MOL Plc. Annual General Meeting 2013 Documents<br />

<br />

<br />

<br />

well. The Gulak-1 exploration well’s test program was completed<br />

but, due to the limited volume of oil shows, the well will be<br />

suspended. Surface facility construction and commissioning of<br />

the Bijell Extended Well Test on the Bijell Appraisal is ongoing.<br />

The appraisal program of the Bijell-1 discovery started with the<br />

Bijell-3 appraisal well, which was the riskiest from a geological<br />

point of view. There was no measurable oil flow thus it is<br />

proposed to abandon the well. Our extensive appraisal program<br />

continued and the Bijell-7 appraisal well was spud.<br />

- In the Shaikan Block, appraisal and the early development<br />

program were executed, the appraisal activity finishing when the<br />

Shaikan-6 well test was completed. To reach the ultimate goal of<br />

significantly increased production, assembly work on the first<br />

Shaikan production facility commenced.<br />

In Kazakhstan<br />

- In the Fedorovskoye Block, testing of the U-23 appraisal well<br />

was finished successfully; the well produced gas and condensate<br />

from additional reservoirs. The drilling of the U-26 appraisal<br />

well started in October.<br />

- The agreement to acquire a 49% share in the North<br />

Karpovskiy block, located in the vicinity of Fedorovskoye, was<br />

completed in November. Drilling of the first exploration well, SK-<br />

1, commenced in Q3 2012 and was ongoing at year end.<br />

In Pakistan testing of the Mami Khel-2 and Maramzai-2 wells<br />

was successfully finished; the wells were completed as gas and<br />

condensate producers and were tied in to the early production<br />

facility. Within the scope of development work a new<br />

production well was started and another well was tied in to the<br />

central processing facility.<br />

In the CEE, the main result of our exploration activities was the<br />

aggregated 5 000 boepd discovery during 2012 from two<br />

Croatian and seven Hungarian wells.<br />

Licences acquired in 2012<br />

After MOL was awarded an exploration concession in 2011 in the<br />

Oman 66 block, an exploration and production sharing agreement<br />

was concluded with the Omani Government in September 2012. As a<br />

result, MOL can now start implementing the exploration program at<br />

the block by acquiring seismic data to define drillable prospects.<br />

In Russia, the Yerilkinskiy block was acquired by BaiTex LLC, a 100%<br />

subsidiary of MOL Group, at auction in July, 2012. The Yerilkinskiy<br />

block is located close to the Baitugan producing oilfield. Strong<br />

operating synergies will accrue since main surface facilities already<br />

installed at Baitugan are ready to serve future Yerilikinskiy<br />

production. As a first step, our future exploration commitments<br />

include acquisition of seismic data.<br />

MOL was already expanding its exploration and production activities<br />

to build a broader portfolio in the CEE when the Romanian Ex-6 Block<br />

was awarded to a consortium in which we participate. Exploration<br />

activities will start with 3D seismic acquisition. In January 2013, MOL<br />

increased its stake in the Ex-6 Block to 100%.<br />