3.3.3 Clearance of Surface Vegetation<br />

Prior to the stripping of topsoil, the Contractor is to remove existing surface vegetation, and dispose<br />

off site to a legal place of disposal.<br />

3.3.4 Removal of Trees<br />

Trees shall be removed only where necessary for construction of the works, where nominated on the<br />

drawings or as otherwise directed by the Superintendent. Where trees are to be removed in areas<br />

of proposed structures, stumps and root systems shall be removed to a depth of at least 1.0 m<br />

below formation level<br />

The excavation shall be backfilled with suitable material placed and compacted in layers of 225 mm<br />

maximum thickness to a density at least that of the adjacent undisturbed natural material.<br />

3.3.5 Removal of Rubbish<br />

The Contractor is to remove and dispose of the rubbish material on the site as indicated on the<br />

drawings.<br />

3.3.6 Stripping and Re-spreading of Topsoil<br />

Topsoil shall be stripped from all areas of construction to a nominal depth of 75 mm and shall be<br />

stockpiled on site for later re-use in filling to road reserves, nature strips, batter slopes etc.<br />

Stockpiles shall have adequate drainage and erosion protection and be protected from<br />

contamination by other excavated material, weeds and building debris.<br />

The Contractor shall provide details of proposed temporary topsoil stockpile locations, for approval<br />

by the Superintendent.<br />

Following completion of earthworks topsoil shall be spread on all batters and other areas designated<br />

in a layer with a thickness as specified with the surface of the topsoil after free of lumps greater than<br />

75 mm.<br />

Any topsoil not required for such re-use, or topsoil surplus to requirements, shall be removed from<br />

the site by the Contractor.<br />

3.3.7 Excavation<br />

3.3.7.1 General<br />

The Contractor shall judge for itself the nature of the material to be excavated and will be deemed to<br />

have made due allowance for excavating material of whatever nature may be encountered,<br />

providing that, in the opinion of the Superintendent, it is capable of being excavated by a mechanical<br />

excavator with a capacity appropriate for the situation, without the use of a rock breaker, jack<br />

hammers and/or blasting.<br />

Overcut shall be made good to the satisfaction of the Superintendent at the Contractor's expense.<br />

In the event that soft spots are revealed in the formation, the Contractor shall immediately notify the<br />

Superintendent. If the Superintendent deems it necessary, the Contractor is to carry out further<br />

excavation as directed and backfill the excavation with material selected by the Superintendent.<br />

The cost of the additional excavation and backfilling will be considered as an extra to the contract.<br />

The Contractor must obtain prior approval from the Superintendent prior to the excavation of soft<br />

spots otherwise no claim will be entertained. The Contractor is to record measurements for the<br />

calculation of the volume of additional excavation and filling, and submit these to the Superintendent<br />

for approval.<br />

3.3.7.2 Bulk Excavation<br />

The excavated areas shall be finished to an even surface. The floors and sides of excavations shall<br />

be trimmed to the lines, levels, grades and batters shown on the drawings and within the tolerances<br />

specified.<br />

Ref No. 20120236SA1 <strong>Kingscote</strong> <strong>Streets</strong> <strong>Upgrades</strong> Technical Specification 5