hereunder:<br />

• Basic Service Delivery and Infrastructure <strong>Development</strong><br />

• Social and Economic <strong>Development</strong><br />

• Institutional Arrangement and Transformation<br />

• Good Governance and Public Participation<br />

• Financial Viability and Management<br />

In addition due consideration is given to the role of spatial development planning within<br />

the Municipality.<br />

The <strong>IDP</strong> contains a number of sections that indicate the strategic direction that the<br />

Ulundi Municipality is due to take over the period of its third generation <strong>IDP</strong>; this also<br />

provides strategic direction to the review of the <strong>IDP</strong> for implementation during the<br />

2012 / 2013 financial year.<br />

Situational Analysis<br />

In the course of the development of the third generation <strong>IDP</strong> for the Municipality which<br />

commenced at the beginning of the 2011 / 2012 financial year, a thorough situational<br />

analysis was undertaken of the Ulundi municipal area; the result of the analysis was<br />

captured in the various functional areas that comprise the five national key performance<br />

indicators to which reference was made above. As part of the review of the <strong>IDP</strong> for<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!