Final Adopted IDP - KZN Development Planning
Final Adopted IDP - KZN Development Planning
Final Adopted IDP - KZN Development Planning
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PROCESS PLAN<br />
The Ulundi Municipality commenced its third generation Integrated <strong>Development</strong> Plan<br />
(<strong>IDP</strong>) with effect from the 2011 / 2012 financial year. As a consequence the 2012 /<br />
2013 financial year represents the first review of the third generation <strong>IDP</strong> of the<br />
Municipality. The Process Plan is a tool used to guide the <strong>IDP</strong> process and this review.<br />
It is in this document that the important areas of the <strong>IDP</strong> are highlighted in order to<br />
promote coordination and alignment by setting out the timeframes, role players,<br />
milestones and responsibilities included in the final product produced. The Process Plan<br />
has been prepared in line with the <strong>IDP</strong> Framework set out by the Zululand District<br />
Municipality; the Process Plan was approved by the Council of the Municipality to initiate<br />
the <strong>IDP</strong> process. A copy of the approved Process Plan is attached as Annexure A to this<br />
<strong>IDP</strong> review document.<br />
FORMAT OF THE <strong>IDP</strong><br />
To ensure consistency throughout and ensure linkage between its components, the <strong>IDP</strong><br />
Review has been prepared in accordance with the national Key Performance Areas as<br />
outlined hereunder:<br />
• Basic Service Delivery and Infrastructure <strong>Development</strong><br />
• Social and Economic <strong>Development</strong><br />
• Institutional Arrangement and Transformation<br />
• Good Governance and Public Participation<br />
• Financial Viability and Management<br />
In addition due consideration is given to the role of spatial development planning within<br />
the Municipality.<br />
The <strong>IDP</strong> contains a number of sections that indicate the strategic direction that the<br />
Ulundi Municipality is due to take over the period of its third generation <strong>IDP</strong>; this also<br />
provides strategic direction to the review of the <strong>IDP</strong> for implementation during the<br />
2012 / 2013 financial year.<br />
Situational Analysis<br />
In the course of the development of the third generation <strong>IDP</strong> for the Municipality which<br />
commenced at the beginning of the 2011 / 2012 financial year, a thorough situational<br />
analysis was undertaken of the Ulundi municipal area; the result of the analysis was<br />
captured in the various functional areas that comprise the five national key performance<br />
indicators to which reference was made above. As part of the review of the <strong>IDP</strong> for<br />
29