21.01.2015 Views

NoetixViews for Oracle Payables - Noetix Technical Support

NoetixViews for Oracle Payables - Noetix Technical Support

NoetixViews for Oracle Payables - Noetix Technical Support

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ledger name, set of books name parameters made optional.<br />

The ledger name parameter of the following answers of the XOP <strong>for</strong>m of the views has been<br />

made optional:<br />

• FA_Adjustments_SLA_GL_Je: What are the asset additions and retirements <strong>for</strong> a<br />

transaction period<br />

• FA_All_Trans_SLA_GL_Je: What are the journals created from asset transactions <strong>for</strong> a<br />

category in a general ledger period<br />

• FA_Asset_Assignments: What assets are being distributed to a specific account<br />

Additionally, the set of books name parameter of the “What assets are being distributed to a<br />

specific account” answer of the XOP <strong>for</strong>m of the FA_Asset_Assignments view has been made<br />

optional.<br />

<strong>Noetix</strong>Answers <strong>for</strong> <strong>Oracle</strong> Bill of Materials<br />

The following answers have been modified in this module:<br />

BOM_Where_Used<br />

For the XOP <strong>for</strong>m of the view, the Assembly_Organization_Name column, assembly organization<br />

name parameter, Component_Organization_Name column, and component organization name<br />

parameter have been added to the answer of the view.<br />

Column, parameter added to answers <strong>for</strong> Bills of Material.<br />

For the XOP <strong>for</strong>m of the following views, the Organization_Name column and organization name<br />

parameter have been added to the corresponding answers.<br />

• BOM_Assemblies: What assembly items have a bill of material<br />

• BOM_Bills: What components (single level) will be on a given asssembly and revision<br />

• BOM_Bill_Costs: What is the current cost of materials <strong>for</strong> a given assembly<br />

• BOM_Bill_Last_Updated: Which bills have been changed since their last update<br />

• BOM_Bill_Onhand_Items: What are the on hand quantities <strong>for</strong> the components of a bill of<br />

material<br />

• BOM_Current_Structured_Bills: What is the indented bill of materials <strong>for</strong> the current<br />

revision of a given assembly item<br />

• BOM_Current_Summary:<br />

o How many units of a specific component do I need to build the current revision of a<br />

specific assembly<br />

o What are the components needed to build an assembly<br />

• BOM_Implemented_Bills: What is the implemented bill of materials (single level details) <strong>for</strong><br />

a given assembly<br />

• BOM_Implemented_Summary: What are the consolidated material requirements of an<br />

implemented Bill of Materials (up to 7 levels) <strong>for</strong> a given assembly<br />

• BOM_Resources: What are the resources available to be assigned to a BOM routing <strong>for</strong> a<br />

given cost type<br />

<strong>Noetix</strong> Corporation 29 support.noetix.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!