19.01.2015 Views

Miracle City Mall Redevelopment Plan - The City of Titusville, Florida

Miracle City Mall Redevelopment Plan - The City of Titusville, Florida

Miracle City Mall Redevelopment Plan - The City of Titusville, Florida

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

<strong>Redevelopment</strong> <strong>Plan</strong><br />

<strong>City</strong> <strong>of</strong> <strong>Titusville</strong>, <strong>Florida</strong><br />

June 2007


<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong><br />

Prepared for:<br />

<strong>City</strong> <strong>of</strong> <strong>Titusville</strong>,<br />

Brevard County, <strong>Florida</strong><br />

Sunrise Properties & Investments, LLC<br />

June 8, 2007


Table <strong>of</strong> Contents<br />

Chapter 1: INTRODUCTION<br />

Overview 5<br />

Context 6<br />

<strong>Plan</strong> Content & Document Organization 7<br />

Chapter 2: INVENTORY and ANALYSIS<br />

Boundary Description 9<br />

Physical Site Conditions 10<br />

Market Analysis 11<br />

<strong>Plan</strong>ning and Zoning Considerations 12<br />

Review <strong>of</strong> Existing <strong>Plan</strong>s and Studies 16<br />

Chapter 3: CONCEPT PLAN<br />

<strong>Plan</strong> Philosophy 18<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> 19<br />

Mixed Use: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> 20<br />

Open Space 22<br />

Streetscape Improvements 23<br />

U.S. 1 Streetscape Improvements 24<br />

Harrison Street Streetscape Improvements 25<br />

Hopkins Avenue Streetscape Improvements 26<br />

Gateways and Signage 27<br />

Stormwater Management 27<br />

Circulation and Parking 28<br />

Neighborhood Connectivity 29<br />

Urban Design 30<br />

Architectural Character 32<br />

Chapter 4: IMPLEMENTATION STRATEGIES<br />

Program Management and Implementation 34<br />

Chapter 5: CAPITAL IMPROVEMENTS STRATEGY<br />

Capital Improvement Strategy 36<br />

Short-Term Strategies<br />

Mid-Term Strategies<br />

Long-Term Strategies<br />

Chapter 6: TAX INCREMENT FINANCING<br />

Appendices<br />

Tax Increment Financing 38<br />

A: Finding <strong>of</strong> Necessity Study 40<br />

B: Funding Sources 51<br />

C: Legal Description <strong>of</strong> the CRA Boundary 54<br />

D: Architectural Guidelines 57<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 3


Chapter 1<br />

Introduction


Overview<br />

<strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> provides a guiding document<br />

that recognizes and articulates a clear community vision for the <strong>Miracle</strong> <strong>City</strong><br />

<strong>Mall</strong> site and its surrounding properties. <strong>The</strong> <strong>Redevelopment</strong> Area is situated<br />

in the center <strong>of</strong> the neighborhoods along U.S. 1, located south <strong>of</strong> Downtown<br />

<strong>Titusville</strong>.<br />

Daytona Beach<br />

0 20 mi<br />

N<br />

Similar to other waterfront communities in <strong>Florida</strong>, <strong>Titusville</strong> faces critical<br />

challenges as it relates to striking a balance between population growth,<br />

development pressures, and economic development with preservation and<br />

management <strong>of</strong> coastal environmental quality. In 2004, the <strong>City</strong> formed an<br />

interim <strong>Titusville</strong> 2020 Team to create an Action <strong>Plan</strong> that identified strategies<br />

to accommodate and manage the consequences <strong>of</strong> growth. <strong>The</strong> U.S. 1 Corridor<br />

Master <strong>Plan</strong>, adopted in August 2006, was one <strong>of</strong> the several initiatives<br />

identified as a short-term strategy by the <strong>Titusville</strong> 2020 Action <strong>Plan</strong>. During<br />

the U.S. 1 Corridor planning process, the community identified redevelopment<br />

<strong>of</strong> the deteriorating <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site as a priority project, that will serve as<br />

a catalyst to revitalize the neighborhoods and improve the physical conditions<br />

<strong>of</strong> the area’s commercial corridors.<br />

Fig. 1: Location <strong>of</strong> <strong>Titusville</strong> in Central Atlantic <strong>Florida</strong>.<br />

<strong>Titusville</strong><br />

Orlando<br />

Palm Bay<br />

<strong>Titusville</strong><br />

Kennedy Space Center<br />

Melbourne<br />

Fig. 2: Proximity <strong>of</strong> neighboring cities around <strong>Titusville</strong>.<br />

ATLANTIC<br />

OCEAN<br />

<strong>The</strong> U.S. 1 Corridor Master <strong>Plan</strong> called for creating a new mixed-use activity<br />

center on the existing <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site that is reflective <strong>of</strong> the community’s<br />

expressed vision for promoting high quality development in the neighborhood<br />

and to mitigate the development pressures on the waterfront properties by<br />

creating infill development opportunities at specific locations on the west<br />

edge <strong>of</strong> U.S. 1. In order to achieve broader public objectives for economic<br />

development and revitalization, the Master <strong>Plan</strong> also recommended examining<br />

the feasibility <strong>of</strong> creating a site-specific Community <strong>Redevelopment</strong> Area that<br />

includes the <strong>Miracle</strong> <strong>City</strong> and Searstown <strong>Mall</strong> sites. In support <strong>of</strong> the <strong>Plan</strong>’s<br />

recommendations, the <strong>City</strong> created a special district, the Urban Village Special<br />

Zoning District, to protect the substantial public interest <strong>of</strong> areas identified as<br />

prime redevelopment sites by the U.S. 1 Corridor Master <strong>Plan</strong>.<br />

Based on the <strong>Plan</strong>’s recommendations, the community’s interest in redeveloping<br />

the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site, and upon purchase <strong>of</strong> the four <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

parcels in 2006, Sunrise Properties & Investments, LLC, retained the RMPK<br />

Group to conduct a Finding <strong>of</strong> Necessity Study for the <strong>Mall</strong> site and determine<br />

the existence <strong>of</strong> “blight” conditions in accordance with Chapter 163 <strong>of</strong> the<br />

<strong>Florida</strong> Statutes. <strong>The</strong> Finding <strong>of</strong> Necessity Study (Appendix A) provides a<br />

factual basis that the <strong>Redevelopment</strong> Area meets the statutory criteria for blight<br />

and that the rehabilitation, conservation, or redevelopment, or a combination<br />

there<strong>of</strong>, is necessary in the in the interest <strong>of</strong> public health, safety, and welfare<br />

<strong>of</strong> the residents. In March, 2007, Brevard County approved a resolution to<br />

confer power to the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> to create the U.S. 1 Corridor Community<br />

<strong>Redevelopment</strong> Area.<br />

<strong>The</strong> formulation <strong>of</strong> a <strong>Redevelopment</strong> <strong>Plan</strong>, using the tools made available in<br />

the <strong>Florida</strong> Statutes, is the most appropriate means <strong>of</strong> overcoming the blight<br />

conditions identified in the Finding <strong>of</strong> Necessity Study. <strong>The</strong> <strong>Miracle</strong> <strong>City</strong><br />

<strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong>, presented in this document, is intended to develop<br />

a comprehensive resource guide that meets the requirements <strong>of</strong> the <strong>Florida</strong><br />

Statutes as it relates to the preparation <strong>of</strong> Community <strong>Redevelopment</strong> <strong>Plan</strong>s. <strong>The</strong><br />

<strong>Plan</strong> is intended to be a flexible document that establishes Agency actions and<br />

policies to overcome obstacles to desired future growth and development within<br />

the <strong>Redevelopment</strong> Area boundaries.<br />

<strong>The</strong> <strong>Redevelopment</strong> Area is presently defined by the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> property<br />

line on the north; Harrison Street on the south; U.S. 1, including the <strong>City</strong>owned<br />

waterfront properties, on the east; and Hopkins Avenue on the west. <strong>The</strong><br />

Gulf <strong>of</strong> Mexico<br />

recommendations presented in the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> are<br />

expected to be accomplished through a public-private partnership that includes<br />

the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong>, the U.S. 1 Corridor Community <strong>Redevelopment</strong> Agency,<br />

and Sunrise Properties & Investments, LLC, the <strong>Mall</strong> owner/developer.<br />

Naples<br />

Lake<br />

Okeechobee<br />

Ft. Myers<br />

Figs. 3-6: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>, present day.<br />

