19.01.2015 Views

Crawford Realty Karratha - Aussiehome

Crawford Realty Karratha - Aussiehome

Crawford Realty Karratha - Aussiehome

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Crawford</strong> <strong>Realty</strong> <strong>Karratha</strong><br />

Major Projects Surrounding <strong>Karratha</strong><br />

Ph: 08 9143 1599 Fax: 08 9143 1699<br />

Email: info@crawfordrealtykarratha.com.au<br />

Unit 4, 5 Warambie Road—PO Box 136, <strong>Karratha</strong> WA 6714<br />

www.crawfordrealty.com.au<br />

1


CRAWFORD REALTY KARRATHA<br />

Information Package<br />

Chevron Australia—Gorgon Gas Project<br />

SUMMARY<br />

The Gorgon Gas Project is one of the world’s<br />

largest natural gas projects and the largest single<br />

resource natural gas project in Australia’s history.<br />

LOCATION<br />

The Greater Gorgon Area gas field is located<br />

130KM off the North West coast of WA. Barrow<br />

Island is located 70Kms off WA’s Pilbara Coast.<br />

EMPLOYMENT<br />

The Gorgon Gas Project is set to create more than<br />

10,000 jobs during this construction phase, with<br />

about 300 jobs during the operational phase.<br />

PRODUCTION<br />

The project includes construction of a 15 million<br />

tonnes per annum of LNG (Liquefied Natural Gas)<br />

plant on Barrow Island. The gas plant will have the<br />

capacity to provide 300 terajoules per day of gas to<br />

WA.<br />

Rio Tinto Minerals—Dampier Salt<br />

SUMMARY<br />

Dampier Salt was built in 1967 with the first shipment<br />

to Japan in 1972.<br />

LOCATION<br />

EMPLOYMENT<br />

PRODUCTION<br />

The Dampier Salt site is located between <strong>Karratha</strong><br />

and Dampier and has a total operational area of<br />

10,014 hectares.<br />

Dampier Salt also has a site in Port Hedland and<br />

Lake McLeod, between the three sites, Dampier<br />

Salt has 400 employees.<br />

Dampier Salt produces 4.2 million tonnes of salt<br />

per annum.<br />

The average ship loading rate is 2,500 - 3,000<br />

tonnes/hour of<br />

salt.<br />

The Australian movie ‘Red Dog’ was<br />

partly filmed on the Dampier Salt site<br />

with many employees acting as extras<br />

www.crawfordrealty.com.au<br />

Whilst care has been taken in the preparation of this information, no responsibility is accepted for the accuracy of the whole or any part and<br />

interested persons are advised to make their own enquiries and satisfy themselves in all respects.<br />

