Miracle City Mall Redevelopment Plan - The City of Titusville, Florida
Miracle City Mall Redevelopment Plan - The City of Titusville, Florida
Miracle City Mall Redevelopment Plan - The City of Titusville, Florida
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
<strong>Redevelopment</strong> <strong>Plan</strong><br />
<strong>City</strong> <strong>of</strong> <strong>Titusville</strong>, <strong>Florida</strong><br />
June 2007
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong><br />
Prepared for:<br />
<strong>City</strong> <strong>of</strong> <strong>Titusville</strong>,<br />
Brevard County, <strong>Florida</strong><br />
Sunrise Properties & Investments, LLC<br />
June 8, 2007
Table <strong>of</strong> Contents<br />
Chapter 1: INTRODUCTION<br />
Overview 5<br />
Context 6<br />
<strong>Plan</strong> Content & Document Organization 7<br />
Chapter 2: INVENTORY and ANALYSIS<br />
Boundary Description 9<br />
Physical Site Conditions 10<br />
Market Analysis 11<br />
<strong>Plan</strong>ning and Zoning Considerations 12<br />
Review <strong>of</strong> Existing <strong>Plan</strong>s and Studies 16<br />
Chapter 3: CONCEPT PLAN<br />
<strong>Plan</strong> Philosophy 18<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> 19<br />
Mixed Use: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> 20<br />
Open Space 22<br />
Streetscape Improvements 23<br />
U.S. 1 Streetscape Improvements 24<br />
Harrison Street Streetscape Improvements 25<br />
Hopkins Avenue Streetscape Improvements 26<br />
Gateways and Signage 27<br />
Stormwater Management 27<br />
Circulation and Parking 28<br />
Neighborhood Connectivity 29<br />
Urban Design 30<br />
Architectural Character 32<br />
Chapter 4: IMPLEMENTATION STRATEGIES<br />
Program Management and Implementation 34<br />
Chapter 5: CAPITAL IMPROVEMENTS STRATEGY<br />
Capital Improvement Strategy 36<br />
Short-Term Strategies<br />
Mid-Term Strategies<br />
Long-Term Strategies<br />
Chapter 6: TAX INCREMENT FINANCING<br />
Appendices<br />
Tax Increment Financing 38<br />
A: Finding <strong>of</strong> Necessity Study 40<br />
B: Funding Sources 51<br />
C: Legal Description <strong>of</strong> the CRA Boundary 54<br />
D: Architectural Guidelines 57<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 3
Chapter 1<br />
Introduction
Overview<br />
<strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> provides a guiding document<br />
that recognizes and articulates a clear community vision for the <strong>Miracle</strong> <strong>City</strong><br />
<strong>Mall</strong> site and its surrounding properties. <strong>The</strong> <strong>Redevelopment</strong> Area is situated<br />
in the center <strong>of</strong> the neighborhoods along U.S. 1, located south <strong>of</strong> Downtown<br />
<strong>Titusville</strong>.<br />
Daytona Beach<br />
0 20 mi<br />
N<br />
Similar to other waterfront communities in <strong>Florida</strong>, <strong>Titusville</strong> faces critical<br />
challenges as it relates to striking a balance between population growth,<br />
development pressures, and economic development with preservation and<br />
management <strong>of</strong> coastal environmental quality. In 2004, the <strong>City</strong> formed an<br />
interim <strong>Titusville</strong> 2020 Team to create an Action <strong>Plan</strong> that identified strategies<br />
to accommodate and manage the consequences <strong>of</strong> growth. <strong>The</strong> U.S. 1 Corridor<br />
Master <strong>Plan</strong>, adopted in August 2006, was one <strong>of</strong> the several initiatives<br />
identified as a short-term strategy by the <strong>Titusville</strong> 2020 Action <strong>Plan</strong>. During<br />
the U.S. 1 Corridor planning process, the community identified redevelopment<br />
<strong>of</strong> the deteriorating <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site as a priority project, that will serve as<br />
a catalyst to revitalize the neighborhoods and improve the physical conditions<br />
<strong>of</strong> the area’s commercial corridors.<br />
Fig. 1: Location <strong>of</strong> <strong>Titusville</strong> in Central Atlantic <strong>Florida</strong>.<br />
<strong>Titusville</strong><br />
Orlando<br />
Palm Bay<br />
<strong>Titusville</strong><br />
Kennedy Space Center<br />
Melbourne<br />
Fig. 2: Proximity <strong>of</strong> neighboring cities around <strong>Titusville</strong>.<br />
ATLANTIC<br />
OCEAN<br />
<strong>The</strong> U.S. 1 Corridor Master <strong>Plan</strong> called for creating a new mixed-use activity<br />
center on the existing <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site that is reflective <strong>of</strong> the community’s<br />
expressed vision for promoting high quality development in the neighborhood<br />
and to mitigate the development pressures on the waterfront properties by<br />
creating infill development opportunities at specific locations on the west<br />
edge <strong>of</strong> U.S. 1. In order to achieve broader public objectives for economic<br />
development and revitalization, the Master <strong>Plan</strong> also recommended examining<br />
the feasibility <strong>of</strong> creating a site-specific Community <strong>Redevelopment</strong> Area that<br />
includes the <strong>Miracle</strong> <strong>City</strong> and Searstown <strong>Mall</strong> sites. In support <strong>of</strong> the <strong>Plan</strong>’s<br />
recommendations, the <strong>City</strong> created a special district, the Urban Village Special<br />
Zoning District, to protect the substantial public interest <strong>of</strong> areas identified as<br />
prime redevelopment sites by the U.S. 1 Corridor Master <strong>Plan</strong>.<br />
Based on the <strong>Plan</strong>’s recommendations, the community’s interest in redeveloping<br />
the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site, and upon purchase <strong>of</strong> the four <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
parcels in 2006, Sunrise Properties & Investments, LLC, retained the RMPK<br />
Group to conduct a Finding <strong>of</strong> Necessity Study for the <strong>Mall</strong> site and determine<br />
the existence <strong>of</strong> “blight” conditions in accordance with Chapter 163 <strong>of</strong> the<br />
<strong>Florida</strong> Statutes. <strong>The</strong> Finding <strong>of</strong> Necessity Study (Appendix A) provides a<br />
factual basis that the <strong>Redevelopment</strong> Area meets the statutory criteria for blight<br />
and that the rehabilitation, conservation, or redevelopment, or a combination<br />
there<strong>of</strong>, is necessary in the in the interest <strong>of</strong> public health, safety, and welfare<br />
<strong>of</strong> the residents. In March, 2007, Brevard County approved a resolution to<br />
confer power to the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> to create the U.S. 1 Corridor Community<br />
<strong>Redevelopment</strong> Area.<br />
<strong>The</strong> formulation <strong>of</strong> a <strong>Redevelopment</strong> <strong>Plan</strong>, using the tools made available in<br />
the <strong>Florida</strong> Statutes, is the most appropriate means <strong>of</strong> overcoming the blight<br />
conditions identified in the Finding <strong>of</strong> Necessity Study. <strong>The</strong> <strong>Miracle</strong> <strong>City</strong><br />
<strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong>, presented in this document, is intended to develop<br />
a comprehensive resource guide that meets the requirements <strong>of</strong> the <strong>Florida</strong><br />
Statutes as it relates to the preparation <strong>of</strong> Community <strong>Redevelopment</strong> <strong>Plan</strong>s. <strong>The</strong><br />
<strong>Plan</strong> is intended to be a flexible document that establishes Agency actions and<br />
policies to overcome obstacles to desired future growth and development within<br />
the <strong>Redevelopment</strong> Area boundaries.<br />
<strong>The</strong> <strong>Redevelopment</strong> Area is presently defined by the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> property<br />
line on the north; Harrison Street on the south; U.S. 1, including the <strong>City</strong>owned<br />
waterfront properties, on the east; and Hopkins Avenue on the west. <strong>The</strong><br />
Gulf <strong>of</strong> Mexico<br />
recommendations presented in the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> are<br />
expected to be accomplished through a public-private partnership that includes<br />
the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong>, the U.S. 1 Corridor Community <strong>Redevelopment</strong> Agency,<br />
and Sunrise Properties & Investments, LLC, the <strong>Mall</strong> owner/developer.<br />
Naples<br />
Lake<br />
Okeechobee<br />
Ft. Myers<br />
Figs. 3-6: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>, present day.<br />
Miami<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 5
PASCO<br />
WORTH<br />
DATE<br />
LINDA<br />
WORTH<br />
BANANA<br />
PVT<br />
ECHO<br />
GOLF VIEW<br />
LANE<br />
PETTY<br />
DOZIER<br />
BARNA<br />
20' R/W<br />
20' R/W<br />
SUN VALLEY<br />
THORNTON<br />
BYRON<br />
BYRON<br />
BARNA<br />
1ST<br />
BROWNING<br />
DIXIE<br />
DIXIE<br />
2ND<br />
DIXIE<br />
COLERIDGE<br />
LARK<br />
3RD<br />
DARDEN<br />
PARK<br />
PARK<br />
BARNA<br />
4TH<br />
GRAY<br />
GRANNIS<br />
ROBBINS<br />
HOOD<br />
YALE<br />
HOOD<br />
5TH<br />
HOOD<br />
ELIZABETH<br />
TRINIDAD<br />
KEATS<br />
6TH<br />
VACATION VILLAS<br />
GAYLE<br />
LE JUNE<br />
SHAW<br />
7TH<br />
DE LEON<br />
CRAIG<br />
SWIFT<br />
8TH<br />
LAS PALMAS<br />
DE LEON<br />
DE LEON<br />
MOON<br />
DE LEON<br />
STUART<br />
WAGER<br />
9TH<br />
APOLLO<br />
FOURTH<br />
10TH<br />
OLIVE<br />
EXISTING<br />
RANEY<br />
ELLIOT<br />
PAR<br />
THIRD<br />
CANAVERAL<br />
KENT<br />
MAYNARD<br />
JOLLY<br />
EINIG<br />
DAVID<br />
BRYAN<br />
DUMMITT<br />
SAVANNAH<br />
ROSEHILL<br />
LIBERTY<br />
LEMON<br />
TANGLEWOOD<br />
GETTYSBURG<br />
LEMON<br />
BEST<br />
PALM<br />
MELISSA<br />
JUPITER<br />
EXISTING<br />
PALM<br />
HOPKINS<br />
KEY LARGO<br />
WETHERSFIELD<br />
THOR<br />
HOPKINS AVE<br />
POLARIS<br />
ABBOTT<br />
INDIAN RIVER<br />
COCOANUT<br />
ALPINE<br />
ALPINE<br />
SISSON<br />
EXISTING<br />
OSCEOLA<br />
TANGELO<br />
CLOVER<br />
MOUNT STERLING<br />
SANCHEZ<br />
RIO<br />
Context<br />
REGIONAL CONTEXT<br />
EXISTING<br />
BUFFALO<br />
CHILDRE<br />
Opened in 1969, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> was designed to accommodate nearly 50<br />
tenants and featured two major retail “anchor” stores—JCPenney and Belk.<br />
Until the early 1990s it was popular as a retail destination and featured numerous<br />
retail uses and entertainment attractions, including a small movie theater in the<br />
north side outparcel. <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> has been engaged in competition with<br />
Searstown <strong>Mall</strong>, built within the same year as <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> a few blocks to<br />
the south. Searstown <strong>Mall</strong>’s construction <strong>of</strong> a movie theater in the 1990s drew<br />
shopping patrons away from <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>, but it was with the opening <strong>of</strong> a<br />
Wal-Mart Supercenter at SR 50 and SR 405 in 1995, along with regional growth<br />
<strong>of</strong> state-<strong>of</strong>-the-art shopping centers in Orlando, that <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> began<br />
facing a compounding level <strong>of</strong> retail competition against which it could not<br />
compete. In 2004, Belk closed its outlet and gradually other tenants have moved<br />
to Searstown <strong>Mall</strong>.<br />
Despite its central and accessible location, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> is facing the<br />
economic decline experienced by numerous other shopping centers across<br />
North America. <strong>The</strong> increase in the growth <strong>of</strong> “dead malls” or “greyfields” is<br />
attributed to several factors such as demographic shifts, changes in consumer<br />
behavior, increased competition from suburban malls, and demand for new<br />
shopping experiences. <strong>The</strong> presence <strong>of</strong> abandoned and deteriorating mall<br />
sites has a significant impact on the economic health and physical conditions<br />
in a community, including poor investment image, lower property values for<br />
surrounding areas, deterioration in physical environment, loss <strong>of</strong> tax revenues<br />
and jobs, and excess impervious surface coverage that leads to environmental<br />
degradation.<br />
Several cities in the nation and the State <strong>of</strong> <strong>Florida</strong> have successfully implemented<br />
redevelopment initiatives to revert abandoned and underutilized mall sites into<br />
vibrant activity centers. Winter Park Village in Winter Park, <strong>Florida</strong>; Mizner Park<br />
in Boca Raton, <strong>Florida</strong>; and Eastgate Town Center in Chattanooga, Tennessee,<br />
are examples <strong>of</strong> redevelopment projects that have successfully transformed<br />
“dead malls” into mixed-use town centers. While not all mall redevelopment<br />
initiatives have been successful, the U.S. 1 Corridor Master <strong>Plan</strong>, adopted by the<br />
<strong>City</strong> Council, provides community endorsement and the impetus to revitalize an<br />
aging commercial corridor using the redevelopment <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site<br />
as a catalyst for desired future development. <strong>The</strong> project has several attributes<br />
in its favor that will be pivotal in successfully implementing the redevelopment<br />
effort:<br />
• 31.4 acres <strong>of</strong> land under single ownership<br />
• Public-private commitment that streamlines development procedures<br />
Fig. 7: Winter Park <strong>Mall</strong> <strong>Redevelopment</strong>, Winter Park, <strong>Florida</strong>.<br />
Fig. 8: Mizner Park in Boca Raton, <strong>Florida</strong>.<br />
• <strong>The</strong> ongoing U.S. 1 Waterfront Recreation Master <strong>Plan</strong> that<br />
supports redevelopment <strong>of</strong> public waterfront properties<br />
• A willingness on the developer’s behalf to create mixed-use<br />
development compatible with the community’s vision<br />
• Community support for mixed-use redevelopment <strong>of</strong> the<br />
<strong>Mall</strong> site and the <strong>City</strong>’s plans to develop a waterfront park to<br />
complement the site<br />
ROYAL OAK<br />
VAUGHN<br />
SHERRY<br />
LOGAN<br />
APRICOT<br />
MALINDA<br />
TROPIC<br />
VISTA<br />
MENDEL<br />
AUGUSTINE<br />
BLUEBERRY<br />
FIGTREE<br />
HERITAGE<br />
KANSAS<br />
WHITE<br />
MORBECA<br />
KEISER<br />
ANGELA<br />
LAKESIDE<br />
HARRISON<br />
PLAYER<br />
SAUNDERS<br />
CAROL<br />
MC NEELA<br />
JAMES<br />
MANGRUM<br />
TREVINO<br />
TRAVIS<br />
LINCOLN<br />
PINE<br />
LYNWOOD<br />
KNOX MC RAE<br />
LOUISIANA<br />
VIRGINIA<br />
LENORE<br />
AUTUMN<br />
COLLINS<br />
WINTER<br />
LILAC<br />
EXISTING<br />
HAMLIN<br />
SPRING CREEK<br />
FORELL<br />
ROCK PIT<br />
PARK<br />
HILLDALE<br />
VALLEY<br />
RAILROAD<br />
VIOLET<br />
SMITH<br />
SOUTH<br />
DIANE<br />
FINSTERWALD<br />
EXISTING<br />
CHENEY<br />
FAIRLANE<br />
DEMARET<br />
NICKLAUS<br />
WUESTOFF<br />
11TH<br />
4TH<br />
ROSELLA<br />
GULDAHL<br />
NORWOOD<br />
DRAA<br />
GARDEN<br />
TEMPLE<br />
TUDOR<br />
LEACH<br />
TEE<br />
WALL<br />
RABUN<br />
PUTTER<br />
EXISTING<br />
QUEEN<br />
KINGS<br />
NIBLICK<br />
TALMADGE<br />
TURNESA<br />
FERRIER<br />
BIMINI<br />
JAMAICA<br />
LOCKE<br />
LEMA<br />
WATROUS<br />
LITTLER<br />
BAHAMA<br />
NASSAU<br />
KINGSTON<br />
SHELLEY<br />
1ST<br />
GRANNIS<br />
HARRISON<br />
THOREAU<br />
MILTON<br />
ROBBINS<br />
THOMAS<br />
JONES<br />
ENGLISH<br />
BLANTON<br />
WHITE SANDS<br />
11TH<br />
PINE<br />
RONALD<br />
WHISPERING HILLS<br />
ZIRUTH<br />
BURNING TREE<br />
RANSOM<br />
HARDY<br />
WATSON<br />
PALMETTO<br />
KENNEDY<br />
DAY<br />
KILLEARN<br />
DE LEON<br />
MARINA<br />
U.S.1 (WASHINGTONAVE)<br />
U.S.1 (WASHINGTONAVE)<br />
ORANGE<br />
BROWN<br />
SAWGRASS<br />
MAIN<br />
WEST<br />
MOCKINGBIRD<br />
PINE VALLEY<br />
TREE<br />
MAC DONALD<br />
CORDELE<br />
GARNET<br />
WEDGEWOOD<br />
COUNTRY CLUB<br />
SANTA CRUZ<br />
LA MESA<br />
COUNTRY CLUB<br />
MUIRFIELD<br />
CLEVELAND<br />
EXISTING<br />
FISHER<br />
LA GRANGE<br />
TROPIC<br />
PINE<br />
UNION<br />
GARDEN ST<br />
MAXWELL<br />
BRIDGE<br />
BOOKER<br />
GILBERT<br />
GIBSON<br />
KENILWORTH<br />
CANAVERAL<br />
BON AIR<br />
PILGRIM<br />
SECOND<br />
COUNTRY CLUB<br />
RANEY<br />
LUCKY<br />
FIRST<br />
WILLIAMSBURG<br />
OAKHILL<br />
DUMMITT<br />
SYCAMORE<br />
MACON<br />
LA CITA<br />
HUNTER PARK<br />
ROZEN<br />
LAKEWOOD<br />
FLORENCIA<br />
FOREST<br />
CLEVELAND<br />
DOW<br />
PALERMO<br />
WILSON<br />
PINE<br />
JULIA<br />
CARLYSLE<br />
MAIN<br />
LEE<br />
PEACHTREE<br />
DELANO<br />
MEADE<br />
WASHINGTON1<br />
S.R. 405(SOUTH ST)<br />
EXISTING<br />
PALM<br />
3RD<br />
ORANGE<br />
BROAD<br />
ST JOHNS<br />
LAUREN<br />
BREVARD<br />
GRACE<br />
LAUREL<br />
HOPKINS<br />
CONCORD<br />
SUNRISE<br />
OLEANDER<br />
KEY<br />
KEY MADEIRA<br />
MARINERS<br />
JANA<br />
KAREN<br />
BAYVIEW<br />
ROGER<br />
HANOVER<br />
BIRCHWOOD<br />
SHADOW WOOD<br />
WILLOWGREEN<br />
BEACON<br />
U.S.1 (WASHINGTONAVE)<br />
WASHINGTON<br />
HAMILTON<br />
SIR HAMILTON<br />
VILLAGE<br />
SCOTTY<br />
HAMILTON<br />
OAKHILL<br />
MAPLE<br />
L M DAVEY<br />
RIVERSIDE<br />
INDIAN RIVER<br />
TERRIER<br />
PARK<br />
PINECREST<br />
VILLAGE<br />
BELLA VISTA<br />
DELESPINE<br />
ELLIS<br />
RIVERSIDE<br />
ROOSEVELT<br />
HOPKINS<br />
JACKSON<br />
SABLE PALM<br />
BELLE ARBOR<br />
WATERSIDE<br />
TUSCARORA<br />
PARRISH<br />
HARRISON ST<br />
WATERSIDE<br />
BEVERLY<br />
ALHAMBRA<br />
ALAMANDA<br />
HOPKINS HOPKINS AVE AVE<br />
PARKER<br />
KNOX MC RAE<br />
LADO<br />
JEPSON<br />
COURT<br />
CAPRON<br />
PRITCHARD<br />
CHENEY<br />
WILLOW<br />
CLYDE<br />
EXISTING<br />
WASHINGTON<br />
A MAX BREWER MEMORIAL<br />
OJIBWAY<br />
SEMINOLE<br />
BERMUDA<br />
NARVAEZ<br />
AVILEZ<br />
CORONADA<br />
LA PALOMA<br />
EXISTING<br />
ACORN<br />
BIRCH<br />
ALLEY<br />
SAN ROBERTO<br />
MISTLETOE<br />
PINEDO<br />
HIBISCUS<br />
U.S.1 U.S.1 (WASHINGTONAVE)<br />
(WASHINGTONAVE)<br />
OLMSTEAD<br />
PARKER<br />
DELESPINE<br />
MAPLE<br />
CEDAR<br />
COQUINA<br />
JEPSON<br />
MOUNT VERNON<br />
ACORN<br />
BIRCH<br />
WASHINGTON<br />
S.R. 50 (CHENEY)<br />
SAN BERNARDO<br />
WASHINGTON<br />
RIVEREDGE<br />
LEGEND<br />
Downtown Boundary<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
<strong>Redevelopment</strong> Area Boundary<br />
U.S.1 Corridor Boundary<br />
Major Roadways<br />
<strong>City</strong> <strong>of</strong> <strong>Titusville</strong> Trail System<br />
MIRACLE CITY MALL CRA PLAN<br />
Fig. 9: Aerial view <strong>of</strong> the <strong>Titusville</strong> area, including existing trails throughout the city.<br />
<strong>City</strong> <strong>of</strong> <strong>Titusville</strong>, <strong>Florida</strong><br />
Feet<br />
0 625 1,250 2,500 3,750 5,000<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 6
<strong>Plan</strong> Content & Document Organization<br />
Inventory and Analysis<br />
<strong>The</strong> <strong>Plan</strong> was developed through an extensive inventory <strong>of</strong> existing conditions<br />
within the <strong>Redevelopment</strong> Area boundaries. Chapter 2 (Inventory and Analysis)<br />
contains a compilation <strong>of</strong> information and data pertaining to existing conditions<br />
and future plans including current and future land uses, existing zoning districts,<br />
traffic circulation, infrastructure, building conditions, environmental issues,<br />
and evaluation <strong>of</strong> previous plans and programs initiated in the <strong>Redevelopment</strong><br />
Area. Information for the inventory was collected from the Brevard County GIS<br />
Property Appraiser data, previous planning studies, the findings <strong>of</strong> the <strong>Miracle</strong><br />
<strong>City</strong> <strong>Mall</strong> Finding <strong>of</strong> Necessity Study, and the U.S. 1 Corridor Master <strong>Plan</strong>.<br />
<strong>The</strong> Analysis examines elements including traffic and pedestrian circulation,<br />
parking, deterioration <strong>of</strong> physical conditions, market conditions, and the<br />
environmental context. While there are issues to be addressed, the analysis found<br />
many opportunities for public realm improvements in the form <strong>of</strong> streetscapes,<br />
gateways, parks and trails as well as the future propensity for market driven<br />
redevelopment activity in the private sector.<br />
Concept <strong>Plan</strong><br />
<strong>The</strong> Concept <strong>Plan</strong>, presented in Chapter 3, was developed after analyzing the<br />
existing conditions in the <strong>Redevelopment</strong> Area and determining the issues and<br />
concerns expressed by members <strong>of</strong> the community during the U.S. 1 Corridor<br />
master planning process. <strong>The</strong> Concept <strong>Plan</strong> presents the general intent <strong>of</strong> the<br />
redevelopment program and provides guidance for the sound redevelopment<br />
<strong>of</strong> the properties in the <strong>Redevelopment</strong> Area. Opportunities for public realm<br />
improvements, anticipated redevelopment activities, and proposed future land<br />
use composition are graphically illustrated in the Concept <strong>Plan</strong>, followed by a<br />
description <strong>of</strong> planning principles intended to provide guidelines for promoting<br />
the sound development and redevelopment <strong>of</strong> the <strong>Redevelopment</strong> Area.<br />
Implementation Strategies<br />
Chapter 4 <strong>of</strong> the <strong>Redevelopment</strong> <strong>Plan</strong> establishes a process and actions required<br />
to realize the economic development, planning, and design objectives that<br />
have been devised for the <strong>Redevelopment</strong> Area. <strong>The</strong> strategies also include<br />
a description <strong>of</strong> the organizational framework and the roles that should be<br />
undertaken by various agencies and stakeholders.<br />
Capital Improvements Strategies<br />
Chapter 5 <strong>of</strong> the <strong>Redevelopment</strong> <strong>Plan</strong> contains a description <strong>of</strong> proposed projects<br />
and programs, arranged according to short, mid, and long term implementation<br />
timeframes, to be undertaken by the Community <strong>Redevelopment</strong> Agency to<br />
implement the redevelopment effort, including anticipated costs.<br />
Tax Increment Financing<br />
Chapter 6 provides preliminary tax increment revenue projections for the U.S. 1<br />
Corridor Community <strong>Redevelopment</strong> Area.<br />
Appendices<br />
Finally, the <strong>Plan</strong> contains four appendices that provide supplemental data and<br />
information. Appendix A is the Finding <strong>of</strong> Necessity Study for <strong>Miracle</strong> <strong>City</strong><br />
<strong>Mall</strong>, completed in January, 2007. Appendix B presents a table <strong>of</strong> funding<br />
sources that may assist in redevelopment efforts. Appendix C contains the legal<br />
description <strong>of</strong> the boundary. Finally, Appendix D presents the architectural<br />
guidelines recommended by the U.S. 1 Corridor Master <strong>Plan</strong>.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 7
Chapter 2<br />
Inventory and Analysis
Boundary<br />
Description<br />
<strong>The</strong> U.S. 1 Corridor <strong>Redevelopment</strong><br />
Area consists <strong>of</strong> ten parcels<br />
encompassing a total area <strong>of</strong><br />
approximately 36 acres. <strong>The</strong><br />
<strong>Redevelopment</strong> Area is generally<br />
defined by the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
property line on the north, Harrison<br />
Street on the south, Hopkins Avenue on<br />
the west, and includes recently acquired<br />
<strong>City</strong>-owned waterfront properties on<br />
the east. Fig. 10 illustrates the U.S. 1<br />
Corridor Community <strong>Redevelopment</strong><br />
Area boundaries. Currently, Sunrise<br />
Properties & Investments, LLC, owns<br />
four <strong>of</strong> the ten parcels (Parcels 1-4).<br />
Parcels 5, 6, and 7 may be purchased<br />
and assembled by Sunrise Properties &<br />
Investments, LLC, in the near future,<br />
while the remaining three parcels (8-<br />
10), located along the waterfront, are<br />
properties recently acquired by the <strong>City</strong><br />
<strong>of</strong> <strong>Titusville</strong>.<br />
HOPKINS AVE.<br />
2<br />
MIRACLE CITY MALL<br />
NORTH SIDE OUTPARCEL<br />
(VACANT)<br />
JACKSON ST.<br />
1<br />
5<br />
6<br />
7<br />
RETAIL<br />
OUTPARCEL<br />
COLONIAL<br />
BANK<br />
FORMER<br />
BURGER KING<br />
(VACANT)<br />
PINEAPPLE BAY<br />
U.S. 1 / WASHINGTON AVE.<br />
RESTAURANT<br />
WENDY'S<br />
WACHOVIA BANK<br />
PELICAN POINT<br />
CONDOS<br />
MIRACLE CITY MALL<br />
USPS<br />
DISTRIBUTION<br />
CENTER<br />
3<br />
Fig. 10:<br />
<strong>Redevelopment</strong> Area Boundary<br />
FORMER<br />
RESTAURANT<br />
(VACANT)<br />
4<br />
HARRISON ST.<br />
FIRESTONE<br />
8<br />
9<br />
Parcels 1 through 4 represent the existing<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>. <strong>The</strong> developer is currently<br />
seeking opportunities to purchase<br />
and assemble parcels 5, 6, and 7 for<br />
development. Parcels 8, 9, and 10 are<br />
<strong>City</strong>-owned waterfront properties that will<br />
be redeveloped for public use.<br />
SEVILLE WAY<br />
10<br />
Y TOWERS<br />
CONDOS<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 9
Physical Site Conditions<br />
This section summarizes the physical site conditions for properties within<br />
the U.S. 1 Corridor <strong>Redevelopment</strong> Area. Meetings and discussions with<br />
property owners and <strong>City</strong> staff contributed significantly to the analysis <strong>of</strong> the<br />
<strong>Redevelopment</strong> Area. Additionally, the RMPK Group conducted a field survey<br />
to characterize the types and extent <strong>of</strong> physical conditions existing within the<br />
<strong>Redevelopment</strong> Area.<br />
Existing Land Uses<br />
<strong>The</strong> existing land use within the <strong>Redevelopment</strong> Area is characterized by<br />
commercial properties, vacant buildings and undeveloped lands. Parcels 1<br />
through 4 (Fig. 10) are occupied presently by <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> and vacant<br />
commercial outparcels previously occupied by retail tenants. Parcels 5 through<br />
7 are also commercial, although Parcel 7, formerly a Burger King restaurant,<br />
has recently been vacated. Across U.S. 1, the <strong>City</strong>-owned waterfront parcels<br />
(8 through 10, page 9) are former commercial properties. Upon purchase by<br />
the <strong>City</strong>, most <strong>of</strong> those commercial uses have been removed and are currently<br />
undeveloped.<br />
Building Conditions<br />
<strong>The</strong> main <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building is structurally sound and features façades,<br />
doors, windows, and claddings that are in good shape. Interior halls and tenant<br />
spaces are also in sound condition, with the exception <strong>of</strong> some back rooms and<br />
ceiling areas.<br />
<strong>The</strong> three outparcel <strong>Mall</strong> buildings are in varying states <strong>of</strong> deterioration. Two <strong>of</strong><br />
the three are largely unoccupied by tenants today and have fallen into disrepair,<br />
although in the past they were occupied by a movie theater and a restaurant.<br />
Extensive damage is observable to the foundation, structural walls, ro<strong>of</strong>s, HVAC<br />
systems, and interiors. Wind and water damage has gone unrepaired, notably<br />
