<strong>BLOUNT</strong> <strong>COUNTY</strong> PLANNING COMMISSION<br />

REGULAR SESSION<br />

THURSDAY, APRIL 26, 2012<br />

5:30 P.M.<br />

The Blount County Planning Commission met in regular session on Thursday, April<br />

26, 2012, at the Courthouse. Staff was represented by: John Lamb - Director of<br />

Planning, Roger Fields - Building Commissioner, Gary Ferguson, Director of<br />

Environmental Health, Justin Teague, Storm water Program Coordinator, and<br />

Administrative Assistant, Marlene Hodge.<br />

Commissioners Present: David Caldwell – Vice Chairman, Mike Caylor, Brad<br />

Harrison, Tom Hodge, Gerald Kirby, Bruce McClellan, Jerry Roddy, Ed Stucky –<br />

Chairman, Clifford Walker, and Gordon Wright. Commissioners Absent: Geneva<br />

Harrison and Monika Murrell.<br />

The minutes for the March 22, 2012, regular monthly meeting were approved.<br />

Minutes were given to members for review prior to the meeting.<br />

PUBLIC HEARINGS: None<br />

SITE PLANS:<br />

355 Dunavant Drive – addition to an existing industrial building along with<br />

additional parking: The property is identified on Tax Map 009 and Parcel 027.22<br />

and is zoned I - Industrial. The addition to the front of the existing building will be<br />

13,650 square feet that will be built over an existing gravel area. All building setback<br />

requirements will be met by this addition.<br />

The site plan showed an Alternate A and Alternate B parking areas. Alternate A is an<br />

area that was approved on the original site plan as “future parking area”. Both<br />

parking areas are already paved and only require striping. The total disturbed area<br />

will be 0.18 acres and the existing impervious area is 2.83 acres; this is only a 6%<br />

increase of impervious surface and does not require a drainage plan and<br />

calculations to be submitted with the site plan. The required erosion control plan has<br />

been submitted and reviewed by the storm water coordinator.<br />

Buffering is not required in accordance to the zoning regulations nor does it require<br />

elevations since it is located within an industrial park, in accordance to Section<br />

7.15C. This site is serviced by city sewer.<br />

Applicant will be required to obtain all necessary permits prior to construction.<br />

A copy of the site plan and staff memo was mailed to members for review prior to<br />

the meeting.<br />