Concrete
Concrete
Concrete
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Concrete</strong> Placement Options<br />
‣ Method 1 - Place pilot lanes<br />
Then, place the fill-in i lanes.<br />
first.<br />
• Sufficient delay between the placement<br />
of a pilot lane and the placeme<br />
ent of the<br />
adjacent filler lane<br />
‣ Method 2 - Place the most central<br />
lane first. Then, place a lane<br />
on each<br />
side of the central lane and continue<br />
placing new lanes on alterna<br />
ate sides.<br />
• This is an efficient process, minimizes<br />
equipment turnaround time.