<strong>Concrete</strong> Placement Options<br />

‣ Method 1 - Place pilot lanes<br />

Then, place the fill-in i lanes.<br />

first.<br />

• Sufficient delay between the placement<br />

of a pilot lane and the placeme<br />

ent of the<br />

adjacent filler lane<br />

‣ Method 2 - Place the most central<br />

lane first. Then, place a lane<br />

on each<br />

side of the central lane and continue<br />

placing new lanes on alterna<br />

ate sides.<br />

• This is an efficient process, minimizes<br />

equipment turnaround time.