Miami<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 5


PASCO<br />

WORTH<br />

DATE<br />

LINDA<br />

WORTH<br />

BANANA<br />

PVT<br />

ECHO<br />

GOLF VIEW<br />

LANE<br />

PETTY<br />

DOZIER<br />

BARNA<br />

20' R/W<br />

20' R/W<br />

SUN VALLEY<br />

THORNTON<br />

BYRON<br />

BYRON<br />

BARNA<br />

1ST<br />

BROWNING<br />

DIXIE<br />

DIXIE<br />

2ND<br />

DIXIE<br />

COLERIDGE<br />

LARK<br />

3RD<br />

DARDEN<br />

PARK<br />

PARK<br />

BARNA<br />

4TH<br />

GRAY<br />

GRANNIS<br />

ROBBINS<br />

HOOD<br />

YALE<br />

HOOD<br />

5TH<br />

HOOD<br />

ELIZABETH<br />

TRINIDAD<br />

KEATS<br />

6TH<br />

VACATION VILLAS<br />

GAYLE<br />

LE JUNE<br />

SHAW<br />

7TH<br />

DE LEON<br />

CRAIG<br />

SWIFT<br />

8TH<br />

LAS PALMAS<br />

DE LEON<br />

DE LEON<br />

MOON<br />

DE LEON<br />

STUART<br />

WAGER<br />

9TH<br />

APOLLO<br />

FOURTH<br />

10TH<br />

OLIVE<br />

EXISTING<br />

RANEY<br />

ELLIOT<br />

PAR<br />

THIRD<br />

CANAVERAL<br />

KENT<br />

MAYNARD<br />

JOLLY<br />

EINIG<br />

DAVID<br />

BRYAN<br />

DUMMITT<br />

SAVANNAH<br />

ROSEHILL<br />

LIBERTY<br />

LEMON<br />

TANGLEWOOD<br />

GETTYSBURG<br />

LEMON<br />

BEST<br />

PALM<br />

MELISSA<br />

JUPITER<br />

EXISTING<br />

PALM<br />

HOPKINS<br />

KEY LARGO<br />

WETHERSFIELD<br />

THOR<br />

HOPKINS AVE<br />

POLARIS<br />

ABBOTT<br />

INDIAN RIVER<br />

COCOANUT<br />

ALPINE<br />

ALPINE<br />

SISSON<br />

EXISTING<br />

OSCEOLA<br />

TANGELO<br />

CLOVER<br />

MOUNT STERLING<br />

SANCHEZ<br />

RIO<br />

Context<br />

REGIONAL CONTEXT<br />

EXISTING<br />

BUFFALO<br />

CHILDRE<br />

Opened in 1969, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> was designed to accommodate nearly 50<br />

tenants and featured two major retail “anchor” stores—JCPenney and Belk.<br />

Until the early 1990s it was popular as a retail destination and featured numerous<br />

retail uses and entertainment attractions, including a small movie theater in the<br />

north side outparcel. <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> has been engaged in competition with<br />

Searstown <strong>Mall</strong>, built within the same year as <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> a few blocks to<br />

the south. Searstown <strong>Mall</strong>’s construction <strong>of</strong> a movie theater in the 1990s drew<br />

shopping patrons away from <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>, but it was with the opening <strong>of</strong> a<br />

Wal-Mart Supercenter at SR 50 and SR 405 in 1995, along with regional growth<br />

<strong>of</strong> state-<strong>of</strong>-the-art shopping centers in Orlando, that <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> began<br />

facing a compounding level <strong>of</strong> retail competition against which it could not<br />

compete. In 2004, Belk closed its outlet and gradually other tenants have moved<br />

to Searstown <strong>Mall</strong>.<br />

Despite its central and accessible location, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> is facing the<br />

economic decline experienced by numerous other shopping centers across<br />

North America. <strong>The</strong> increase in the growth <strong>of</strong> “dead malls” or “greyfields” is<br />

attributed to several factors such as demographic shifts, changes in consumer<br />

behavior, increased competition from suburban malls, and demand for new<br />

shopping experiences. <strong>The</strong> presence <strong>of</strong> abandoned and deteriorating mall<br />

sites has a significant impact on the economic health and physical conditions<br />

in a community, including poor investment image, lower property values for<br />

surrounding areas, deterioration in physical environment, loss <strong>of</strong> tax revenues<br />

and jobs, and excess impervious surface coverage that leads to environmental<br />

degradation.<br />

Several cities in the nation and the State <strong>of</strong> <strong>Florida</strong> have successfully implemented<br />

redevelopment initiatives to revert abandoned and underutilized mall sites into<br />

vibrant activity centers. Winter Park Village in Winter Park, <strong>Florida</strong>; Mizner Park<br />

in Boca Raton, <strong>Florida</strong>; and Eastgate Town Center in Chattanooga, Tennessee,<br />

are examples <strong>of</strong> redevelopment projects that have successfully transformed<br />

“dead malls” into mixed-use town centers. While not all mall redevelopment<br />

initiatives have been successful, the U.S. 1 Corridor Master <strong>Plan</strong>, adopted by the<br />

<strong>City</strong> Council, provides community endorsement and the impetus to revitalize an<br />

aging commercial corridor using the redevelopment <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site<br />

as a catalyst for desired future development. <strong>The</strong> project has several attributes<br />

in its favor that will be pivotal in successfully implementing the redevelopment<br />

effort:<br />

• 31.4 acres <strong>of</strong> land under single ownership<br />

• Public-private commitment that streamlines development procedures<br />

Fig. 7: Winter Park <strong>Mall</strong> <strong>Redevelopment</strong>, Winter Park, <strong>Florida</strong>.<br />

Fig. 8: Mizner Park in Boca Raton, <strong>Florida</strong>.<br />

• <strong>The</strong> ongoing U.S. 1 Waterfront Recreation Master <strong>Plan</strong> that<br />

supports redevelopment <strong>of</strong> public waterfront properties<br />

• A willingness on the developer’s behalf to create mixed-use<br />

development compatible with the community’s vision<br />

• Community support for mixed-use redevelopment <strong>of</strong> the<br />

<strong>Mall</strong> site and the <strong>City</strong>’s plans to develop a waterfront park to<br />