since the hurricane season <strong>of</strong> 2004. <strong>The</strong> two unoccupied buildings warrant<br />
removal.<br />
Certain renovations have been undertaken on some <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
buildings. <strong>The</strong> ro<strong>of</strong> <strong>of</strong> the third outparcel building, a Firestone auto center, was<br />
recently replaced, and a section <strong>of</strong> ro<strong>of</strong> on the main <strong>Mall</strong> building was also<br />
upgraded. Most renovation has occurred in the main <strong>Mall</strong> building in order to<br />
maintain the soundness <strong>of</strong> the building for daily retail use, but the renovations<br />
have generally not gone beyond necessary minimums.<br />
Site Conditions<br />
Site conditions outside <strong>of</strong> all existing buildings are also variable. Pavement conditions<br />
are poor in the north end <strong>of</strong> the <strong>Mall</strong> parking area, particularly around the almost-vacant<br />
north outparcel, and in average condition elsewhere. Around Colonial Bank, landscaping<br />
is denser and well-maintained, while the medians <strong>of</strong> U.S. 1 through the <strong>Redevelopment</strong><br />
Area are landscaped in a visually pleasing manner.<br />
Sidewalks, all <strong>of</strong> which are composed <strong>of</strong> regular 4-foot wide concrete slabs, are available<br />
on both sides <strong>of</strong> U.S. 1, Harrison Street, and Hopkins Avenue. <strong>Plan</strong>ting strips separate<br />
the sidewalk from the curb. <strong>The</strong>re are numerous curb cuts along the perimeter <strong>of</strong> <strong>Miracle</strong><br />
<strong>City</strong> <strong>Mall</strong> in order to accommodate the multiple parking lot entry/exit points. <strong>Mall</strong><br />
signage is in deteriorating condition. <strong>The</strong> signalized intersection at U.S. 1 and Harrison<br />
Street features mast arms, but the one for the <strong>Mall</strong> entrance on U.S. 1 does not. Pavement<br />
conditions <strong>of</strong> the three main streets in the <strong>Redevelopment</strong> Area are good, particularly on<br />
U.S. 1, which was recently upgraded.<br />
Site conditions <strong>of</strong> the three waterfront parcels have changed in recent months. Upon<br />
purchase <strong>of</strong> these parcels, the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> removed all existing structures but one<br />
and re-graded the land level. Grass and low weeds have naturally recovered the oncebare<br />
soil, and only a handful <strong>of</strong> palm trees line the perimeter <strong>of</strong> the three parcels. <strong>The</strong><br />
slope <strong>of</strong> the land gradually meets the water’s edge on the eastern side <strong>of</strong> these parcels,<br />
and an existing stormwater retention pond is thickly covered by invasive vegetation.<br />
Accumulated debris and artificially altered shoreline slopes have deteriorated the water’s<br />
edge.<br />
Adjacent Land Uses<br />
<strong>The</strong> Indian River Shores and Palm Court neighborhoods are located to the south <strong>of</strong> the<br />
<strong>Redevelopment</strong> Area. <strong>The</strong>se neighborhoods are composed <strong>of</strong> single-family, detached<br />
homes with scattered commercial uses fronting Harrison Street. Between Hopkins<br />
Avenue and U.S. 1 north <strong>of</strong> the <strong>Mall</strong> property line is a row <strong>of</strong> single-family homes.<br />
<strong>The</strong>se represent the southern end <strong>of</strong> the Bougainvillea/Riverview Terrace neighborhood,<br />
a residential district <strong>of</strong> single-family homes that extends northward to <strong>Titusville</strong> High<br />
School<br />
Bay Towers, a condominium complex, is located adjacent to the three <strong>City</strong>-owned<br />
waterfront parcels east <strong>of</strong> U.S. 1. Bay Towers is separated from these parcels by a tall<br />
vegetative hedge.<br />
<strong>The</strong> area east <strong>of</strong> the <strong>Redevelopment</strong> Area, on the west side <strong>of</strong> Hopkins Avenue is<br />
characterized by suburban strip mall-oriented commercial establishments and light<br />
industrial uses.<br />
Fig. 11: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> exterior façade.<br />
Fig. 12: North side parking lot conditions.<br />
Fig. 13: Vacant restaurant outparcel (Parcel 4).<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 10
Market Analysis<br />
<strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site is strategically located at the intersection <strong>of</strong> Harrison<br />
Street and U.S. 1, providing easy access to Downtown <strong>Titusville</strong> and neighboring<br />
cities. <strong>The</strong> demographics <strong>of</strong> the area show a stable residential base surrounding<br />
the project site; however, 2005 census estimates indicate a shortage <strong>of</strong> owneroccupied<br />
housing in the adjacent neighborhoods. Increasing the residential base<br />
and market-rate home ownership will be a critical factor in attracting potential<br />
retail investors to the proposed mixed-use redevelopment project.<br />
According to the International Council <strong>of</strong> Shopping Centers, recent consumer<br />
behavioral trends relating to retail uses indicate a shift to “open-air malls”,<br />
hybrid malls (enclosed design combined with open-air format) and valueoriented<br />
malls (outlet tenants with entertainment themes) within a mixed-use<br />
context accommodating a mix <strong>of</strong> retail, commercial and residential uses. <strong>The</strong><br />
decline <strong>of</strong> retail sales and high vacancy rates in the existing <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
are indicative <strong>of</strong> these changing consumer patterns.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>’s proximity to the Searstown <strong>Mall</strong>, its primary competitor in<br />
the area, has also contributed to the decline and under performance <strong>of</strong> the <strong>Mall</strong>.<br />
It is unlikely that a “no-action” scenario will generate additional consumer traffic<br />
for the <strong>Mall</strong>. <strong>The</strong> owner’s interest in redeveloping the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site<br />
as a mixed-use, urban-village style development presents a unique opportunity<br />
to act as a catalyst for connecting the surrounding neighborhoods to the rest <strong>of</strong><br />
the <strong>City</strong>, while at the same time establishing the foundation for changing the<br />
area’s investment image. Supporting high density residential uses, across from<br />
the planned waterfront public park, also serves the purpose <strong>of</strong> relieving existing<br />
development pressures on the waterfront.<br />
<strong>The</strong> Primary Trade Area for the retail market in 2005, assumed to include a<br />
population residing within a 10-mile radius, contains nearly 35,000 households<br />
with a median household income <strong>of</strong> $43,851 (Source: Demographics Now,<br />
2005). <strong>The</strong> market viability <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site is anticipated to<br />
capitalize on attracting consumers from a larger market while at the same time<br />
ensuring that community goals and objectives are fulfilled and the local tax base<br />
is strengthened.<br />
<strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong> fulfills multiple roles that meet diverse community<br />
needs—from a neighborhood retail center to a gateway, and from a recreational<br />
destination to a central community gathering plaza. Based on preliminary market<br />
studies and local input through public workshops, potential opportunities exist<br />
to introduce small-scale grocery stores, destination retail spaces, full-service<br />
restaurant opportunities, street cafés, Class “A” <strong>of</strong>fice space, and possibly hotel<br />
uses that are supported by a strong residential component as part <strong>of</strong> the proposed<br />
development program.<br />
na city<br />
Geneva CDP<br />
huluota CDP<br />
420<br />
Bithlo CDP<br />
Christmas CDP<br />
Wedgefield CDP<br />
Basic Variables (2005) Population Density<br />
Oak Hill city<br />
95<br />
Mims CDP<br />
46<br />
1<br />
405<br />
405<br />
407<br />
Port St. John CDP<br />
Sharpes CDP<br />
528<br />
3<br />
524<br />
Cocoa city<br />
520<br />
401<br />
Cape Canaveral city<br />
Cocoa Beach city<br />
2500 S WASHINGTON AVE,<br />
TITUSVILLE, FL 32780<br />
Legend<br />
ZIP Codes<br />
Basic Variables (2005) Population Density<br />
Above 3,600<br />
325 to 3,600<br />
29 to 325<br />
2.60 to 29<br />
Below 2.60<br />
No Data<br />
Subject Site<br />
5,10,20 mile radii<br />
Post Code Bndry<br />
Big <strong>City</strong> Ctr<br />
Medium <strong>City</strong> Ctr<br />
Prim. Hwy<br />
Secd. Hwy<br />
Place Areas<br />
Aerial Photo Coverage<br />
Source: Applied Geographic Solutions © 2005.<br />
DemographicsNow is brought to you by SRC,<br />
LLC. © 2005 All Rights Reserved<br />
Date: 04/13/06<br />
Fig. 14:<br />
Radii demographics centered on <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
(2500 S. Washington Ave.)<br />
Source: Demographics Now<br />
Fig. 15: Assets and Opportunities Map<br />
ASSETS:<br />
Strategic location<br />
<strong>City</strong>-owned waterfront properties<br />
Large property under single ownership<br />
Multiple accesses from 3 major roads<br />
Community support for redevelopment<br />
Waterfront views<br />
Proximity to Downtown <strong>Titusville</strong><br />
OPPORTUNITIES:<br />
Mixed use Development/Neighborhood Center<br />
- owner occupied<br />
- ground floor retail<br />
- urban plaza/public plaza<br />
Connections<br />
- to the waterfront parks & trail system<br />
- to adjacent neighborhoods<br />
- views to the waterfront<br />
Pursue streetscape improvements & gateways<br />
Reduce area-wide stormwater run<strong>of</strong>f<br />
Establish a precedent for future development through<br />
well-defined architectural standards<br />
Address physical deterioration & environmental decline<br />
with new ownership<br />
Provide neighborhood services and “destination” uses<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 11
<strong>Plan</strong>ning & Zoning<br />
Considerations<br />
<strong>The</strong> <strong>City</strong> <strong>of</strong> <strong>Titusville</strong>’s Comprehensive <strong>Plan</strong> contains numerous goals,<br />
objectives, policies, and strategies that have a direct impact on the future<br />
development <strong>of</strong> properties in the U.S. 1 Corridor Community <strong>Redevelopment</strong><br />
Area. <strong>The</strong>se are grouped according to comprehensive plan “elements”, as shown<br />
below. For each element, the goals, objectives, policies, and strategies listed have<br />
a direct bearing on the redevelopment <strong>of</strong> the <strong>Mall</strong> property and the <strong>City</strong>-owned<br />
waterfront properties.<br />
Future Land Use Element<br />
GOAL #1: TO DIRECT GROWTH TO SUITABLE AREAS AND REGULATE LAND<br />
DEVELOPMENT, TO PROVIDE FOR THE LOCATION AND DISTRIBUTION OF<br />
THE MOST APPROPRIATE DENSITY AND INTENSITY OF THE LAND WHILE<br />
PROTECTING THE PUBLIC HEALTH, SAFETY AND WELFARE. [9J-5.006(3)(a)]<br />
OBJECTIVE #1: DEVELOPMENT ORDERS SHALL BE ISSUED ONLY IF<br />
PUBLIC FACILITIES NECESSARY TO MEET LEVEL OF SERVICE STANDARDS<br />
(WHICH ARE ADOPTED AS PART OF THE CAPITAL IMPROVEMENTS<br />
ELEMENT OF THIS PLAN) ARE AVAILABLE CONCURRENT WITH THE<br />
IMPACTS OF THE DEVELOPMENT. [9J-5.006(3)(b)(1)]<br />
Policy #1: New development which is not contiguous to <strong>City</strong> services shall<br />
occur in an orderly and economical manner, with those areas having the greatest<br />
combined complement <strong>of</strong> existing or planned urban public facilities and services<br />
being identified for higher intensity development. New development shall be<br />
staged for urbanization in a contiguous manner that minimizes additional public<br />
investments. [9J-5.006(3)(b)(3)]<br />
Policy #2: Expansions <strong>of</strong> the urban service areas shall be reflected in and<br />
coordinated with the <strong>City</strong>’s capital improvement program. [9J-5.006(3)(b)(3)]<br />
OBJECTIVE #2: THE CITY OF TITUSVILLE SHALL ENSURE THAT<br />
THE CITY’S NATURAL, HISTORIC, AND RECREATIONAL RESOURCES<br />
ARE PROTECTED FROM ADVERSE IMPACTS OF DEVELOPMENT AND<br />
REDEVELOPMENT ON ADJACENT LANDS. [9J.5.006(3)(b)(4)]<br />
Policy #1: <strong>The</strong> <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> shall take steps to identify its historic resources to<br />
maximize the <strong>City</strong>’s ability to protect these resources.<br />
Strategy #1: A study shall be conducted to identify the <strong>City</strong>’s<br />
historic resources prior to the implementation <strong>of</strong> Land Development<br />
regulations required by this Comprehensive <strong>Plan</strong>.<br />
Strategy #2: Nominations, based on the above referenced survey,<br />
shall be made to the National Register <strong>of</strong> Historic Places and <strong>Florida</strong><br />
Master Site File in spring <strong>of</strong> 1988.<br />
Policy #2: <strong>The</strong> <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> will undertake efforts to protect its cultural,<br />
historical and archaeological resources from vandalism and destruction. [9J-<br />
5.006(3)(c)(8)]<br />
Strategy #1: Site security shall be enhanced through security fencing<br />
and the posting <strong>of</strong> trespassing notices on applicable public owned<br />
property.<br />
Strategy #2: If determined to be desirable by the property owners, a<br />
neighborhood watch program will be initiated in Residential Historic<br />
Properties District.<br />
Strategy #3: Educate the public to the cost associated with the loss<br />
<strong>of</strong> cultural, historical and archeological resources via posters and<br />
newspaper articles.<br />
OBJECTIVE #6: THE CITY OF TITUSVILLE SHALL PROVIDE FOR<br />
APPROPRIATE AND ADEQUATE LAND FOR COMMERCIAL LAND USES<br />
THROUGH LAND DEVELOPMENT REGULATIONS TO SERVE THE NEEDS<br />
OF THE PROJECTED RESIDENTS AND VISITORS TO THE CITY.<br />
Policy #1: Designation <strong>of</strong> all commercial land uses shall be identified on the<br />
Future Land Use Map as appropriate, based on the following general factors and<br />
performance requirements:<br />
A. Sites for commercial development shall be located with convenient and<br />
direct access at arterial intersections. Collector/arterial intersections are<br />
acceptable provided minimal access is necessary on the collector street.<br />
B. Negative impacts <strong>of</strong> commercial land uses on environmentally sensitive<br />
areas shall be minimized and/or eliminated. <strong>The</strong> Conservation Element<br />
objectives and policies and performance requirements shall be utilized in<br />
determining the appropriateness <strong>of</strong> commercial land use designations.<br />
C. Commercial development sites shall be accessible to and/or provide essential<br />
public services at levels <strong>of</strong> service adopted within the Capital Improvements<br />
Element <strong>of</strong> this Comprehensive <strong>Plan</strong>, including transportation, potable water,<br />
sewer collection/treatment, solid waste, drainage, recreation and open space,<br />
law enforcement, and fire protection.<br />
D. Commercial land use designations shall be encouraged in a pattern which<br />
<strong>of</strong>fers maximum accessibility, compatibility, and clustering. Commercial land<br />
use designations shall be given priority at locations exhibiting proximity<br />
to other types <strong>of</strong> non-residential uses, including employment centers and<br />
marketing centers.<br />
E. Commercial land use designations and accompanying proposals shall<br />
consider compatibility between commercial and surrounding land uses,<br />
including, but not limited to, traffic circulation, pedestrian access, hours <strong>of</strong><br />
operation, visual impacts, privacy factors and impacts on the micro climate.<br />
F. Land development regulations shall include requirements for natural<br />
vegetative and other appropriate buffers and/or setbacks to minimize nuisance<br />
effects <strong>of</strong> commercial land uses which include noise, odor, glare and privacy<br />
factors and visual impacts and to minimize such commercial use intrusion into<br />
residential land use areas.<br />
G. Water-dependent commercial land uses will be considered for location<br />
along the Indian River Lagoon. Water-related commercial uses shall only be<br />
considered on the uplands adjacent to the Indian River Lagoon.<br />
H. Coastal Management and Conservation Elements objectives, policies and<br />
performance requirements shall be utilized in determining the location <strong>of</strong><br />
commercial land uses adjacent to water bodies.<br />
I. Commercial land use designations shall be limited to those areas designated<br />
as commercial or mixed use on the Future Land Use Map except as may be<br />
permitted by <strong>Plan</strong>ned Development Regulations. Requests to increase and/or<br />
convey commercial land rights to an alternate site must be accompanied by<br />
adequate market analysis to prove necessity for such request.<br />
Policy #2: Locations for High Intensity Commercial land use shall be deemed<br />
appropriate providing the following factors are additionally complied with:<br />
OBJECTIVE #8: THE CITY OF TITUSVILLE SHALL ENCOURAGE THE MIX<br />
OF RESIDENTIAL, OFFICE, AND COMMERCIAL USES IN URBAN AREAS<br />
THROUGH INNOVATIVE LAND DEVELOPMENT REGULATIONS.<br />
Policy #1: Designation <strong>of</strong> mixed uses as an Urban Mixed Use (UMU) land use<br />
shall be identified on the Future Land Use Map within the urban areas <strong>of</strong> the <strong>City</strong><br />
and pursue appropriate strategies based upon the following issues, factors and<br />
criteria:<br />
A. Provide for the compatibility <strong>of</strong> mixed land use patterns which should<br />
consists <strong>of</strong> commercial, <strong>of</strong>fice, and residential uses through the implementation<br />
<strong>of</strong> appropriate land development regulations.<br />
B. Provide for pedestrian and cycling facilities, as well as other pedestrian<br />
amenities such as interesting streetscapes, urban plazas and open space, and<br />
landscaping.<br />
C. Protect public access to natural amenities, such as the Indian River, lakes,<br />
streams, wetlands, and protected wildlife habitat.<br />
D. Develop a program to link the Main Street corridor with the surrounding<br />
neighborhood through pedestrian access, streetscape improvements,<br />
architectural continuity, tree preservation and buffering techniques (privacy<br />
screening, setbacks, landscaping and noise control).<br />
E. Focus private and public efforts on redevelopment <strong>of</strong> blighted structures and<br />
maintenance <strong>of</strong> the built environment.<br />
F. Encourage private development activities to coordinate with existing<br />
residents and property owners, when appropriate compatibility with site design<br />
and architecture can be accomplished. Coordinate the provision <strong>of</strong> adequate<br />
public facilities and services.<br />
G. Require appropriate visual screens/buffers, with emphasis on landscape<br />
materials, between residential and other land uses when new or expanded<br />
development is proposed.<br />
H. Apply applicable resources <strong>of</strong> the <strong>Titusville</strong> Improvement Program/<br />
Community Development Block Grant program to Assist low and moderate<br />
income families and improve the neighborhood environment through infill<br />
housing.<br />
I. Encourage the location and relocation <strong>of</strong> industrial uses to areas appropriately<br />
designated as industrial on the Future Land Use Map.<br />
J. Provide for a reduced need for infrastructure by allowing for shared parking,<br />
drainage, and other facilities.<br />
K. Provide residents with a variety <strong>of</strong> housing choices, both in housing type<br />
and cost.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 12
L. This designation is intended primarily for the redevelopment <strong>of</strong> areas with<br />
a distinctly urban character; however, there shall not be encroachment into<br />
existing residential neighborhoods with a density less than five units per acre.<br />
M. Non-residential uses shall be limited to areas adjacent to collector or higher<br />
roadways. (Ord. No. 106-2006, §1, 12/19/05)<br />
OBJECTIVE #9: THE CITY OF TITUSVILLE SHALL PURSUE THE<br />
PRESERVATION OF THE COMMERCIAL/RESIDENTIAL MIXED USE AREA<br />
ADJACENT TO THE INDIAN RIVER LAGOON AND REDEVELOP BLIGHTED<br />
AREAS THROUGH INNOVATIVE LAND DEVELOPMENT REGULATIONS.<br />
Policy #1: Designation <strong>of</strong> the land use along the Indian River/Washington Avenue<br />
corridor as Shoreline Mixed Use (SMU) based on historical and existing land use<br />
commitments as a mix <strong>of</strong> commercial, residential, recreational, and public/semipublic<br />
uses. Appropriate strategies shall be pursued based upon the following<br />
factors and criteria:<br />
OBJECTIVE #15: THE CITY OF TITUSVILLE SHALL PURSUE INNOVATIVE<br />
LAND DEVELOPMENT REGULATIONS TO ESTABLISH THE PLANNED<br />
UNIT DEVELOPMENT CONCEPT FOR RESIDENTIAL, COMMERCIAL, AND<br />
INDUSTRIAL LAND USES AND CONSIDER OTHER MIXED LAND USE<br />
DEVELOPMENT TECHNIQUES.<br />
Policy #1: Designation <strong>of</strong> <strong>Plan</strong>ned Unit Development (PUD) land use category<br />
shall be identified on the Future Land Use Map and the process for residential,<br />
commercial, and industrial land uses, mixed use planned unit development shall be<br />
based upon the following general factors and performance criteria:<br />
A. Encourage creative approaches in housing developments that will result in<br />
quality living environment through innovative design and aesthetic controls.<br />
B. Provide for pedestrian and cycling facilities, as well as other pedestrian<br />
amenities such as interesting streetscapes, urban plazas and open space, and<br />
landscaping when providing for residential and commercial use.<br />
C. Link any commercial or activity centers with surrounding uses through<br />
pedestrian, streetscape improvements, architectural continuity, tree preservation<br />
and buffering techniques (private screening, setbacks, landscaping, and noise<br />
control).<br />
D. Protect public access to natural amenities, such as the Indian River, lakes,<br />
streams, wetlands, and protected wildlife habitat.<br />
E. Encourage creative approaches in commercial/industrial developments that<br />
will result in quality shopping and working environments through innovative<br />
design and aesthetic controls.<br />
F. Encourage a combination <strong>of</strong> housing types and styles including single<br />
family, two-family, and multiple family dwellings.<br />
G. Encourage flexibility in design by permitting development clustering and a<br />
variety <strong>of</strong> architectural styles and treatments.<br />
H. Encourage the preservation <strong>of</strong> common open space, recreational facilities,<br />
natural features such as woodland and wetland areas.<br />
I. Consider the carrying capacity <strong>of</strong> the various levels <strong>of</strong> service for<br />
infrastructure and services.<br />
J. Encourage mixed use zoning districts to intermix residential land use with<br />
employment, commercial, educational and recreational opportunities in those<br />
unique mixed use areas designated on the Future Land Use Map.<br />
K. Encourage develop <strong>of</strong> vacant and/or unused urbanized areas to minimize<br />
urban sprawl. (Ord. No. 106-2006, §2, 12/19/05)<br />
OBJECTIVE #16: THE CITY OF TITUSVILLE SHALL PURSUE THE<br />
DEVELOPMENT OR REGIONAL MIXED USE DEVELOPMENT WHICH SHALL<br />
BE INTENDED TO ACT AS A CENTER OF COMMERCIAL, PROFESSIONAL,<br />
FINANCIAL, HIGH TECH INDUSTRIAL AND UNIQUE RETAIL SERVING<br />
A SPECIFIC RESIDENTIAL COMMUNITY THROUGH INNOVATIVE LAND<br />
DEVELOPMENT REGULATIONS.<br />
Policy #1: Designation <strong>of</strong> the Regional Mixed Use land uses shall be identified<br />
on the Future Land Use Map as appropriate, based on the general factors and<br />
performance criteria noted below in this policy. <strong>The</strong> Mixed Use Districts shall be<br />
designated on the map consistent with the land development regulations and shall<br />
comply with the following performance standards:<br />
A. Regional Mixed Use shall developments contains a minimum <strong>of</strong> 160 acres.<br />
No additions to the development shall be permitted to the original development<br />
boundaries.<br />
B. Shall include a mix <strong>of</strong> three (3) or more uses consisting <strong>of</strong> the following:<br />
Type <strong>of</strong> Use<br />
Single-Family<br />
Multi-Family<br />
Commercial<br />
Industrial<br />
Public Uses<br />
Recreational uses<br />
Allowable Density and/or<br />
Intensity<br />
0-6.7 du/acre<br />
10 to 40 units/acre<br />
10 to 40 timeshare/resort units<br />
per acre<br />
50% lot coverage/ FAR from<br />
0 to 3<br />
50% lot coverage/ 0 to 1 FAR<br />
Not applicable<br />
Not applicable<br />
C. No single use, as noted in above noted item B, shall occupy more than 50%<br />
in acreage <strong>of</strong> the regional mixed-use district.<br />
D. A mix <strong>of</strong> use project which is exceeding the Development <strong>of</strong> Regional<br />
Impact (DRI) threshold shall also be required to obtain appropriate State <strong>of</strong><br />
<strong>Florida</strong> DRI approval in addition to any <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> approvals.<br />
E. Negative impacts on environmentally sensitive areas shall be minimized,<br />
eliminated and/or mitigated. <strong>The</strong> Conservation Element objectives and policies<br />
shall be utilized in determining the appropriateness <strong>of</strong> industrial land use<br />
designations and the specific intensity <strong>of</strong> use authorized by land development<br />
regulations.<br />
F. All development activity shall be within all adopted concurrency requirements<br />
identified in the Land Development Regulations.<br />
G. Encouraged preservation <strong>of</strong> natural areas, such as woodland and wetland<br />
areas.<br />
H. Encourage a compatible and interrelated mix <strong>of</strong> residential and nonresidential<br />
development, which should include employment and recreational<br />
opportunities.<br />
I. Should encourage innovative design and aesthetic controls.<br />
J. Shall be required to a have buffering areas between different uses.<br />
K. Internal traffic movements shall be designed in a manner that provides for<br />
pedestrian and vehicular traffic compatibility and safety<br />
L. Minimize circulation conflicts by providing truck routes to industrial areas<br />
and pedestrian access to residential areas, with traffic control devices at conflict<br />
points with general traffic circulation.<br />
M. Governmental facilities shall be located in areas easily accessible by the<br />
public and compatible with surrounding land uses<br />
N. School facilities shall be located in conjunction with residential patterns and<br />
easily accessible by the public. Residential development shall be coordinated<br />
with the Brevard County School Board to encourage adequate, functional, and<br />
accessible facility for the public.<br />
O. Requirements/criteria noted in Object 5, Objective 6 and Objective 10 <strong>of</strong> the<br />
<strong>City</strong> <strong>of</strong> <strong>Titusville</strong> Future Land Use Element <strong>of</strong> the Comprehensive <strong>Plan</strong>.<br />
P. Regional Mixed Use Development shall be located <strong>of</strong>f an existing improved<br />
