20.01.2015 Views

njit-etd2003-081 - New Jersey Institute of Technology

njit-etd2003-081 - New Jersey Institute of Technology

njit-etd2003-081 - New Jersey Institute of Technology

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

222<br />

Figure 5.58 Bode plot <strong>of</strong> the HRV model using RSP as input and HR IIBI as output.<br />

Figures 5.58 and 5.59 show the poles/zeros plot and the Bode plot <strong>of</strong> the blackbox<br />

model calculated using the rsp as input and iibi as output. Figure 5.60 indicates the<br />

comparison between the system and the simulated amplitude and phase response. Notice<br />

that even with a simple ARX model, the amplitude and the low frequency phase <strong>of</strong> the<br />

Bode plot <strong>of</strong> the system and the simulated model match relatively well. The phase plot <strong>of</strong><br />

the real system and the simulated model seem to diverge greatly for frequencies beyond<br />

the cut-<strong>of</strong>f frequency.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!