complement the site<br />

ROYAL OAK<br />

VAUGHN<br />

SHERRY<br />

LOGAN<br />

APRICOT<br />

MALINDA<br />

TROPIC<br />

VISTA<br />

MENDEL<br />

AUGUSTINE<br />

BLUEBERRY<br />

FIGTREE<br />

HERITAGE<br />

KANSAS<br />

WHITE<br />

MORBECA<br />

KEISER<br />

ANGELA<br />

LAKESIDE<br />

HARRISON<br />

PLAYER<br />

SAUNDERS<br />

CAROL<br />

MC NEELA<br />

JAMES<br />

MANGRUM<br />

TREVINO<br />

TRAVIS<br />

LINCOLN<br />

PINE<br />

LYNWOOD<br />

KNOX MC RAE<br />

LOUISIANA<br />

VIRGINIA<br />

LENORE<br />

AUTUMN<br />

COLLINS<br />

WINTER<br />

LILAC<br />

EXISTING<br />

HAMLIN<br />

SPRING CREEK<br />

FORELL<br />

ROCK PIT<br />

PARK<br />

HILLDALE<br />

VALLEY<br />

RAILROAD<br />

VIOLET<br />

SMITH<br />

SOUTH<br />

DIANE<br />

FINSTERWALD<br />

EXISTING<br />

CHENEY<br />

FAIRLANE<br />

DEMARET<br />

NICKLAUS<br />

WUESTOFF<br />

11TH<br />

4TH<br />

ROSELLA<br />

GULDAHL<br />

NORWOOD<br />

DRAA<br />

GARDEN<br />

TEMPLE<br />

TUDOR<br />

LEACH<br />

TEE<br />

WALL<br />

RABUN<br />

PUTTER<br />

EXISTING<br />

QUEEN<br />

KINGS<br />

NIBLICK<br />

TALMADGE<br />

TURNESA<br />

FERRIER<br />

BIMINI<br />

JAMAICA<br />

LOCKE<br />

LEMA<br />

WATROUS<br />

LITTLER<br />

BAHAMA<br />

NASSAU<br />

KINGSTON<br />

SHELLEY<br />

1ST<br />

GRANNIS<br />

HARRISON<br />

THOREAU<br />

MILTON<br />

ROBBINS<br />

THOMAS<br />

JONES<br />

ENGLISH<br />

BLANTON<br />

WHITE SANDS<br />

11TH<br />

PINE<br />

RONALD<br />

WHISPERING HILLS<br />

ZIRUTH<br />

BURNING TREE<br />

RANSOM<br />

HARDY<br />

WATSON<br />

PALMETTO<br />

KENNEDY<br />

DAY<br />

KILLEARN<br />

DE LEON<br />

MARINA<br />

U.S.1 (WASHINGTONAVE)<br />

U.S.1 (WASHINGTONAVE)<br />

ORANGE<br />

BROWN<br />

SAWGRASS<br />

MAIN<br />

WEST<br />

MOCKINGBIRD<br />

PINE VALLEY<br />

TREE<br />

MAC DONALD<br />

CORDELE<br />

GARNET<br />

WEDGEWOOD<br />

COUNTRY CLUB<br />

SANTA CRUZ<br />

LA MESA<br />

COUNTRY CLUB<br />

MUIRFIELD<br />

CLEVELAND<br />

EXISTING<br />

FISHER<br />

LA GRANGE<br />

TROPIC<br />

PINE<br />

UNION<br />

GARDEN ST<br />

MAXWELL<br />

BRIDGE<br />

BOOKER<br />

GILBERT<br />

GIBSON<br />

KENILWORTH<br />

CANAVERAL<br />

BON AIR<br />

PILGRIM<br />

SECOND<br />

COUNTRY CLUB<br />

RANEY<br />

LUCKY<br />

FIRST<br />

WILLIAMSBURG<br />

OAKHILL<br />

DUMMITT<br />

SYCAMORE<br />

MACON<br />

LA CITA<br />

HUNTER PARK<br />

ROZEN<br />

LAKEWOOD<br />

FLORENCIA<br />

FOREST<br />

CLEVELAND<br />

DOW<br />

PALERMO<br />

WILSON<br />

PINE<br />

JULIA<br />

CARLYSLE<br />

MAIN<br />

LEE<br />

PEACHTREE<br />

DELANO<br />

MEADE<br />

WASHINGTON1<br />

S.R. 405(SOUTH ST)<br />

EXISTING<br />

PALM<br />

3RD<br />

ORANGE<br />

BROAD<br />

ST JOHNS<br />

LAUREN<br />

BREVARD<br />

GRACE<br />

LAUREL<br />

HOPKINS<br />

CONCORD<br />

SUNRISE<br />

OLEANDER<br />

KEY<br />

KEY MADEIRA<br />

MARINERS<br />

JANA<br />

KAREN<br />

BAYVIEW<br />

ROGER<br />

HANOVER<br />

BIRCHWOOD<br />

SHADOW WOOD<br />

WILLOWGREEN<br />

BEACON<br />

U.S.1 (WASHINGTONAVE)<br />

WASHINGTON<br />

HAMILTON<br />

SIR HAMILTON<br />

VILLAGE<br />

SCOTTY<br />

HAMILTON<br />

OAKHILL<br />

MAPLE<br />

L M DAVEY<br />

RIVERSIDE<br />

INDIAN RIVER<br />

TERRIER<br />

PARK<br />

PINECREST<br />

VILLAGE<br />

BELLA VISTA<br />

DELESPINE<br />

ELLIS<br />

RIVERSIDE<br />

ROOSEVELT<br />

HOPKINS<br />

JACKSON<br />

SABLE PALM<br />

BELLE ARBOR<br />

WATERSIDE<br />

TUSCARORA<br />

PARRISH<br />

HARRISON ST<br />

WATERSIDE<br />

BEVERLY<br />

ALHAMBRA<br />

ALAMANDA<br />

HOPKINS HOPKINS AVE AVE<br />

PARKER<br />

KNOX MC RAE<br />

LADO<br />

JEPSON<br />

COURT<br />

CAPRON<br />

PRITCHARD<br />

CHENEY<br />

WILLOW<br />

CLYDE<br />

EXISTING<br />

WASHINGTON<br />

A MAX BREWER MEMORIAL<br />

OJIBWAY<br />

SEMINOLE<br />

BERMUDA<br />

NARVAEZ<br />

AVILEZ<br />

CORONADA<br />

LA PALOMA<br />

EXISTING<br />

ACORN<br />

BIRCH<br />

ALLEY<br />

SAN ROBERTO<br />

MISTLETOE<br />

PINEDO<br />

HIBISCUS<br />

U.S.1 U.S.1 (WASHINGTONAVE)<br />

(WASHINGTONAVE)<br />

OLMSTEAD<br />

PARKER<br />

DELESPINE<br />

MAPLE<br />

CEDAR<br />

COQUINA<br />

JEPSON<br />

MOUNT VERNON<br />

ACORN<br />

BIRCH<br />

WASHINGTON<br />

S.R. 50 (CHENEY)<br />

SAN BERNARDO<br />

WASHINGTON<br />

RIVEREDGE<br />

LEGEND<br />

Downtown Boundary<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

<strong>Redevelopment</strong> Area Boundary<br />

U.S.1 Corridor Boundary<br />

Major Roadways<br />

<strong>City</strong> <strong>of</strong> <strong>Titusville</strong> Trail System<br />

MIRACLE CITY MALL CRA PLAN<br />

Fig. 9: Aerial view <strong>of</strong> the <strong>Titusville</strong> area, including existing trails throughout the city.<br />

<strong>City</strong> <strong>of</strong> <strong>Titusville</strong>, <strong>Florida</strong><br />

Feet<br />

0 625 1,250 2,500 3,750 5,000<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 6


<strong>Plan</strong> Content & Document Organization<br />

Inventory and Analysis<br />

<strong>The</strong> <strong>Plan</strong> was developed through an extensive inventory <strong>of</strong> existing conditions<br />

within the <strong>Redevelopment</strong> Area boundaries. Chapter 2 (Inventory and Analysis)<br />

contains a compilation <strong>of</strong> information and data pertaining to existing conditions<br />

and future plans including current and future land uses, existing zoning districts,<br />

traffic circulation, infrastructure, building conditions, environmental issues,<br />

and evaluation <strong>of</strong> previous plans and programs initiated in the <strong>Redevelopment</strong><br />

Area. Information for the inventory was collected from the Brevard County GIS<br />

Property Appraiser data, previous planning studies, the findings <strong>of</strong> the <strong>Miracle</strong><br />

<strong>City</strong> <strong>Mall</strong> Finding <strong>of</strong> Necessity Study, and the U.S. 1 Corridor Master <strong>Plan</strong>.<br />

<strong>The</strong> Analysis examines elements including traffic and pedestrian circulation,<br />

parking, deterioration <strong>of</strong> physical conditions, market conditions, and the<br />

environmental context. While there are issues to be addressed, the analysis found<br />

many opportunities for public realm improvements in the form <strong>of</strong> streetscapes,<br />

gateways, parks and trails as well as the future propensity for market driven<br />

redevelopment activity in the private sector.<br />

Concept <strong>Plan</strong><br />

<strong>The</strong> Concept <strong>Plan</strong>, presented in Chapter 3, was developed after analyzing the<br />

existing conditions in the <strong>Redevelopment</strong> Area and determining the issues and<br />

concerns expressed by members <strong>of</strong> the community during the U.S. 1 Corridor<br />

master planning process. <strong>The</strong> Concept <strong>Plan</strong> presents the general intent <strong>of</strong> the<br />

redevelopment program and provides guidance for the sound redevelopment<br />

<strong>of</strong> the properties in the <strong>Redevelopment</strong> Area. Opportunities for public realm<br />

improvements, anticipated redevelopment activities, and proposed future land<br />

use composition are graphically illustrated in the Concept <strong>Plan</strong>, followed by a<br />

description <strong>of</strong> planning principles intended to provide guidelines for promoting<br />

the sound development and redevelopment <strong>of</strong> the <strong>Redevelopment</strong> Area.<br />

Implementation Strategies<br />

Chapter 4 <strong>of</strong> the <strong>Redevelopment</strong> <strong>Plan</strong> establishes a process and actions required<br />

to realize the economic development, planning, and design objectives that<br />

have been devised for the <strong>Redevelopment</strong> Area. <strong>The</strong> strategies also include<br />

a description <strong>of</strong> the organizational framework and the roles that should be<br />

undertaken by various agencies and stakeholders.<br />

Capital Improvements Strategies<br />

Chapter 5 <strong>of</strong> the <strong>Redevelopment</strong> <strong>Plan</strong> contains a description <strong>of</strong> proposed projects<br />

and programs, arranged according to short, mid, and long term implementation<br />

timeframes, to be undertaken by the Community <strong>Redevelopment</strong> Agency to<br />

implement the redevelopment effort, including anticipated costs.<br />

Tax Increment Financing<br />

Chapter 6 provides preliminary tax increment revenue projections for the U.S. 1<br />

Corridor Community <strong>Redevelopment</strong> Area.<br />

Appendices<br />

Finally, the <strong>Plan</strong> contains four appendices that provide supplemental data and<br />

information. Appendix A is the Finding <strong>of</strong> Necessity Study for <strong>Miracle</strong> <strong>City</strong><br />

<strong>Mall</strong>, completed in January, 2007. Appendix B presents a table <strong>of</strong> funding<br />

sources that may assist in redevelopment efforts. Appendix C contains the legal<br />

description <strong>of</strong> the boundary. Finally, Appendix D presents the architectural<br />

guidelines recommended by the U.S. 1 Corridor Master <strong>Plan</strong>.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 7


Chapter 2<br />

Inventory and Analysis


Boundary<br />

Description<br />

<strong>The</strong> U.S. 1 Corridor <strong>Redevelopment</strong><br />

Area consists <strong>of</strong> ten parcels<br />

encompassing a total area <strong>of</strong><br />

approximately 36 acres. <strong>The</strong><br />

<strong>Redevelopment</strong> Area is generally<br />

defined by the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

property line on the north, Harrison<br />

Street on the south, Hopkins Avenue on<br />

the west, and includes recently acquired<br />

<strong>City</strong>-owned waterfront properties on<br />

the east. Fig. 10 illustrates the U.S. 1<br />

Corridor Community <strong>Redevelopment</strong><br />

Area boundaries. Currently, Sunrise<br />

Properties & Investments, LLC, owns<br />

four <strong>of</strong> the ten parcels (Parcels 1-4).<br />

Parcels 5, 6, and 7 may be purchased<br />

and assembled by Sunrise Properties &<br />

Investments, LLC, in the near future,<br />

while the remaining three parcels (8-<br />

10), located along the waterfront, are<br />

properties recently acquired by the <strong>City</strong><br />

<strong>of</strong> <strong>Titusville</strong>.<br />

HOPKINS AVE.<br />

2<br />

MIRACLE CITY MALL<br />

NORTH SIDE OUTPARCEL<br />

(VACANT)<br />

JACKSON ST.<br />

1<br />

5<br />

6<br />

7<br />

RETAIL<br />

OUTPARCEL<br />

COLONIAL<br />

BANK<br />

FORMER<br />

BURGER KING<br />

(VACANT)<br />

PINEAPPLE BAY<br />

U.S. 1 / WASHINGTON AVE.<br />

RESTAURANT<br />

WENDY'S<br />

WACHOVIA BANK<br />

PELICAN POINT<br />

CONDOS<br />

MIRACLE CITY MALL<br />

USPS<br />

DISTRIBUTION<br />

CENTER<br />

3<br />

Fig. 10:<br />

<strong>Redevelopment</strong> Area Boundary<br />

FORMER<br />

RESTAURANT<br />

(VACANT)<br />

4<br />

HARRISON ST.<br />

FIRESTONE<br />

8<br />

9<br />

Parcels 1 through 4 represent the existing<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>. <strong>The</strong> developer is currently<br />

seeking opportunities to purchase<br />

and assemble parcels 5, 6, and 7 for<br />

development. Parcels 8, 9, and 10 are<br />

<strong>City</strong>-owned waterfront properties that will<br />

be redeveloped for public use.<br />

SEVILLE WAY<br />

10<br />

Y TOWERS<br />

CONDOS<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 9


Physical Site Conditions<br />

This section summarizes the physical site conditions for properties within<br />

the U.S. 1 Corridor <strong>Redevelopment</strong> Area. Meetings and discussions with<br />

property owners and <strong>City</strong> staff contributed significantly to the analysis <strong>of</strong> the<br />