Major/Minor arterial roadway corridors. A minimum <strong>of</strong> 25% <strong>of</strong> the total<br />
perimeter boundary <strong>of</strong> the site shall directly front <strong>of</strong>f a Major/Minor Arterial. All<br />
main access points to the development shall be from a Major/Minor Arterial.<br />
Policy #2: <strong>The</strong> <strong>City</strong> shall further delineate, through its land development<br />
regulations, Single Family, Multi Family, Commercial and High Tech Industrial<br />
zoning mechanisms to create zoning categories for the Regional Mixed Use land<br />
use. This zoning category shall be further delineated with appropriate locational<br />
and performance criteria<br />
OBJECTIVE #17: THE CITY OF TITUSVILLE WILL ESTABLISH<br />
STANDARDS FOR DENSITY AND/OR INTENSITY OF USE FOR EACH<br />
FUTURE LAND USE CATEGORY.<br />
Policy #1: <strong>The</strong> following standards for densities or intensities <strong>of</strong> use shall apply<br />
to each future land use category as indicated [on the next page]:<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 13
Land Use Objective Density<br />
(Residential Use)<br />
Industrial #5 n/a .2 FAR 2<br />
Intensity<br />
(Non-Residential Use)<br />
Commercial #6 n/a .2 FAR 2<br />
Downtown Mixed Use #7 20 du/acre .2 FAR 2<br />
Urban Mixed Use #8 15 du/acre .2 FAR 2<br />
Shoreline Mixed Use #9 20 du/acre .2 FAR 2<br />
Residential One #10 1 du/acre .2 FAR 2<br />
Residential Two #10 2 du/acre .2 FAR 2<br />
Low Density Residential #10 5 du/acre .2 FAR 2<br />
Medium Density<br />
Residential<br />
#10 10 du/acre .2 FAR 2<br />
High Density Residential #10 15 du/acre .2 FAR 2<br />
Public/Semi-public #11 n/a .2 FAR 2<br />
Conservation #12 1 du/5 acres n/a<br />
Regional Mixed Use 1 #16<br />
<strong>Plan</strong>ned Unit<br />
Development<br />
#15 12 du/acre .2 FAR 2<br />
1<br />
Density/Intensity standards for Regional Mixed Use are contained in Objective 16,<br />
Policy 1B<br />
2<br />
<strong>The</strong> .2 FAR will be applied to individually developed lots/parcels. Where a planned/<br />
mixed use development is proposed and common amenities (i.e., parking, stormwater<br />
retention, open space, etc.) are provided, the .2 FAR will apply to the total planned/<br />
mixed use development; however, individual parcels within the planned/mixed use<br />
development will be allowed at a higher FAR based upon site specific impacts.<br />
3<br />
<strong>The</strong> density in this category may be increased by 50% when using Transfer <strong>of</strong><br />
Development Rights as specified in Policy 2, Strategy 3.<br />
Coastal Management Element<br />
<strong>The</strong> contents <strong>of</strong> this element will have significant influence on redevelopment<br />
efforts on the three publicly-owned waterfront parcels that are part <strong>of</strong> the U.S. 1<br />
Corridor Community <strong>Redevelopment</strong> Area.<br />
GOAL #1: TO PRESERVE, RESTORE, AND ENHANCE COASTAL RESOURCES<br />
TO MAXIMIZE PUBLIC USE AND ASSURE THEIR FUTURE ECOLOGICAL<br />
BENEFIT. [9J-5.012(3)(a)]<br />
OBJECTIVE #1: TO MAINTAIN AND UPGRADE THE QUALITY OF THE<br />
INDIAN RIVER LAGOON AND OTHER LAKES AND RIVERS AT THE CLASS<br />
II WATER QUALITY STANDARD AS SET BY THE STATE OF FLORIDA. [9J-<br />
5.012(3)(a)]<br />
Policy #1: Erosion and sedimentation control practices shall be employed for all<br />
urban development and agricultural activities where needed to protect natural<br />
waterbodies, water courses, and wetlands from siltation. <strong>The</strong> following minimum<br />
criteria shall apply in the implementation <strong>of</strong> this policy. [9J-5.012(3)(c)(1 and 2)]<br />
Strategy #1: Adequate erosion and sedimentation<br />
control practices are those recommended by<br />
the Soil Conservation Service and which are<br />
designed to substantially reduce or eliminate soil<br />
loss into waterbodies and wetlands.<br />
Strategy #2: Clearing <strong>of</strong> specific building<br />
sites shall not commence until the developer<br />
is permitted to construct on that site. Clearing<br />
shall be limited to that area to be covered by<br />
construction and necessary drives and walkways.<br />
In all other areas the native vegetation should<br />
remain undisturbed where possible.<br />
Strategy #3: Appropriate techniques to control<br />
wind erosion shall be used during clearing and<br />
site preparation for development or agricultural<br />
activities.<br />
Strategy #4: Seeding and mulching, or other<br />
stabilizing actions <strong>of</strong> disturbed areas shall be<br />
undertaken within 30 days to completion <strong>of</strong><br />
clearing work on a development site.<br />
Strategy #5: All slopes on new non-agricultural<br />
canals, ditches and swales shall be no steeper the<br />
3:1 (horizontal:vertical), and slopes on artificial<br />
ponds no more than 4:1, in order to minimize<br />
erosion and sedimentation.<br />
Strategy #6: Waterfront construction shall be required to use<br />
appropriate erosion and siltation control practices during and after<br />
construction to prevent siltation <strong>of</strong> the adjacent waterbody.<br />
Strategy #7: Stormwater management systems shall be designed to<br />
ensure that water velocities remain below those which would cause<br />
scour and/or erosion.<br />
Policy #2: Wastewater treatment plant effluent impacts shall be minimized or<br />
eliminated to the maximum extent feasible. <strong>The</strong> following measures will be<br />
utilized to implement this policy. [9J-5.012(3)(c)(1)]<br />
Strategy #1: Wastewater treatment systems outfalling to all existing<br />
surface water shall be designed or retr<strong>of</strong>itted as soon as economically<br />
feasible to reduce/eliminate the discharge.<br />
Strategy #2: Periodic inspections shall be conducted on all wastewater<br />
treatment plants within the <strong>City</strong> to ensure that the facility is in good<br />
repair.<br />
Policy #3: <strong>The</strong> siting, operation and monitoring <strong>of</strong> industries which use or generate<br />
hazardous materials shall ensure that groundwater and surface waters are not<br />
contaminated through release <strong>of</strong> hazardous materials into the environment. <strong>The</strong><br />
following definitions apply in the implementation <strong>of</strong> this policy: [9J-5.012(3)(c)(1<br />
and 2)]<br />
1. “Hazardous materials” are those for which notification <strong>of</strong> the FDER is<br />
required by CH. 17-30, F.A.C.<br />
2. Surface water or groundwater contamination is defined as an increase<br />
in the concentration <strong>of</strong> any hazardous material in excess <strong>of</strong> the limits<br />
imposed by CH. 17-3 and CH. 17-30, F.A.C.<br />
Policy #4: <strong>The</strong> negative impact <strong>of</strong> agricultural operations on surface water<br />
quality shall be minimized by encouraging the use <strong>of</strong> appropriate water quality<br />
management techniques. [9J-5.012(3)(c)(1 and 2)]<br />
Policy #5: <strong>The</strong> <strong>City</strong> shall, in preserving the Indian River Lagoon system and other<br />
bodies <strong>of</strong> water within the <strong>City</strong> limits, coordinate with other local governments and<br />
the Marine Resources Council to ensure: [9J-5.012(3)(c)(1-14)]<br />
• adequate sites for water-dependent uses<br />
• prevention <strong>of</strong> estuarine pollution<br />
• control <strong>of</strong> surface water run<strong>of</strong>f<br />
• protection <strong>of</strong> living marine resources<br />
• reduction <strong>of</strong> exposure to natural hazards<br />
• public access<br />
• that required infrastructure is available to serve the development or<br />
redevelopment in the coastal area.<br />
OBJECTIVE #3: TO ASSURE MAXIMUM RETENTION OF THE<br />
RECREATIONAL VALUES OF THE COASTAL AREA, PARTICULARLY<br />
PROVISION OF REASONABLE PHYSICAL AND VISUAL ACCESS TO THE<br />
INDIAN RIVER LAGOON AND THE COASTAL AREA. [9J-5.012(3)(b)(9) AND<br />
9J-5.012(3)(c)(9)]<br />
Policy #1: <strong>The</strong> purchase <strong>of</strong> land for preservation/recreation shall be based upon<br />
the comprehensive and coordinated acquisition program which is outlined in the<br />
Recreation and Open Space Element <strong>of</strong> this <strong>Plan</strong>.<br />
Policy #2: Ensure that maximum protection <strong>of</strong> the public’s right to pedestrian<br />
access to the Indian River Lagoon, other bodies <strong>of</strong> water and the area’s beach is<br />
provided through adherence to the following policies: [9J-5.012(3)(c)(9)]<br />
1. <strong>The</strong> <strong>City</strong> shall work with all governmental and non-governmental<br />
entities <strong>of</strong> <strong>Florida</strong> to gain another access route to Playalinda Beach.<br />
2. Dedication <strong>of</strong> easements for public access shall be encourage from<br />
developments proposed along the Indian River Lagoon shoreline. <strong>The</strong>se<br />
easements are to be located on the uplands running horizontally along the<br />
shoreline. <strong>The</strong> easement can be utilized in the calculation <strong>of</strong> the MWHL<br />
setback requirement. <strong>The</strong> vacation <strong>of</strong> such easements shall be strongly<br />
discouraged unless a suitable alternative can be provided.<br />
3. <strong>The</strong> <strong>City</strong> shall encourage developments along the river to set aside<br />
areas for public access to river from inland.<br />
OBJECTIVE #4: TO ENCOURAGE THE EXPANSION OF EXISTING MARINA<br />
FACILITIES WHICH WILL HAVE MINIMUM IMPACT ON THE INDIAN<br />
RIVER LAGOONAL SYSTEM AND TO DISCOURAGE THEIR LOCATION IN<br />
INAPPROPRIATE AREAS. [9J-5.012(3)(c)(8)]<br />
Policy #1: Marinas shall be located in areas where maximum physical advantage<br />
exists, where the least dredging and maintenance are required, and where adequate<br />
resources will not be adversely affected subject to State and Federal regulations.<br />
Strategy #1: <strong>The</strong> <strong>City</strong> shall perform periodic maintenance dredging <strong>of</strong> public<br />
access channels within <strong>City</strong> limits.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 14
Recreation and Open Space Element<br />
<strong>The</strong> contents <strong>of</strong> this element will have significant influence on redevelopment<br />
efforts on the three publicly-owned waterfront parcels that are part <strong>of</strong> the U.S. 1<br />
Corridor Community <strong>Redevelopment</strong> Area.<br />
GOAL #1: TO PROVIDE A FULL RANGE OF RECREATIONAL ACTIVITIES THAT<br />
ARE ACCESSIBLE, COMPATIBLE AND CONTINUOUS WITH THE OVERALL<br />
MULTI-PURPOSE OPEN SPACE SYSTEM. [9J-5.014(3)(a)]<br />
OBJECTIVE #1: THE CITY SHALL ENSURE THAT THE PUBLIC HAS<br />
REASONABLE ACCESS TO ALL RECREATIONAL OPPORTUNITIES AND<br />
FACILITIES. [9J-5.014(3)(c)(3)]<br />
Policy #1: <strong>The</strong> <strong>City</strong> shall enhance and improve the accessibility <strong>of</strong> parks and<br />
recreational facilities whiles protecting their quality by:<br />
Strategy #1: Ensuring that facilities are accessible by the handicapped<br />
(handicapped parking, ramps, etc.)<br />
Strategy #2: Requiring that all <strong>City</strong> owned park and recreational<br />
facilities have direct access on a public street.<br />
Strategy #3: Adopting a comprehensive Bicycle and Pedestrian <strong>Plan</strong><br />
to ensure the accessibility <strong>of</strong> all recreational opportunity.<br />
Policy #2: <strong>The</strong> <strong>City</strong> shall maintain and/or improve access to waterways by:<br />
Strategy #1: Encouraging the County to acquire beach and waterfront<br />
property through a 1% sales tax or any means approved by a public<br />
referendum.<br />
Strategy #2: Maintaining its current recreational parks along the<br />
waterfront.<br />
Strategy #3: Ensuring ample, functional boat ramps are adjacent to<br />
waterfront parks to meet the current and future demands <strong>of</strong> the public.<br />
<strong>The</strong> <strong>City</strong> shall take a proactive stance toward acquiring and developing<br />
additional boat ramp facilities within the <strong>City</strong>.<br />
OBJECTIVE #2: THE CITY SHALL ENSURE THAT CURRENT AND FUTURE<br />
OPEN SPACE USES ARE COMPATIBLE AND CONTINUOUS WITH THE<br />
PHYSICAL CHARACTERISTICS OF THE AREA AND WITH THE ADJACENT<br />
LAND USES AND FEATURES OF THE AREA. [9J-5.014(3)(b)(4)]<br />
Policy #1: <strong>The</strong> <strong>City</strong> shall design parks that are compatible to various segments <strong>of</strong><br />
the population and the ecosystem.<br />
Policy #2: <strong>The</strong> <strong>City</strong> shall design parks so one particular use does not destroy the<br />
value <strong>of</strong> the site for other intended purposes.<br />
Policy #3: <strong>The</strong> <strong>City</strong> shall give consideration to the impacts on surrounding areas <strong>of</strong><br />
new park sites (transportation, character <strong>of</strong> adjacent property, noise activity level,<br />
etc.).<br />
GOAL #3: TO ACQUIRE AND PRESERVE WITHIN BUDGETARY LIMITS ANY<br />
AND ALL AREAS IDENTIFIED WITHIN THIS PLAN TO BE SPECIAL AND/OR<br />
ENDANGERED ECOSYSTEMS. [9J-5.014(3)(a)]<br />
OBJECTIVE #4: THE CITY SHALL ENCOURAGE THE PROVISION OF OPEN<br />
SPACE BY PUBLIC AND PRIVATE ENTERPRISE.<br />
Policy #1: <strong>The</strong> <strong>City</strong> shall examine all possible private and public resources in order<br />
to enhance its current and future recreation/open space areas including:<br />
• land acquisition<br />
• development <strong>of</strong> areas and facilities<br />
• technical and advisory services<br />
• consumer education<br />
• research and planning<br />
Housing Element<br />
<strong>The</strong> contents <strong>of</strong> this element will have significant influence on redevelopment<br />
efforts at the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site.<br />
GOAL #1: THE CITY OF TITUSVILLE SHALL, THROUGH ITS COMPREHENSIVE<br />
PLAN, MAKE PROVISION FOR ADEQUATE AND AFFORDABLE HOUSING<br />
THAT MEET THE PHYSICAL AND SOCIAL NEEDS OF ALL SEGMENTS OF THE<br />
CURRENT AND FUTURE POPULATION OF THE CITY. [9J-5.010(3)(a)]<br />
OBJECTIVE #3: THE CITY SHALL SUPPORT/INCREASE THE<br />
COORDINATION BETWEEN THE PUBLIC AND PRIVATE SECTORS<br />
INVOLVED IN THE PROVISION OF HOUSING, COMMUNITY DEVELOPMENT<br />
AND REDEVELOPMENT ACTIVITIES BY: [9J-5.010(c)1]<br />
Policy #1: Strengthening the communication amongst the various organizations<br />
comprising the housing market (i.e., public assistance agencies, financial<br />
institutions and realtors) through workshops and such activity.<br />
Zoning Designations<br />
Parcels 1 through 7 have been zoned by the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> as an Urban<br />
Village Special District. This designation is intended to protect the special and<br />
substantial public interest <strong>of</strong> these parcels. Within these parcels, a mix <strong>of</strong> land<br />
uses is encouraged, with higher density residential, commercial, <strong>of</strong>fice, and other<br />
uses permitted with greater height limitations than otherwise allowable in the<br />
<strong>City</strong> <strong>of</strong> <strong>Titusville</strong>. <strong>The</strong> UV Special District is intended as well to be in accordance<br />
with the Urban Mixed Use future land use designation as established in the <strong>City</strong>’s<br />
Comprehensive <strong>Plan</strong> and the U.S. 1 Corridor Master <strong>Plan</strong>.<br />
Permitted uses in the UV Special District include residential townhomes,<br />
duplexes, triplexes, quadraplexes, and other multifamily units, retail food markets<br />
and supermarkets, public and governmental <strong>of</strong>fices, business and pr<strong>of</strong>essional<br />
<strong>of</strong>fices, retail uses, hotels and motels, parking garages, cultural facilities, and<br />
recreational amenities. Certain conditional uses may be permitted as well,<br />
such as child care facilities, <strong>of</strong>fices for nonpr<strong>of</strong>it organizations, commercial<br />
entertainment facilities like movie theaters, arcades, and dance clubs, and certain<br />
tourist attractions. <strong>The</strong>se uses, if permitted, must meet particular urban design<br />
and other criteria that are established to create harmonious relationships with<br />
approved neighboring land uses.<br />
Parcels 8, 9, and 10 (see Fig. 10, page 9), along with the entire Lagoon shoreline<br />
through <strong>Titusville</strong>, is in the <strong>Titusville</strong> Shoreline Area Overlay District (TSA).<br />
<strong>The</strong> TSA is primarily regulatory and provides additional protection to the<br />
Lagoon waterfront. Certain restrictions on development are established for the<br />
TSA, including minimum setback distances <strong>of</strong> 20 feet from the mean high water<br />
level <strong>of</strong> the Indian River Lagoon for all principal structures and most accessory<br />
uses except for bulkheads, seawalls, piers, wharves, docks, boathouses, and<br />
boardwalks.<br />
Prohibited uses in the TSA include development that would render impervious<br />
by coverage <strong>of</strong> buildings more than 35% <strong>of</strong> the setback area. Development in the<br />
TSA must additionally allow a minimum <strong>of</strong> 25% <strong>of</strong> lot width open to the breeze.<br />
No structure or fence over four feet high can be positioned within a breezeway.<br />
Breezeway corridors must be straight front to back and unobstructed vertically.<br />
Breezeways are also encouraged to contain non-opaque fence structures.<br />
<strong>The</strong> aforementioned references to the <strong>City</strong>’s comprehensive plan and zoning<br />
regulations are for reference purposes only and reflect policies that were in place<br />
when the <strong>Redevelopment</strong> <strong>Plan</strong> was approved. It is intended and anticipated<br />
that the <strong>City</strong> and <strong>Redevelopment</strong> Agency will continuously cooperate and<br />
coordinate updates to said policies and regulations on their own initiative, or at<br />
the request <strong>of</strong> the <strong>Mall</strong> owner/developer, to the extent necessary to implement<br />
the <strong>Redevelopment</strong> <strong>Plan</strong>.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 15
Review <strong>of</strong> Existing <strong>Plan</strong>s & Studies<br />
<strong>The</strong> following is a summary <strong>of</strong> plans and studies related to the <strong>Redevelopment</strong><br />
Area and its surrounding neighborhoods. <strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Concept <strong>Plan</strong><br />
builds upon the recommendations contained in previous plans, in particular the<br />
U.S. 1 Corridor Master <strong>Plan</strong> (adopted in August, 2006) and the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
Finding <strong>of</strong> Necessity Study (completed in January, 2007).<br />
U.S. 1 Corridor Master <strong>Plan</strong><br />
<strong>The</strong> U.S. 1 Corridor Master <strong>Plan</strong> was developed through a community-driven<br />
planning process. <strong>The</strong> <strong>Plan</strong> presents a vision for neighborhoods, located south <strong>of</strong><br />
Downtown <strong>Titusville</strong> and north <strong>of</strong> SR 50, and provides general objectives and<br />
specific strategies to enhance the quality <strong>of</strong> life in the U.S. 1 Corridor Study Area.<br />
Its primary purpose is to serve as a guiding document for community leaders, <strong>City</strong><br />
agencies, residents, and stakeholders to pursue opportunities for neighborhood<br />
improvements, redevelopment, and environmental restoration within the U.S.<br />
1 Corridor Study Area. <strong>The</strong> <strong>Plan</strong> identifies the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site as a key<br />
redevelopment opportunity that is envisioned to serve as a catalyst for promoting<br />
high quality development and improving local economic conditions within the<br />
designated area. It also identifies the intersection <strong>of</strong> Harrison Street and U.S. 1<br />
as a gateway opportunity that should be designed to create a sense <strong>of</strong> arrival into<br />
the neighborhoods located within the area. In addition, the document contains<br />
urban design guidelines that provide a framework for future development based<br />
on the community’s desired vision for preserving and enhancing its unique<br />
neighborhood character.<br />
<strong>The</strong> <strong>Plan</strong> recommends the following action strategies directly related to<br />
the redevelopment <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site and the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong>’s<br />
waterfront parks and trails network:<br />
• Work with the <strong>Mall</strong> developer to incorporate public realm improvements<br />
and create a financing structure to ensure that the community’s desired<br />
vision for the future character <strong>of</strong> the area is respected and fulfilled.<br />
• Encourage a mix <strong>of</strong> uses, including residential, specialty retail,<br />
destination restaurants, and urban plazas, as an integral component <strong>of</strong><br />
the development.<br />
• Develop regulations and performance incentives that assure a reasonable<br />
return on the developer’s investment but not at the expense <strong>of</strong> the<br />
community’s desired vision.<br />
• Capitalize on redevelopment activities to connect neighborhoods<br />
through the extension <strong>of</strong> the street grid through the site.<br />
• Manage and contain stormwater run<strong>of</strong>f within the <strong>Redevelopment</strong> Area<br />
boundaries.<br />
• Ensure that desired architectural and urban design guidelines are adopted<br />
as part <strong>of</strong> land development regulations negotiated with the developer.<br />
• Explore the potential for connecting future water-related activities at<br />
the recently acquired <strong>City</strong>-owned property on the waterfront (southeast<br />
corner <strong>of</strong> Harrison Avenue and U.S. 1) with the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
redevelopment.<br />
• Create a site-specific, time-limited Community <strong>Redevelopment</strong> Agency<br />
for the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> redevelopment project. Resources generated<br />
from the fund could be used for the continuation <strong>of</strong> public realm<br />
improvements within the defined area.<br />
• Support rezoning the <strong>Mall</strong> site from Regional Commercial to a new<br />
mixed-use district.<br />
Additionally, the <strong>Plan</strong> recommends the following action strategies for corridor<br />
improvements to U.S. 1 and Hopkins Avenue:<br />
• Provide business owners and developers with incentives such as tax<br />
breaks to upgrade existing properties and/or redevelop properties in<br />
order to maintain control <strong>of</strong> the architectural and design character <strong>of</strong><br />
infill development.<br />
• Create gateways at primary intersections to define the Study Area’s<br />
character and identity (U.S. 1 and Harrison Street)<br />
<strong>Titusville</strong> Waterfront Recreation Master <strong>Plan</strong><br />
This Master <strong>Plan</strong>, currently ongoing, identifies opportunities to create a network<br />
<strong>of</strong> waterfront trails and parks system and shoreline restoration activities for 3.4<br />
miles <strong>of</strong> South <strong>Titusville</strong> waterfront, including the three publicly owned waterfront<br />
parcels that are part <strong>of</strong> the U.S. 1 Corridor Community <strong>Redevelopment</strong> Area. <strong>The</strong><br />
design for the <strong>City</strong>-owned waterfront properties, located in the southeast corner<br />
<strong>of</strong> the <strong>Redevelopment</strong> Area, will be addressed as part <strong>of</strong> this Master <strong>Plan</strong>.<br />
<strong>The</strong> following objectives form the foundation for the design recommendations<br />
contained in the Master <strong>Plan</strong>:<br />
• Ensure the connection <strong>of</strong> isolated parks with a continuous trail and<br />
greenway system along the waterfront.<br />
• Coordinate the location <strong>of</strong> active waterfront recreation areas in the<br />
vicinity <strong>of</strong> neighborhood anchors, including <strong>Titusville</strong> High School, the<br />
two mall sites, and historic neighborhoods.<br />
• Connect neighborhoods to the open space system through pedestrian<br />
and vehicular street extensions to the waterfront at strategic locations<br />
(Harrison Street, Country Club Drive, Olmstead Drive, and Knox<br />
McRae Drive).<br />
• Emphasize the importance <strong>of</strong> view corridors from the roadway during<br />
the design phase <strong>of</strong> the waterfront parks and trail system.<br />
• Devise incentives to encourage property owners and developers to<br />
maintain the views <strong>of</strong> the shoreline through the provision <strong>of</strong> breezeways<br />
and clearing <strong>of</strong> invasive vegetation.<br />
• Seek to eliminate pollutant discharges and stormwater run<strong>of</strong>f into the<br />
Indian River Lagoon.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Finding <strong>of</strong> Necessity Study<br />
<strong>The</strong> Finding <strong>of</strong> Necessity Study elected to determine presence <strong>of</strong> blight, according<br />
to Chapter 163, Part III, <strong>of</strong> the <strong>Florida</strong> Statutes, based on three particular criteria:<br />
property value trends, retail occupancy trends, and physical site conditions. After<br />
a comprehensive examination <strong>of</strong> these criteria, it was conclusively determined<br />
that the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site and adjacent properties included in the Study Area<br />
exhibit characteristics <strong>of</strong> blight. A summary is provided below:<br />
• Aggregate assessed values <strong>of</strong> real property in the area for ad valorem<br />
tax purposes have failed to show any appreciable increase over the 5<br />
years prior to the finding <strong>of</strong> such conditions. Brevard County as a whole,<br />
between 2000 and 2005, showed almost 17% growth while the <strong>City</strong> <strong>of</strong><br />
<strong>Titusville</strong> showed almost 11% growth. <strong>The</strong> <strong>Redevelopment</strong> Area only<br />
managed 1.5% growth in the same time period.<br />
• Deterioration <strong>of</strong> site or other improvements is leading to a lowered<br />
investment image. A comprehensive review <strong>of</strong> building conditions<br />
showed that extensive damage is present in two <strong>of</strong> the four main<br />
<strong>Mall</strong> buildings, while the other two buildings exhibit deteriorating<br />
conditions.<br />
• High commercial vacancy rates and significant declining sales revenue<br />
point to decreased investment interest in the <strong>Redevelopment</strong> Area.<br />
Between 2001 and 2005, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> lost 94% <strong>of</strong> its sales<br />
revenue, while vacancy rates increased to almost 40% <strong>of</strong> total available<br />
leasable space in the <strong>Mall</strong>.<br />
<strong>The</strong> combination <strong>of</strong> these factors makes a strong case for an assessment <strong>of</strong> blight<br />
in the <strong>Redevelopment</strong> Area. Structural conditions in the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
buildings are declining to the point that the <strong>Mall</strong> cannot compete effectively<br />
in the current consumer market environment. Declining sales revenues are an<br />
indication <strong>of</strong> economic distress that makes it difficult for property management<br />
to invest in renovations or support current configurations or solely commercial<br />
