(vi)<br />
<strong>The</strong> solid waste in the form of over burden, sub-grade ore and<br />
nickel ore bearing material shall be stacked separately.<br />
<strong>The</strong> solid waste in the form of over burden, sub-grade ore and nickel ore<br />
bearing material are being stacked separately.<br />
Over burden Qty (CuM)<br />
(Including Nickel<br />
bearing material)<br />
Target as per<br />
mining Scheme<br />
for 2012-13<br />
During the year<br />
(April'12 to<br />
Sept'12)<br />
CUMULATIVE<br />
TOTAL<br />
875288 238675.34 7580533.34<br />
Sub Grade Qty. (MT) Nil Nil 6,12,929<br />
Nickel Ore Material Qty<br />
(CuM)<br />
2-3% of total OB<br />
excavation<br />
8399 11,11,039<br />
(vii)<br />
<strong>The</strong> overburden generated shall be stacked at earmarked dump<br />
site only and it should not be kept active for a long period of time.<br />
<strong>The</strong> overburden generated is stacked at earmarked dump site and it is<br />
stabilized by vegetating scientifically with suitable native and other species<br />
without keeping the dump active for a long period of time.<br />
<strong>The</strong> total height of the dump shall not exceed 60m.<br />
<strong>The</strong> total height of the dump is 60m (partly) at the end of September’12.<br />
Proper terracing of OB dump should be carried out so that the<br />
overall slope shall not exceed 28 degree.<br />
<strong>The</strong> recommendations made in the slope stability study carried<br />
out through Central Mining Research Institute shall be effectively<br />
implemented.<br />
<strong>The</strong> OB dump should be scientifically vegetated with suitable<br />
native species to prevent erosion and surface run off.<br />
In critical areas, use of geo textiles shall be undertaken for<br />
stabilization of the dump.<br />
Proper terracing of OB dump has been carried out so that the overall slope is<br />
25 degree at the end of month sept 12.<br />
<strong>The</strong> recommendations made in the slope stability study carried out through<br />
Central Institute of Mining and Fuel Research are being implemented<br />
effectively.<br />
OB Dump has been stabilised by planting native species such as Bahada,<br />
Neem, Sisoo, Chakunda etc.<br />
Earlier, coir matting over an area of 2976m 2 at slope of the 1 st stage OB dump<br />
was carried out. During the period under review, coir matting over an<br />
additional area of 3890m 2 has been carried out at slope of the 2 nd stage OB<br />
dump for the purpose of stabilization and to avoid generation of suspended<br />
solids from the fresh (finalised) dump slope during rainy season.