MOL Plc. Annual General Meeting 2013 Documents<br />

Exploration and appraisal<br />

wells<br />

KAZAKHSTAN<br />

Rhozkovsky U-21<br />

Rhozkovsky U-22<br />

Rhozkovsky U-23<br />

Rhozkovsky U-26<br />

SK-1<br />

OMAN<br />

Hawasina-1<br />

Q1 2012 Q2 2012 Q3 2012 Q4 2012 Progress Comment / Test result<br />

waiting for<br />

Well test expected in H1 2013.<br />

test<br />

waiting for<br />

Well test expected in H1 2013.<br />

test<br />

Testing started in August 2012 and finished in December 2012. Test result of the<br />

well on the 11 mm choke – Tournasian reservoir: gas (239.611 m3/day) and<br />

tested<br />

condensate (351 m3/day) and Bobrikovsky reservoir: gas (124.562 m3/day and<br />

light oil (301 m3/day). Total: ~2,193 boepd gas, 3,912 boepd condensate.<br />

under<br />

drilling<br />

under<br />

drilling<br />

under<br />

drilling<br />

The well was spudded in October 20, 2012; the planned TD is 5,200 m. Current<br />

depth at end December was 3,680m. Well test is expected in Q1 2013.<br />

Drilling of SK-1 well started on 21st September and MOL acquired 49% share in<br />

the North Karpovsky block on 15 November 2012. Actual depth at end of<br />

December was 3,742m, well test is expected in Q2 2013.<br />

Drilling started on 4 December 2012 with planned T.D.: 4,100m . Depth was<br />

159m at the end of 2012. Well test is expected in Q3 2012.<br />

HUNGARY<br />

Komádi-Ny-2 tested Discovery. Test result: 276 boepd oil and 38 boepd gas via 6mm choke<br />

Nagykörös-D-3 tested Discovery. Test result: 202 boepd gas via 8mm choke<br />

Nagyszénás-ÉK-1 tested Dry with gas show<br />

Vízvár-S-2<br />

tested<br />

Discovery. Test result: 246 boepd oil via 6 mm choke and 391 boepd gas via<br />

8mm choke<br />

Tiszi-2 tested Discovery. Test result: 382 boepd gas via 8mm choke<br />

Tápióság-1 tested Dry<br />

Gutorfölde-1 tested Discovery. Test result: 484 boepd gas via 9.5mm choke<br />

Rádi-1 tested Discovery. Test result: 336 boepd gas via 7.5 mm choke<br />

Bak-D-1 tested Dry<br />

Bak-DNy-1 tested Dry<br />

Zaláta-K-1 tested Dry with gas shows<br />

Belezna-K-2<br />

tested<br />

Discovery. Probably not commercial quantity. Test result: 37 boepd gas via 6mm<br />

choke<br />

Nagykáta-Ny-1<br />

under Well test completed 9, January 2013. Discovery. Test result: 1,206 boepd oil via<br />

testing 6mm choke<br />

Csévharaszt-2<br />

under<br />

testing<br />

Well test completed 10, January 2013. Dry.<br />

Beru-4/unconventional<br />

Beru-6/unconventional<br />

SYRIA<br />

Mudawara 3<br />

CROATIA<br />

Hrastilnica-3<br />

Đeletovci-1 Zapad<br />

Antunovac-1<br />

EGYPT<br />

Rawda SE-1<br />

under<br />

testing<br />

waiting for<br />

test<br />

waiting for<br />

test<br />

tested<br />

tested<br />

unsuccessful<br />

unsuccessful<br />

Drilled, fracturing program completed, under testing, long pilot production<br />

test. Gas production rate has stabilized at the level of 16,000 m3/d (84 boepd).<br />

In 2012 total gas production: 7.3m m3, condensate production: 678m3. In 2012<br />

total CH production was 0.06 Mmboe from the well.<br />

Drilling completed, conventional test completed, waiting for hydraulic<br />

fracturing<br />

Well drilled in Q4 2010, test postponed due to force majeure.<br />

Drilled in Q1 2012. Tested in Q3 2012. Test data showed daily oil production of<br />

approximately 1,450 bbl (Qo=cca 400m3/day).<br />

Start of drilling at the end of Q1 2012 (March). Drilling finished in Q2 2012 (at<br />

the end of April). Tested in Q3. Tests showed daily oil production of<br />

approximately 600 bbl. (Totally obtained: Qo= 391.7 m3; Qw= 3.74 m3 in 108.5<br />

hours of testing.)<br />

Drilled in Q4 2012 (from October to December). There were no hydrocarbon<br />

shows while drilling - not tested, unsuccessful.<br />

Drilled in Q2. Not tested. Unsuccessful. There were no hydrocarbon shows<br />

while drilling and the well was plugged and abandoned.<br />

Sidra-2<br />

tested<br />

Drilled and completed in Q3. Tested in Q3. Oil producer well from Lower Abu<br />

Roash "G" Member. Test results: 1,245 BOPD for 24 hr; WC 1,2%; API 39.5.<br />

drilling<br />

test<br />

drilling and test<br />

in the same<br />

Key exploration results were<br />

as follows:<br />

In the Kurdistan Region of Iraq:<br />

- After finalising drilling in 2012 in the Akri-Bijeel Block, our<br />

second discovery was announced at the beginning of 2013 when<br />

medium density crude was found in the Bakrman-1 exploration<br />

14/94