uses. In fact, infrastructure in many places is deficient to the point where<br />
renovation may not be cost-effective.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 16
Chapter 3<br />
Concept <strong>Plan</strong><br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 17
<strong>Plan</strong> Philosophy<br />
This chapter presents a descriptive narrative <strong>of</strong> the conceptual elements<br />
proposed in the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong>. <strong>The</strong> <strong>Redevelopment</strong><br />
<strong>Plan</strong> has been developed as a guideline for promoting the sound development<br />
and redevelopment <strong>of</strong> the properties within the <strong>Redevelopment</strong> Area boundaries.<br />
Opportunities for public improvements, redevelopment activities and proposed<br />
future land use composition are identified and graphically illustrated on the<br />
Concept <strong>Plan</strong>. <strong>The</strong> Concept <strong>Plan</strong> illustrative graphic represents the foundation<br />
<strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> and is based on a synthesis <strong>of</strong><br />
existing conditions, community’s expressed goals and objectives for the future<br />
development <strong>of</strong> the <strong>Mall</strong> site and waterfront properties, as well as a preliminary<br />
analysis <strong>of</strong> prevailing market opportunities.<br />
<strong>The</strong> <strong>Plan</strong> builds upon the recommendations <strong>of</strong> the approved U.S. 1 Corridor<br />
Master <strong>Plan</strong> as it relates to redevelopment activities, waterfront development,<br />
public improvements and proposed future land use composition. <strong>The</strong> <strong>Plan</strong><br />
elements were conceived based on the community’s desired vision for the<br />
redevelopment <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> identified during the public workshops<br />
that were conducted during the U.S. 1 Corridor master planning process.<br />
<strong>The</strong> following principles illustrate the overall goals and objectives <strong>of</strong> the <strong>Miracle</strong><br />
<strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong>, as represented by the <strong>Mall</strong> owner/developer and<br />
community residents:<br />
• <strong>The</strong> <strong>Plan</strong> identifies, in general, where primary land uses (public space,<br />
mixed-use, residential, commercial, and <strong>of</strong>fice) and activity centers will<br />
be located in order to enhance the quality <strong>of</strong> life for the community and<br />
create a development pattern that attracts businesses and residents to<br />
South <strong>Titusville</strong>.<br />
• <strong>The</strong> <strong>Plan</strong> provides a tool for the U.S. 1 Corridor Community<br />
<strong>Redevelopment</strong> Agency to promote economic development by showing<br />
prospective private entities’ locations that have been designated for their<br />
purpose, thereby reducing the developer’s risk and permitting hurdles<br />
when coming to the area.<br />
• <strong>The</strong> <strong>Plan</strong> provides a holistic means for the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong>, the <strong>Mall</strong><br />
owners, and the U.S. 1 Corridor Community <strong>Redevelopment</strong> Agency to<br />
facilitate the proposed development based on an agreed-upon strategy.<br />
• <strong>The</strong> <strong>Plan</strong> provides the <strong>City</strong> with a broad range <strong>of</strong> strategies for approving<br />
new developments in a consistent manner through a streamlined<br />
process.<br />
• <strong>The</strong> <strong>Plan</strong> allows the <strong>City</strong> to make capital improvements projections<br />
based upon known future, public project needs, demands and proposed<br />
locations.<br />
• <strong>The</strong> <strong>Plan</strong> promotes nodal development patterns with higher densities<br />
located at specific sites, such as the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site, with lower<br />
heights, building masses and residential uses in surrounding areas.<br />
• <strong>The</strong> <strong>Plan</strong> facilitates the preparation <strong>of</strong> new land development regulations<br />
that provide a higher standard <strong>of</strong> urban and residential design.<br />
• <strong>The</strong> <strong>Plan</strong> takes advantage <strong>of</strong> the Indian River Lagoon, existing and<br />
proposed parks, and the regional trail system by introducing opportunities<br />
for increased linkages to all three.<br />
• <strong>The</strong> <strong>Plan</strong> embraces transportation and pedestrian mobility strategies<br />
contained in the U.S. 1 Corridor Master <strong>Plan</strong> as well as anticipated needs<br />
that will be generated by public realm waterfront improvements and the<br />
development <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site.<br />
• <strong>The</strong> <strong>Plan</strong> anticipates destination-based retail development and activities<br />
serving the regional market alongside needs-based commercial<br />
development that will provide goods and services for residents located<br />
in surrounding neighborhoods and the wider community.<br />
• <strong>The</strong> <strong>Plan</strong> suggests attracting a vibrant mix <strong>of</strong> uses in the<br />
<strong>Redevelopment</strong> Area, including but not limited to, diverse housing<br />
opportunities, restaurants and cafés, specialty retail, new <strong>of</strong>fice uses,<br />
artist studios and galleries, and hotel or tourist accommodations.<br />
• <strong>The</strong> <strong>Plan</strong> supports the following social, environmental, physical,<br />
and economic development objectives expressed by community<br />
representatives during the U.S. 1 Corridor master planning process:<br />
• Improve physical and visual access to the Indian River<br />
Lagoon.<br />
• Preserve ecological habitat and improvement <strong>of</strong> the<br />
environmental conditions <strong>of</strong> the shoreline.<br />
• Employ innovative techniques to treat and contain run<strong>of</strong>f<br />
within a well-designed stormwater management system.<br />
• Enhance the aesthetic character <strong>of</strong> U.S. 1, Harrison Street and<br />
Hopkins Avenue.<br />
• Ensure continuity between planning objectives in the U.S. 1<br />
Corridor Master <strong>Plan</strong> and the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong><br />
<strong>Plan</strong>.<br />
• Provide adequate landscape buffering to preserve the singlefamily<br />
residential neighborhoods surrounding the U.S. 1<br />
Corridor Community <strong>Redevelopment</strong> Area, to maintain the<br />
existing neighborhood scale in future redevelopment, and to<br />
prevent commercial encroachment into residential areas.<br />
• Support for public-oriented, water-related uses.<br />
• Strengthen and expand cultural heritage and ecotourism<br />
opportunities.<br />
• Promote development patterns that ensure compact and<br />
pedestrian scaled activities through restricted heights, building<br />
masses and encourage low-impact development.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 18
Fig. 16: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Conceptual <strong>Plan</strong><br />
Source: RMPK Group, Inc.
Mixed-Use: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
<strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> redevelopment program builds on the strategies<br />
recommended in the U.S. 1 Corridor Master <strong>Plan</strong> by introducing a mixed-use<br />
project that is compatible with the existing neighborhood character, while<br />
at the same time reinforcing connections to its surrounding neighborhoods.<br />
<strong>The</strong> conceptual development program supports the community’s vision<br />
for revitalizing the deteriorated <strong>Mall</strong> property and provides momentum for<br />
redevelopment efforts and public improvement projects identified in the U.S.<br />
1 Corridor Master <strong>Plan</strong>. <strong>The</strong> <strong>Plan</strong> is embedded in the reconfiguration <strong>of</strong> the<br />
<strong>Mall</strong> property to accommodate a diverse mix <strong>of</strong> residential, commercial, <strong>of</strong>fice,<br />
and public open space. <strong>The</strong> conceptual site plan and development program is<br />
intended to depict a framework for future development and is flexible in nature.<br />
<strong>The</strong> <strong>Mall</strong> site is redesigned with an overarching goal to reconnect the<br />
neighborhoods, located to the north and south <strong>of</strong> the <strong>Mall</strong> site with each other,<br />
while at the same time creating a distinctive sense <strong>of</strong> place and destinationoriented<br />
uses attracting a regional consumer base. <strong>Redevelopment</strong> <strong>of</strong> the <strong>Mall</strong><br />
property is also intended to achieve broader public objectives for economic<br />
development and revitalization. It is expected that redevelopment will help<br />
improve the area’s investment image, enhance the area’s aesthetic character,<br />
create a compact neighborhood development pattern, and contribute to improving<br />
the environmental conditions <strong>of</strong> the area’s natural resources.<br />
• Buildings oriented parallel to the internal street axis that help reinforce<br />
the visual axis established to the waterfront;<br />
• Building heights increase from lower heights for the outparcels to three<br />
stories along the street edges and a maximum <strong>of</strong> five stories in the mixeduse<br />
buildings, creating a pedestrian-scale environment and maintaining<br />
relationships to existing neighborhood structures;<br />
• On-street parking located on internal streets to create convenient<br />
parking spaces for retail traffic in addition to three centrally-located<br />
parking structures to accommodate residents’ parking needs; and<br />
• Containment and treatment within a closed stormwater management<br />
system with all stormwater collected in and around the site.<br />
<strong>The</strong> following planning principles serve as guidelines to ensure that the<br />
redevelopment <strong>of</strong> the <strong>Mall</strong> fulfills the goals <strong>of</strong> compact development,<br />
neighborhood compatibility, and sustainability set forth by the adopted U.S. 1<br />
Corridor Master <strong>Plan</strong> and the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> Comprehensive <strong>Plan</strong>.<br />
OBJECTIVE<br />
Create a vibrant mixed-use district designed as a compact and walkable town<br />
center that provides the social, cultural and commercial focus for existing and<br />
future residents in the entire <strong>City</strong>.<br />
<strong>The</strong> “urban-village” theme reflected in the site design is intended to create a<br />
network <strong>of</strong> internal streets aligned on a diagonal axis (northwest to southeast)<br />
that visually connects the proposed development to the Kennedy Space Center<br />
across the Indian River Lagoon. An urban plaza forms the focal point <strong>of</strong> the<br />
development and is proposed at the intersection <strong>of</strong> an internal street and a<br />
pedestrian walkway that serves as the extension to the <strong>City</strong>’s sidewalk system<br />
along U.S. 1 and Harrison Street (see Fig. 17, this page).<br />
This plaza, designed around a landscaped roundabout feature, also serves as<br />
a traffic calming element separating vehicular and pedestrian traffic. Vertical<br />
mixed-use buildings, with ground-level retail and upper-level residential uses,<br />
are set back from the plaza and provide a space for outdoor seating for street cafés<br />
and restaurants. As illustrated in Fig. 17, the internal streets will be developed<br />
to include sidewalks, on-street parallel parking spaces, and landscaped areas.<br />
<strong>The</strong> residential uses consist <strong>of</strong> a mix <strong>of</strong> housing types including townhomes,<br />
condominiums, and apartments.<br />
<strong>The</strong> proposed development program for the mixed-use project also includes the<br />
following elements:<br />
• Smaller scale residential townhomes, combined with a 25-foot landscape<br />
buffer, that help transition into the single-family neighborhoods to the<br />
north and south <strong>of</strong> the <strong>Mall</strong> site;<br />
Fig. 17: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong><br />
Source: CPH Architects, Inc.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 20
PLANNING PRINCIPLES:<br />
Total Site Area (Conceptual)<br />
30.86 ac<br />
Urban Village (UV)<br />
• Provide physical and visual connectivity to adjacent neighborhoods and<br />
development employing a combination <strong>of</strong> strategies such as forming<br />
connections to the existing sidewalk network, waterfront parks and trails<br />
system, and surrounding commercial development; placing well-defined<br />
public access points along existing public streets; etc.<br />
• Design elements that accentuate the views to the Indian River Lagoon<br />
and improve connectivity to the <strong>City</strong>-owned property planned to be<br />
developed as a waterfront park.<br />
• Accommodate a mix <strong>of</strong> uses including residential, specialty retail, and<br />
hotel uses with adequate parking facilities. Retail activities should be<br />
oriented towards the street and have direct access to the streetscape<br />
areas through storefront entries.<br />
• Create an opportunity for a public open space or plaza that serves as a<br />
gathering space for the entire community.<br />
• Ensure consistency with site planning principles and architectural<br />
guidelines expressed by the community-oriented commercial<br />
development to the street, integrate architectural elements to add visual<br />
interest, shared parking facilities.<br />
• Identify multiple vehicular and pedestrian circulation routes and<br />
access points to avoid traffic congestion on major streets and promote<br />
pedestrian use <strong>of</strong> the site.<br />
• Maintain density requirements to 15 dwelling units per acre, in<br />
accordance with the Urban Village zoning district requirements for<br />
maximum density.<br />
• Incorporate sustainable site design and innovative run<strong>of</strong>f treatment<br />
strategies with respect to the design <strong>of</strong> stormwater management<br />
systems.<br />
Total Pervious Area<br />
Open Space and Pedestrian Amenities<br />
Stormwater Area<br />
Total Impervious Area<br />
Roads and Surface Parking<br />
Buildings and Parking Structures<br />
Density<br />
Maximum Building Height<br />
Total Parking<br />
Surface Parking<br />
Parking Structure 1<br />
Parking Structure 2<br />
Parking Structure 3<br />
Total Outparcel Area<br />
Outparcel 1<br />
Outparcel 2<br />
Outparcel 3A<br />
Outparcel 3B<br />
Outparcel 4<br />
12.96 ac<br />
10.19 ac<br />
2.77 ac<br />
17.9 ac<br />
7.72 ac<br />
10.18 ac<br />
15 dwelling units/ac<br />
60 ft<br />
1,610 spaces<br />
299 spaces<br />
387 spaces<br />
462 spaces<br />
462 spaces<br />
40,939.5 sq. ft.<br />
13,358.5 sq. ft.<br />
6,718.5 sq. ft.<br />
6,678 sq. ft.<br />
12,509.5 sq. ft.<br />
1,675 sq. ft.<br />
Maximum Residential Density<br />
Townhouse Projects<br />
Maximum Allowable Height<br />
Table 2:<br />
Conceptual Development Requirements by the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong><br />
Urban Village Special District<br />
Source: <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> Land Development Regulations<br />
Table 1:<br />
Conceptual Site data for <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
(Parcels 1 - 7)<br />
Source: CPH Architects<br />
Exception:<br />
Conditional Situation:<br />
Maximum Building Height<br />
Retail Space<br />
Land Use Buffers<br />
Open Space<br />
15 dwelling units/acre<br />
No more than 10 d.u./bldg<br />
50 ft<br />
60 ft if ground floor is >75% retail<br />
Up to 100 ft by conditional approval<br />
60 ft<br />
40,000 sq. ft. or less per bldg<br />
25 ft. min. btw Commercial and<br />
Residential<br />
Must represent 25% <strong>of</strong> UV gross<br />
acreage<br />
Building Land Use Retail SF Units Stories Required<br />
Parking<br />
Provided<br />
Parking<br />
A Comm/Res 28,500 77 3, 4, & 5 368 376<br />
B Comm/Res 37,500 88 3, 4, & 5 404 412<br />
C Residential - 80 5 200 208<br />
D Residential - 20 3 50 59<br />
E Comm/Res 19,600 109 4 255 263<br />
F Residential - 19 3 48 56<br />
G Residential - 48 3 144 144<br />
H Comm/Res 19,600 33 4 63 92<br />
Parcel 5 Commercial 2,000 5 1 30 90<br />
Parcel 6 Commercial 2,000 1 1 20 20<br />
Parcel 7 Commercial 5,000 10 1 15 15<br />
Total 114,200 490 1,597 1,735<br />
Table 3:<br />
Conceptual Building program for <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
(Parcels 1 - 7)<br />
Source: CPH Architects<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 21
Open Space<br />
<strong>The</strong> U.S. 1 Corridor master planning process recommended establishing<br />
connections between the <strong>City</strong>’s planned waterfront improvements and new<br />
developments along the western edge <strong>of</strong> U.S. 1. <strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong><br />
intends to continue strengthening and expanding the <strong>City</strong>’s existing and planned<br />
system <strong>of</strong> parks, open space and trails and to provide clear linkages between the<br />
area’s recreational facilities and the surrounding neighborhoods. <strong>The</strong> proposed<br />
<strong>City</strong>-owned waterfront park (located at the southeast corner <strong>of</strong> Harrison Street<br />
and U.S. 1) and the proposed central plaza (part <strong>of</strong> the proposed <strong>Miracle</strong> <strong>City</strong><br />
<strong>Mall</strong> development program) will provide additional open space destinations for<br />
mixed-use patrons, employees, and area residents.<br />
<strong>City</strong>-owned waterfront properties located across from the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site<br />
<strong>of</strong>fer an opportunity to introduce uses that support recreation and ecotourism,<br />
as well as improve access and views to the Indian River Lagoon. <strong>The</strong> <strong>City</strong> is<br />
currently preparing a Waterfront Recreation Master <strong>Plan</strong> for all public-owned<br />
waterfront properties and right-<strong>of</strong>-ways. <strong>The</strong> recommended improvements,<br />
when combined with on-going streetscape and trail improvements, will provide<br />
a well-integrated open space network that enhances public access to the area’s<br />
natural resources and recreational facilities.<br />
PLANNING PRINCIPLES:<br />
• Create opportunities to develop strong visual linkages between the<br />
proposed central plaza, perimeter greenways and the <strong>City</strong>’s planned<br />
U.S. 1 trail network and proposed waterfront park (southeast corner <strong>of</strong><br />
Harrison Street and U.S. 1);<br />
• Incorporate open space amenities for area residents and visitors to the<br />
development, including pedestrian lighting, seating areas, planters, bike<br />
racks, and trash receptacles;<br />
• Ensure views to parking and service areas are screened from all internal<br />
and perimeter streets primarily through tree planting;<br />
• Integrate improvements to the proposed waterfront park with the <strong>Miracle</strong><br />
<strong>City</strong> <strong>Mall</strong> site open space network and streetscape improvements to<br />
provide a continuity <strong>of</strong> streetscape elements;<br />
• Locate interior plazas adjacent to retail or <strong>of</strong>fice uses defined by using<br />
building edges and landscape elements;<br />
• Provide safe and inviting pedestrian access to the plaza from street<br />
frontage;<br />
• Design internal walkways, trails and promenades to direct pedestrians<br />
to area destinations such as building entrances, the central plaza, the<br />
waterfront park, and parking access locations.<br />
Proposed open space improvements recommended by the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site<br />
conceptual plan are expected to result in creating new open space and recreational<br />
opportunities for residents and visitors. <strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site’s proposed<br />
program incorporates a diverse range <strong>of</strong> open space elements such as a central<br />
open space plaza, a continuous landscaped buffer along the perimeter <strong>of</strong> the<br />
site, stormwater ponds that include passive recreation elements, and streetscape<br />
elements. <strong>The</strong> open space system, comprising nearly 40% <strong>of</strong> the property, or<br />
approximately 13 acres, is designed to accentuate the <strong>City</strong>-wide network <strong>of</strong> trails<br />
and open spaces serving the area residents.<br />
OBJECTIVE:<br />
Create an interconnected system <strong>of</strong> open spaces and walkways<br />
promoting pedestrian traffic while strengthening links with surrounding<br />
neighborhoods and providing readily accessible recreational opportunities<br />
for the residents.<br />
Fig. 18:<br />
Waterfront Park Section; southeast corner <strong>of</strong><br />
U.S. 1 and Harrison Street.<br />
Source: RMPK Group, Inc.<br />
Fig. 19:<br />
Examples <strong>of</strong> Urban Plazas<br />
<strong>City</strong> Place, West Palm Beach, FL<br />
Source: RMPK Group, Inc.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 22
Streetscape Improvements<br />
In accordance with the recommendations <strong>of</strong> the U.S. 1 Corridor Master <strong>Plan</strong><br />
and the <strong>City</strong>’s Land Development Regulations, the roadways and streets in<br />
the <strong>Redevelopment</strong> <strong>Plan</strong> are intended to serve as extensions <strong>of</strong> public open<br />
space (streetscape, parks, and urban plazas) designed to create a traffic<br />
circulation pattern that minimizes the impacts on adjacent residential areas.<br />
<strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong> envisions creating a hierarchy <strong>of</strong> streets that provide<br />
efficient vehicular circulation and pedestrian movement patterns between internal<br />
streets within the redeveloped <strong>Mall</strong> site and the surrounding arterial roadways.<br />
Pedestrian connections to the surrounding neighborhoods, located north and<br />
south <strong>of</strong> the <strong>Mall</strong> site, will be accentuated to provide convenient access to the<br />
new community without generating excessive traffic on local streets.<br />
PLANNING PRINCIPLES:<br />
• Design streets to accommodate minimum required<br />
pavement based on traffic volume and speed limits.<br />
Utilize available right-<strong>of</strong>-way widths to maintain a<br />
clear unobstructed pedestrian network.<br />
• Separate sidewalks from the curb with a planting<br />
strip, when possible. Use tree grates in retail streets<br />
to provide ample space for pedestrian circulation on<br />
sidewalks.<br />
Before<br />
<strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong> provides additional pedestrian area to the public streets<br />
adjacent to the property. Internal walkways, walking trails and promenades<br />
provided on the east portion <strong>of</strong> the development will connect the central plaza<br />
with the <strong>City</strong>’s sidewalks located on the west edge <strong>of</strong> U.S. 1, the north edge<br />
<strong>of</strong> Harrison Street, and the east edge <strong>of</strong> Hopkins Avenue. Coordinating public<br />
realm improvements on the opposite side <strong>of</strong> these roadways with the planned<br />
<strong>Mall</strong> site improvements will be a critical factor in establishing a continuity <strong>of</strong><br />
streetscape elements, including streetscape design and sidewalk design. <strong>The</strong><br />
proposed improvements will not adversely impact the capacity <strong>of</strong> the roadways.<br />
Rather, they will improve bicycle and pedestrian access increasing the level <strong>of</strong><br />
activity along the street, which, in turn, will promote a healthy environment for<br />
local businesses.<br />
OBJECTIVE:<br />
Develop a unified system <strong>of</strong> streetscape improvements that enhances the<br />
visual character <strong>of</strong> existing roadways while at the same time promoting a<br />
pedestrian-friendly environment with increased visibility to the waterfront.<br />
• Design sidewalks to accommodate handicap<br />
accessibility requirements as set forth in the Americans<br />
with Disabilities Act.<br />
• Place all utility lines underground to ensure that<br />
sightlines to the waterfront are unobstructed and<br />
to lessen the impacts <strong>of</strong> hurricanes and storms on<br />
residents.<br />
• Separate pedestrian and vehicular traffic through<br />
a well-designed system <strong>of</strong> internal streets and<br />
strategically located access points to and from the<br />
site. <strong>The</strong> exact location and design <strong>of</strong> the access<br />
improvements shall be determined in accordance<br />
with pr<strong>of</strong>essional traffic studies conducted by the<br />
developer/owner.<br />
• Provide on-street parking along internal streets as a<br />
buffer between pedestrian and vehicular traffic, and<br />
increase retail traffic along streets accommodating<br />
storefronts at ground level.<br />
After<br />
• Locate wayfinding signage, directional signage to<br />
pedestrian destinations (waterfront parks and trails,<br />
central plaza, parking areas), near intersection entry<br />
points, designed in a consistent and easily identifiable<br />
manner.<br />
Figs. 20-21:<br />
Before-and-After Photo Simulation <strong>of</strong> U.S. 1 Corridor<br />
Source: RMPK Group, Inc.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 23
Streetscape Improvements:<br />
U.S. 1<br />
U.S. 1 is the primary transportation corridor through <strong>Titusville</strong>. <strong>The</strong> roadway<br />
is designed primarily to carry high volumes <strong>of</strong> traffic and lacks pedestrian<br />
amenities. <strong>The</strong>re are four travel lanes, two in each direction, a center turn lane and<br />
two unmarked bike lanes. In order to create a pedestrian-oriented corridor, the<br />
streetscape along U.S. 1 needs to be reoriented to cater to the pedestrian as well<br />
as to the automobile. <strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong> does not anticipate any changes<br />
to the existing travel lanes, although improvements to the center median lane are<br />
recommended. Street trees, such as live oaks and palms, are recommended along<br />
the street edge as well as the center median with low-lying shrubs and ground<br />
cover to enhance the landscape. Improvements to this corridor from an aesthetic<br />
and user comfort perspective will increase its appeal for pedestrian users and<br />
increase the highway’s scenic qualities.<br />
Fig. 22 shows improvements to the highway medians and boulevards, particularly<br />
in the way <strong>of</strong> shade trees and visually pleasing landscaping. <strong>The</strong> intersection<br />
<strong>of</strong> U.S. 1 and Harrison Street is considered an important area because it is<br />
the primary link between <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> and the public-owned waterfront<br />
parcels across the highway. In the plan at right, the intersection is provided with a<br />
pavement treatment to create a sense <strong>of</strong> arrival into the <strong>Redevelopment</strong> Area. <strong>The</strong><br />
<strong>Plan</strong> recommends expanding the available pedestrian spaces to accommodate<br />
wider sidewalks and increase pedestrian connectivity, whenever possible.<br />
Fig. 22:<br />
Top: U.S. 1 Streetscape Improvement <strong>Plan</strong><br />
Source: RMPK Group, Inc.<br />