<strong>Redevelopment</strong> Area. Additionally, the RMPK Group conducted a field survey<br />

to characterize the types and extent <strong>of</strong> physical conditions existing within the<br />

<strong>Redevelopment</strong> Area.<br />

Existing Land Uses<br />

<strong>The</strong> existing land use within the <strong>Redevelopment</strong> Area is characterized by<br />

commercial properties, vacant buildings and undeveloped lands. Parcels 1<br />

through 4 (Fig. 10) are occupied presently by <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> and vacant<br />

commercial outparcels previously occupied by retail tenants. Parcels 5 through<br />

7 are also commercial, although Parcel 7, formerly a Burger King restaurant,<br />

has recently been vacated. Across U.S. 1, the <strong>City</strong>-owned waterfront parcels<br />

(8 through 10, page 9) are former commercial properties. Upon purchase by<br />

the <strong>City</strong>, most <strong>of</strong> those commercial uses have been removed and are currently<br />

undeveloped.<br />

Building Conditions<br />

<strong>The</strong> main <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building is structurally sound and features façades,<br />

doors, windows, and claddings that are in good shape. Interior halls and tenant<br />

spaces are also in sound condition, with the exception <strong>of</strong> some back rooms and<br />

ceiling areas.<br />

<strong>The</strong> three outparcel <strong>Mall</strong> buildings are in varying states <strong>of</strong> deterioration. Two <strong>of</strong><br />

the three are largely unoccupied by tenants today and have fallen into disrepair,<br />

although in the past they were occupied by a movie theater and a restaurant.<br />

Extensive damage is observable to the foundation, structural walls, ro<strong>of</strong>s, HVAC<br />

systems, and interiors. Wind and water damage has gone unrepaired, notably<br />

since the hurricane season <strong>of</strong> 2004. <strong>The</strong> two unoccupied buildings warrant<br />

removal.<br />

Certain renovations have been undertaken on some <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

buildings. <strong>The</strong> ro<strong>of</strong> <strong>of</strong> the third outparcel building, a Firestone auto center, was<br />

recently replaced, and a section <strong>of</strong> ro<strong>of</strong> on the main <strong>Mall</strong> building was also<br />

upgraded. Most renovation has occurred in the main <strong>Mall</strong> building in order to<br />

maintain the soundness <strong>of</strong> the building for daily retail use, but the renovations<br />

have generally not gone beyond necessary minimums.<br />

Site Conditions<br />

Site conditions outside <strong>of</strong> all existing buildings are also variable. Pavement conditions<br />

are poor in the north end <strong>of</strong> the <strong>Mall</strong> parking area, particularly around the almost-vacant<br />

north outparcel, and in average condition elsewhere. Around Colonial Bank, landscaping<br />

is denser and well-maintained, while the medians <strong>of</strong> U.S. 1 through the <strong>Redevelopment</strong><br />

Area are landscaped in a visually pleasing manner.<br />

Sidewalks, all <strong>of</strong> which are composed <strong>of</strong> regular 4-foot wide concrete slabs, are available<br />

on both sides <strong>of</strong> U.S. 1, Harrison Street, and Hopkins Avenue. <strong>Plan</strong>ting strips separate<br />

the sidewalk from the curb. <strong>The</strong>re are numerous curb cuts along the perimeter <strong>of</strong> <strong>Miracle</strong><br />

<strong>City</strong> <strong>Mall</strong> in order to accommodate the multiple parking lot entry/exit points. <strong>Mall</strong><br />

signage is in deteriorating condition. <strong>The</strong> signalized intersection at U.S. 1 and Harrison<br />

Street features mast arms, but the one for the <strong>Mall</strong> entrance on U.S. 1 does not. Pavement<br />

conditions <strong>of</strong> the three main streets in the <strong>Redevelopment</strong> Area are good, particularly on<br />

U.S. 1, which was recently upgraded.<br />

Site conditions <strong>of</strong> the three waterfront parcels have changed in recent months. Upon<br />

purchase <strong>of</strong> these parcels, the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> removed all existing structures but one<br />

and re-graded the land level. Grass and low weeds have naturally recovered the oncebare<br />

soil, and only a handful <strong>of</strong> palm trees line the perimeter <strong>of</strong> the three parcels. <strong>The</strong><br />

slope <strong>of</strong> the land gradually meets the water’s edge on the eastern side <strong>of</strong> these parcels,<br />

and an existing stormwater retention pond is thickly covered by invasive vegetation.<br />

Accumulated debris and artificially altered shoreline slopes have deteriorated the water’s<br />

edge.<br />

Adjacent Land Uses<br />

<strong>The</strong> Indian River Shores and Palm Court neighborhoods are located to the south <strong>of</strong> the<br />

<strong>Redevelopment</strong> Area. <strong>The</strong>se neighborhoods are composed <strong>of</strong> single-family, detached<br />

homes with scattered commercial uses fronting Harrison Street. Between Hopkins<br />

Avenue and U.S. 1 north <strong>of</strong> the <strong>Mall</strong> property line is a row <strong>of</strong> single-family homes.<br />

<strong>The</strong>se represent the southern end <strong>of</strong> the Bougainvillea/Riverview Terrace neighborhood,<br />

a residential district <strong>of</strong> single-family homes that extends northward to <strong>Titusville</strong> High<br />

School<br />

Bay Towers, a condominium complex, is located adjacent to the three <strong>City</strong>-owned<br />

waterfront parcels east <strong>of</strong> U.S. 1. Bay Towers is separated from these parcels by a tall<br />

vegetative hedge.<br />

<strong>The</strong> area east <strong>of</strong> the <strong>Redevelopment</strong> Area, on the west side <strong>of</strong> Hopkins Avenue is<br />

characterized by suburban strip mall-oriented commercial establishments and light<br />

industrial uses.<br />

Fig. 11: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> exterior façade.<br />

Fig. 12: North side parking lot conditions.<br />

Fig. 13: Vacant restaurant outparcel (Parcel 4).<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 10


Market Analysis<br />

<strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site is strategically located at the intersection <strong>of</strong> Harrison<br />

Street and U.S. 1, providing easy access to Downtown <strong>Titusville</strong> and neighboring<br />

cities. <strong>The</strong> demographics <strong>of</strong> the area show a stable residential base surrounding<br />

the project site; however, 2005 census estimates indicate a shortage <strong>of</strong> owneroccupied<br />

housing in the adjacent neighborhoods. Increasing the residential base<br />

and market-rate home ownership will be a critical factor in attracting potential<br />

retail investors to the proposed mixed-use redevelopment project.<br />

According to the International Council <strong>of</strong> Shopping Centers, recent consumer<br />

behavioral trends relating to retail uses indicate a shift to “open-air malls”,<br />

hybrid malls (enclosed design combined with open-air format) and valueoriented<br />

malls (outlet tenants with entertainment themes) within a mixed-use<br />

context accommodating a mix <strong>of</strong> retail, commercial and residential uses. <strong>The</strong><br />

decline <strong>of</strong> retail sales and high vacancy rates in the existing <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

are indicative <strong>of</strong> these changing consumer patterns.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>’s proximity to the Searstown <strong>Mall</strong>, its primary competitor in<br />

the area, has also contributed to the decline and under performance <strong>of</strong> the <strong>Mall</strong>.<br />

It is unlikely that a “no-action” scenario will generate additional consumer traffic<br />

for the <strong>Mall</strong>. <strong>The</strong> owner’s interest in redeveloping the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site<br />

as a mixed-use, urban-village style development presents a unique opportunity<br />

to act as a catalyst for connecting the surrounding neighborhoods to the rest <strong>of</strong><br />

the <strong>City</strong>, while at the same time establishing the foundation for changing the<br />

area’s investment image. Supporting high density residential uses, across from<br />

the planned waterfront public park, also serves the purpose <strong>of</strong> relieving existing<br />

development pressures on the waterfront.<br />

<strong>The</strong> Primary Trade Area for the retail market in 2005, assumed to include a<br />

population residing within a 10-mile radius, contains nearly 35,000 households<br />

with a median household income <strong>of</strong> $43,851 (Source: Demographics Now,<br />

