MOL Plc. Annual General Meeting 2013 Documents<br />

Outstanding exploration<br />

drilling success maintained,<br />

reaching 64% in 2012<br />

Exploration activities in 2012<br />

Our intensive exploration activities delivered successes in the<br />

Kurdistan Region of Iraq, Kazakhstan, Pakistan and in the CEE<br />

region.<br />

During 2012, 25 exploration wells were tested out of which 16 were<br />

successful. 13 additional wells were under or waiting for testing,<br />

while 5 wells were under drilling at the end of the period. As in<br />

previous years, we maintained our outstanding exploration drilling<br />

success rate which reached 64% in 2012.<br />

Status of exploration and appraisal wells:<br />

Exploration and appraisal<br />

wells<br />

KURDISTAN REGION OF IRAQ<br />

Q1 2012 Q2 2012 Q3 2012 Q4 2012 Progress Comment / Test result<br />

Bijell-3 (Aqra-1)<br />

tested<br />

Drilling started on 17 January 2012, final depth reached was 4,980m in August.<br />

Testing was finished and well was classified as unsuccessful in December 2012.<br />

Bakrman-1<br />

Gulak-1<br />

Bijell-7 (Sharfuna-1)<br />

Shaikan-4<br />

Shaikan-5<br />

Shaikan-6<br />

PAKISTAN<br />

Makori East-2<br />

Mami Khel-2<br />

Maramzai-2<br />

Manzalai-10<br />

RUSSIA<br />

Surgut Ayskaya 1<br />

Surgut Atayskaya 2<br />

Prikoltogorskaye-127<br />

Kedrovskoye-105<br />

under<br />

testing<br />

under<br />

testing<br />

under<br />

drilling<br />

tested<br />

tested<br />

tested<br />

tested<br />

tested<br />

tested<br />

under<br />

drilling<br />

Bakrman-1 well was spud on 7th of May 2012, final depth reached in December<br />

was 3,930m. The Second Open Hole test of Bakrman exploration well resulted<br />

2,616 bbl oil (32-35°API) and 5.86 MMscfd (1,070 boepd) gas inflows.<br />

Gulak-1 well was spud on 15 July 2012, final depth reached was 3,640m in<br />

November 2012. The test program was finished. Due to the limited volume of<br />

oil shows resulted by the DST #4, the well will be suspended.<br />

Well was spud on 19th of December 2012. B-7 depths was 353m at the end of<br />

the December.<br />

Five out of the seven tests produced hydrocarbon inflow: Triassic Kurra Chine<br />

formation from intervall 3,010-3,030m yielded condensate 5,086 bcpd and gas<br />

7,151 mscfd. Jurassic Sargelu formation from zones 1,370-1,390 and 1,450-<br />

1,460m had inflow oil 4,580 bpd and 1,050 mscfd gas).<br />

Drilling started on 28 October 2011, drilling finished in June 2012 at 3,745m.<br />

Well test was finished and the well has been completed as a Jurassic producer<br />

with 3,420 boepd heavy oil inflow.<br />

Drilling started in December 2011, final depth reached was 3,545m in May 2012.<br />

Suspended, pending further evaluation.<br />

Drilling started on 5 July 2011, finished on 15 March 2012. Well test was<br />

finished by end May 2012. The well proved to be a gas and oil producer from<br />

multiple reservoirs. It was tied to Makori EPFand started producing on 20<br />

December, 2012. Production at 48/64” choke 23.5 mmcfd gas and 5,045 bblpd<br />

condensate, FWHP 3,949 psi.<br />

Drilling started in 11 June and finished by end of August 2012. The well proved<br />

to be a gas and condensate producer from multiple reservoirs.Completion of<br />

the well was finished by the end October 2012.Tie-in works to CPF are in<br />

progress. Production at 48/64” choke 39.3 mmcfd gas and 1,854 bblpd<br />

condensate, FWHP 3,379 psi.<br />

Drilling started in 28 June and the rig was released after successful testing and<br />

completion on 15 December 2012. Tie-in works to CPF are in progress.<br />

Production at 48/64” choke 38,4 mmcfd gas and 1,500 bblpd condensate, FWHP<br />

3,259 psi.<br />

Drilling started in 2 November 2012, with planned T.D.:3,938m. Well test is<br />

expected in Q1 2013.<br />

waiting for<br />

test<br />

Test continues with hydrofracturing of Jurassic layer and with test production<br />

as well.<br />

waiting for Test continues with hydrofracturing of Jurassic layer and with test production<br />

test as well.<br />

Drilling started on 08.04.2012. Target depth reached on 24 of June (3,365m). The<br />

waiting for well was conserved on 3 September and currently it is on waiting status.<br />

test Continuation of testing with hydrofracturing will be performed in the winter<br />

season of 2013.<br />

under<br />

testing<br />

Drilling started on 17.05.2012. Target depth reached on 20 of September was<br />

2,899m (planned: 2,960m). The well test still ongoing at the end of 2012 due to<br />

the discovery of a new interval, acquisition of new geological information and<br />

the insolvency of a drilling subcontractor<br />

13/94