Fig. 23:<br />
Bottom: U.S. 1 Streetscape Section (Harrison St. and U.S. 1)<br />
Source: RMPK Group, Inc.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 24
Streetscape Improvements:<br />
Harrison Street<br />
Harrison Street is the main east-west collector connecting the <strong>Redevelopment</strong><br />
Area to the residential neighborhoods west <strong>of</strong> the U.S. 1 Corridor Study Area.<br />
<strong>The</strong> road consists <strong>of</strong> two travel lanes, one in each direction, with a 4-foot-wide<br />
sidewalk on both sides <strong>of</strong> the street. <strong>The</strong> street lacks pedestrian amenities such as<br />
benches, trash receptacles, and landscaping.<br />
Existing land use differences will be expanded even further upon completion <strong>of</strong><br />
the redevelopment effort at the <strong>Mall</strong>. In addition to serving an important role as<br />
a circulation route for traffic, Harrison Street will also serve as a transition area<br />
between the two land uses.<br />
Along Harrison Street, the plan recommends retaining the two travel lanes,<br />
widening the sidewalks, marking crosswalks, and planting street trees, ground<br />
cover and shrubs along the street’s edge. Proposed streetscape improvements<br />
along Harrison Street are intended to create an attractive path along the southern<br />
edge <strong>of</strong> the redeveloped <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> area, intersecting at U.S. 1 and<br />
Hopkins Avenue with well-developed gateways. This street ranks as a high<br />
priority for the next phase <strong>of</strong> streetscape improvements.<br />
In the before-and-after simulations below, Harrison Street is given an extensive<br />
landscaping and urban design upgrade, including widened sidewalks for pedestrian<br />
use.<br />
Fig. 24:<br />
Harrison Street Section<br />
Source: RMPK Group, Inc.<br />
After<br />
Before<br />
Figs. 25-26:<br />
Harrison Street Before-and-After Photo Simulation<br />
(Intersection <strong>of</strong> Harrison St. and U.S. 1)<br />
Source: RMPK Group, Inc.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 25
Streetscape Improvements:<br />
Hopkins Avenue<br />
Although not as busy as U.S. 1, Hopkins Avenue remains an essential northsouth<br />
route in South <strong>Titusville</strong>, and, upon completion <strong>of</strong> the redevelopment <strong>of</strong><br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>, this street will become even more important for circulation<br />
management in and around the <strong>Mall</strong> area. In response to a probable increase in<br />
traffic on Hopkins Avenue, streetscape improvement efforts on a scale similar to<br />
U.S. 1 are proposed for Hopkins Avenue.<br />
It is recommended that the streetscape includes street trees along the entire<br />
length on both the west and east sides <strong>of</strong> Hopkins Avenue. <strong>The</strong> street trees may<br />
include a mix <strong>of</strong> canopy trees, such as live oaks and palms, and a mix <strong>of</strong> shrubs<br />
and ground cover. Other amenities <strong>of</strong> the streetscape may include pedestrianscale<br />
lighting, banners, wayfinding signage, directional signage, benches, bus<br />
stops, trash receptacles, bike racks, and newspaper stands. <strong>The</strong> streetscape is<br />
anticipated to provide opportunities for extending the sidewalk network that<br />
is located within the redeveloped <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> and bringing it into the<br />
residential neighborhoods. <strong>The</strong> sidewalk network is expected to connect to<br />
adjacent residential areas.<br />
Figs. 27-28:<br />
Top: Hopkins Avenue Streetscape Improvement <strong>Plan</strong><br />
Bottom: Hopkins Ave./Harrison St. Section<br />
Source: RMPK Group, Inc.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 26
Gateways and Signage<br />
Stormwater Management<br />
Gateways are visual landmarks that reinforce the entrance into a geographic area<br />
and employ a combination <strong>of</strong> elements, including landscaping, paving materials<br />
and patterns, signage, structures, and more. <strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong> identifies<br />
several opportunities for establishing gateways to create a coherent identity for<br />
the neighborhoods and the primary commercial corridors. Accentuating primary<br />
intersections through a combination <strong>of</strong> streetscape elements (signature trees,<br />
landscaped sidewalk edges, median landscaping, brick pavers, colored concrete,<br />
etc.) and a well-designed directional signage system will create a sense <strong>of</strong> arrival<br />
into the area.<br />
Gateway opportunities include the areas <strong>of</strong> transition into the area’s activity nodes<br />
as well as entrances into identified destination areas. Gateway improvements<br />
should be prioritized in conjunction with planned streetscape improvements.<br />
<strong>The</strong> intersections <strong>of</strong> Harrison Street with U.S. 1 and Hopkins Avenue are prime<br />
locations for gateways.<br />
PLANNING PRINCIPLES:<br />
• A major entry statement should include landscaping and signage<br />
directing people to the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> project and the waterfront<br />
parks and trails network.<br />
• U.S. 1 should be landscaped and signed as a major entrance to the<br />
<strong>Redevelopment</strong> Area, signifying arrival from the communities located to<br />
the south.<br />
• Harrison Street south <strong>of</strong> the <strong>Redevelopment</strong> Area should be redeveloped<br />
as a canopy roadway.<br />
Stormwater management is an essential component <strong>of</strong> any urban development<br />
project. Extensive impervious coverage <strong>of</strong> the ground reduces the amount<br />
<strong>of</strong> absorption <strong>of</strong> rainfall, resulting in run<strong>of</strong>f that can pose dangers and<br />
inconveniences to motorists and pedestrians. To avoid these problems, paved<br />
surfaces are typically designed to collect run<strong>of</strong>f into drainage systems that<br />
convey stormwater away from the area. In much <strong>of</strong> South <strong>Titusville</strong>, that system<br />
is a closed drainage system that carries run<strong>of</strong>f directly into the Indian River<br />
Lagoon.<br />
<strong>The</strong> stormwater management system at <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> and elsewhere in<br />
South <strong>Titusville</strong> does not reflect advances in technology or best practices<br />
developed in recent decades. Run<strong>of</strong>f is presently collected from the extensively<br />
paved site into closed underground storm sewer channels and discharged into<br />
the Indian River Lagoon via a shallow, poorly maintained stormwater retention<br />
pond on one <strong>of</strong> the <strong>City</strong>-owned waterfront parcels across U.S. 1. <strong>Redevelopment</strong><br />
efforts at <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> must take into account the need for a redesigning <strong>of</strong><br />
the existing stormwater management system.<br />
Controlling and treating stormwater run<strong>of</strong>f on-site is an important element <strong>of</strong> the<br />
<strong>Redevelopment</strong> <strong>Plan</strong> for the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site. On the <strong>Mall</strong> site, stormwater<br />
management provides an opportunity for the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> and the private<br />
sector to work together in establishing innovative and creative solutions to<br />
address stormwater run<strong>of</strong>f. Additionally, the <strong>City</strong> has an opportunity to access<br />
substantial funding from various state and federal programs and agencies in<br />
order to implement new stormwater management features.<br />
<strong>The</strong> master stormwater retention system for the redevelopment <strong>of</strong> the <strong>Miracle</strong><br />
<strong>City</strong> <strong>Mall</strong> site will be designed as a wet retention system and will include<br />
passive recreation features such as walkways, gazebos, fountains and benches.<br />
<strong>The</strong> stormwater retention system for the property is expected to accommodate,<br />
control and treat <strong>of</strong>f-site stormwater that has traditionally been transmitted<br />
through the property and discharged directly into the Indian River Lagoon.<br />
A total <strong>of</strong> 2.77 acres <strong>of</strong> stormwater pond are proposed for just the four <strong>Miracle</strong><br />
<strong>City</strong> <strong>Mall</strong> parcels alone. <strong>The</strong>se are expected to contain run<strong>of</strong>f from within the<br />
entire site and the surrounding areas in an innovative and physically appealing<br />
manner. Upon completion, the new stormwater management system could serve<br />
as a model for the rest <strong>of</strong> the <strong>City</strong>.<br />
Fig. 30:<br />
Existing Stormwater Pond Area on Parcel 8<br />
Source: RMPK Group, Inc.<br />
Fig. 29:<br />
Example <strong>of</strong> a Gateway in Kissimmee, FL<br />
Source: RMPK Group, Inc.<br />
Fig. 31:<br />
Conceptual Rendering <strong>of</strong> Open Space and Landscaping: Stormwater Retention<br />
Ponds as Open Areas<br />
Source: RMPK Group, Inc.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 27
Circulation and Parking<br />
Parking is the most influential element in designing an efficient automobile<br />
and pedestrian traffic circulation system. A combination <strong>of</strong> on-street parking,<br />
public parking surface lots, and shared parking provisions should be provided to<br />
address the parking needs <strong>of</strong> the proposed improvements. <strong>The</strong> <strong>Redevelopment</strong><br />
<strong>Plan</strong> for the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site provides 58 spaces more than the required<br />
parking spaces, in accordance with the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> Land Development<br />
Regulations. <strong>The</strong> three parking structures are wrapped with mixed-use buildings<br />
serving as the primary façade and mitigating their visual dominance. Parking<br />
areas for residential units are located to the northwest section <strong>of</strong> the site and<br />
will be buffered from adjacent roadways and residential areas through adequate<br />
landscaping.<br />
Internal streetscape design serving ground-level retail uses accommodates<br />
on-street parallel parking spaces to serve as a buffer between pedestrians and<br />
vehicular traffic. <strong>The</strong> following guidelines should be taken into consideration<br />
during the design and configuration <strong>of</strong> parking facilities in the <strong>Redevelopment</strong><br />
Area:<br />
GUIDELINES:<br />
• Design parking structures as an integral part <strong>of</strong> the mixed-use structures<br />
and as an extension <strong>of</strong> the adjacent buildings consistent with the design<br />
guidelines for mixed-use development.<br />
• Provide pedestrian linkages and directional signage to parking areas<br />
that are designed with landscaping and well-lit active ground level<br />
uses.<br />
• Ensure vehicular access to the garage from side streets and that ingress<br />
and egress points are designed in a manner that minimizes pedestrian<br />
conflicts.<br />
• Locate on-street parking in accordance with <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> parking<br />
regulations.<br />
• Internal access drives should join together existing public streets and<br />
should line up with adjacent private drives.<br />
• Internal parking lots should connect with adjacent parking lots where<br />
possible.<br />
Fig. 32:<br />
Conceptual Rendering <strong>of</strong> a Mixed-Use Parking Structure<br />
Source: RMPK Group, Inc.<br />
Figs. 34-36:<br />
Parking Management in Mixed-Use Settings<br />
Source: RMPK Group, Inc.<br />
Fig. 33:<br />
Conceptual Perspective <strong>of</strong> an Internal Street in Redeveloped <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>;<br />
On-street Parking Arrangement Shown<br />
Source: CPH Architects, Inc.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 28
Neighborhood Connectivity<br />
During the U.S. 1 Corridor master planning process, the community supported<br />
the <strong>Plan</strong>’s recommendations to redevelop the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site as a<br />
mixed-use development in conjunction with improvements to the <strong>City</strong>-owned<br />
waterfront property. In addition, the residents expressed the need to ensure<br />
that broader community goals are attained through the redevelopment process,<br />
including improving the pedestrian environment, creating opportunities for<br />
owner-occupied housing, developing a community focal point and gathering<br />
space, establishing architectural guidelines consistent with the area’s existing<br />
character, and introducing more pedestrian-oriented retail uses.<br />
<strong>The</strong> recommendations outlined in this <strong>Plan</strong> meet the community’s desired<br />
vision for the redevelopment <strong>of</strong> the properties within the <strong>Redevelopment</strong> Area.<br />
<strong>Redevelopment</strong> <strong>of</strong> the <strong>Mall</strong> site and the <strong>City</strong>-owned waterfront property is<br />
intended to achieve broader public objectives for neighborhood revitalization and<br />
economic development: improving streetscape conditions along the peripheral<br />
corridors, creating a town center with public gathering areas, mitigating impacts<br />
<strong>of</strong> stormwater run<strong>of</strong>f into the Indian River Lagoon from surrounding areas, and<br />
improving public access to the waterfront.<br />
<strong>The</strong> character <strong>of</strong> the proposed development is intended to reflect the qualities <strong>of</strong><br />
<strong>Titusville</strong>’s distinctive neighborhoods by incorporating appropriate architectural<br />
styles, creating tree canopies, and extending the area’s street network.<br />
<strong>The</strong> density <strong>of</strong> neighborhoods within the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> redevelopment<br />
project will be greater than the existing single-family residential neighborhoods<br />
surrounding them, adding to the diversity <strong>of</strong> housing options available to area<br />
residents. <strong>The</strong> following planning principles support the area’s unique sense <strong>of</strong><br />
place in accordance with the findings and strategies <strong>of</strong> the U.S. 1 Corridor Master<br />
<strong>Plan</strong>.<br />
OBJECTIVE:<br />
Develop an activity center designed with contextually sensitive urban<br />
design principles that <strong>of</strong>fer significant benefits to the community, create a<br />
harmonious visual setting, and enhance the livability <strong>of</strong> the surrounding<br />
neighborhoods and the entire <strong>City</strong>.<br />
PLANNING GUIDELINES:<br />
• Ensure that proposed development is compatible in scale and character<br />
to the <strong>City</strong>’s architectural and cultural heritage.<br />
• Maintain a sense <strong>of</strong> connection to traditional single-family<br />
neighborhoods in the surrounding areas while accommodating a mix <strong>of</strong><br />
residential, <strong>of</strong>fice and neighborhood retail uses.<br />
• Design the mixture <strong>of</strong> residential and commercial uses within the<br />
building so as to minimize, to the greatest extent practical, the potential<br />
After<br />
detrimental influence <strong>of</strong> commercial uses on the residential uses,<br />
including the location <strong>of</strong> entranceways and the use <strong>of</strong> soundpro<strong>of</strong>ing<br />
materials to minimize noise intervention between uses, when possible.<br />
• Provide adequate landscape buffers to separate parking and service<br />
areas from single-family neighborhoods adjoining the property line<br />
located in the northern section <strong>of</strong> the site.<br />
• Establish well-defined pedestrian connections from and to the proposed<br />
<strong>Mall</strong> site redevelopment project and the existing sidewalks, trails and<br />
open space network.<br />
• Built spaces should promote and enhance a comfortable pedestrian<br />
scale and orientation.<br />
• Locate access points along the main corridors to alleviate traffic<br />
problems and increase pedestrian accessibility.<br />
Before<br />
Figs. 38-39:<br />
Massing Arrangements for Adjacent Buildings<br />
Source: RMPK Group, Inc.<br />
Figs. 40-41:<br />
Before-and-After Photo Simulation <strong>of</strong> Hopkins Avenue<br />
Source: RMPK Group, Inc.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 29
Urban Design<br />
<strong>The</strong> purpose <strong>of</strong> the <strong>Redevelopment</strong> <strong>Plan</strong>’s Urban Design Guidelines is to provide<br />
a guide for making decisions about public and private improvements within the<br />
proposed <strong>Redevelopment</strong> Area boundaries. Through the use <strong>of</strong> the Guidelines,<br />
both private and public projects shall endeavor to preserve and enhance the form,<br />
scale, and visual character that make the <strong>Redevelopment</strong> Area unique within the<br />
<strong>City</strong> and the region. <strong>The</strong> Guidelines will assist to ensure that each incremental<br />
site design, architectural and streetscape project contribute to a positive image<br />
for the <strong>City</strong>. <strong>The</strong> intent <strong>of</strong> the recommended Urban Design Guidelines is to cause<br />
future corridor development to occur in a manner that establishes a pedestrian<br />
setting that <strong>of</strong>fers connections between the waterfront and surrounding residential<br />
neighborhoods within an aesthetically pleasing environment.<br />
In particular, the Guidelines are designed to support the following objectives in<br />
accordance with the U.S. 1 Corridor Master <strong>Plan</strong>, the Urban Village mixed-use<br />
special district regulations and the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong>’s Comprehensive <strong>Plan</strong>:<br />
• Create a vibrant mixed-use urban environment.<br />
• Create aesthetically pleasing and vibrant pedestrian oriented areas.<br />
• Provide improved visual and physical connectivity between the<br />
<strong>Redevelopment</strong> Area and its surrounding neighborhoods.<br />
• Encourage the creation <strong>of</strong> exciting and inviting public urban spaces.<br />
• Develop an architectural character that is unique to the <strong>City</strong> <strong>of</strong><br />
<strong>Titusville</strong>.<br />
• Provide interesting architectural design diversity within a continuity <strong>of</strong><br />
urban design principals.<br />
• Provide safe, efficient, and aesthetically pleasing accommodations for<br />
vehicular access and parking.<br />
BUILDING DESIGN:<br />
<strong>The</strong> built environment is vital in maintaining an area’s visual<br />
integrity and unique character. Traditionally sized and smaller<br />
scaled buildings help to establish a pedestrian scale and also<br />
maintain the existing neighborhood character.<br />
<strong>Plan</strong>ning Guidelines:<br />
• All new development, additions and/or renovations<br />
should reflect the traditional development patterns and<br />
strive to encourage an efficient pedestrian-oriented<br />
environment.<br />
• New buildings should incorporate a clear division<br />
between street level and upper floors through a change<br />
<strong>of</strong> architectural elements, materials, and/or color.<br />
• Use elements to accentuate the neighborhood’s<br />
architectural styles in the U.S. 1 Corridor Master<br />
<strong>Plan</strong>, when possible. Relate to adjoining residential<br />
neighborhoods with scale, detail and use <strong>of</strong> appropriate<br />
materials.<br />
Building Placement Guidelines:<br />
• Locate buildings and site elements in relationship to<br />
existing neighborhood structures and create a coherent<br />
street edge reinforcing the established visual axis to the<br />
waterfront.<br />
• Create public plazas as significant corners.<br />
• Maximize the street-frontage for the building.<br />
• Orient buildings and landscape elements to define the<br />
pedestrian space edges.<br />
• Provide safe and inviting pedestrian access to public<br />
plazas from U.S. 1 and Harrison Street.<br />
• Service, refuse, and delivery areas should be located<br />
to the rear <strong>of</strong> the buildings with convenient vehicular<br />
access, unless facing a single-family residence or the<br />
front <strong>of</strong> another building in which case service areas<br />
should be shielded from view <strong>of</strong> adjacent buildings.<br />
Fig. 42:<br />
Conceptual Perspective; <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong><br />
Source: CPH Architects, Inc.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 30
Massing Guidelines:<br />
• Buildings that appear similar in mass and scale to other buildings<br />
in the surrounding areas will help to maintain the area’s unique<br />
character. It is important to maintain a variety <strong>of</strong> heights to create<br />
visual interest.<br />
• In order to minimize the perceived size <strong>of</strong> a building, step down its<br />
height toward the street, neighboring structures and the rear <strong>of</strong> the<br />
lot.<br />
• In order to break up the perceived mass <strong>of</strong> structure, divide it into<br />
modules that are similar in size to buildings seen traditionally.<br />
Buffer Guidelines:<br />
Two types <strong>of</strong> buffers are utilized to separate mixed-use buildings from<br />
residential areas. <strong>The</strong>se include landscape buffers and townhomes /<br />
condominium building façades. Landscape buffers will be used if the<br />
lot on which the mixed-use buildings is to be placed does not have any<br />
portion <strong>of</strong> the rear or side <strong>of</strong> its lot facing another roadway.<br />
• A landscape buffer will be used to separate the residential areas<br />
from the parking facilities or the building’s rear façade.<br />
• Townhomes/building façades will be used as transitions between<br />
the residential neighborhood and mixed-use buildings if the lot on<br />
which a mixed-use building is to be placed does have a portion <strong>of</strong><br />
the rear or side <strong>of</strong> its lot facing another roadway. Neighborhoods<br />
that face these mixed-use facilities will have views <strong>of</strong> townhomes<br />
instead <strong>of</strong> parking lots or the rear <strong>of</strong> the mixed-use facilities.<br />
Figs. 43-44:<br />
Above and Right: Conceptual Perspectives; <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
<strong>Redevelopment</strong> <strong>Plan</strong><br />
Source: CPH Architects, Inc.<br />
Fig. 45:<br />
Internal Plaza Design<br />
Source: RMPK Group, Inc.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 31
Architectural Character<br />
<strong>The</strong> selection <strong>of</strong> an appropriate architectural character that is compatible with<br />
the historic buildings in the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> will be one <strong>of</strong> the key factors<br />
in developing a harmonious relationship between the new development and<br />
existing neighborhoods. <strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong> anticipates that, due to<br />
the variation <strong>of</strong> the types <strong>of</strong> housing and commercial uses, there will be a<br />
combination <strong>of</strong> architectural styles within the development. However, the new<br />
development is expected to emulate either one <strong>of</strong> the four main architectural<br />
styles or a combination <strong>of</strong> architectural styles recommended in the U.S. 1<br />
Corridor Master <strong>Plan</strong>. <strong>The</strong> following guidelines are intended to establish<br />
minimum design standards for architects and designers involved in future<br />
development <strong>of</strong> properties on the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site and the <strong>City</strong>-owned<br />
waterfront property.<br />
Guidelines:<br />
• Design residential and commercial spaces as an expression <strong>of</strong> the<br />
established architectural styles, including <strong>Florida</strong> Frame Vernacular,<br />
Spanish Eclectic, Bungalow, Classic Revival (see Appendix D).<br />
• Encourage building forms that will define high quality and ensure<br />
compatible relationships to adjoining neighborhoods.<br />
• Discourage buildings from orienting blank wall façades or service areas<br />
towards a public street.<br />
• Use materials and façade elements complementary to those found in the<br />
<strong>City</strong>’s traditional architectural styles.<br />
• Incorporate various architectural elements such as balconies, railings,<br />
awnings, canopies, and cornices to create visual interest.<br />
• Provide transparent glazing and windows in retail uses along sidewalks<br />
to accentuate pedestrian environment.<br />
• Encourage developer to include green building practices in proposed<br />
developments.<br />
Fig. 46:<br />
Proposed Architectural Character<br />
Source: CPH Architects, Inc.<br />
Fig. 47:<br />
Bungalow Style Elevation<br />
Source: RMPK Group, Inc., U.S. 1 Corridor Master <strong>Plan</strong><br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 32
Chapter 4<br />
Implementation Strategies
Program Management and Implementation<br />
Implementation <strong>of</strong> the <strong>Redevelopment</strong> <strong>Plan</strong> will require the coordinated efforts<br />
<strong>of</strong> the <strong>City</strong>, the <strong>Redevelopment</strong> Agency, other government agencies, and the<br />
developer. It will involve the support <strong>of</strong> local businesses and area residents.<br />
<strong>The</strong>se efforts will be coupled with the employment <strong>of</strong> various, legal, funding and<br />
promotional techniques to successfully implement the program. This section <strong>of</strong><br />
the <strong>Redevelopment</strong> <strong>Plan</strong> sets forth a process and actions required to realize the<br />
economic development, planning and design objectives that have been devised<br />
for the <strong>Redevelopment</strong> Area.<br />
It must be understood that the elements <strong>of</strong> the <strong>Redevelopment</strong> <strong>Plan</strong> will not occur<br />
all at once and within the time sequence described herein. <strong>The</strong> <strong>Redevelopment</strong><br />
<strong>Plan</strong> is intended to be a guiding document for local government actions designed<br />
to overcome deterrents that inhibit desired future growth and development. <strong>The</strong><br />
<strong>Plan</strong> is not intended to be static and should be evaluated in light <strong>of</strong> changes in<br />
the economy and market demands, relevant public concerns and opportunities<br />
associated with private development proposals.<br />
Organizational Roles and Relationships<br />
It is recommended that the U.S. 1 Corridor Community <strong>Redevelopment</strong> Agency<br />
Board should consist <strong>of</strong> all five members <strong>of</strong> the <strong>City</strong> Council. <strong>The</strong>y should be<br />
designated to carry out community redevelopment activities pursuant to Part<br />
III, Chapter 163 <strong>of</strong> the <strong>Florida</strong> Statutes and must assume this role with vitality<br />
and enthusiasm. <strong>The</strong> Agency, in cooperation with <strong>City</strong> leaders, must support<br />
the program’s activities and provide a well-devised management system to<br />
