Major Projects Surrounding <strong>Karratha</strong><br />
Ph: 08 9143 1599 Fax: 08 9143 1699<br />
Email: info@crawfordrealtykarratha.com.au<br />
Unit 4, 5 Warambie Road—PO Box 136, <strong>Karratha</strong> WA 6714<br />
www.crawfordrealty.com.au<br />
1
CRAWFORD REALTY KARRATHA<br />
Information Package<br />
Chevron Australia—Gorgon Gas Project<br />
SUMMARY<br />
The Gorgon Gas Project is one of the world’s<br />
largest natural gas projects and the largest single<br />
resource natural gas project in Australia’s history.<br />
LOCATION<br />
The Greater Gorgon Area gas field is located<br />
130KM off the North West coast of WA. Barrow<br />
Island is located 70Kms off WA’s Pilbara Coast.<br />
EMPLOYMENT<br />
The Gorgon Gas Project is set to create more than<br />
10,000 jobs during this construction phase, with<br />
about 300 jobs during the operational phase.<br />
PRODUCTION<br />
The project includes construction of a 15 million<br />
tonnes per annum of LNG (Liquefied Natural Gas)<br />
plant on Barrow Island. The gas plant will have the<br />
capacity to provide 300 terajoules per day of gas to<br />
WA.<br />
Rio Tinto Minerals—Dampier Salt<br />
SUMMARY<br />
Dampier Salt was built in 1967 with the first shipment<br />
to Japan in 1972.<br />
LOCATION<br />
EMPLOYMENT<br />
PRODUCTION<br />
The Dampier Salt site is located between <strong>Karratha</strong><br />
and Dampier and has a total operational area of<br />
10,014 hectares.<br />
Dampier Salt also has a site in Port Hedland and<br />
Lake McLeod, between the three sites, Dampier<br />
Salt has 400 employees.<br />
Dampier Salt produces 4.2 million tonnes of salt<br />
per annum.<br />
The average ship loading rate is 2,500 - 3,000<br />
tonnes/hour of<br />
salt.<br />
The Australian movie ‘Red Dog’ was<br />
partly filmed on the Dampier Salt site<br />
with many employees acting as extras<br />
www.crawfordrealty.com.au<br />
Whilst care has been taken in the preparation of this information, no responsibility is accepted for the accuracy of the whole or any part and<br />
interested persons are advised to make their own enquiries and satisfy themselves in all respects.<br />
2
CRAWFORD REALTY KARRATHA<br />
Information Package<br />
Woodside Energy Ltd—Pluto LNG Project<br />
SUMMARY<br />
LOCATION<br />
EMPLOYMENT<br />
PRODUCTION<br />
The Pluto LNG plant is still in it’s construction phase<br />
which officially began in November 2007.<br />
The first LNG cargo is estimated for March 2012.<br />
The Pluto LNG plant is being constructed on the<br />
Burrup Peninsula which is approximately 28kms<br />
from <strong>Karratha</strong>.<br />
The project has generated more than 5,000<br />
Australia jobs since construction began.<br />
The Pluto LNG Project has a forecast production<br />
capacity of 4.3 million tonnes per year with one<br />
processing train.<br />
North West Shelf Venture—Woodside <strong>Karratha</strong> Gas Plant<br />
SUMMARY<br />
LOCATION<br />
EMPLOYMENT<br />
PRODUCTION<br />
The six companies that form the North West Shelf<br />
Venture are BHP Billiton Petroleum, BP Developments<br />
Aust, Chevron Australia, Japan Australia<br />
LNG, Shell Developments and Woodside Energy Ltd<br />
who is also the operator of the North West Shelf<br />
Project’s facilities, including the <strong>Karratha</strong> Gas Plant.<br />
Domestic gas is delivered from the KGP to Bunbury<br />
via the Dampier to Bunbury Natural Gas Pipeline.<br />
The Woodside <strong>Karratha</strong> Gas Plant was built in 1984<br />
and covers approximately 200 hectares of land on<br />
the Burrup Peninsula.<br />
There are approximately 430 people employed onshore<br />
and about 450 mariners are employed on the<br />
North West Shelf Venture’s LNG shipping fleet.<br />