2005). <strong>The</strong> market viability <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site is anticipated to<br />

capitalize on attracting consumers from a larger market while at the same time<br />

ensuring that community goals and objectives are fulfilled and the local tax base<br />

is strengthened.<br />

<strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong> fulfills multiple roles that meet diverse community<br />

needs—from a neighborhood retail center to a gateway, and from a recreational<br />

destination to a central community gathering plaza. Based on preliminary market<br />

studies and local input through public workshops, potential opportunities exist<br />

to introduce small-scale grocery stores, destination retail spaces, full-service<br />

restaurant opportunities, street cafés, Class “A” <strong>of</strong>fice space, and possibly hotel<br />

uses that are supported by a strong residential component as part <strong>of</strong> the proposed<br />

development program.<br />

na city<br />

Geneva CDP<br />

huluota CDP<br />

420<br />

Bithlo CDP<br />

Christmas CDP<br />

Wedgefield CDP<br />

Basic Variables (2005) Population Density<br />

Oak Hill city<br />

95<br />

Mims CDP<br />

46<br />

1<br />

405<br />

405<br />

407<br />

Port St. John CDP<br />

Sharpes CDP<br />

528<br />

3<br />

524<br />

Cocoa city<br />

520<br />

401<br />

Cape Canaveral city<br />

Cocoa Beach city<br />

2500 S WASHINGTON AVE,<br />

TITUSVILLE, FL 32780<br />

Legend<br />

ZIP Codes<br />

Basic Variables (2005) Population Density<br />

Above 3,600<br />

325 to 3,600<br />

29 to 325<br />

2.60 to 29<br />

Below 2.60<br />

No Data<br />

Subject Site<br />

5,10,20 mile radii<br />

Post Code Bndry<br />

Big <strong>City</strong> Ctr<br />

Medium <strong>City</strong> Ctr<br />

Prim. Hwy<br />

Secd. Hwy<br />

Place Areas<br />

Aerial Photo Coverage<br />

Source: Applied Geographic Solutions © 2005.<br />

DemographicsNow is brought to you by SRC,<br />

LLC. © 2005 All Rights Reserved<br />

Date: 04/13/06<br />

Fig. 14:<br />

Radii demographics centered on <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

(2500 S. Washington Ave.)<br />

Source: Demographics Now<br />

Fig. 15: Assets and Opportunities Map<br />

ASSETS:<br />

Strategic location<br />

<strong>City</strong>-owned waterfront properties<br />

Large property under single ownership<br />

Multiple accesses from 3 major roads<br />

Community support for redevelopment<br />

Waterfront views<br />

Proximity to Downtown <strong>Titusville</strong><br />

OPPORTUNITIES:<br />

Mixed use Development/Neighborhood Center<br />

- owner occupied<br />

- ground floor retail<br />

- urban plaza/public plaza<br />

Connections<br />

- to the waterfront parks & trail system<br />

- to adjacent neighborhoods<br />

- views to the waterfront<br />

Pursue streetscape improvements & gateways<br />

Reduce area-wide stormwater run<strong>of</strong>f<br />

Establish a precedent for future development through<br />

well-defined architectural standards<br />

Address physical deterioration & environmental decline<br />

with new ownership<br />

Provide neighborhood services and “destination” uses<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 11


<strong>Plan</strong>ning & Zoning<br />

Considerations<br />

<strong>The</strong> <strong>City</strong> <strong>of</strong> <strong>Titusville</strong>’s Comprehensive <strong>Plan</strong> contains numerous goals,<br />

objectives, policies, and strategies that have a direct impact on the future<br />

development <strong>of</strong> properties in the U.S. 1 Corridor Community <strong>Redevelopment</strong><br />

Area. <strong>The</strong>se are grouped according to comprehensive plan “elements”, as shown<br />

below. For each element, the goals, objectives, policies, and strategies listed have<br />

a direct bearing on the redevelopment <strong>of</strong> the <strong>Mall</strong> property and the <strong>City</strong>-owned<br />

waterfront properties.<br />

Future Land Use Element<br />

GOAL #1: TO DIRECT GROWTH TO SUITABLE AREAS AND REGULATE LAND<br />

DEVELOPMENT, TO PROVIDE FOR THE LOCATION AND DISTRIBUTION OF<br />

THE MOST APPROPRIATE DENSITY AND INTENSITY OF THE LAND WHILE<br />

PROTECTING THE PUBLIC HEALTH, SAFETY AND WELFARE. [9J-5.006(3)(a)]<br />

OBJECTIVE #1: DEVELOPMENT ORDERS SHALL BE ISSUED ONLY IF<br />

PUBLIC FACILITIES NECESSARY TO MEET LEVEL OF SERVICE STANDARDS<br />

(WHICH ARE ADOPTED AS PART OF THE CAPITAL IMPROVEMENTS<br />

ELEMENT OF THIS PLAN) ARE AVAILABLE CONCURRENT WITH THE<br />

IMPACTS OF THE DEVELOPMENT. [9J-5.006(3)(b)(1)]<br />

Policy #1: New development which is not contiguous to <strong>City</strong> services shall<br />

occur in an orderly and economical manner, with those areas having the greatest<br />

combined complement <strong>of</strong> existing or planned urban public facilities and services<br />

being identified for higher intensity development. New development shall be<br />

staged for urbanization in a contiguous manner that minimizes additional public<br />

investments. [9J-5.006(3)(b)(3)]<br />

Policy #2: Expansions <strong>of</strong> the urban service areas shall be reflected in and<br />

coordinated with the <strong>City</strong>’s capital improvement program. [9J-5.006(3)(b)(3)]<br />

OBJECTIVE #2: THE CITY OF TITUSVILLE SHALL ENSURE THAT<br />

THE CITY’S NATURAL, HISTORIC, AND RECREATIONAL RESOURCES<br />

ARE PROTECTED FROM ADVERSE IMPACTS OF DEVELOPMENT AND<br />

REDEVELOPMENT ON ADJACENT LANDS. [9J.5.006(3)(b)(4)]<br />

Policy #1: <strong>The</strong> <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> shall take steps to identify its historic resources to<br />

maximize the <strong>City</strong>’s ability to protect these resources.<br />

Strategy #1: A study shall be conducted to identify the <strong>City</strong>’s<br />

historic resources prior to the implementation <strong>of</strong> Land Development<br />

regulations required by this Comprehensive <strong>Plan</strong>.<br />

Strategy #2: Nominations, based on the above referenced survey,<br />

shall be made to the National Register <strong>of</strong> Historic Places and <strong>Florida</strong><br />

Master Site File in spring <strong>of</strong> 1988.<br />

Policy #2: <strong>The</strong> <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> will undertake efforts to protect its cultural,<br />

historical and archaeological resources from vandalism and destruction. [9J-<br />

5.006(3)(c)(8)]<br />

Strategy #1: Site security shall be enhanced through security fencing<br />

and the posting <strong>of</strong> trespassing notices on applicable public owned<br />

property.<br />

Strategy #2: If determined to be desirable by the property owners, a<br />

neighborhood watch program will be initiated in Residential Historic<br />

Properties District.<br />

Strategy #3: Educate the public to the cost associated with the loss<br />

<strong>of</strong> cultural, historical and archeological resources via posters and<br />

newspaper articles.<br />

OBJECTIVE #6: THE CITY OF TITUSVILLE SHALL PROVIDE FOR<br />

APPROPRIATE AND ADEQUATE LAND FOR COMMERCIAL LAND USES<br />

THROUGH LAND DEVELOPMENT REGULATIONS TO SERVE THE NEEDS<br />

OF THE PROJECTED RESIDENTS AND VISITORS TO THE CITY.<br />

Policy #1: Designation <strong>of</strong> all commercial land uses shall be identified on the<br />

Future Land Use Map as appropriate, based on the following general factors and<br />

performance requirements:<br />

A. Sites for commercial development shall be located with convenient and<br />

direct access at arterial intersections. Collector/arterial intersections are<br />

acceptable provided minimal access is necessary on the collector street.<br />

B. Negative impacts <strong>of</strong> commercial land uses on environmentally sensitive<br />

areas shall be minimized and/or eliminated. <strong>The</strong> Conservation Element<br />

objectives and policies and performance requirements shall be utilized in<br />

determining the appropriateness <strong>of</strong> commercial land use designations.<br />

C. Commercial development sites shall be accessible to and/or provide essential<br />

public services at levels <strong>of</strong> service adopted within the Capital Improvements<br />

Element <strong>of</strong> this Comprehensive <strong>Plan</strong>, including transportation, potable water,<br />

sewer collection/treatment, solid waste, drainage, recreation and open space,<br />

law enforcement, and fire protection.<br />

D. Commercial land use designations shall be encouraged in a pattern which<br />

<strong>of</strong>fers maximum accessibility, compatibility, and clustering. Commercial land<br />

use designations shall be given priority at locations exhibiting proximity<br />

to other types <strong>of</strong> non-residential uses, including employment centers and<br />

marketing centers.<br />

E. Commercial land use designations and accompanying proposals shall<br />

consider compatibility between commercial and surrounding land uses,<br />

including, but not limited to, traffic circulation, pedestrian access, hours <strong>of</strong><br />

operation, visual impacts, privacy factors and impacts on the micro climate.<br />

F. Land development regulations shall include requirements for natural<br />

vegetative and other appropriate buffers and/or setbacks to minimize nuisance<br />

effects <strong>of</strong> commercial land uses which include noise, odor, glare and privacy<br />

factors and visual impacts and to minimize such commercial use intrusion into<br />

residential land use areas.<br />

G. Water-dependent commercial land uses will be considered for location<br />

along the Indian River Lagoon. Water-related commercial uses shall only be<br />

considered on the uplands adjacent to the Indian River Lagoon.<br />

H. Coastal Management and Conservation Elements objectives, policies and<br />

performance requirements shall be utilized in determining the location <strong>of</strong><br />

commercial land uses adjacent to water bodies.<br />

I. Commercial land use designations shall be limited to those areas designated<br />

as commercial or mixed use on the Future Land Use Map except as may be<br />

permitted by <strong>Plan</strong>ned Development Regulations. Requests to increase and/or<br />

convey commercial land rights to an alternate site must be accompanied by<br />

adequate market analysis to prove necessity for such request.<br />

Policy #2: Locations for High Intensity Commercial land use shall be deemed<br />

appropriate providing the following factors are additionally complied with:<br />

