(vi)<br />

<strong>The</strong> solid waste in the form of over burden, sub-grade ore and<br />

nickel ore bearing material shall be stacked separately.<br />

<strong>The</strong> solid waste in the form of over burden, sub-grade ore and nickel ore<br />

bearing material are being stacked separately.<br />

Over burden Qty (CuM)<br />

(Including Nickel<br />

bearing material)<br />

Target as per<br />

mining Scheme<br />

for 2012-13<br />

During the year<br />

(April'12 to<br />

Sept'12)<br />

CUMULATIVE<br />

TOTAL<br />

875288 238675.34 7580533.34<br />

Sub Grade Qty. (MT) Nil Nil 6,12,929<br />

Nickel Ore Material Qty<br />

(CuM)<br />

2-3% of total OB<br />

excavation<br />

8399 11,11,039<br />

(vii)<br />

<strong>The</strong> overburden generated shall be stacked at earmarked dump<br />

site only and it should not be kept active for a long period of time.<br />

<strong>The</strong> overburden generated is stacked at earmarked dump site and it is<br />

stabilized by vegetating scientifically with suitable native and other species<br />

without keeping the dump active for a long period of time.<br />

<strong>The</strong> total height of the dump shall not exceed 60m.<br />

<strong>The</strong> total height of the dump is 60m (partly) at the end of September’12.<br />

Proper terracing of OB dump should be carried out so that the<br />

overall slope shall not exceed 28 degree.<br />

<strong>The</strong> recommendations made in the slope stability study carried<br />

out through Central Mining Research Institute shall be effectively<br />

implemented.<br />

<strong>The</strong> OB dump should be scientifically vegetated with suitable<br />

native species to prevent erosion and surface run off.<br />

In critical areas, use of geo textiles shall be undertaken for<br />

stabilization of the dump.<br />

Proper terracing of OB dump has been carried out so that the overall slope is<br />

25 degree at the end of month sept 12.<br />

<strong>The</strong> recommendations made in the slope stability study carried out through<br />

Central Institute of Mining and Fuel Research are being implemented<br />

effectively.<br />

OB Dump has been stabilised by planting native species such as Bahada,<br />

Neem, Sisoo, Chakunda etc.<br />

Earlier, coir matting over an area of 2976m 2 at slope of the 1 st stage OB dump<br />

was carried out. During the period under review, coir matting over an<br />

additional area of 3890m 2 has been carried out at slope of the 2 nd stage OB<br />

dump for the purpose of stabilization and to avoid generation of suspended<br />

solids from the fresh (finalised) dump slope during rainy season.