The surface of the base slab shall be screeded off to the levels and cross-sections shown on the<br />

drawings and trowelled to a smooth steel float finish.<br />

4.3.13 Box Culvert Installation - Crown Units<br />

The precast concrete box culvert crown units shall be laid on the previously placed base.<br />

Where precast base slabs are specified, the crown sections shall be accurately positioned so that<br />

the joints between the crown and base sections coincide.<br />

The crown sections shall be seated evenly on the base, by bedding in 1:3 cement and sand mortar if<br />

necessary.<br />

4.3.14 Box Culvert Jointing<br />

Culvert units shall be jointed externally by applying joint sealing tape (Densopol 60HT or similar)<br />

fitted in accordance with the manufacturers recommendations.<br />

The internal rebate of each joint shall be carefully packed with 1:2 cement and sand grout and tooled<br />

to give a smooth finish.<br />

4.3.15 Backfilling and Surface Reinstatement<br />

After the initial backfilling with surround material has been completed, the remainder of the trench<br />

shall be backfilled and the surface reinstated in accordance with the requirements of the Site<br />

Preparation and Earthworks section of this specification.<br />

4.3.16 Drainage Structures<br />

Drainage structures include, headwalls, wing-walls, junction boxes, side entry pits, drop structures<br />

and energy dissipaters.<br />

All drainage structures shall be constructed to the lines, levels and dimensions as shown on the<br />

drawings. The Contractor shall make provision during pipe laying for all such drainage structures by<br />

setting pipes to levels and locations shown on the drawings.<br />

All maintenance holes, junction boxes, inspection pits, side entry pits or other drainage structures<br />

shall be fitted with a cover and frames as approved by the Superintendent. All such covers and<br />

frames shall be supplied by the Contractor and shall include the provision of key and concrete infill<br />

where applicable. They shall be installed in accordance with the manufacturer's instructions.<br />

Concrete work shall comply with the relevant requirements of the AS 3000 Concrete Structures, the<br />

design drawings and any Standard <strong>Council</strong> details. Reinforcement for drainage structures shall be<br />

manufactured and supplied in AS 4671 – “Steel Reinforcing Materials” class N and installed in<br />

accordance with AS 3600 – “Concrete Structures”.<br />

All steel components shall be hot-dip galvanised prior to installation. Covers and frames for drainage<br />

structures will be as per the drawings and in accordance with AS 3996 – “Metal Access Covers,<br />

Road Grates and Frames" and AS 4198 – “Precast Concrete Access Chambers for Sewerage<br />

Applications” as appropriate.<br />

Particular care is to be taken with streamlining of all internal surfaces of sumps, junction boxes and<br />

pipe joints, as required by and shown on the drawings. Joints between drainage lines and precast<br />

drainage structures shall be strengthened with a concrete “bandage” of a minimum of 100 mm thick,<br />

encircling the pipeline at the joint .The inside joint between drainage lines and pipelines shall be<br />

rendered flush with the inside wall of the structure with mortar or equivalent.<br />

Top of the cover or grade including frame shall be flush with the paving surface or 25 mm above the<br />

finished surface of landscaped areas as appropriate.<br />

4.3.16.1 Ground Water Pumping<br />

No concrete shall be placed in water. Should pumping be necessary from the interior of any<br />

excavation, it shall be done in such a manner as to preclude the possibility of the movement of water<br />

through any fresh concrete.<br />

Ref No. 20120236SA1 <strong>Kingscote</strong> <strong>Streets</strong> <strong>Upgrades</strong> Technical Specification 17