8 Kerbing<br />

This section of the specification details the requirements for supply and construction of kerbing.<br />

Kerbing shall include the construction of upright kerb, median kerb, kerb and gutters, spoon drains,<br />

edge strips, and property crossovers. This section shall be read in conjunction with the design<br />

drawings.<br />

8.1 General<br />

This specification shall be read in conjunction with the following Standards and references, which<br />

are deemed to form a part of this specification.<br />

AS 2876<br />

AS1428.4<br />

AS 3600<br />

AS 1379<br />

AS3610<br />

AS 1012<br />

AS 3972<br />

AS 4671<br />

AS 2578.1<br />

AS 3799<br />

AS 1478<br />

Concrete kerbs and channels (gutters) - Manually or machine placed<br />

Design for access and mobility – tactile indicators<br />

Concrete Structures<br />

Specification and Supply of Concrete<br />

Formwork for Concrete<br />

Methods of testing Concrete<br />

Portland and Blended Cements<br />

Steel Reinforcing Materials<br />

Aggregates and rock for engineering purposes – Concrete Aggregate<br />

Liquid membrane forming curing compounds for concrete<br />

Chemical admixtures for concrete, mortar and grout<br />

8.2 Materials – Kerbing<br />

8.2.1 Concrete<br />

All concrete is to be ready mixed and delivered in agitating trucks in accordance with AS 1379 by the<br />

batch production process, unless approved otherwise by the Superintendent.<br />

The concrete for the various parts of the work shall be so designed and produced that the following<br />

performance requirements are met:<br />

Table 8.1<br />

Concrete Design Criteria – Kerbing<br />

Item f’c at 28 days Slump<br />

Kerb and gutter, slip formed 20 MPa 40 mm<br />

Kerb and gutter, hand formed 20 MPa 80 mm<br />

Kerb ramps and pit aprons 20 MPa 80 mm<br />

Spoon drains 32 MPa 80 mm<br />

Unless otherwise specified all concrete shall have drying shrinkage test results to AS 1012 showing<br />

a maximum (including tolerance) of 650 µm.<br />

Ref No. 20120236SA1 <strong>Kingscote</strong> <strong>Streets</strong> <strong>Upgrades</strong> Technical Specification 38