1 General Provisions<br />

1.1 Public Utilities<br />

Information provided to the Contractor is neither necessarily complete nor accurate and is provided<br />

for general information only. The Contractor shall investigate the existence and location of buried<br />

and overhead public and private services within the working area. The Contractor shall satisfy itself<br />

as to their exact location in liaison with the relevant service authority.<br />

The Contractor shall comply with the guidelines issued by the Office of the Technical Regulator and<br />

relevant authorities when working in the vicinity of underground and overhead services. The<br />

Contractor shall take due care when working in the vicinity of existing services and take all<br />

necessary precautions during the Contract to protect all services from damage. The Contractor shall<br />

be responsible for any cost resulting from damage to services through its operations.<br />

The Contractor shall be responsible for determining the effect of the existing services on<br />

construction activities, and shall make all arrangements and necessary payments to the respective<br />

authorities for any temporary or permanent relocation of services and new service connections<br />

which may be required by or as a consequence of its operations and the project requirements.<br />

Authorities shall be given six (6) weeks notice prior to any service work being undertaken.<br />

If, while works are in progress, any authority desires to place a service, the Contractor shall allow<br />

reasonable access and working space for the authority to carry out such placement, if so requested<br />

by the Superintendent.<br />

Any existing or abandoned service that is disturbed shall be restored to the satisfaction of the<br />

service authority at the Contractor’s cost.<br />

1.2 Temporary Alterations to Public Utilities<br />

If, during the course of construction works, the Contractor deems it necessary to have Public Utilities<br />

removed or altered to enable easier or quicker construction, such removal or alterations will be<br />

arranged by the Contractor and any costs incurred will be paid by the Contractor.<br />

1.3 Relevant Authorities<br />

The Contractor shall be responsible for liaising with all relevant authorities with regard to<br />

programming of works. Where work is to be undertaken in accordance with relevant authorities’<br />

standards and specifications, the Contractor is to seek and obtain the necessary approvals.<br />

1.4 Survey<br />

1.4.1 Survey Marks<br />

1.4.2 Levels<br />

The attention of the Contractor is drawn to the appropriate sections of the Crown Lands Act and the<br />

Surveyors Act in regard to the care of survey marks.<br />

Existing levels at the time of the most recent survey are supplied for the assistance of the Contractor<br />

and are not intended to indicate every detail of the surface profile.<br />

1.4.3 Verification Surveys<br />

The Contractor shall provide a verification survey detailing the variance between the design level<br />

and the actual level at the following times:<br />

Ref No. 20120236SA1 <strong>Kingscote</strong> <strong>Streets</strong> <strong>Upgrades</strong> Technical Specification 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!