carry out the <strong>Redevelopment</strong> <strong>Plan</strong>. <strong>The</strong>y will be responsible for establishing the<br />
administrative, financial and programmatic mechanisms necessary to achieve<br />
the goals and objectives <strong>of</strong> the <strong>Redevelopment</strong> <strong>Plan</strong>. <strong>The</strong> Agency will establish<br />
policies that support the principles described in this <strong>Plan</strong> and concentrate on the<br />
following actions throughout the redevelopment process:<br />
• Provide commitment <strong>of</strong> public policy and resources for the<br />
redevelopment effort.<br />
• Support the redevelopment mission and ensure implementation <strong>of</strong><br />
scheduled projects.<br />
• Commit to making the necessary public improvements identified in<br />
the <strong>Plan</strong>.<br />
• Provide necessary staffing and administrative support to properly<br />
implement the <strong>Redevelopment</strong> <strong>Plan</strong>.<br />
<strong>The</strong> <strong>City</strong> Council, serving as the Community <strong>Redevelopment</strong> Agency, must<br />
develop the organizational framework and institutional relationships to facilitate<br />
effective redevelopment activities in cooperation with the developer, area<br />
businesses, residents and community representatives. <strong>The</strong> Agency shall have<br />
all <strong>of</strong> the powers granted under the Community <strong>Redevelopment</strong> Act <strong>of</strong> 1969<br />
in order to have the maximum flexibility and tools necessary to implement the<br />
<strong>Redevelopment</strong> <strong>Plan</strong>.<br />
Adopt the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong><br />
<strong>The</strong> <strong>Titusville</strong> <strong>City</strong> Council should adopt the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong><br />
<strong>Plan</strong> to utilize the tools made available by the <strong>Florida</strong> Statutes as it relates to<br />
overcoming obstacles to economic development and neighborhood revitalization<br />
cited in this <strong>Plan</strong>.<br />
Establish the <strong>Redevelopment</strong> Trust Fund<br />
Program funding and accounting is administered through the <strong>Redevelopment</strong><br />
Trust Fund, which is created by ordinance <strong>of</strong> the governing authority.<br />
Subsequent to adoption <strong>of</strong> the <strong>Redevelopment</strong> <strong>Plan</strong>, the Trust Fund is<br />
established and, according to the Statute, provides for the collection <strong>of</strong> tax<br />
increment revenues to finance capital improvements identified in the <strong>Plan</strong>. Upon<br />
adoption, the ordinance freezes the tax base and establishes the base valuation<br />
<strong>of</strong> the property located within the established boundaries <strong>of</strong> the <strong>Redevelopment</strong><br />
Area. <strong>The</strong>reafter, all taxes assessed by qualified taxing authorities on future<br />
increases in the value <strong>of</strong> properties contained in the <strong>Redevelopment</strong> Area are<br />
diverted to the <strong>Redevelopment</strong> Trust Fund. All taxes assessed on the value <strong>of</strong><br />
property determined prior to the adoption <strong>of</strong> the ordinance continue to flow to<br />
the general revenue accounts <strong>of</strong> local taxing authorities. A separate account must<br />
be established in the <strong>City</strong> Budget to track the allocation and disbursement <strong>of</strong><br />
Agency revenues.<br />
Finance and Management<br />
Community redevelopment will not be successful without funding through tax<br />
increment financing. <strong>The</strong>refore the ultimate goal <strong>of</strong> the redevelopment program is<br />
to increase the tax base to generate additional revenue for capital improvements<br />
and services through implementation <strong>of</strong> projects and programs, as described<br />
in this <strong>Plan</strong>. Managed effectively, tax increment resources can be leveraged to<br />
enable the undertaking <strong>of</strong> substantial public and private sector improvements.<br />
With this in mind, the following finance and management practices should be<br />
employed.<br />
• Coordinate with the <strong>City</strong> Manager, Finance Director and other<br />
department heads to strategically devise annual operating and capital<br />
improvements budgets to maximize the use <strong>of</strong> anticipated tax increment<br />
revenues.<br />
• Coordinate with appropriate County, State and other public <strong>of</strong>ficials,<br />
which may be sponsoring capital improvements in the District to<br />
maximize the leveraging <strong>of</strong> financial resources.<br />
• Through the use <strong>of</strong> tax increment financing and other funding sources,<br />
infrastructure improvements such as water, sanitary sewer, electrical,<br />
telephone, cable, internet and stormwater conveyance systems should be<br />
designed and constructed with the capacity to meet future demand based<br />
on the future land use activities identified in the <strong>Redevelopment</strong> <strong>Plan</strong>.<br />
• <strong>The</strong> Agency should leverage tax increment revenues through grants,<br />
commercial loans, or other financial mechanisms to expedite the<br />
completion <strong>of</strong> projects.<br />
• Based on revenue projections contained in the <strong>Redevelopment</strong> <strong>Plan</strong>,<br />
the Agency should consider short-term interim project financing with<br />
anticipation <strong>of</strong> long-term bond financing.<br />
• <strong>The</strong> Agency should work with area banks and bond counsels to research<br />
bond feasibility for financing major public facilities. <strong>The</strong> <strong>City</strong> should<br />
conduct a grant feasibility analysis to match any federal, state and local<br />
grant programs with projects contained in the <strong>Plan</strong>.<br />
Finalize Development Agreement<br />
<strong>The</strong> success <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> ultimately relies<br />
on close coordination <strong>of</strong> the various activities between the public and private<br />
sectors. Pursuant to the authority granted under the Community <strong>Redevelopment</strong><br />
Act <strong>of</strong> 1969 including, but not limited to, Sections 163.370 and 163.400,<br />
<strong>Florida</strong> Statutes, and other applicable provisions <strong>of</strong> the law, the <strong>City</strong> and the<br />
<strong>Redevelopment</strong> Agency shall negotiate and enter into a development agreement<br />
with the <strong>Mall</strong> owner/developer for the purpose <strong>of</strong> implementing the provisions<br />
for the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> and such other agreements that<br />
may be necessary. Through these agreements, the <strong>City</strong>, <strong>Redevelopment</strong> Agency,<br />
and the <strong>Mall</strong> owner/developer should clearly delineate their respective roles and<br />
obligations regarding the design, development, construction, operation, timing,<br />
phasing, and financial contributions relative to the redevelopment <strong>of</strong> the <strong>Miracle</strong><br />
<strong>City</strong> <strong>Mall</strong> property. Further, the <strong>City</strong> and the <strong>Redevelopment</strong> Agency should<br />
address such other issues that may aid in planning, undertaking, or carrying out<br />
the provisions <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong>.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 34
Chapter 5<br />
Capital Improvements Strategy
Capital Improvements Strategy<br />
This section shows how the Concept <strong>Plan</strong> translates to a phased series <strong>of</strong> capital<br />
improvements and breaks down anticipated costs for further plans and activities.<br />
<strong>The</strong> community should understand that the <strong>Redevelopment</strong> Agency, working<br />
closely with the <strong>City</strong> and other government entities, will be pursuing multiple<br />
elements <strong>of</strong> the <strong>Plan</strong> at all times. It is important to note that the following<br />
summary <strong>of</strong> capital projects and programs is flexible in nature and should be<br />
evaluated in light <strong>of</strong> changing market demands. It is the best estimate <strong>of</strong> project<br />
costs based on a measure <strong>of</strong> the order <strong>of</strong> magnitude <strong>of</strong> the project in relation to<br />
anticipated revenues. As a matter <strong>of</strong> practice the Agency should prepare annual<br />
budgets as well as establish one, three and five-year work programs for budgetary<br />
and administrative purposes. Ultimately project costs will be refined during the<br />
design and construction phase <strong>of</strong> any given project.<br />
<strong>The</strong> proposed <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> contains several major<br />
projects consisting <strong>of</strong> public, private, and joint public/private efforts that will<br />
take at least ten years for completion. It is critical that the Agency incorporates<br />
a sound project implementation strategy when identifying priorities. This<br />
will ensure the most effective results in terms <strong>of</strong> addressing the community’s<br />
needs while stimulating private sector activity to obtain a favorable return<br />
on the public sector’s financial investment. <strong>The</strong> following phasing plan sets<br />
forth recommendations concerning project priorities and funding sources. To<br />
streamline the process and simplify the presentation, project priorities have been<br />
reduced to the following three phases:<br />
• Short-Term Projects - Projects that should be implemented immediately<br />
and completed within one to three years.<br />
• Mid-Term Projects – Projects that should be implemented and completed<br />
within three to five years.<br />
• Long-Term Projects - Projects that will likely be implemented and<br />
completed in more than five years.<br />
Short-Term Capital Budget (FY 2008 - FY 2010)<br />
Project Cost Source Year<br />
Reimbursement for Previous <strong>Plan</strong>s and Studies $75,000 TIF 2008<br />
Stormwater Master <strong>Plan</strong> Study (Joint Participation) $75,000 TIF, SWIM Grant 2008<br />
Demolition & Disposal Expenses (Joint Participation) $250,000 TIF, DEP Grant 2008<br />
Stormwater Retention & Amenities (Joint Participation) $2,250,000 TIF, SWIM Grant 2008<br />
On-Site Park & Open-Space Amenities (Joint Participation) $750,000 Private Sector,TIF 2008<br />
Mid-Term Capital Budget (FY 2010 - FY 2012)<br />
Project Cost Source Year<br />
On-site Pedestrian Amenities (Joint Participation)<br />
(Hardscape, Lighting, Sidewalks, Landscape, etc.)<br />
Structured Parking (Joint Participation)<br />
$2,000,000 Private Sector,TIF 2010<br />
Approx. 1,300 @ $10,000 per space $13,000,000 Private Sector, TIF, Fee Revenues 2010-2011<br />
Long-Term Capital Budget (2012 - 2017)<br />
Project Cost Source Year<br />
Joint Participation Projects Subject to TIF Availability<br />
Waterfront Park & Trail Amenities @ U.S.1 & Harrison $1,750,000 TIF, FCT, FRDAP, DEP Grants 2012<br />
Streetscape Improvements U.S.1, Harrison, Hopkins $3,000,000 TIF, FDOT, Gas Tax 2014-2017<br />
It is expected that the majority <strong>of</strong> the capital improvements will be phased as part<br />
<strong>of</strong> the planned redevelopment <strong>of</strong> the <strong>Mall</strong> and jointly funded through anticipated<br />
tax increment revenues that will be generated as a result <strong>of</strong> the project. Basic<br />
infrastructure improvements such as stormwater retention, internal and external<br />
pedestrian systems, landscaping and lighting will be undertaken as part <strong>of</strong> the<br />
proposed <strong>Mall</strong> redevelopment project. Other, more costly public improvements,<br />
such as roadway improvements to Harrison Street, Hopkins Avenue and U.S. 1,<br />
will likely take place during the latter phases <strong>of</strong> development and may require<br />
additional sources <strong>of</strong> funding, including grants and other revenue sources.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 36
Chapter 6<br />
Tax Increment Financing
Tax Increment Financing<br />
Type <strong>of</strong> Expenses Allowed<br />
<strong>The</strong>re are five major types <strong>of</strong> expenses allowed under <strong>Florida</strong> Statues 163.387(6) for<br />
tax increment revenues.<br />
1. Establishment and Operations - they can first be used for the<br />
implementation and administrative expenses <strong>of</strong> the Community<br />
<strong>Redevelopment</strong> Agency<br />
2. <strong>Plan</strong>ning and Analysis - they can then be used to develop the<br />
necessary engineering, architectural, and financial plans<br />
3. Financing - the revenues may be used to issue and repay debt<br />
for proposed capital improvements contained in the Community<br />
<strong>Redevelopment</strong> <strong>Plan</strong><br />
4. Acquisition - the revenues may be used to acquire real property<br />
5. Preparation - finally, the revenues may be used for site preparation,<br />
including the relocation <strong>of</strong> existing residents<br />
According to F.S. 163.370(2), however, the funds may not be used for the<br />
following purposes:<br />
1. To construct or expand administration buildings for public<br />
bodies, unless each taxing authority involved agrees,<br />
2. Any publicly-owned capital improvements which are not an<br />
integral part <strong>of</strong> the redevelopment if the improvements are<br />
normally financed by user fees, and if the improvements would<br />
have otherwise been made without the <strong>Redevelopment</strong> Agency<br />
within three years, or<br />
3. General government operating expenses unrelated to the<br />
<strong>Redevelopment</strong> Agency.<br />
Tax increment revenue is typically the major source <strong>of</strong> funding for redevelopment<br />
projects under the State <strong>of</strong> <strong>Florida</strong> Community <strong>Redevelopment</strong> Act.<br />
Tax Increment Projections<br />
<strong>The</strong> following spreadsheet provides tax increment revenue projections for the<br />
U.S. 1 Corridor <strong>Redevelopment</strong> Area. Revenue estimates are based on anticipated<br />
taxable property values to be generated upon the phased completion <strong>of</strong> the proposed<br />
redevelopment <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>. <strong>The</strong> revenue projections are based on<br />
anticipated total development construction costs and are based generally on the<br />
order <strong>of</strong> magnitude <strong>of</strong> costs for similar projects including the Winter Park <strong>Mall</strong><br />
redevelopment project and the Mizner Park project developed in Boca Raton. It<br />
has been assumed that total construction value will be approximately $100-million.<br />
To then determine the taxable value <strong>of</strong> the redeveloped site it is assumed that the<br />
taxable value would be established at approximately 70% <strong>of</strong> the construction value.<br />
<strong>The</strong>se values are used only for preliminary planning, budgeting and management<br />
purposes. <strong>The</strong>se estimates have been determined without a fixed, approved<br />
development program to provide specific project costs and must account for the<br />
fact that final costs will not be determined until the project has been designed and<br />
bid for construction. Final revenues will be determined by the property appraiser<br />
annually based on the completion <strong>of</strong> the taxable elements <strong>of</strong> the project.<br />
<strong>The</strong> model contains assumptions that increase the property values in the second<br />
and fourth years based on the anticipated completion <strong>of</strong> certain phases <strong>of</strong> the<br />
proposed redevelopment project. <strong>The</strong>se calculations anticipate nearly $24.5-million<br />
in increased value on the 2008 tax roll based on completion <strong>of</strong> the first phase,<br />
estimated at 35% <strong>of</strong> the entire project <strong>of</strong> $70-million. <strong>The</strong> tax base grows again in<br />
2009, adding another $24.5-million and again by $21-million in 2010 based on final<br />
completion.<br />
U.S. 1 Corridor Community <strong>Redevelopment</strong> Area Tax Increment Revenue Projections<br />
Years<br />
Annual Increase in Taxable<br />
Value<br />
Annual Incremental<br />
Increase County <strong>City</strong><br />
Gross Incremental CRA<br />
Revenue<br />
Net (95%) Incremental CRA<br />
Revenue<br />
2006 (Base) $5,653,920 $0 $0 $0<br />
2007 $5,653,920 $0 $0 $0 $0 $0<br />
2008 $29,653,920 $24,500,000 $94,467 $127,398 $221,865 $210,771<br />
2009 $54,653,920 $49,000,000 $188,934 $254,795 $443,729 $421,543<br />
2010 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />
2011 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />
2012 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />
2013 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />
2014 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />
2015 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />
2016 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />
2017 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />
$2,442,649 $3,294,137 $5,736,786 $5,449,947<br />
Because <strong>of</strong> the value <strong>of</strong> this project, the <strong>Miracle</strong> <strong>City</strong> redevelopment program is<br />
well positioned for successfully completing the public improvements identified<br />
in the <strong>Redevelopment</strong> <strong>Plan</strong>. <strong>The</strong> Agency has several options for obtaining initial<br />
financing and grants to enable immediate planning and design <strong>of</strong> their projects. <strong>The</strong><br />
Agency can obtain interim financing through a bond anticipation note, commercial<br />
loan or commercial line <strong>of</strong> credit based on projected revenues. <strong>The</strong>se funds,<br />
combined with other funding sources and programs identified in this <strong>Plan</strong>, should<br />
enable the <strong>City</strong> and the Agency to embark on an aggressive public improvement<br />
program that will serve as a catalyst for additional private sector investment along<br />
the U.S. 1 Corridor.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 38
Appendix A<br />
Finding <strong>of</strong> Necessity Study for<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>
Finding <strong>of</strong> Necessity Study<br />
For the creation <strong>of</strong> a<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
Community <strong>Redevelopment</strong> Area<br />
<strong>City</strong> <strong>of</strong> <strong>Titusville</strong>, Brevard County, <strong>Florida</strong><br />
Prepared for:<br />
<strong>City</strong> <strong>of</strong> <strong>Titusville</strong>,<br />
Brevard County, <strong>Florida</strong><br />
Sunrise Properties & Investments, LLC<br />
January 2007<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 40
Table <strong>of</strong> Contents<br />
Introduction 43<br />
Community <strong>Redevelopment</strong> Act <strong>of</strong> 1969 44<br />
Definition <strong>of</strong> Blight (Chapter 163.340(8), F.S.)<br />
<strong>Redevelopment</strong> District Boundaries 45<br />
Definition <strong>of</strong> Study Area<br />
Study Area Boundary Description<br />
Study Maps<br />
Inventory <strong>of</strong> Blighted Conditions 46<br />
Tax Base Trends<br />
Deterioration <strong>of</strong> Site or Other Improvements<br />
Commercial Vacancy Rates<br />
Conclusions 50<br />
Recommendations 50<br />
Table 3<br />
Establish a Community <strong>Redevelopment</strong> Agency<br />
Prepare a <strong>Redevelopment</strong> <strong>Plan</strong><br />
Establish a <strong>Redevelopment</strong> Trust Fund<br />
Table <strong>of</strong> Assessed Values 51<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 41
Introduction<br />
<strong>The</strong> <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> undertook a master planning effort, completed in July<br />
2006, for a segment <strong>of</strong> U.S. Route 1 traversing through South <strong>Titusville</strong>. During<br />
this project, redevelopment <strong>of</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> was identified by community<br />
residents as a project pivotal to the revitalization <strong>of</strong> the highway corridor. In<br />
recognition <strong>of</strong> this, and upon purchase <strong>of</strong> the four <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> parcels<br />
in 2006, Sunrise Properties & Investments, LLC, retained the RMPK Group<br />
in August, 2006, to conduct a finding-<strong>of</strong>-necessity study for the <strong>Miracle</strong> <strong>City</strong><br />
<strong>Mall</strong> site to determine the need for a site-specific community redevelopment<br />
agency (CRA) pursuant to requirements established in the Statutes <strong>of</strong> the State<br />
<strong>of</strong> <strong>Florida</strong>.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>, located at 2500 South Washington Avenue (U.S. 1), is one<br />
<strong>of</strong> South <strong>Titusville</strong>’s major shopping centers. <strong>The</strong> <strong>Mall</strong> building is a 44-unit,<br />
310,000-square-foot complex on a 30.8-acre property, with three outparcels at<br />
the northwest, southwest, and southeast corners <strong>of</strong> the property. Today, the Study<br />
Area further includes three small lots; two <strong>of</strong> which were developed in the 1970s<br />
and one (the northernmost parcel) that was developed in the 1950s. <strong>The</strong>se lots<br />
(Parcels 5, 6, and 7 on Map 2, page 45) are lined in a row at the northeast end <strong>of</strong><br />
the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> property. <strong>The</strong> northernmost lot is 0.7 acres in size, while<br />
the middle lot is 0.62 acres, and the southernmost lot is 1.27 acres. <strong>The</strong>se lots<br />
are currently occupied by retail businesses. In addition to these lots, the recent<br />
3.2-acre waterfront acquisition by the <strong>City</strong> across Harrison Street (Parcels 8,<br />
9, and 10) are included in the Study Area to ensure continuity between future<br />
redevelopment activities along the waterfront and the <strong>Mall</strong> site.<br />
Opened in 1969, the <strong>Mall</strong> was capable <strong>of</strong> accommodating close to 50 tenants<br />
and featured two major retail “anchor” stores—JCPenney and Belks. Until the<br />
early 1990s it was popular as a retail destination and featured numerous retail<br />
uses and entertainment attractions, including a small movie theater in the north<br />
side ouparcel. But from the beginning, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> has been engaged in<br />
competition with Searstown <strong>Mall</strong>, built within the same year as <strong>Miracle</strong> <strong>City</strong><br />
<strong>Mall</strong> and a few blocks to the south. Searstown <strong>Mall</strong>’s construction <strong>of</strong> a movie<br />
theater in the 1990s drew shopping patrons away from <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>, but it<br />
was with the opening <strong>of</strong> a Wal-Mart Supercenter at SR 50 and SR 405 in 1995,<br />
along with regional growth <strong>of</strong> state-<strong>of</strong>-the-art shopping centers in Orlando, that<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> began facing an compounding level <strong>of</strong> retail competition<br />
against which it could not compete. Belks closed in 2004, creating a void filled<br />
by S<strong>of</strong>as Direct furniture store. Unfortunately, this new anchor store is expected<br />
to be closing shortly as well.<br />
Today, despite its central and accessible location, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> is facing the<br />
economic decline experienced by numerous other shopping centers across North<br />
America. Declining malls are characterized by high retail unit vacancy rates,<br />
low customer traffic levels, and deteriorating physical conditions in its vacant<br />
buildings and units. Changes in local demographic or economic conditions may<br />
lead to the slow decline <strong>of</strong> a shopping mall. <strong>Mall</strong>s anchored by department or<br />
large chain stores are <strong>of</strong>ten susceptible to decline if one or more <strong>of</strong> their anchor<br />
stores close. Popularity in recent years for power centers and freestanding<br />
“category killer” megastores (e.g., Wal-Mart Supercenters) has reduced the<br />
appeal <strong>of</strong> department stores and the traditional mall as a shopping experience.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> has become one <strong>of</strong> innumerable malls in North America<br />
victim to this shift in shopping culture.<br />
Fig. 1: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> signage and parking lot on a weekday afternoon.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 42
Community <strong>Redevelopment</strong> Act <strong>of</strong> 1969<br />
<strong>The</strong> Community <strong>Redevelopment</strong> Act <strong>of</strong> 1969, in Chapter 163, Part III, <strong>of</strong><br />
the <strong>Florida</strong> Statutes, authorizes local governments to establish community<br />
redevelopment agencies (CRAs) to improve blighted areas within their<br />
jurisdictions. <strong>The</strong> Act sets forth the legal process by which local governments<br />
may establish CRAs and provides financing and regulatory tools to accomplish<br />
the goal <strong>of</strong> improving selected areas.<br />
Chapter 163.355, F.S., requires local governments desiring the establishment <strong>of</strong> a<br />
CRA to adopt by resolution a finding that one or more blighted areas exist within<br />
their jurisdiction and that the rehabilitation, conservation, or redevelopment (or<br />
a combination there<strong>of</strong>) <strong>of</strong> such areas is necessary in the interest <strong>of</strong> the public<br />
health, safety, morals, or welfare <strong>of</strong> area residents. <strong>The</strong> purpose <strong>of</strong> this study is<br />
to provide information to Sunrise Properties & Investments, LLC and <strong>Titusville</strong><br />
<strong>City</strong> Council that will serve as a factual basis for a finding that the <strong>Miracle</strong> <strong>City</strong><br />
<strong>Mall</strong> site meets the statutory criteria for blight.<br />
Statutory Definition <strong>of</strong> Blight (Chapter 163.340(8), F.S.)<br />
A blighted area means an area in which there are a substantial number <strong>of</strong><br />
deteriorated, or deteriorating structures, in which conditions, as indicated by<br />
government-maintained statistics or other studies, are leading to economic<br />
distress or endanger life or property, and in which two or more <strong>of</strong> the following<br />
factors are present:<br />
(a) Predominance <strong>of</strong> defective or inadequate street layout, parking<br />
facilities, roadways, bridges, or public<br />
transportation facilities;<br />
(b) Aggregate assessed values <strong>of</strong> real property in the area for ad valorem<br />
tax purposes failing to show any<br />
appreciable increase over the 5 years prior to the finding <strong>of</strong> such<br />
conditions;<br />
(c) Faulty lot layout in relation to size, adequacy, accessibility, or<br />
usefulness;<br />
(d) Unsanitary or unsafe conditions;<br />
(e) Deterioration <strong>of</strong> site or other improvements;<br />
(f) Inadequate and outdated building density patterns;<br />
(g) Falling lease rates per square foot <strong>of</strong> <strong>of</strong>fice, commercial, or<br />
industrial space compared to the remainder <strong>of</strong> the<br />