OBJECTIVE #8: THE CITY OF TITUSVILLE SHALL ENCOURAGE THE MIX<br />

OF RESIDENTIAL, OFFICE, AND COMMERCIAL USES IN URBAN AREAS<br />

THROUGH INNOVATIVE LAND DEVELOPMENT REGULATIONS.<br />

Policy #1: Designation <strong>of</strong> mixed uses as an Urban Mixed Use (UMU) land use<br />

shall be identified on the Future Land Use Map within the urban areas <strong>of</strong> the <strong>City</strong><br />

and pursue appropriate strategies based upon the following issues, factors and<br />

criteria:<br />

A. Provide for the compatibility <strong>of</strong> mixed land use patterns which should<br />

consists <strong>of</strong> commercial, <strong>of</strong>fice, and residential uses through the implementation<br />

<strong>of</strong> appropriate land development regulations.<br />

B. Provide for pedestrian and cycling facilities, as well as other pedestrian<br />

amenities such as interesting streetscapes, urban plazas and open space, and<br />

landscaping.<br />

C. Protect public access to natural amenities, such as the Indian River, lakes,<br />

streams, wetlands, and protected wildlife habitat.<br />

D. Develop a program to link the Main Street corridor with the surrounding<br />

neighborhood through pedestrian access, streetscape improvements,<br />

architectural continuity, tree preservation and buffering techniques (privacy<br />

screening, setbacks, landscaping and noise control).<br />

E. Focus private and public efforts on redevelopment <strong>of</strong> blighted structures and<br />

maintenance <strong>of</strong> the built environment.<br />

F. Encourage private development activities to coordinate with existing<br />

residents and property owners, when appropriate compatibility with site design<br />

and architecture can be accomplished. Coordinate the provision <strong>of</strong> adequate<br />

public facilities and services.<br />

G. Require appropriate visual screens/buffers, with emphasis on landscape<br />

materials, between residential and other land uses when new or expanded<br />

development is proposed.<br />

H. Apply applicable resources <strong>of</strong> the <strong>Titusville</strong> Improvement Program/<br />

Community Development Block Grant program to Assist low and moderate<br />

income families and improve the neighborhood environment through infill<br />

housing.<br />

I. Encourage the location and relocation <strong>of</strong> industrial uses to areas appropriately<br />

designated as industrial on the Future Land Use Map.<br />

J. Provide for a reduced need for infrastructure by allowing for shared parking,<br />

drainage, and other facilities.<br />

K. Provide residents with a variety <strong>of</strong> housing choices, both in housing type<br />

and cost.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 12


L. This designation is intended primarily for the redevelopment <strong>of</strong> areas with<br />

a distinctly urban character; however, there shall not be encroachment into<br />

existing residential neighborhoods with a density less than five units per acre.<br />

M. Non-residential uses shall be limited to areas adjacent to collector or higher<br />

roadways. (Ord. No. 106-2006, §1, 12/19/05)<br />

OBJECTIVE #9: THE CITY OF TITUSVILLE SHALL PURSUE THE<br />

PRESERVATION OF THE COMMERCIAL/RESIDENTIAL MIXED USE AREA<br />

ADJACENT TO THE INDIAN RIVER LAGOON AND REDEVELOP BLIGHTED<br />

AREAS THROUGH INNOVATIVE LAND DEVELOPMENT REGULATIONS.<br />

Policy #1: Designation <strong>of</strong> the land use along the Indian River/Washington Avenue<br />

corridor as Shoreline Mixed Use (SMU) based on historical and existing land use<br />

commitments as a mix <strong>of</strong> commercial, residential, recreational, and public/semipublic<br />

uses. Appropriate strategies shall be pursued based upon the following<br />

factors and criteria:<br />

OBJECTIVE #15: THE CITY OF TITUSVILLE SHALL PURSUE INNOVATIVE<br />

LAND DEVELOPMENT REGULATIONS TO ESTABLISH THE PLANNED<br />

UNIT DEVELOPMENT CONCEPT FOR RESIDENTIAL, COMMERCIAL, AND<br />

INDUSTRIAL LAND USES AND CONSIDER OTHER MIXED LAND USE<br />

DEVELOPMENT TECHNIQUES.<br />

Policy #1: Designation <strong>of</strong> <strong>Plan</strong>ned Unit Development (PUD) land use category<br />

shall be identified on the Future Land Use Map and the process for residential,<br />

commercial, and industrial land uses, mixed use planned unit development shall be<br />

based upon the following general factors and performance criteria:<br />

A. Encourage creative approaches in housing developments that will result in<br />

quality living environment through innovative design and aesthetic controls.<br />

B. Provide for pedestrian and cycling facilities, as well as other pedestrian<br />

amenities such as interesting streetscapes, urban plazas and open space, and<br />

landscaping when providing for residential and commercial use.<br />

C. Link any commercial or activity centers with surrounding uses through<br />

pedestrian, streetscape improvements, architectural continuity, tree preservation<br />

and buffering techniques (private screening, setbacks, landscaping, and noise<br />

control).<br />

D. Protect public access to natural amenities, such as the Indian River, lakes,<br />

streams, wetlands, and protected wildlife habitat.<br />

E. Encourage creative approaches in commercial/industrial developments that<br />

will result in quality shopping and working environments through innovative<br />

design and aesthetic controls.<br />

F. Encourage a combination <strong>of</strong> housing types and styles including single<br />

family, two-family, and multiple family dwellings.<br />

G. Encourage flexibility in design by permitting development clustering and a<br />

variety <strong>of</strong> architectural styles and treatments.<br />

H. Encourage the preservation <strong>of</strong> common open space, recreational facilities,<br />

natural features such as woodland and wetland areas.<br />

I. Consider the carrying capacity <strong>of</strong> the various levels <strong>of</strong> service for<br />

infrastructure and services.<br />

J. Encourage mixed use zoning districts to intermix residential land use with<br />

employment, commercial, educational and recreational opportunities in those<br />

unique mixed use areas designated on the Future Land Use Map.<br />

K. Encourage develop <strong>of</strong> vacant and/or unused urbanized areas to minimize<br />

urban sprawl. (Ord. No. 106-2006, §2, 12/19/05)<br />

OBJECTIVE #16: THE CITY OF TITUSVILLE SHALL PURSUE THE<br />

DEVELOPMENT OR REGIONAL MIXED USE DEVELOPMENT WHICH SHALL<br />

BE INTENDED TO ACT AS A CENTER OF COMMERCIAL, PROFESSIONAL,<br />

FINANCIAL, HIGH TECH INDUSTRIAL AND UNIQUE RETAIL SERVING<br />

A SPECIFIC RESIDENTIAL COMMUNITY THROUGH INNOVATIVE LAND<br />

DEVELOPMENT REGULATIONS.<br />

Policy #1: Designation <strong>of</strong> the Regional Mixed Use land uses shall be identified<br />

on the Future Land Use Map as appropriate, based on the general factors and<br />

performance criteria noted below in this policy. <strong>The</strong> Mixed Use Districts shall be<br />

designated on the map consistent with the land development regulations and shall<br />

comply with the following performance standards:<br />

A. Regional Mixed Use shall developments contains a minimum <strong>of</strong> 160 acres.<br />

No additions to the development shall be permitted to the original development<br />

boundaries.<br />

B. Shall include a mix <strong>of</strong> three (3) or more uses consisting <strong>of</strong> the following:<br />

Type <strong>of</strong> Use<br />

Single-Family<br />

Multi-Family<br />

Commercial<br />

Industrial<br />

Public Uses<br />

Recreational uses<br />

Allowable Density and/or<br />

Intensity<br />

0-6.7 du/acre<br />

10 to 40 units/acre<br />

10 to 40 timeshare/resort units<br />

per acre<br />

50% lot coverage/ FAR from<br />

0 to 3<br />

50% lot coverage/ 0 to 1 FAR<br />

Not applicable<br />

Not applicable<br />

C. No single use, as noted in above noted item B, shall occupy more than 50%<br />

in acreage <strong>of</strong> the regional mixed-use district.<br />

D. A mix <strong>of</strong> use project which is exceeding the Development <strong>of</strong> Regional<br />

Impact (DRI) threshold shall also be required to obtain appropriate State <strong>of</strong><br />

<strong>Florida</strong> DRI approval in addition to any <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> approvals.<br />

E. Negative impacts on environmentally sensitive areas shall be minimized,<br />

eliminated and/or mitigated. <strong>The</strong> Conservation Element objectives and policies<br />

shall be utilized in determining the appropriateness <strong>of</strong> industrial land use<br />

designations and the specific intensity <strong>of</strong> use authorized by land development<br />

regulations.<br />

F. All development activity shall be within all adopted concurrency requirements<br />

identified in the Land Development Regulations.<br />

G. Encouraged preservation <strong>of</strong> natural areas, such as woodland and wetland<br />

areas.<br />

H. Encourage a compatible and interrelated mix <strong>of</strong> residential and nonresidential<br />

development, which should include employment and recreational<br />

opportunities.<br />

I. Should encourage innovative design and aesthetic controls.<br />

J. Shall be required to a have buffering areas between different uses.<br />

K. Internal traffic movements shall be designed in a manner that provides for<br />

pedestrian and vehicular traffic compatibility and safety<br />

L. Minimize circulation conflicts by providing truck routes to industrial areas<br />

and pedestrian access to residential areas, with traffic control devices at conflict<br />

points with general traffic circulation.<br />

M. Governmental facilities shall be located in areas easily accessible by the<br />

public and compatible with surrounding land uses<br />

N. School facilities shall be located in conjunction with residential patterns and<br />

easily accessible by the public. Residential development shall be coordinated<br />

with the Brevard County School Board to encourage adequate, functional, and<br />

accessible facility for the public.<br />

O. Requirements/criteria noted in Object 5, Objective 6 and Objective 10 <strong>of</strong> the<br />

<strong>City</strong> <strong>of</strong> <strong>Titusville</strong> Future Land Use Element <strong>of</strong> the Comprehensive <strong>Plan</strong>.<br />