2


CRAWFORD REALTY KARRATHA<br />

Information Package<br />

Woodside Energy Ltd—Pluto LNG Project<br />

SUMMARY<br />

LOCATION<br />

EMPLOYMENT<br />

PRODUCTION<br />

The Pluto LNG plant is still in it’s construction phase<br />

which officially began in November 2007.<br />

The first LNG cargo is estimated for March 2012.<br />

The Pluto LNG plant is being constructed on the<br />

Burrup Peninsula which is approximately 28kms<br />

from <strong>Karratha</strong>.<br />

The project has generated more than 5,000<br />

Australia jobs since construction began.<br />

The Pluto LNG Project has a forecast production<br />

capacity of 4.3 million tonnes per year with one<br />

processing train.<br />

North West Shelf Venture—Woodside <strong>Karratha</strong> Gas Plant<br />

SUMMARY<br />

LOCATION<br />

EMPLOYMENT<br />

PRODUCTION<br />

The six companies that form the North West Shelf<br />

Venture are BHP Billiton Petroleum, BP Developments<br />

Aust, Chevron Australia, Japan Australia<br />

LNG, Shell Developments and Woodside Energy Ltd<br />

who is also the operator of the North West Shelf<br />

Project’s facilities, including the <strong>Karratha</strong> Gas Plant.<br />

Domestic gas is delivered from the KGP to Bunbury<br />

via the Dampier to Bunbury Natural Gas Pipeline.<br />

The Woodside <strong>Karratha</strong> Gas Plant was built in 1984<br />

and covers approximately 200 hectares of land on<br />

the Burrup Peninsula.<br />

There are approximately 430 people employed onshore<br />

and about 450 mariners are employed on the<br />

North West Shelf Venture’s LNG shipping fleet.<br />

The <strong>Karratha</strong> Gas Plant produces 12,000 tonnes per<br />

day of domestic gas, 52,000 tonnes per day of LNG,<br />

4,200 tonnes per day of LPG and 165,000 barrels<br />

per day of condensate.<br />

The LNG capacity of the gas plant 16.3 million<br />

tonnes per annum.<br />

www.crawfordrealty.com.au<br />

Whilst care has been taken in the preparation of this information, no responsibility is accepted for the accuracy of the whole or any part and<br />

interested persons are advised to make their own enquiries and satisfy themselves in all respects.<br />

3


CRAWFORD REALTY KARRATHA<br />

Information Package<br />

Rio Tinto Iron Ore<br />

SUMMARY<br />

EMPLOYMENT<br />

PRODUCTION<br />

LOCATION<br />

With a network of 13 mines, three shipping terminals and the largest privately<br />

owned heavy freight railway in Australia spanning more than 1,400 kilometres, Rio<br />

Tinto’s Pilbara iron ore operations have expanded to an annual capacity of 220<br />

million tonnes, with advanced plans to further expand.<br />

There are 6,556 Rio Tinto Iron Ore employees according to 2009 figures.<br />

Rio Tinto Iron Ore are currently in the midst of an exciting phase of expansion and<br />

growth. Investing over $8 billion in the next five years, with iron operations in the<br />

Pilbara expanding to 333 million tonnes per annum (Mt/a) by 2015.<br />

This is an increase of more than 50 per cent of current capacity, representing the<br />

largest mining project in Australian history.<br />

Although the iron ore mines are further inland <strong>Karratha</strong> and surrounding towns<br />

house many Rio Tinto employees who work at the Dampier and Cape Lambert Ports<br />

and the train maintenance sites.<br />

Cape Lambert Port<br />

Dampier Port Facilities<br />

<br />

The Cape Lambert is located 40km’s<br />

<br />

The Rio Tinto Dampier Port facilities<br />

north of <strong>Karratha</strong>.<br />

include shipping terminals at Parker<br />

<br />

This port has an annual capacity to<br />

Point and East Intercourse Island. Both<br />

handle 80 million tonnes of iron ore.<br />

of these terminals are located in the<br />

<br />

Individual ships at the port take<br />

Dampier vicinity and have the capacity<br />

between 24 and 36 hours to load.<br />

to dock multiple Iron Ore carriers at<br />

<br />

The wharf at Cape Lambert is 3 kms<br />

any one time.<br />

long, 30 metres high and one of the<br />

largest, longest and deepest wharves<br />

in Australia.<br />

<br />

Dampier also houses the Seven Mile<br />

site where both the locomotives and<br />

ore cars are maintained.<br />

www.crawfordrealty.com.au<br />

Whilst care has been taken in the preparation of this information, no responsibility is accepted for the accuracy of the whole or any part and<br />

interested persons are advised to make their own enquiries and satisfy themselves in all respects.<br />

4


CRAWFORD REALTY KARRATHA<br />

Information Package<br />

API - Proposed Anketell Point Port<br />

SUMMARY<br />

LOCATION<br />

EMPLOYMENT<br />

PRODUCTION<br />

Proposed joint venture between Aquila & AMCI to<br />

mine and export Iron Ore in the Pilbara.<br />

Anketell Point is located between Wickham and<br />

Cape Lambert on the Pilbara coast line.<br />

Construction phase will provide 3,500 jobs, and<br />

after completion the port and mine will have a<br />

workforce of 1,000.<br />

The project will produce 30 million tonnes of ore<br />

per annum and $2.4 billion per year.<br />

Each train will carry approximately 15,000 tonnes of<br />

iron ore from processing to port<br />

If the proposed project goes ahead, first iron on<br />

ship is scheduled for 2014<br />

Other mining companies such as MCC and FMG<br />

have an interest in the use of the proposed port at<br />

Anketell Point.<br />

<strong>Karratha</strong>—City Of the North<br />

As part of the state government’s Pilbara Cities plan, <strong>Karratha</strong> will<br />

