All concrete work shall be in accordance with the requirements of the Concrete and Concrete Work<br />

section of this specification.<br />

4.3.22 Open Earth Channels<br />

Open earth channels shall be constructed in the locations and to the lines, levels, grades and<br />

dimensions as shown on the drawings. The construction shall be carried out in accordance with the<br />

relevant requirements of the Site Preparation and Earthworks section of the specification.<br />

The surplus material from the excavation of the open channel unlined drains shall be disposed of in<br />

the manner described in the Site Preparation and Earthworks Section of this specification.<br />

4.4 Quality Requirements – Stormwater Drainage<br />

4.4.1 Inspections<br />

The following Hold Points are required during the construction of stormwater drainage:<br />

H-SD1<br />

H-SD2<br />

Excavation complete<br />

Pipe-laying complete<br />

H- SD3 Backfilling complete<br />

Note: If the drain is backfilled before the pipeline is check-levelled and inspected by the<br />

Superintendent (Stage 2), either part or ALL of the backfilling may be required to be removed by the<br />

Contractor to facilitate checking and inspection.<br />

Inspection can be made promptly if a request is received the previous day. All materials and<br />

methods used are to be in accordance with sound drainage practice and to the satisfaction of the<br />

Superintendent. The Superintendent may require tests on the job at any stage of construction.<br />

4.4.2 Quality Testing<br />

4.4.2.1 Compaction Testing<br />

Compaction tests are to be carried out at the frequency specified in the Site Preparation and<br />

Earthworks section of this Specification.<br />

4.4.2.2 Concrete Supply<br />

The Contractor shall undertake quality testing of concrete incorporated into kerbing at the following<br />

minimum frequency:<br />

Table 4.3<br />

Item<br />

Compressive Strength<br />

Slump<br />

Concrete testing Frequency<br />

Minimum Testing Frequency<br />

One test cylinder from the first truck, and one on average per 5 trucks<br />

One slump every second truck<br />

Concrete sampling and testing shall be undertaken in accordance with AS 1012.<br />

At completion of the kerbing the Contractor shall clear all water tables of dirt and debris and conduct<br />

a water test to demonstrate that all water tables are free draining.<br />

4.4.2.3 Flow Test<br />

Immediately prior to the practical completion inspection, the Contractor is to undertake a flow test of<br />

all pipes including PVC pipes in the presence of the Superintendent.<br />

Any blockages or concerns with the flow test raised by the Superintendent shall be investigated by<br />

the Contractor and repaired as necessary. The section of pipe is to be flow tested again following<br />

repair.<br />

Ref No. 20120236SA1 <strong>Kingscote</strong> <strong>Streets</strong> <strong>Upgrades</strong> Technical Specification 20