P. Regional Mixed Use Development shall be located <strong>of</strong>f an existing improved<br />

Major/Minor arterial roadway corridors. A minimum <strong>of</strong> 25% <strong>of</strong> the total<br />

perimeter boundary <strong>of</strong> the site shall directly front <strong>of</strong>f a Major/Minor Arterial. All<br />

main access points to the development shall be from a Major/Minor Arterial.<br />

Policy #2: <strong>The</strong> <strong>City</strong> shall further delineate, through its land development<br />

regulations, Single Family, Multi Family, Commercial and High Tech Industrial<br />

zoning mechanisms to create zoning categories for the Regional Mixed Use land<br />

use. This zoning category shall be further delineated with appropriate locational<br />

and performance criteria<br />

OBJECTIVE #17: THE CITY OF TITUSVILLE WILL ESTABLISH<br />

STANDARDS FOR DENSITY AND/OR INTENSITY OF USE FOR EACH<br />

FUTURE LAND USE CATEGORY.<br />

Policy #1: <strong>The</strong> following standards for densities or intensities <strong>of</strong> use shall apply<br />

to each future land use category as indicated [on the next page]:<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 13


Land Use Objective Density<br />

(Residential Use)<br />

Industrial #5 n/a .2 FAR 2<br />

Intensity<br />

(Non-Residential Use)<br />

Commercial #6 n/a .2 FAR 2<br />

Downtown Mixed Use #7 20 du/acre .2 FAR 2<br />

Urban Mixed Use #8 15 du/acre .2 FAR 2<br />

Shoreline Mixed Use #9 20 du/acre .2 FAR 2<br />

Residential One #10 1 du/acre .2 FAR 2<br />

Residential Two #10 2 du/acre .2 FAR 2<br />

Low Density Residential #10 5 du/acre .2 FAR 2<br />

Medium Density<br />

Residential<br />

#10 10 du/acre .2 FAR 2<br />

High Density Residential #10 15 du/acre .2 FAR 2<br />

Public/Semi-public #11 n/a .2 FAR 2<br />

Conservation #12 1 du/5 acres n/a<br />

Regional Mixed Use 1 #16<br />

<strong>Plan</strong>ned Unit<br />

Development<br />

#15 12 du/acre .2 FAR 2<br />

1<br />

Density/Intensity standards for Regional Mixed Use are contained in Objective 16,<br />

Policy 1B<br />

2<br />

<strong>The</strong> .2 FAR will be applied to individually developed lots/parcels. Where a planned/<br />

mixed use development is proposed and common amenities (i.e., parking, stormwater<br />

retention, open space, etc.) are provided, the .2 FAR will apply to the total planned/<br />

mixed use development; however, individual parcels within the planned/mixed use<br />

development will be allowed at a higher FAR based upon site specific impacts.<br />

3<br />

<strong>The</strong> density in this category may be increased by 50% when using Transfer <strong>of</strong><br />

Development Rights as specified in Policy 2, Strategy 3.<br />

Coastal Management Element<br />

<strong>The</strong> contents <strong>of</strong> this element will have significant influence on redevelopment<br />

efforts on the three publicly-owned waterfront parcels that are part <strong>of</strong> the U.S. 1<br />

Corridor Community <strong>Redevelopment</strong> Area.<br />

GOAL #1: TO PRESERVE, RESTORE, AND ENHANCE COASTAL RESOURCES<br />

TO MAXIMIZE PUBLIC USE AND ASSURE THEIR FUTURE ECOLOGICAL<br />

BENEFIT. [9J-5.012(3)(a)]<br />

OBJECTIVE #1: TO MAINTAIN AND UPGRADE THE QUALITY OF THE<br />

INDIAN RIVER LAGOON AND OTHER LAKES AND RIVERS AT THE CLASS<br />

II WATER QUALITY STANDARD AS SET BY THE STATE OF FLORIDA. [9J-<br />

5.012(3)(a)]<br />

Policy #1: Erosion and sedimentation control practices shall be employed for all<br />

urban development and agricultural activities where needed to protect natural<br />

waterbodies, water courses, and wetlands from siltation. <strong>The</strong> following minimum<br />

criteria shall apply in the implementation <strong>of</strong> this policy. [9J-5.012(3)(c)(1 and 2)]<br />

Strategy #1: Adequate erosion and sedimentation<br />

control practices are those recommended by<br />

the Soil Conservation Service and which are<br />

designed to substantially reduce or eliminate soil<br />

loss into waterbodies and wetlands.<br />

Strategy #2: Clearing <strong>of</strong> specific building<br />

sites shall not commence until the developer<br />

is permitted to construct on that site. Clearing<br />

shall be limited to that area to be covered by<br />

construction and necessary drives and walkways.<br />

In all other areas the native vegetation should<br />

remain undisturbed where possible.<br />

Strategy #3: Appropriate techniques to control<br />

wind erosion shall be used during clearing and<br />

site preparation for development or agricultural<br />

activities.<br />

Strategy #4: Seeding and mulching, or other<br />

stabilizing actions <strong>of</strong> disturbed areas shall be<br />

undertaken within 30 days to completion <strong>of</strong><br />

clearing work on a development site.<br />

Strategy #5: All slopes on new non-agricultural<br />

canals, ditches and swales shall be no steeper the<br />

3:1 (horizontal:vertical), and slopes on artificial<br />

ponds no more than 4:1, in order to minimize<br />

erosion and sedimentation.<br />

Strategy #6: Waterfront construction shall be required to use<br />

appropriate erosion and siltation control practices during and after<br />

construction to prevent siltation <strong>of</strong> the adjacent waterbody.<br />

Strategy #7: Stormwater management systems shall be designed to<br />

ensure that water velocities remain below those which would cause<br />

scour and/or erosion.<br />

Policy #2: Wastewater treatment plant effluent impacts shall be minimized or<br />

eliminated to the maximum extent feasible. <strong>The</strong> following measures will be<br />

utilized to implement this policy. [9J-5.012(3)(c)(1)]<br />

Strategy #1: Wastewater treatment systems outfalling to all existing<br />

surface water shall be designed or retr<strong>of</strong>itted as soon as economically<br />

feasible to reduce/eliminate the discharge.<br />

Strategy #2: Periodic inspections shall be conducted on all wastewater<br />

treatment plants within the <strong>City</strong> to ensure that the facility is in good<br />

repair.<br />

Policy #3: <strong>The</strong> siting, operation and monitoring <strong>of</strong> industries which use or generate<br />

hazardous materials shall ensure that groundwater and surface waters are not<br />

contaminated through release <strong>of</strong> hazardous materials into the environment. <strong>The</strong><br />

following definitions apply in the implementation <strong>of</strong> this policy: [9J-5.012(3)(c)(1<br />

and 2)]<br />

1. “Hazardous materials” are those for which notification <strong>of</strong> the FDER is<br />

required by CH. 17-30, F.A.C.<br />

2. Surface water or groundwater contamination is defined as an increase<br />

in the concentration <strong>of</strong> any hazardous material in excess <strong>of</strong> the limits<br />

imposed by CH. 17-3 and CH. 17-30, F.A.C.<br />

Policy #4: <strong>The</strong> negative impact <strong>of</strong> agricultural operations on surface water<br />

quality shall be minimized by encouraging the use <strong>of</strong> appropriate water quality<br />

management techniques. [9J-5.012(3)(c)(1 and 2)]<br />

Policy #5: <strong>The</strong> <strong>City</strong> shall, in preserving the Indian River Lagoon system and other<br />

bodies <strong>of</strong> water within the <strong>City</strong> limits, coordinate with other local governments and<br />

the Marine Resources Council to ensure: [9J-5.012(3)(c)(1-14)]<br />

• adequate sites for water-dependent uses<br />

• prevention <strong>of</strong> estuarine pollution<br />

• control <strong>of</strong> surface water run<strong>of</strong>f<br />

• protection <strong>of</strong> living marine resources<br />

• reduction <strong>of</strong> exposure to natural hazards<br />

• public access<br />

• that required infrastructure is available to serve the development or<br />

redevelopment in the coastal area.<br />

OBJECTIVE #3: TO ASSURE MAXIMUM RETENTION OF THE<br />

RECREATIONAL VALUES OF THE COASTAL AREA, PARTICULARLY<br />

PROVISION OF REASONABLE PHYSICAL AND VISUAL ACCESS TO THE<br />

INDIAN RIVER LAGOON AND THE COASTAL AREA. [9J-5.012(3)(b)(9) AND<br />

9J-5.012(3)(c)(9)]<br />

Policy #1: <strong>The</strong> purchase <strong>of</strong> land for preservation/recreation shall be based upon<br />

the comprehensive and coordinated acquisition program which is outlined in the<br />

Recreation and Open Space Element <strong>of</strong> this <strong>Plan</strong>.<br />

Policy #2: Ensure that maximum protection <strong>of</strong> the public’s right to pedestrian<br />

access to the Indian River Lagoon, other bodies <strong>of</strong> water and the area’s beach is<br />

provided through adherence to the following policies: [9J-5.012(3)(c)(9)]<br />

1. <strong>The</strong> <strong>City</strong> shall work with all governmental and non-governmental<br />

entities <strong>of</strong> <strong>Florida</strong> to gain another access route to Playalinda Beach.<br />