be transformed from the current mining town of approximately<br />

18,000 people into a significant regional city with population of<br />

50,000.<br />

There is a State Government commitment of $300 million from the<br />

Royalties for Regions project.<br />

The town will be revitalised with investment in housing, community<br />

facilities, hospitals, medical and health centres, education and<br />

training facilities, waterfronts and town centres.<br />

www.crawfordrealty.com.au<br />

Whilst care has been taken in the preparation of this information, no responsibility is accepted for the accuracy of the whole or any part and<br />

interested persons are advised to make their own enquiries and satisfy themselves in all respects.<br />

5


CRAWFORD REALTY KARRATHA<br />

Information Package<br />

<strong>Karratha</strong> Mining Camps<br />

CAPACITY<br />

LOCATION<br />

FACILITIES<br />

Gap Ridge Village<br />

1,500 man capacity<br />

Madigan Road, <strong>Karratha</strong><br />

Kitchen/Diner, retail shop, wet mess, beer garden,<br />

laundry building and gym<br />

CAPACITY<br />

LOCATION<br />

FACILITIES<br />

Searipple Camp<br />

Searipple Road, Bulgarra<br />

Pools, gym, recreation room, cyclone shelter and<br />

internet room<br />

CAPACITY<br />

LOCATION<br />

FACILITIES<br />

Kingfisher Camp<br />

250 room capacity<br />

Madigan Road, <strong>Karratha</strong><br />

Entertainment and leisure facilities, gym, pool, bay and<br />

on-site dining (catered meals)<br />

CAPACITY<br />

LOCATION<br />

FACILITIES<br />

Bay Village<br />

522 person capacity<br />

Balmoral Road, Nickol<br />

Gym, recreation facilities, on-site dining<br />

www.crawfordrealty.com.au<br />

Whilst care has been taken in the preparation of this information, no responsibility is accepted for the accuracy of the whole or any part and<br />

interested persons are advised to make their own enquiries and satisfy themselves in all respects.<br />

6


CRAWFORD REALTY KARRATHA<br />

Information Package<br />

<strong>Karratha</strong> Accommodation<br />

<strong>Karratha</strong> International Hotel<br />

CAPACITY<br />

LOCATION<br />

OCCUPANCY<br />

80 rooms<br />

Corner of Hillview and Dampier roads, <strong>Karratha</strong><br />

Usually fully booked during the week with some<br />

vacancies on weekends. This hotel is usually booked out<br />

for 1 to 2 weeks.<br />

All Seasons<br />

CAPACITY<br />

LOCATION<br />

OCCUPANCY<br />

60 rooms<br />

Searipple Road, <strong>Karratha</strong><br />

Generally fully booked from Monday to Thursday. This<br />

hotel is usually booked from 2—3 weeks.<br />

Best Western <strong>Karratha</strong> Central Apartments<br />

CAPACITY<br />

LOCATION<br />

OCCUPANCY<br />

84 rooms<br />

Searipple Road, <strong>Karratha</strong><br />

Usually fully booked mid—week with some vacancies on<br />

weekends. This hotel can be fully booked for 2—3 weeks<br />

at a time.<br />

Dampier Mermaid Hotel and Motel<br />

CAPACITY<br />

LOCATION<br />

OCCUPANCY<br />

68 Rooms<br />

The Esplanade, Dampier<br />

Usually fully booked all of the time. Due to convenient<br />

location this hotel is booked long term by companies.<br />

Pilbara Holiday Park<br />

CAPACITY<br />

LOCATION<br />

Sites 189<br />

Rosemary Road, <strong>Karratha</strong><br />

CAPACITY<br />

LOCATION<br />

Balmoral Holiday Park<br />

Sites 229<br />

Balmoral Road, <strong>Karratha</strong><br />

www.crawfordrealty.com.au<br />

Whilst care has been taken in the preparation of this information, no responsibility is accepted for the accuracy of the whole or any part and<br />

interested persons are advised to make their own enquiries and satisfy themselves in all respects.<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!