county or municipality;<br />
(h) Tax or special assessment delinquency exceeding the fair value <strong>of</strong> the<br />
land;<br />
(i) Residential and commercial vacancy rates higher in the area than in<br />
the remainder <strong>of</strong> the county or municipality;<br />
(j) Incidence <strong>of</strong> crime in the area higher than in the remainder <strong>of</strong> the<br />
county or municipality;<br />
(k) Fire and emergency medical service calls to the area proportionately<br />
higher than in the remainder <strong>of</strong> the county or municipality;<br />
(l) A greater number <strong>of</strong> violations <strong>of</strong> the <strong>Florida</strong> Building Code in the<br />
area than the number <strong>of</strong> violations recorded in the remainder <strong>of</strong> the<br />
county or municipality;<br />
(m) Diversity <strong>of</strong> ownership or defective or unusual conditions <strong>of</strong> title<br />
which prevent the free alienability <strong>of</strong> land within the deteriorated or<br />
hazardous area; or<br />
(n) Governmentally owned property with adverse environmental<br />
conditions caused by a public or private entity.<br />
<strong>The</strong> methodology for data collection and analysis utilizes a breakdown <strong>of</strong> the<br />
criteria described in the <strong>Florida</strong> Statutes to determine the existence <strong>of</strong> blight.<br />
Each <strong>of</strong> the statutory criteria is examined to determine the presence or absence<br />
<strong>of</strong> that condition. For those conditions existing in the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site, a<br />
more detailed analysis is undertaken. <strong>The</strong> study presents detailed information on<br />
the following conditions indicative <strong>of</strong> blight:<br />
(b Aggregate assessed values <strong>of</strong> real property in the area for ad valorem<br />
tax purposes failing to show any appreciable increase over the 5<br />
years prior to the finding <strong>of</strong> such conditions;<br />
(e Deterioration <strong>of</strong> site or other improvements;<br />
(i Residential and commercial vacancy rates higher in the area than in<br />
the remainder <strong>of</strong> the county or municipality.<br />
Note: An additional criterion, faulty lot layout in relation to size, adequacy,<br />
accessibility, or usefulness, qualifies in relation to the three northeastern lots<br />
(Parcels 5, 6, and 7). <strong>The</strong>se lots do not conform to standards for the <strong>City</strong> <strong>of</strong><br />
<strong>Titusville</strong>’s Regional Commercial Zoning District, particularly in regard to<br />
minimum lot size (2 acres).<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 43
TEZ<br />
CONDOS<br />
PINECREST<br />
PINECREST<br />
<strong>Redevelopment</strong> District Boundaries<br />
ROOSEVELT<br />
ROOSEVELT<br />
Study Area Definition<br />
Creation <strong>of</strong> the proposed CRA will be determined after a thorough evaluation <strong>of</strong><br />
the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building and immediately adjacent properties (Parcels 1<br />
through 7 on Map 2, this page). Final determination for parcels to be included in<br />
the Study Area is based on the following criteria:<br />
• Statutory criteria pertaining to site conditions<br />
• Consideration <strong>of</strong> future development or redevelopment potential<br />
• Consideration <strong>of</strong> sound planning principles for continuity <strong>of</strong> future<br />
land use based on adjacent land uses or land attributes, transportation<br />
systems, and the efficient provision <strong>of</strong> government utilities and services<br />
• Consideration <strong>of</strong> adjacent parcels along the frontage <strong>of</strong> U.S. 1 that may,<br />
at a future time, be combined with the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site for a more<br />
efficient use <strong>of</strong> land<br />
• Presence <strong>of</strong> areas providing a logical terminus for Study Area boundaries<br />
such as adjacent road right-<strong>of</strong>-ways and the riverfront<br />
• Ιntent to eventually promote development on a contiguous property<br />
under single ownership to improve the functional characteristics <strong>of</strong> the<br />
site<br />
• Ιnclusion <strong>of</strong> two waterfront properties across Harrison Street recently<br />
acquired by the <strong>City</strong> in order to ensure continuity for future planning and<br />
design efforts along the waterfront<br />
Study Area Description<br />
<strong>The</strong> Study Area is found within the city limit <strong>of</strong> <strong>Titusville</strong>. <strong>The</strong> boundary <strong>of</strong> the<br />
Study Area can be described by vertices at the southeast corner <strong>of</strong> Washington<br />
Avenue and Harrison Street (including two city-owned parcels at 2611 and 2655<br />
Washington Ave.), the southwest corner <strong>of</strong> Harrison St. and Hopkins Ave., and<br />
the northern boundary <strong>of</strong> the <strong>Mall</strong> property. <strong>The</strong> proposed redevelopment area<br />
contains 10 parcels—4 <strong>of</strong> which are owned by Sunrise Properties & Investments,<br />
LLC—that combined represent approximately 36 acres <strong>of</strong> land. <strong>The</strong> <strong>Mall</strong> building<br />
is the largest site structure at 310,293 square feet, followed in order by the<br />
outparcel on the north end (36,940 sq. ft.), a former restaurant on the southwest<br />
corner (10,000 sq. ft.), and the existing Firestone building on the southeast corner<br />
(7,650 sq. ft.). <strong>The</strong> <strong>Mall</strong> building contains approximately 44 leasable units, while<br />
the north end outparcel contains 7 units and the other two structures<br />
are single unit entities. Parcels 5, 6, and 7 contain small structures.<br />
Parcel 5 is occupied by a 4,716 square-foot building, while Parcel 6<br />
has only a 1,200 square-foot building. Parcel 7 has a 3,164 squarefoot<br />
building. Of the city-owned parcels, 8 through 10, only Parcel<br />
8 is occupied by a building (a Goodyear tire center). This building<br />
will be removed when redevelopment plans for Parcels 8 through<br />
10 are prepared.<br />
Maps 1 and 2 illustrate the Study Area boundary and property lines<br />
for the 10 parcels <strong>of</strong> the Study Area. <strong>The</strong>se parcels are identified by<br />
numbered circles. Parcel 1 contains the north side outparcel, Parcel<br />
2 is a strip <strong>of</strong> land with no recognized address comprising some<br />
<strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building. Parcel 3 is occupied largely by<br />
the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building and the existing Firestone building.<br />
Parcel 4 contains the former restaurant building (Morrison’s Café)<br />
on the southwest corner <strong>of</strong> the Study Area. Three parcels (5, 6,<br />
and 7) on the northeast corner <strong>of</strong> the Study Area are not owned<br />
by Sunrise Properties & Investments, LLC, but will be included<br />
in any future development plans for the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site.<br />
Parcel 5 is identified by the Brevard County Property Appraiser<br />
Office as a multiple-unit retail center. Parcel 6 is a retail branch <strong>of</strong><br />
Colonial Bank, and Parcel 7 is now vacant but formerly a Burger<br />
King restaurant. Parcels 8 through 10 are city-owned waterfront<br />
acquisitions. For the purposes <strong>of</strong> this study, the Study Area<br />
considers all 10 parcels as a single entity.<br />
HAMILTON<br />
LA CITA<br />
HOPKINS AVE<br />
HOPKINS AVE.<br />
VILLAGE<br />
2<br />
JACKSON ST<br />
FORMER<br />
RESTAURANT<br />
(VACANT)<br />
MIRACLE CITY MALL<br />
NORTH SIDE OUTPARCEL<br />
(VACANT)<br />
HOPKINS<br />
JACKSON<br />
ALHAMBRA<br />
ST.<br />
1<br />
ROOSEVELT ST.<br />
MIRACLE CITY MALL<br />
HARRISON ST.<br />
SEVILLE WAY<br />
LADO<br />
5<br />
6<br />
RETAIL<br />
OUTPARCEL<br />
COLONIAL<br />
BANK<br />
FORMER<br />
BURGER KING<br />
(VACANT)<br />
3<br />
4<br />
ALAMANDA<br />
SEVILLE<br />
LADO<br />
ALHAMBRA<br />
OJIBWAY<br />
ROYAL PALM<br />
HARRISON ST<br />
SEMINOLE<br />
7<br />
FLAMINGO<br />
OJIBWAY<br />
U.S. 1 (WASHINGTON AVE)<br />
Map 1: Aerial view <strong>of</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site. Boundary outlined in red.<br />
FIRESTONE<br />
PINEAPPLE BAY<br />
RESTAURANT<br />
U.S. 1 / WASHINGTON AVE.<br />
CITRUS<br />
SEMINOLE<br />
PELICAN POINT<br />
CONDOS<br />
WENDY'S<br />
WACHOVIA BANK<br />
USPS<br />
DISTRIBUTION<br />
CENTER<br />
COURT<br />
8<br />
9<br />
10<br />
Map 2: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> parcels are shown in yellow. <strong>The</strong> Study Area boundary is outlined in<br />
red. Parcel numbers are described in the narrative.<br />
CITRUS<br />
COURT<br />
BAY TOWERS<br />
WASHINGTON<br />
WASHINGTON<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 44<br />
VILLAGE<br />
KRYSTAL<br />
RESTAURANT<br />
BERMUDA
Inventory <strong>of</strong> Blighted Conditions<br />
This section presents the inventory <strong>of</strong> the various elements constituting a blighting<br />
condition identified in the proposed redevelopment area. Characteristics <strong>of</strong> three<br />
elements were examined to determine whether a condition <strong>of</strong> blight exists:<br />
1. Τax base trends<br />
2. Physical conditions <strong>of</strong> the site and buildings<br />
3. Commercial vacancy rates<br />
<strong>The</strong> characteristics <strong>of</strong> these elements will help determine the presence <strong>of</strong> bligh as<br />
established in the <strong>Florida</strong> Statutes.<br />
• Tax Base Trends (2000-2005):<br />
Between 2000 and 2005, assessed taxable values for the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Study<br />
Area (Parcels 1 through 7), minus the waterfront properties acquired by the city<br />
(Parcels 8, 9, and 10), grew at a slower rate than the assessed values for the<br />
<strong>City</strong> <strong>of</strong> <strong>Titusville</strong> or the assessed values for Brevard County (see Table 1 below<br />
and Table 3, page 51). Parcels 8, 9, and 10 are not included in this evaluation<br />
because they are tax-exempt as publicly-owned properties. Table 1 demonstrates<br />
that compared to <strong>Titusville</strong>’s or Brevard County’s steady growth in assessed<br />
property value, the properties <strong>of</strong> the Study Area have not experienced similar<br />
growth patterns. In fact, between 2002 and 2003, the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Study<br />
Area actually lost almost 8% <strong>of</strong> its taxable value—a situation caused largely by<br />
a significant drop in the <strong>Mall</strong> tenancy rate.<br />
Growth in property values is considered a significant indicator <strong>of</strong> investment<br />
worth. <strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Study Area has gained less than 8% in value<br />
between 2000 and 2005, while <strong>Titusville</strong> as a whole has grown by over 54%<br />
and Brevard County’s total growth rate is almost 83%. <strong>The</strong> Study Area’s annual<br />
growth rate is only 1.5% compared to 10.8% as seen in the rest <strong>of</strong> <strong>Titusville</strong> and<br />
16.6% growth as witnessed in Brevard County. Total percent change rates for<br />
the Study Area are only approximately one-seventh <strong>of</strong> those for <strong>Titusville</strong> and<br />
approximately one-eleventh <strong>of</strong> those for Brevard County. <strong>The</strong>se rates indicate<br />
the taxable value <strong>of</strong> the Study Area has not kept pace with the rest <strong>of</strong> the <strong>City</strong> or<br />
County.<br />
• Deterioration <strong>of</strong> Site or Other Improvements:<br />
1. Structural Conditions <strong>of</strong> Buildings<br />
A strong indicator <strong>of</strong> blight is the presence <strong>of</strong> deteriorated building conditions,<br />
which point to a lack <strong>of</strong> interest or capability in maintaining existing investment<br />
value. Buildings in poor structural condition can negatively affect the values <strong>of</strong><br />
adjacent buildings and properties enjoying better investment in their structural<br />
condition.<br />
Meteorological events specific to the subtropical <strong>Florida</strong> climate can also<br />
negatively affect the structural integrity <strong>of</strong> buildings; <strong>of</strong>ten drastically. Hurricanes<br />
may cause damage to the exterior and/or interior <strong>of</strong> buildings and accelerate the<br />
progression <strong>of</strong> existing structural problems. Hurricane seasons characterized by<br />
multiple storms, as in 2004, for example, exacerbate the problem; the building<br />
stock <strong>of</strong> entire communities can be devastated repeatedly.<br />
For the purpose <strong>of</strong> establishing the condition <strong>of</strong> the buildings in the Study Area,<br />
a field survey was conducted by Advanced Imaging Services Company (AIS) in<br />
January 2006. AIS, a division <strong>of</strong> Speur Corporation and based in Merritt Island,<br />
<strong>Florida</strong>, is a consulting firm specializing in building imaging, energy auditing,<br />
and mechanical and structural engineering inspection. <strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
building, north end outparcel, former restaurant building, and existing Firestone<br />
building were externally and internally inspected by AIS and rated according to<br />
the following criteria:<br />
1. Good: Satisfactory with normal wear and tear.<br />
2. Fair: Satisfactory but declining in usefulness.<br />
3. Poor: Unsatisfactory and in need <strong>of</strong> immediate repair.<br />
Note: AIS did not perform any inspection on the buildings occupying<br />
Parcels 5, 6, 7, or 8. Except for the now-closed Burger King on Parcel 7,<br />
these structures are currently occupied and buildings are in good or fair<br />
condition. Parcel 5, occupied by a multi-unit retail center, is understood<br />
to have been recently renovated.<br />
Area 2000-2001<br />
% Change<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
Study Area<br />
2001-2002<br />
% Change<br />
Source: Brevard County Property Appraiser, 2006<br />
2002-2003<br />
% Change<br />
2003-2004<br />
% Change<br />
2004-2005<br />
% Change<br />
2000-2005<br />
Total %<br />
Change<br />
2000-2005<br />
Annual %<br />
Change<br />
+
<strong>The</strong> following is a summary <strong>of</strong> building conditions observed during the AIS<br />
field survey.<br />
*RMPK Group conducted a similar field study in September, 2006, from<br />
a customer-oriented perspective and observed habitable conditions in<br />
Walls: Exterior walls exhibit structural cracking in the first-floor masonry.<br />
Potential exists for undermining and/or load stress caused by wind on north<br />
side for a series <strong>of</strong> units in the north end outparcel building. North end and<br />
southwest corner outparcels are considered to be in poor condition.<br />
the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building but not <strong>of</strong> a quality that could attract a<br />
customer base or tenants able to compete in the current retail market.<br />
<strong>The</strong> AIS report does not mention interior conditions observable from<br />
customer-accessible locations (e.g., central corridor). Access to other<br />
buildings or to ro<strong>of</strong>s, back rooms, maintenance areas, etc., was not<br />
Doors & Windows: Main entry doors are serviceable and in good<br />
condition. Cracked windows, sills, and lintels observed in some areas, notably<br />
the concourse area and on the north end outparcel. Trim on all units <strong>of</strong> the<br />
north end outparcel are in poor condition.<br />
Fig. 2: Deteriorating foundation and<br />
door conditions (AIS, January, 2006).<br />
attempted by RMPK Group.<br />
Age plays a significant role in the condition <strong>of</strong> buildings. While older buildings<br />
can be maintained in excellent condition, they are generally more costly to<br />
maintain and more susceptible to neglect than newer buildings. Older buildings<br />
Fig. 6: Damaged wall, JCPenney<br />
building (AIS, January, 2006).<br />
Ro<strong>of</strong>ing: Many ro<strong>of</strong> drains are not operating as expected. <strong>The</strong><br />
Firestone building ro<strong>of</strong> was replaced in October, 2005, but all other ro<strong>of</strong> areas<br />
require either minor patching or complete replacement (some ro<strong>of</strong>s require<br />
replacement within 3 to 5 years). Water intrusion occurs over Unit #100.<br />
may also have hidden structural problems that may go undetected until an event<br />
such as a severe storm causes structural damage or failure. <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>,<br />
now 36 years old, is ready for investment in major renovations, as evidenced<br />
by the replacement in October, 2005, <strong>of</strong> the ro<strong>of</strong> over JCPenney.<br />
Flashing needs to be adjusted in over 10 locations to maintain proper seals. No<br />
valleys are present. Overall ro<strong>of</strong>ing condition is fair on the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />
building but fair to poor on the north end outparcel building.<br />
Foundation: Concrete slab floors contain cracks caused by settlement<br />
in all property structures, although commercial grade slabs are capable <strong>of</strong><br />
Fig. 3: Dilapidated interior in <strong>Miracle</strong><br />
<strong>City</strong> <strong>Mall</strong> building (AIS, January,<br />
2006).<br />
Fig. 7: Damaged HVAC equipment,<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building (AIS,<br />
January, 2006).<br />
withstanding considerable stresses.<br />
HVAC:<br />
Inlet and outlet lines are leaking into one <strong>of</strong> the two 500-ton<br />
chillers on the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building (second chiller was not operating<br />
at the time <strong>of</strong> inspection). Five evaporator units are leaking condensation into<br />
emergency overflow pans. Of 24 air handler units throughout the <strong>Mall</strong> building,<br />
only 5 were not operating as designed. Routine maintenance is required to<br />
keep evaporator coils free <strong>of</strong> dust. Overall condition for HVAC in <strong>Miracle</strong><br />
<strong>City</strong> <strong>Mall</strong> is considered fair. On north end outparcel building and former<br />
restaurant building, no HVAC units were operating due to lack <strong>of</strong> power and<br />
Fig. 4: Collapsing ceiling in north<br />
side outparcel (AIS, January, 2006).<br />
Fig. 8: Aging HVAC equipmnt, north<br />
side outparcel (AIS, January, 2006).<br />
water. Existing machinery appears to require immediate replacement. Overall<br />
conditions here are poor.<br />
Interiors*:<br />
Interior conditions are uniformly poor throughout the entire<br />
north end outparcel. Water damage from leaking ro<strong>of</strong>s is evident in a number<br />
<strong>of</strong> units. Other structural damage includes exposed insulation, missing ceiling<br />
tile, damaged sheetrock, and damaged floors. Overall conditions are poor.<br />
In <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>, a few retail units exhibit similar conditions, but these<br />
conditions appear to be outside <strong>of</strong> customer view (i.e., observable only from<br />
back room or places where mall customers do not typically have access).<br />
Fig. 5: Dilapidated interior in north<br />
side outparcel (AIS, January, 2006).<br />
Fig. 9: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> ro<strong>of</strong> (AIS,<br />
January, 2006).<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 46
2. Site Conditions<br />
Building conditions are an important element in determining the presence <strong>of</strong><br />
blight but do not describe the overall conditions <strong>of</strong> blighted parcels. Blight can<br />
also be characterized by deteriorated site conditions not related to buildings, e.g.,<br />
paving conditions, landscaping, signage and lighting infrastructure, and more.<br />
<strong>The</strong> deterioration <strong>of</strong> site and building are factors that can be precipitated by<br />
sudden and damaging storm events and worsened by neglect following building<br />
vacancy. While reversible, a large number <strong>of</strong> such site/building deterioration<br />
examples contribute strongly to a finding <strong>of</strong> blight.<br />
RMPK Group conducted a field survey <strong>of</strong> site conditions for <strong>Miracle</strong> <strong>City</strong><br />
<strong>Mall</strong> buildings in September 2006 (Parcels 5, 6, and 7 were observed to be in<br />
Fig. 10: Deteriorating parking lot, northeast corner<br />
<strong>of</strong> Study Area (RMPK Group, September, 2006).<br />
Fig. 13: Rear side <strong>of</strong> vacant north side outparcel<br />
(RMPK Group, September, 2006).<br />
Fig. 14: Damaged rear wall <strong>of</strong> north side outparcel<br />
(RMPK Group, September, 2006).<br />
satisfactory conditions):<br />
Parking lots:<br />
Pavement is deteriorating at numerous locations throughout<br />
Parcels 1 through 4, and weeds are growing through cracks and spalled areas<br />
in Parcel 1. Potholes are evident behind the north end outparcel. Pavement<br />
markings are still recognizable but have not been painted in many months. Curb<br />
cuts are numerous. Conditions are fair to poor.<br />
Landscaping conditions:<br />
Minimal numbers <strong>of</strong> healthy but small trees<br />
provide little shade on the parking lots. Some aesthetic landscaping exists at and<br />
near <strong>Mall</strong> building entrances, but, overall, adequate landscaping on the property<br />
is lacking and therefore considered in poor condition.<br />
Drainage: No turf areas or stormwater retention facilities are present on Parcels 1<br />
Fig. 11: Potholes behind north side outparcel (RMPK<br />
Group, September, 2006).<br />
Fig. 15: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> front façade (RMPK<br />
Group, September, 2006).<br />
Fig. 16: JCPenney near-empty parking lot (RMPK<br />
Group, September, 2006).<br />
through 4. Over 95% <strong>of</strong> the Study Area is imperviable to stormwater. Stormwater<br />
is handled by a closed system <strong>of</strong> grates and culverts that channels run<strong>of</strong>f directly<br />
into the Indian River Lagoon. This situation is highly unsatisfactory according to<br />
current stormwater management practices and is therefore a strong indication <strong>of</strong><br />
blight. Poor condition.<br />
Signage:<br />
Curbside <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> entry signs are functional yet<br />
exhibit dated aesthetics and show little evidence <strong>of</strong> continued maintentance.<br />
Fair to poor condition.<br />
Building façades and entries: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> façades and entryways are<br />
aesthetically dated. Fair condition.<br />
Fig. 12: Rear side <strong>of</strong> vacant north side outparcel<br />
(RMPK Group, September, 2006).<br />
Fig. 17: Vacant retail unit, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> (RMPK<br />
Group, September, 2006).<br />
Fig. 18: Vacant retail unit, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> (RMPK<br />
Group, September, 2006).<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 47
• Commercial vacancy rates<br />
Currently, 17 out <strong>of</strong> 44 units in <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> are unoccupied, and one anchor<br />
store (S<strong>of</strong>as Direct) is closing. Six <strong>of</strong> 7 units in the north end outparcel building<br />
are not occupied by leasing tenants. <strong>The</strong> former Morrison’s Café outparcel on<br />
the southwest corner <strong>of</strong> the Study Area is entirely unoccupied. <strong>The</strong> freestanding<br />
Firestone building (southeast corner <strong>of</strong> the Study Area) is currently occupied but<br />
the tenant is understood to be considering relocating to a newer facility. At this<br />
time, the Study Area vacancy rate on a per-unit basis is 32%, and on a squarefootage<br />
basis is 24%. In the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building alone, the vacancy rate<br />
is 39% on a per-unit basis and 13.8% on a square-footage basis. Once S<strong>of</strong>as<br />
Direct has closed, sometime before the end <strong>of</strong> 2006, the <strong>Mall</strong> building vacancy<br />
rate will increase to about 25% on a square-footage basis. This is an excessive<br />
vacancy rate, particularly compared to the current 6% retail vacancy rate for<br />
all <strong>of</strong> <strong>Titusville</strong> (as determined by the Economic Development Commission <strong>of</strong><br />
<strong>Florida</strong>’s Space Coast).<br />
Vacancy rates have been increasing over the past few years. In 2001, both<br />
anchor stores were occupied and they, along with the rest <strong>of</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>,<br />
produced sales <strong>of</strong> over $16-million. In 2002, sales dropped to about $9.7-million,<br />
a loss <strong>of</strong> almost 40%. By 2005, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> had lost one <strong>of</strong> its primary<br />
anchors, over a dozen <strong>of</strong> its retail tenants, and almost 95% <strong>of</strong> its 2001 sales<br />
volume—a precipitous decline in only four years (see Table 2 below). This is<br />
strongly evident <strong>of</strong> the progressively growing failure <strong>of</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> in its<br />
current condition to maintain a customer or tenant base.<br />
Figs. 19 (top) & 20: Deserted central corridor <strong>of</strong><br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> (RMPK Group, September, 2006).<br />
Year<br />
Sales Figures<br />
2001 $16-million<br />
2002 $9.7-million<br />
% change -39.2%<br />
2003 $4.2-million<br />
% change -56.3%<br />
2004 $1.5-million<br />
% change -35.7%<br />
2005 < $1-million<br />
% change > -33.3%<br />
01-’05 % change > -94%<br />
Fig. 21: For Lease sign, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> (RMPK<br />
Group, September, 2006).<br />
* figures are estimates and do not include all <strong>Mall</strong> tenants<br />
Source: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Property Management Office<br />
Table 2: Sales trends for <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>, 2001-2005.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 48
Conclusions and Recommendations<br />
<strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site and adjacent properties included in this study exhibit<br />
characteristics <strong>of</strong> blight. Specifically, this report documents evidence for three<br />
criteria that substantiate a Finding <strong>of</strong> Necessity for a blighted area according to<br />
Chapter 163, Part III, <strong>of</strong> the <strong>Florida</strong> Statutes. <strong>The</strong>se criteria assert the following:<br />
1. Aggregate assessed values <strong>of</strong> real property in the area for ad<br />
valorem tax purposes have failed to show<br />
any appreciable increase over the 5 years prior to the finding <strong>of</strong><br />
such conditions<br />
2. Deterioration <strong>of</strong> site or other improvements is leading to a<br />
lowered investment image<br />
3. High commercial vacancy rates are pointing to decreased<br />
investment interest in the Study Area<br />
<strong>The</strong> culmination <strong>of</strong> these factors makes a strong case for an assessment <strong>of</strong> blight<br />
in the Study Area. Structural conditions in the <strong>Miracle</strong> Ciy <strong>Mall</strong> buildings are<br />