The <strong>Karratha</strong> Gas Plant produces 12,000 tonnes per<br />
day of domestic gas, 52,000 tonnes per day of LNG,<br />
4,200 tonnes per day of LPG and 165,000 barrels<br />
per day of condensate.<br />
The LNG capacity of the gas plant 16.3 million<br />
tonnes per annum.<br />
www.crawfordrealty.com.au<br />
Whilst care has been taken in the preparation of this information, no responsibility is accepted for the accuracy of the whole or any part and<br />
interested persons are advised to make their own enquiries and satisfy themselves in all respects.<br />
3
CRAWFORD REALTY KARRATHA<br />
Information Package<br />
Rio Tinto Iron Ore<br />
SUMMARY<br />
EMPLOYMENT<br />
PRODUCTION<br />
LOCATION<br />
With a network of 13 mines, three shipping terminals and the largest privately<br />
owned heavy freight railway in Australia spanning more than 1,400 kilometres, Rio<br />
Tinto’s Pilbara iron ore operations have expanded to an annual capacity of 220<br />
million tonnes, with advanced plans to further expand.<br />
There are 6,556 Rio Tinto Iron Ore employees according to 2009 figures.<br />
Rio Tinto Iron Ore are currently in the midst of an exciting phase of expansion and<br />
growth. Investing over $8 billion in the next five years, with iron operations in the<br />
Pilbara expanding to 333 million tonnes per annum (Mt/a) by 2015.<br />
This is an increase of more than 50 per cent of current capacity, representing the<br />
largest mining project in Australian history.<br />
Although the iron ore mines are further inland <strong>Karratha</strong> and surrounding towns<br />
house many Rio Tinto employees who work at the Dampier and Cape Lambert Ports<br />
and the train maintenance sites.<br />
Cape Lambert Port<br />
Dampier Port Facilities<br />
<br />
The Cape Lambert is located 40km’s<br />
<br />
The Rio Tinto Dampier Port facilities<br />
north of <strong>Karratha</strong>.<br />
include shipping terminals at Parker<br />
<br />
This port has an annual capacity to<br />
Point and East Intercourse Island. Both<br />
handle 80 million tonnes of iron ore.<br />
of these terminals are located in the<br />
<br />
Individual ships at the port take<br />
Dampier vicinity and have the capacity<br />
between 24 and 36 hours to load.<br />
to dock multiple Iron Ore carriers at<br />
<br />
The wharf at Cape Lambert is 3 kms<br />
any one time.<br />
long, 30 metres high and one of the<br />
largest, longest and deepest wharves<br />
in Australia.<br />
<br />
Dampier also houses the Seven Mile<br />
site where both the locomotives and<br />
ore cars are maintained.<br />
www.crawfordrealty.com.au<br />
Whilst care has been taken in the preparation of this information, no responsibility is accepted for the accuracy of the whole or any part and<br />
interested persons are advised to make their own enquiries and satisfy themselves in all respects.<br />
4
CRAWFORD REALTY KARRATHA<br />
Information Package<br />
API - Proposed Anketell Point Port<br />
SUMMARY<br />
LOCATION<br />
EMPLOYMENT<br />
PRODUCTION<br />
Proposed joint venture between Aquila & AMCI to<br />
mine and export Iron Ore in the Pilbara.<br />
Anketell Point is located between Wickham and<br />
Cape Lambert on the Pilbara coast line.<br />
Construction phase will provide 3,500 jobs, and<br />
after completion the port and mine will have a<br />
workforce of 1,000.<br />
The project will produce 30 million tonnes of ore<br />
per annum and $2.4 billion per year.<br />
Each train will carry approximately 15,000 tonnes of<br />
iron ore from processing to port<br />
If the proposed project goes ahead, first iron on<br />
ship is scheduled for 2014<br />
Other mining companies such as MCC and FMG<br />
have an interest in the use of the proposed port at<br />
Anketell Point.<br />
