19.01.2015 Views

Bachelor of Commerce (Digital Marketing) - Postsecondary ...

Bachelor of Commerce (Digital Marketing) - Postsecondary ...

Bachelor of Commerce (Digital Marketing) - Postsecondary ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

C. Progress Towards Achieving Board Ends and College Strategic Directions<br />

Technological Innovation<br />

C.1 Vision and Mission (Policy A-05) (cont’d)<br />

Information Technology Services will work with departments throughout the College to<br />

eliminate paper forms wherever possible by developing and substituting electronic forms<br />

and workflows. E-commerce and electronic payment functions are being reviewed<br />

throughout the College with a view to enhance and evolve these services to improve<br />

productivity, meet customer requirements and comply with emerging industry standards.<br />

The College has allocated new equipment resources for the expansion <strong>of</strong> simulation<br />

technology within the School <strong>of</strong> Nursing. In addition, the College has increased staffing<br />

resources within the simulation labs. These additional investments will allow more students<br />

to access the simulation labs and reduce the need for some clinical placements (which have<br />

become increasingly difficult to arrange for nurses and allied health science students).<br />

Social media functionality will be integrated into the FanshaweOnline learning management<br />

system used by faculty and students throughout the College. This will ensure that<br />

FanshaweOnline <strong>of</strong>fers enhanced collaboration and communication opportunities and takes<br />

advantage <strong>of</strong> complementary social media products where they can add value to the<br />

educational experience or strengthen engagement.<br />

A comprehensive assessment <strong>of</strong> the anticipated Windows 8 Operating System is planned<br />

upon its release in 2012. If the system performs well, planning will commence to upgrade<br />

windows computers to ensure that the College’s computing platforms remain up to date.<br />

To ensure that programs remain current and relevant with changing technology, equipment<br />

upgrades are required each year. The demand always exceeds the available resources and<br />

in the current economic environment, this situation has been exacerbated. Nevertheless, a<br />

number <strong>of</strong> equipment upgrades are planned for the next year. A few examples include:<br />

o<br />

o<br />

o<br />

o<br />

o<br />

o<br />

o<br />

New SmartBoards for classrooms and meeting rooms;<br />

Non-critical emergency power distribution and computer server back-up;<br />

New and replacement high-tech podiums;<br />

Collaborative learning spaces;<br />

Health Sciences lab equipment;<br />

Sheet metal lab renewal; and<br />

Virtualization and cloud computing.<br />

Through the Equipment and Facility Package (EFP) process, new investments will also be<br />

made during the Summer 2012 to upgrade the MAC Computer Labs in M-Building. The use<br />

<strong>of</strong> MAC computers is essential to many <strong>of</strong> the programs within the School <strong>of</strong> Contemporary<br />

Media and the School <strong>of</strong> Design. These investments will ensure that students are using the<br />

latest computer technology in their programs.<br />

- 16 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!