Test Section<br />

‣Used to evaluate concrete batching, transporting,<br />

placement, finishing, curi<br />

ng & QA/QC<br />

‣First day of paving – min. 500 ft, max. one lot<br />

• Testing equal to production paving testing<br />

• <strong>Concrete</strong> mixture used is designated the approved<br />

mixture for production paving<br />

• TEST SECTION REJECTED IF PAVEMENT IS<br />

DEFICIENT / DEFECTIVE<br />

E & IF THICKNESS NOT<br />

RIGHT<br />

• Pre-test section paving &<br />

rejected test section<br />

considered defective – removed & replaced