6 Granular Pavement<br />
This section of the specification details the requirements for supply, spreading, compaction and<br />
maintenance of unbound granular pavements. This section shall be read in conjunction with the<br />
pavement design details of the drawings.<br />
6.1 General<br />
This specification shall be read in conjunction with the following Standards and references, which<br />
are deemed to form a part of this specification.<br />
TSA Master Specification – Part 215<br />
TSA Master Specification – Part 221<br />
TSA Operational Instruction - 21.6<br />
AS 1289<br />
AS 1141<br />
Supply of pavement materials<br />
Un-stabilised granular pavement<br />
Recycled Materials for Transport Infrastructure.<br />
Methods of Testing Soils for Engineering Purposes<br />
Sampling and Testing of Aggregates.<br />
6.2 Materials – Granular Pavement<br />
Granular pavement materials are to be as specified herein or as otherwise approved by the<br />
Superintendent.<br />
The properties of the granular pavement material shall comply with the grading based requirements<br />
as specified in the Transport SA Specification.<br />
6.2.1 Quarried Pavement Materials<br />
Quarried granular pavement materials shall be obtained from the crushing of approved hard, sound,<br />
clean and durable quartzite natural rock in accordance with the Transport SA Specification,<br />
Part 215.<br />
The type, class and size of the quarried pavement materials shall be as detailed in the pavement<br />
design on the design drawings.<br />
6.3 Construction and Workmanship<br />
6.3.1 General<br />
Placement of each granular pavement layer shall not commence until the subgrade or underlying<br />
layers have been inspected by the Superintendent, and any preceding Hold Points have been<br />
released.<br />
6.3.2 Placement of Granular Pavement<br />
Each pavement layer shall be spread as a uniform homogeneous layer, which after compaction and<br />
trimming will provide the compacted layer thickness as specified in the pavement design.<br />
Care shall be taken through the spreading process and at junctions with existing pavements to<br />
ensure material is uniform in moisture and particle distribution. Placement of the material shall be<br />
planned to reduce the number of joints between placement runs.<br />
During and/or following the compaction process each layer shall be trimmed to produce a tight<br />
dense surface to the tolerances specified. Any areas identified as low shall be tyned, respread and<br />
recompacted.<br />