<strong>Karratha</strong>—City Of the North<br />
As part of the state government’s Pilbara Cities plan, <strong>Karratha</strong> will<br />
be transformed from the current mining town of approximately<br />
18,000 people into a significant regional city with population of<br />
50,000.<br />
There is a State Government commitment of $300 million from the<br />
Royalties for Regions project.<br />
The town will be revitalised with investment in housing, community<br />
facilities, hospitals, medical and health centres, education and<br />
training facilities, waterfronts and town centres.<br />
www.crawfordrealty.com.au<br />
Whilst care has been taken in the preparation of this information, no responsibility is accepted for the accuracy of the whole or any part and<br />
interested persons are advised to make their own enquiries and satisfy themselves in all respects.<br />
5
CRAWFORD REALTY KARRATHA<br />
Information Package<br />
<strong>Karratha</strong> Mining Camps<br />
CAPACITY<br />
LOCATION<br />
FACILITIES<br />
Gap Ridge Village<br />
1,500 man capacity<br />
Madigan Road, <strong>Karratha</strong><br />
Kitchen/Diner, retail shop, wet mess, beer garden,<br />
laundry building and gym<br />
CAPACITY<br />
LOCATION<br />
FACILITIES<br />
Searipple Camp<br />
Searipple Road, Bulgarra<br />
Pools, gym, recreation room, cyclone shelter and<br />
internet room<br />
CAPACITY<br />
LOCATION<br />
FACILITIES<br />
Kingfisher Camp<br />
250 room capacity<br />
Madigan Road, <strong>Karratha</strong><br />
Entertainment and leisure facilities, gym, pool, bay and<br />
on-site dining (catered meals)<br />
CAPACITY<br />
LOCATION<br />
FACILITIES<br />
Bay Village<br />
522 person capacity<br />
Balmoral Road, Nickol<br />
Gym, recreation facilities, on-site dining<br />
www.crawfordrealty.com.au<br />
Whilst care has been taken in the preparation of this information, no responsibility is accepted for the accuracy of the whole or any part and<br />
interested persons are advised to make their own enquiries and satisfy themselves in all respects.<br />
6
CRAWFORD REALTY KARRATHA<br />
Information Package<br />
<strong>Karratha</strong> Accommodation<br />
<strong>Karratha</strong> International Hotel<br />
CAPACITY<br />
LOCATION<br />
OCCUPANCY<br />
80 rooms<br />
Corner of Hillview and Dampier roads, <strong>Karratha</strong><br />
Usually fully booked during the week with some<br />
vacancies on weekends. This hotel is usually booked out<br />
for 1 to 2 weeks.<br />
All Seasons<br />
CAPACITY<br />
LOCATION<br />
OCCUPANCY<br />
60 rooms<br />
Searipple Road, <strong>Karratha</strong><br />
Generally fully booked from Monday to Thursday. This<br />
hotel is usually booked from 2—3 weeks.<br />
Best Western <strong>Karratha</strong> Central Apartments<br />
CAPACITY<br />
LOCATION<br />
OCCUPANCY<br />
84 rooms<br />
Searipple Road, <strong>Karratha</strong><br />
Usually fully booked mid—week with some vacancies on<br />
weekends. This hotel can be fully booked for 2—3 weeks<br />
at a time.<br />
Dampier Mermaid Hotel and Motel<br />
CAPACITY<br />
LOCATION<br />
OCCUPANCY<br />
68 Rooms<br />
The Esplanade, Dampier<br />
Usually fully booked all of the time. Due to convenient<br />
location this hotel is booked long term by companies.<br />
Pilbara Holiday Park<br />
CAPACITY<br />
LOCATION<br />
Sites 189<br />
Rosemary Road, <strong>Karratha</strong><br />
CAPACITY<br />
LOCATION<br />
Balmoral Holiday Park<br />
Sites 229<br />
Balmoral Road, <strong>Karratha</strong><br />
www.crawfordrealty.com.au<br />
Whilst care has been taken in the preparation of this information, no responsibility is accepted for the accuracy of the whole or any part and<br />
interested persons are advised to make their own enquiries and satisfy themselves in all respects.<br />
7