declining to the point that the <strong>Mall</strong> cannot compete effectively in the current<br />
consumer market environment. Declining sales revenues are an indication <strong>of</strong><br />
economic distress that makes it difficult for property management to invest in<br />
renovations or support current configurations or solely commercial uses. In fact,<br />
infrastructure in many places is deficient to the point where renovation is not<br />
worthwhile. As indicated in the U.S. 1 Corridor Master <strong>Plan</strong>, redevelopment<br />
<strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> area has been identified by community residents as a<br />
priority project. On the basis <strong>of</strong> this finding report, complete redevelopment <strong>of</strong><br />
the Study Area, introducing a new mix <strong>of</strong> commercial, residential, and <strong>of</strong>fice uses<br />
in a more modernized manner, is the strongly recommended course <strong>of</strong> action.<br />
According to Chapter 163, Part III, F.S., the next step following a determination<br />
<strong>of</strong> existence <strong>of</strong> blight is adoption <strong>of</strong> a finding <strong>of</strong> necessity by the <strong>Titusville</strong> <strong>City</strong><br />
Council, which will allow the creation <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Community<br />
<strong>Redevelopment</strong> Area.<br />
As determined in relevant court cases regarding findings <strong>of</strong> necessity, a finding<br />
<strong>of</strong> blight will be upheld if there is “competent substantial evidence” presented on<br />
the record for the governing body’s decision to be based. <strong>The</strong> <strong>Florida</strong> Supreme<br />
Court has defined the term “competent substantial evidence” as follows:<br />
Substantial evidence has been described as such evidence as will<br />
establish a substantial basis <strong>of</strong> fact from which the fact at issue can be<br />
reasonably inferred. We have stated it to be such relevant evidence, as a<br />
reasonable mind would accept as adequate to support a conclusion... We<br />
are <strong>of</strong> the view ... that the evidence relied upon to sustain the ultimate<br />
finding should be sufficiently relevant to sustain the ultimate finding<br />
and should be sufficiently relevant and material that a reasonable mind<br />
would accept it as adequate to the conclusion reached. To this extent the<br />
‘substantial’ should also be ‘competent’.<br />
Recommendations are as follows:<br />
1. Establish a Community <strong>Redevelopment</strong> Area<br />
Based on the results <strong>of</strong> this study, the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> should proceed to create<br />
a community redevelopment area for the Study Area in accordance with the<br />
provisions <strong>of</strong> the State Community <strong>Redevelopment</strong> Act. <strong>The</strong> <strong>City</strong> must work<br />
with Brevard County to obtain the authority to create a CRA based on the charter<br />
County provisions set forth in <strong>Florida</strong> Statutes.<br />
Briefly, the process for creating a CRA is as follows:<br />
1. <strong>City</strong> Council accepts the findings <strong>of</strong> the study and moves to request that<br />
the County adopt a resolution delegating<br />
authorities contained in Chapter 163 <strong>of</strong> the <strong>Florida</strong> Statutes.<br />
2. <strong>City</strong> staff meet with County Commissioners and request placement <strong>of</strong><br />
the item on the Board <strong>of</strong> County<br />
Commissioners agenda.<br />
3. <strong>The</strong> County Attorney, in coordination with the <strong>City</strong>, prepares a draft<br />
resolution.<br />
4. <strong>The</strong> County provides written notice to the applicable taxing authorities<br />
<strong>of</strong> the upcoming meeting and<br />
resolution.<br />
5. <strong>The</strong> Board <strong>of</strong> County Commissioners acts upon the resolution.<br />
6. <strong>City</strong> Council prepares a resolution to adopt the finding <strong>of</strong> blight and<br />
create a redevelopment district.<br />
7. <strong>City</strong> Council provides written notice to the applicable taxing authorities<br />
<strong>of</strong> the upcoming action.<br />
8. <strong>City</strong> Council adopts the resolution.<br />
2. Prepare a <strong>Redevelopment</strong> <strong>Plan</strong><br />
Chapter 163.362, F.S., provides a detailed description <strong>of</strong> the required contents <strong>of</strong><br />
a <strong>Redevelopment</strong> <strong>Plan</strong>. A <strong>Redevelopment</strong> <strong>Plan</strong> is intended to address the issues<br />
identified in a finding-<strong>of</strong>-necessity study, define community redevelopment<br />
goals and objectives, and establish specific Community <strong>Redevelopment</strong> Agency<br />
policies and actions. <strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong> will provide a framework for<br />
oversight <strong>of</strong> the land development process and improve the marketability <strong>of</strong><br />
the CRA. It can also provide a strategy for obtaining economic incentives that<br />
encourage private sector investment and capital improvements that ensure<br />
infrastructure is in place to support future growth and development.<br />
Working with the three adjacent property owners, a master plan for the<br />
redevelopment <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site should be the primary element <strong>of</strong> the<br />
redevelopment plan for the Study Area that will meet the requirements established<br />
for such plans in the <strong>Florida</strong> Statutes. <strong>The</strong> redevelopment plan will establish the<br />
framework for a developer agreement between the <strong>City</strong> and the property owners<br />
that sets forth specific expectations, roles, relationships, and participation by the<br />
public and private sector to ensure the successful redevlopment <strong>of</strong> the site.<br />
3. Establish a <strong>Redevelopment</strong> Trust Fund<br />
Program funding and accounting is administered through a CRA trust fund that<br />
may be created by ordinance <strong>of</strong> the governing authority. <strong>The</strong> trust fund can be<br />
established subsequent to adoption <strong>of</strong> a Community <strong>Redevelopment</strong> <strong>Plan</strong> that<br />
will, according to <strong>Florida</strong> Statutes, provide for the collection <strong>of</strong> tax increment<br />
revenues to finance capital improvements identified in the <strong>Redevelopment</strong> <strong>Plan</strong>.<br />
Upon creation <strong>of</strong> a trust fund, the trust fund ordinance freezes the tax base and<br />
establishes the base valuation <strong>of</strong> the property located within the boundaries <strong>of</strong><br />
the redevelopment area. From that point, all taxes assessed on future increases<br />
in the value <strong>of</strong> properties within the redevelopment area are appropriated to<br />
the <strong>Redevelopment</strong> Trust Fund. All taxes assessed on the value <strong>of</strong> property<br />
determined prior to adoption <strong>of</strong> the ordinance will continue to generate revenues<br />
for local taxing authorities.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 49
Year Parcel 1:<br />
2505<br />
Hopkins Ave<br />
Parcel 2<br />
No address<br />
Parcel 3:<br />
2500 S.<br />
Washington<br />
Ave<br />
Parcel 4:<br />
250<br />
Harrison St<br />
Sunrise<br />
Properties<br />
parcels:<br />
1 thru 4<br />
Parcel 5:<br />
2412 S.<br />
Washington<br />
Ave<br />
Parcel 6:<br />
2460 S.<br />
Washington<br />
Ave<br />
Parcel 7:<br />
2480 S.<br />
Washington<br />
Ave<br />
<strong>City</strong> <strong>of</strong> <strong>Titusville</strong><br />
Brevard County**<br />
2000 $698,210 $900,000 $3,800,000 $500,000 $5,798,210 $410 $201,020 $403,450 $1,070,919,481 $17,000,000,000<br />
2001 $698,210 $675,000 $3,900,000 $500,000 $5,773,210 $410 $201,420 $442,670 $1,098,461,024 $18,300,000,000<br />
% change 0% -25% +2.6% 0% -
Appendix B<br />
Funding Sources
Table <strong>of</strong> Funding Sources for <strong>Redevelopment</strong> Activities<br />
Program Name Description Sponsor More Information<br />
Land and Water Conservation Fund (LWCF)<br />
<strong>The</strong> LWCF program provides matching grants to states and local governments for the acquisition and development <strong>of</strong> public outdoor<br />
recreation areas and facilities. <strong>The</strong> program is intended to create and maintain a nationwide legacy <strong>of</strong> high quality recreation<br />
areas and facilities and to stimulate non-federal investments in the protection and maintenance <strong>of</strong> recreation resources across the<br />
United States. <strong>The</strong> funding that is allocated to each state, or “stateside” funding, is administered by that state. Through the LWCF,<br />
the <strong>Florida</strong> Department <strong>of</strong> Parks and Recreation provides funds for statewide planning, and for acquiring and developing outdoor<br />
recreation areas and facilities LWCF grant funds may be used for the acquisition and development <strong>of</strong> state and local facilities that<br />
provide active and/or passive recreation opportunities.<br />
US Department <strong>of</strong> the<br />
Interior, National Park<br />
Service<br />
Federal funding <strong>of</strong> this program varies from<br />
year to year depending on appropriations. For<br />
program information, visit: http:// www.nps.gov/<br />
ncrc/programs/flp/index.html<br />
<strong>Florida</strong> Recreational Trails Program (RTP)<br />
RTP is a competitive program which provides grants for projects that provide, renovate or maintain recreational trails, trailhead and<br />
trailside facilities. <strong>The</strong> Intermodal Surface Transportation Efficiency Act (ISTEA) <strong>of</strong> 1991 included the National Recreational Trails<br />
Fund Act (NRTFA) and established the National Recreational Trails Funding Program (NRTFP). <strong>The</strong> National Highway System<br />
Designation Act (NHS Act) <strong>of</strong> 1995 amended and revived the NRTFA. <strong>The</strong> Transportation Equity Act for the 21st Century (TEA-21)<br />
amended the previous legislation and provided for six years <strong>of</strong> funding. <strong>The</strong> current maximum grant amount for mixed-use projects<br />
and non-motorized projects is $200,000. <strong>The</strong> maximum grant award amount for motorized projects is $437,420 annually.<br />
<strong>Florida</strong> Department <strong>of</strong><br />
Environmental Protection<br />
<strong>Florida</strong> Inland Navigation District Waterway<br />
Assistance Program (WAP)<br />
<strong>The</strong> Waterway Assistance Program is a grant program established by the <strong>Florida</strong> Legislature and the District for the purpose<br />
<strong>of</strong> financially cooperating with local governments to alleviate problems associated with the Atlantic Intracoastal Waterway and<br />
associated waterways within the District. <strong>The</strong> maximum grant award amount for eligible projects is $300,000 annually.<br />
<strong>Florida</strong> Inland Navigation<br />
District<br />
http://www.aicw.org/wap.htm<br />
<strong>Florida</strong> Urban Forestry Grant<br />
As part <strong>of</strong> the federal government’s Urban and Community Forestry Matching Grant Program, funds will be available to<br />
organizations to develop or enhance their urban and community forestry programs. <strong>The</strong> maximum grant award available is $25,000<br />
on an annual basis.<br />
<strong>Florida</strong> Department<br />
<strong>of</strong> Agriculture and<br />
Consumer Services<br />
http://www.fl-d<strong>of</strong>.com/forest_management/cfa_<br />
urban_grants.html<br />
<strong>Florida</strong> Boating Improvement Program (FBIP)<br />
<strong>The</strong> <strong>Florida</strong> Boating Improvement Program provides funding through competitive grants for boating access projects and other<br />
boating-related activities on coastal and/or inland waters <strong>of</strong> <strong>Florida</strong>. Eligible program participants include county governments,<br />
municipalities and other governmental entities <strong>of</strong> the State <strong>of</strong> <strong>Florida</strong><br />
<strong>Florida</strong> Fish and<br />
Wildlife Conservation<br />
Commission<br />
http://myfwc.com/boating/grants/fbip.htm<br />
Keep American Beautiful (KAB) Grant<br />
Keep America Beautiful is a national nonpr<strong>of</strong>it public education organization dedicated since 1953 to engaging individuals to take<br />
greater responsibility for improving their local community environments. Annual landscaping grant program administered through the<br />
State Department <strong>of</strong> Agriculture. With a $20,000 limit, projects may be phased.<br />
<strong>Florida</strong> Department <strong>of</strong><br />
Agriculture<br />
http://www.kab.org/aboutus.aspid=32&rid=38<br />
Cultural Facilities Grant<br />
This grant, requiring a 50% cash match, <strong>of</strong>fers funding assistance for the construction <strong>of</strong> cultural facilities, including arts, historical,<br />
and science centers up to a maximum <strong>of</strong> $500,000.<br />
State <strong>of</strong> <strong>Florida</strong><br />
http://www.florida-arts.org/grants/facilities/<br />
index.htm<br />
<strong>Florida</strong> Department <strong>of</strong> Transportation’s Local<br />
Agency Program<br />
<strong>The</strong> program is designed to provide funding and technical assistance to local governments interested in implementing federal aid<br />
transportation projects. <strong>Florida</strong> Highway Beautification Council. Based on the results <strong>of</strong> this annual review process, the Secretary <strong>of</strong><br />
the Department <strong>of</strong> Transportation may award up to a total <strong>of</strong> $3 million in Grants to eligible applicants.<br />
<strong>Florida</strong> Department <strong>of</strong><br />
Transportation<br />
River Restoration Grants<br />
$5,000 to $25,000 per project. Non-federal match not required. But encouraged. Grants provided to projects that are using dam<br />
removal or fish passage to restore and protect the ecological integrity <strong>of</strong> rivers and improve freshwater habitats for anadromous fish.<br />
State, local, and tribal governments, conservation groups, and other non-pr<strong>of</strong>its.<br />
American Rivers<br />
(partner with National<br />
Oceanic & Atmospheric<br />
Administration (NOAA)<br />
http://www.amrivers.org/dam removal/<br />
grantguidelines.htm<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 52
Name Description Sponsor More Information<br />
<strong>Florida</strong> Community’s Trust (FCT) Fund Grant<br />
This grant program was established for environmental land acquisition. <strong>Florida</strong> Communities Trust (FCT) is a state land acquisition<br />
grant program that provides funding to local governments and eligible non-pr<strong>of</strong>it environmental organizations for acquisition <strong>of</strong><br />
community-based parks, open space and greenways that further outdoor recreation and natural resource protection needs identified<br />
in local government comprehensive plans.<br />
<strong>Florida</strong> Department <strong>of</strong><br />
Community Affairs<br />
<strong>Florida</strong> Greenways and Trails Program<br />
<strong>The</strong> <strong>Florida</strong> Department <strong>of</strong> Environmental Protection administers this grant, which can be used for acquisition <strong>of</strong> property for linear<br />
corridors, open space connectors and trails. <strong>The</strong>re is a cap <strong>of</strong> $5,500,000 with no match required.<br />
<strong>Florida</strong> Department <strong>of</strong><br />
Environmental Protection<br />
Coastal Partnership Initiative<br />
This initiative is designed to support innovative local-level coastal management projects in four program areas: public access,<br />
remarkable coastal places, working waterfronts, and community stewardship. Governmental, educational, and non-pr<strong>of</strong>it entities<br />
can apply, and the <strong>Florida</strong> Coastal Management Program <strong>of</strong>fers technical assistance and training along with the more traditional<br />
funding support. Financial awards are limited to no more than $50,000 and no less than $15,000 and may be used for planning<br />
and coordination activities, land acquisition, small construction, or capital improvement projects. If the type <strong>of</strong> assistance provided<br />
through the grant contract is financial assistance, the recipient will be required to provide 100% matching funding, which may be<br />
cash or in-kind.<br />
<strong>Florida</strong> Department <strong>of</strong><br />
Environmental Protection<br />
<strong>Florida</strong> Recreation Development Assistance<br />
Program (FRDAP)<br />
This annual, state recreation assistance program may be used for recreational land acquisition, park design and construction. Active<br />
park amenities are normally afforded a higher priority than passive parks. With a limit <strong>of</strong> $150,000, projects may be phased over<br />
several years. Grants under $50,000 require no match. Grants over $50,000 require a 50% match. <strong>The</strong> maximum grant amount is<br />
$200,000<br />
<strong>Florida</strong> Department <strong>of</strong><br />
Environmental Protection<br />
East Central <strong>Florida</strong> Water Management<br />
District (ECFWMD)<br />
ECFWMD funding is available for assistance in stormwater improvement projects, which is beneficial for redevelopment projects that<br />
contain areas identified as having drainage deficiencies.<br />
East Central <strong>Florida</strong> Water<br />
Management District<br />
(ECFWMD)<br />
North American Wetlands Conservation Act<br />
(NAWCA) - Standard Grants<br />
$51,000-$1.0M to fund a 4-year plan <strong>of</strong> action supported by a NAWCA grant and partner funds to conserve wetlands and wetlandsdependent<br />
fish and wildlife through acquisition (including easements and title donations), restoration, and/or enhancement. Match<br />
must be non-Federal and at least equal to the grant request.<br />
US Fish & Wildlife Service<br />
http://northamerican.fws.gov/NA<br />
Community-Based Restoration Project:<br />
National and Regional Partnerships<br />
Grassroots, community-based projects for restoring and conserving marine resources and their habitats. Typical grants range from $<br />
100,000 to $ 600,000.<br />
National Oceanic<br />
and Atmospheric<br />
Administration (NOAA)<br />
Community-Based<br />
Restoration Program<br />
http://www.nmfs.noaa.gov/habitat/restoration/<br />
projects_programs/progras.html<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 53
Appendix C<br />
Legal Description <strong>of</strong> <strong>Miracle</strong><br />
<strong>City</strong> <strong>Mall</strong> CRA Boundaries
Legal Description for the U.S. 1 Corridor Community<br />
<strong>Redevelopment</strong> Area<br />
Parcel “A”<br />
<strong>The</strong> South 413 feet <strong>of</strong> lot 9 East <strong>of</strong> Hopkins Avenue and West <strong>of</strong> U.S. Highway<br />
No.1, Plat <strong>of</strong> Bayview Subdivision, according to the plat there<strong>of</strong>, as recorded in<br />
Plat Book 1, Page 64, <strong>of</strong> the Public Records <strong>of</strong> Brevard County, <strong>Florida</strong>.<br />
Along with;<br />
All <strong>of</strong> lot 10 East <strong>of</strong> Hopkins Avenue and West <strong>of</strong> U.S. Highway No.1, Plat <strong>of</strong><br />
Bayview Subdivision, according to the plat there<strong>of</strong>, as recorded in Plat Book 1,<br />
Page 64, <strong>of</strong> the Public Records <strong>of</strong> Brevard County, <strong>Florida</strong>.<br />
Along with;<br />
All <strong>of</strong> lots 1, 2, 3, 4 and 5 East <strong>of</strong> Hopkins Avenue and West <strong>of</strong> U.S. Highway No.1,<br />
Bayview Estates Subdivision, according to the plat there<strong>of</strong>, as recorded in Plat Book 2,<br />
Page 76, <strong>of</strong> the Public Records <strong>of</strong> Brevard County, <strong>Florida</strong>.<br />
Parcel “B”<br />
All <strong>of</strong> lots 5, 6, and the North 14.5 feet <strong>of</strong> the vacated Right-<strong>of</strong>-Way <strong>of</strong> Delespine<br />
Avenue, Block “A”, Boye’s Subdivision, according to the plat there<strong>of</strong>, as recorded in<br />
Plat Book 2, Page 40, less and except the Right-<strong>of</strong>-Way <strong>of</strong> U.S. Highway No. 1, <strong>of</strong> the<br />
Public Records<br />
<strong>of</strong> Brevard County, <strong>Florida</strong>.<br />
Along with;<br />
All <strong>of</strong> lot 7, the North 10 feet <strong>of</strong> lot 8, and the South 14.5 feet <strong>of</strong> the vacated Right-<strong>of</strong>-<br />
Way <strong>of</strong> Delespine Avenue, Block “B”, Boye’s Subdivision, according to the plat there<strong>of</strong>,<br />
as recorded in Plat Book 2, Page 40, less and except the Right-<strong>of</strong>-Way <strong>of</strong> U.S. Highway<br />
No.1, <strong>of</strong> the Public Records <strong>of</strong> Brevard County, <strong>Florida</strong>.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 55
Appendix D<br />
Architectural Guidelines from<br />
U.S. 1 Corridor Master <strong>Plan</strong>
Architectural Guidelines<br />
Architectural Styles<br />
This section illustrates a conceptual approach to establish minimum architectural standards for<br />
future development projects. <strong>The</strong> primary goal <strong>of</strong> the Architectural Guidelines is to ensure that<br />
each individual site design, architectural and streetscape project contribute to the positive image<br />
<strong>of</strong> the U.S.1 Corridor Study Area.<br />
<strong>The</strong> building elements outlined are inspired from the study <strong>of</strong> historic buildings in the <strong>City</strong> <strong>of</strong><br />
<strong>Titusville</strong> and should be incorporated to enhance the area’s unique and authentic character. <strong>The</strong><br />
architect/ developer is encouraged to provide innovative design solutions which may not meet<br />
the exact details <strong>of</strong> the guidelines. However, it is the responsibility <strong>of</strong> the architect to convince the<br />
<strong>City</strong> that the proposed design solutions are compatible with the traditional architectural character<br />
<strong>of</strong> the adjacent properties.<br />
Appropriate Architectural Styles<br />
While the Architectural Requirements do not recommend a specific design theme for buildings,<br />
it is encouraged that projects proposed in the Study Area must have either one <strong>of</strong> the four main<br />
architectural styles or a combination <strong>of</strong> the styles listed below as appropriate for use in each<br />
Character District.<br />
• <strong>Florida</strong> Frame Vernacular<br />
• Spanish Eclectic<br />
• Bungalow Style<br />
• Classical Revival<br />
Historic Architectural Examples in <strong>Titusville</strong><br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 57
DESIGN GUIDELINES<br />
Louvered Vent<br />
Cupola<br />
Ro<strong>of</strong> Slope<br />
(Gable/ Hipped)<br />
Projecting Eaves<br />
Porch Ro<strong>of</strong> Slope<br />
Cornice<br />
Lintel<br />
Double Hung<br />
Windows<br />
Raised Porch<br />
Fig 8.16 Frame Vernacular Elevation<br />
SIMPLE WOOD RAILING<br />
<strong>Florida</strong> Frame Vernacular Building Elements<br />
Characteristics<br />
• <strong>Plan</strong>: Regular, rectangular<br />
• Foundation: Concrete block<br />
• Material: Horizontal wood siding, Brick or smooth masonry<br />
• Ro<strong>of</strong> Type: Steep gable ro<strong>of</strong>, less common hip<br />
• Ro<strong>of</strong> surfacing: Metal or composition asbestos shingles<br />
• Details: Simple, jig-sawn patterns around porches and eaves, large attached front porch, revealed fireplace, double hung<br />
vertical windows.<br />
<strong>The</strong> façade should contain a minimum <strong>of</strong> five <strong>of</strong> the following façade design elements for the <strong>Florida</strong> Vernacular Style (Refer to<br />
Fig. 8.15-8.17 for illustrations):<br />
1. Metal Ro<strong>of</strong>ing materials<br />
2. Steep pitched gabled and hipped ro<strong>of</strong>s<br />
3. Exposed Truss work<br />
4. Simple Wood Cornice<br />
5. Double Hung Windows<br />
6. Simple wood railings<br />
7. Low-pitched ro<strong>of</strong> porches<br />
8. Wood Frame Construction<br />
9. Dormer Windows<br />
CORNICE<br />
(without ornamentation)<br />
SIMPLE BRACKETS/<br />
EXPOSED TRUSS WORK<br />
DORMER WINDOW<br />
STEEP PITCHED GABLE ROOF<br />
LOW-PITCHED PORCH ROOF<br />
DOUBLE HUNG WINDOWS<br />
Fig 8.17 Architectural Details<br />
Railing, Cornice and Brackets<br />
Fig 8.18 Architectural Details<br />
Ro<strong>of</strong> Elements, Windows<br />
Source: RMPK Group, Inc.<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 58
Spanish Eclectic Style<br />
Characteristics<br />
• <strong>Plan</strong>: Irregular<br />
• Foundation: Concrete block<br />
• Material: Stucco Exterior Wall Surfacing<br />
• Ro<strong>of</strong> Type: Low- Pitched Ro<strong>of</strong><br />
• Ro<strong>of</strong> surfacing: Red Tile Ro<strong>of</strong>ing; Flat with curvilinear parapet<br />
Fig 8.19 Spanish Eclectic Examples: Study Area<br />
<strong>The</strong> façade should contain a minimum <strong>of</strong> five <strong>of</strong> the following façade design elements for the Spanish Eclectic Style (Refer to Fig.<br />
8.19-8.20 for illustrations):<br />
1. Little or no eave overhang<br />
2. Prominent Arch over Door or Window or Porch<br />
3. Columns, Window Surrounds, Wrought Iron Grilles;<br />
4. Balconies and balconettes<br />
5. Red clay tile ro<strong>of</strong>ing<br />
6. Decorative ironwork<br />
7. Stucco walls<br />
8. Low-Pitched Ro<strong>of</strong>s<br />
9. Double-hung windows<br />
Fig 8.20 Spanish Eclectic Elevation<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 59
Bungalow Style<br />
Characteristics<br />
• <strong>Plan</strong>: Regular, Rectangular, usually oriented with narrow side facing the street<br />
• Foundation: Brick Pier or Continuous Brick or Concrete Block<br />
• Material: Horizontal wood siding, shingles<br />
• Ro<strong>of</strong> Type: Gable Main ro<strong>of</strong> over gable porch ro<strong>of</strong><br />
• Ro<strong>of</strong> surfacing: Shingles/ Metal<br />
Fig 8.21 Bungalow Style Elevation<br />
<strong>The</strong> façade should contain a minimum <strong>of</strong> three <strong>of</strong> the following façade design elements for the Bungalow Style (Refer to Fig. 8.20<br />
for illustrations):<br />
1. Simple, exposed structural elements, knees braces,<br />
2. Tapered chimneys<br />
3. Exposed rafter ends with carved decorative patterns to combine structure and ornament<br />
4. Shingles/ Metal ro<strong>of</strong><br />
5. Horizontal wood siding<br />
Classic Revival<br />
Characteristics<br />
• <strong>Plan</strong>: Regular, Rectangular<br />
• Foundation: Brick Pier or Continuous Brick<br />
• Material: Horizontal wood siding, Brick, Smooth Masonry<br />
• Ro<strong>of</strong> Type: Low-Pitched Hip, Flat Ro<strong>of</strong><br />
• Ro<strong>of</strong> surfacing: Embossed sheet metal or metal shingles; composition, asbestos shingles<br />
<strong>The</strong> façade should contain a minimum <strong>of</strong> three <strong>of</strong> the following façade design elements for the Classic Revival Style (Refer to<br />
Fig. 8.22 for illustrations):<br />
1. Columns, Balustrades, Medallions and French Doors<br />
2. Entrance Detailing- Transom, Sidelights, Ornamental Woodwork<br />
3. Embossed sheet metal or metal shingles; asbestos shingles<br />
4. Low pitched hip ro<strong>of</strong><br />
5. Horizontal wood siding<br />
Fig 8.22 Classic Revival Elevation<br />
<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 60
Prepared by: