• Material, which, after compaction, contains large particles, which may lead to difficulties in the<br />

excavation of trenches for footings or services etc.<br />

• Single-sized or gap-graded gravels or rock fill that will not break down on compaction, leaving<br />

voids into which finer material may subsequently migrate.<br />

• Saline, chemically aggressive or polluted soils, and carbonate soils where acid disposal may<br />

occur.<br />

• Potential acid sulphate soils.<br />

• Materials that cannot be tested to demonstrate compliance with the specification<br />

3.2.3 Imported Fill Materials<br />

Material that is to be imported to the site and is not a quarry product, shall be assessed and<br />

recommended as being suitable for use on the site by an approved Environmental Consultant in<br />

accordance with the National Environmental Protection (Assessment of Site Contamination)<br />

Measure, and the recommendation must be supported by the Superintendent.<br />

No fill material may be brought into site without written approval from the Superintendent and<br />

appropriate accompanied documentation. Material imported on site that does not meet the<br />

requirement of the National Environmental Protection (Assessment of Site Contamination) Measure<br />

shall be removed from site at the cost of the Contractor.<br />

3.2.4 Unsuitable materials<br />

Unsuitable materials shall be site won materials unable to be compacted to for the construction of<br />

structural fill including:<br />

• organic soil (topsoil)<br />

• fill contaminated through past site usage which contain toxic substances or soluble compounds<br />

• fill containing deleterious materials including, metal, wood, plastic, rubbish, vegetation<br />

• other materials deemed unsuitable by the Superintendent.<br />

3.2.5 Backfilling Sand<br />

Backfilling sand shall be Type D Sand in accordance with DTEI Specification Sa-D.<br />

3.2.6 Garden Loam<br />

Garden Loam shall be an approved sand-loam blend in which all material passes a 2.36 mm sieve.<br />

The material shall be free from weeds, roots, clay lumps and other foreign material, and shall be<br />

suitable for growing lawns and plants.<br />

The total salt content shall not exceed 0.2% by dry weight and the linear shrinkage shall not exceed<br />

10%.<br />

3.3 Construction and Workmanship – Site Preparation and Earthworks<br />

3.3.1 Geotechnical Inspection and Testing Authority (GITA)<br />

The Contractor shall engage a suitably qualified independent Geotechnical Inspection and Testing<br />

Authority (GITA) to undertake inspections and testing as required in accordance with AS 3798 –<br />

Guidelines on Earthworks for Commercial and Residential Developments.<br />

3.3.2 Site Clearance<br />

The site shall be cleared only in those parts on which the specified construction works are to be<br />

carried out, or as otherwise shown on the drawings.<br />

All materials resulting from the site preparation shall be removed from the site and disposed of by<br />

the Contractor at his expense.<br />

Ref No. 20120236SA1 <strong>Kingscote</strong> <strong>Streets</strong> <strong>Upgrades</strong> Technical Specification 4