2. Dedication <strong>of</strong> easements for public access shall be encourage from<br />

developments proposed along the Indian River Lagoon shoreline. <strong>The</strong>se<br />

easements are to be located on the uplands running horizontally along the<br />

shoreline. <strong>The</strong> easement can be utilized in the calculation <strong>of</strong> the MWHL<br />

setback requirement. <strong>The</strong> vacation <strong>of</strong> such easements shall be strongly<br />

discouraged unless a suitable alternative can be provided.<br />

3. <strong>The</strong> <strong>City</strong> shall encourage developments along the river to set aside<br />

areas for public access to river from inland.<br />

OBJECTIVE #4: TO ENCOURAGE THE EXPANSION OF EXISTING MARINA<br />

FACILITIES WHICH WILL HAVE MINIMUM IMPACT ON THE INDIAN<br />

RIVER LAGOONAL SYSTEM AND TO DISCOURAGE THEIR LOCATION IN<br />

INAPPROPRIATE AREAS. [9J-5.012(3)(c)(8)]<br />

Policy #1: Marinas shall be located in areas where maximum physical advantage<br />

exists, where the least dredging and maintenance are required, and where adequate<br />

resources will not be adversely affected subject to State and Federal regulations.<br />

Strategy #1: <strong>The</strong> <strong>City</strong> shall perform periodic maintenance dredging <strong>of</strong> public<br />

access channels within <strong>City</strong> limits.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 14


Recreation and Open Space Element<br />

<strong>The</strong> contents <strong>of</strong> this element will have significant influence on redevelopment<br />

efforts on the three publicly-owned waterfront parcels that are part <strong>of</strong> the U.S. 1<br />

Corridor Community <strong>Redevelopment</strong> Area.<br />

GOAL #1: TO PROVIDE A FULL RANGE OF RECREATIONAL ACTIVITIES THAT<br />

ARE ACCESSIBLE, COMPATIBLE AND CONTINUOUS WITH THE OVERALL<br />

MULTI-PURPOSE OPEN SPACE SYSTEM. [9J-5.014(3)(a)]<br />

OBJECTIVE #1: THE CITY SHALL ENSURE THAT THE PUBLIC HAS<br />

REASONABLE ACCESS TO ALL RECREATIONAL OPPORTUNITIES AND<br />

FACILITIES. [9J-5.014(3)(c)(3)]<br />

Policy #1: <strong>The</strong> <strong>City</strong> shall enhance and improve the accessibility <strong>of</strong> parks and<br />

recreational facilities whiles protecting their quality by:<br />

Strategy #1: Ensuring that facilities are accessible by the handicapped<br />

(handicapped parking, ramps, etc.)<br />

Strategy #2: Requiring that all <strong>City</strong> owned park and recreational<br />

facilities have direct access on a public street.<br />

Strategy #3: Adopting a comprehensive Bicycle and Pedestrian <strong>Plan</strong><br />

to ensure the accessibility <strong>of</strong> all recreational opportunity.<br />

Policy #2: <strong>The</strong> <strong>City</strong> shall maintain and/or improve access to waterways by:<br />

Strategy #1: Encouraging the County to acquire beach and waterfront<br />

property through a 1% sales tax or any means approved by a public<br />

referendum.<br />

Strategy #2: Maintaining its current recreational parks along the<br />

waterfront.<br />

Strategy #3: Ensuring ample, functional boat ramps are adjacent to<br />

waterfront parks to meet the current and future demands <strong>of</strong> the public.<br />

<strong>The</strong> <strong>City</strong> shall take a proactive stance toward acquiring and developing<br />

additional boat ramp facilities within the <strong>City</strong>.<br />

OBJECTIVE #2: THE CITY SHALL ENSURE THAT CURRENT AND FUTURE<br />

OPEN SPACE USES ARE COMPATIBLE AND CONTINUOUS WITH THE<br />

PHYSICAL CHARACTERISTICS OF THE AREA AND WITH THE ADJACENT<br />

LAND USES AND FEATURES OF THE AREA. [9J-5.014(3)(b)(4)]<br />

Policy #1: <strong>The</strong> <strong>City</strong> shall design parks that are compatible to various segments <strong>of</strong><br />

the population and the ecosystem.<br />

Policy #2: <strong>The</strong> <strong>City</strong> shall design parks so one particular use does not destroy the<br />

value <strong>of</strong> the site for other intended purposes.<br />

Policy #3: <strong>The</strong> <strong>City</strong> shall give consideration to the impacts on surrounding areas <strong>of</strong><br />

new park sites (transportation, character <strong>of</strong> adjacent property, noise activity level,<br />

etc.).<br />

GOAL #3: TO ACQUIRE AND PRESERVE WITHIN BUDGETARY LIMITS ANY<br />

AND ALL AREAS IDENTIFIED WITHIN THIS PLAN TO BE SPECIAL AND/OR<br />

ENDANGERED ECOSYSTEMS. [9J-5.014(3)(a)]<br />

OBJECTIVE #4: THE CITY SHALL ENCOURAGE THE PROVISION OF OPEN<br />

SPACE BY PUBLIC AND PRIVATE ENTERPRISE.<br />

Policy #1: <strong>The</strong> <strong>City</strong> shall examine all possible private and public resources in order<br />

to enhance its current and future recreation/open space areas including:<br />

• land acquisition<br />

• development <strong>of</strong> areas and facilities<br />

• technical and advisory services<br />

• consumer education<br />

• research and planning<br />

Housing Element<br />

<strong>The</strong> contents <strong>of</strong> this element will have significant influence on redevelopment<br />

efforts at the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site.<br />

GOAL #1: THE CITY OF TITUSVILLE SHALL, THROUGH ITS COMPREHENSIVE<br />

PLAN, MAKE PROVISION FOR ADEQUATE AND AFFORDABLE HOUSING<br />

THAT MEET THE PHYSICAL AND SOCIAL NEEDS OF ALL SEGMENTS OF THE<br />

CURRENT AND FUTURE POPULATION OF THE CITY. [9J-5.010(3)(a)]<br />

OBJECTIVE #3: THE CITY SHALL SUPPORT/INCREASE THE<br />

COORDINATION BETWEEN THE PUBLIC AND PRIVATE SECTORS<br />

INVOLVED IN THE PROVISION OF HOUSING, COMMUNITY DEVELOPMENT<br />

AND REDEVELOPMENT ACTIVITIES BY: [9J-5.010(c)1]<br />

Policy #1: Strengthening the communication amongst the various organizations<br />

comprising the housing market (i.e., public assistance agencies, financial<br />

institutions and realtors) through workshops and such activity.<br />

Zoning Designations<br />

Parcels 1 through 7 have been zoned by the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> as an Urban<br />

Village Special District. This designation is intended to protect the special and<br />

substantial public interest <strong>of</strong> these parcels. Within these parcels, a mix <strong>of</strong> land<br />

uses is encouraged, with higher density residential, commercial, <strong>of</strong>fice, and other<br />

uses permitted with greater height limitations than otherwise allowable in the<br />

<strong>City</strong> <strong>of</strong> <strong>Titusville</strong>. <strong>The</strong> UV Special District is intended as well to be in accordance<br />

with the Urban Mixed Use future land use designation as established in the <strong>City</strong>’s<br />

Comprehensive <strong>Plan</strong> and the U.S. 1 Corridor Master <strong>Plan</strong>.<br />

Permitted uses in the UV Special District include residential townhomes,<br />

duplexes, triplexes, quadraplexes, and other multifamily units, retail food markets<br />

and supermarkets, public and governmental <strong>of</strong>fices, business and pr<strong>of</strong>essional<br />

<strong>of</strong>fices, retail uses, hotels and motels, parking garages, cultural facilities, and<br />

recreational amenities. Certain conditional uses may be permitted as well,<br />

such as child care facilities, <strong>of</strong>fices for nonpr<strong>of</strong>it organizations, commercial<br />

entertainment facilities like movie theaters, arcades, and dance clubs, and certain<br />

tourist attractions. <strong>The</strong>se uses, if permitted, must meet particular urban design<br />

and other criteria that are established to create harmonious relationships with<br />

approved neighboring land uses.<br />

Parcels 8, 9, and 10 (see Fig. 10, page 9), along with the entire Lagoon shoreline<br />

through <strong>Titusville</strong>, is in the <strong>Titusville</strong> Shoreline Area Overlay District (TSA).<br />

<strong>The</strong> TSA is primarily regulatory and provides additional protection to the<br />

Lagoon waterfront. Certain restrictions on development are established for the<br />

TSA, including minimum setback distances <strong>of</strong> 20 feet from the mean high water<br />

level <strong>of</strong> the Indian River Lagoon for all principal structures and most accessory<br />

uses except for bulkheads, seawalls, piers, wharves, docks, boathouses, and<br />

boardwalks.<br />

Prohibited uses in the TSA include development that would render impervious<br />

by coverage <strong>of</strong> buildings more than 35% <strong>of</strong> the setback area. Development in the<br />

TSA must additionally allow a minimum <strong>of</strong> 25% <strong>of</strong> lot width open to the breeze.<br />

No structure or fence over four feet high can be positioned within a breezeway.<br />

Breezeway corridors must be straight front to back and unobstructed vertically.<br />

Breezeways are also encouraged to contain non-opaque fence structures.<br />

<strong>The</strong> aforementioned references to the <strong>City</strong>’s comprehensive plan and zoning<br />

regulations are for reference purposes only and reflect policies that were in place<br />

when the <strong>Redevelopment</strong> <strong>Plan</strong> was approved. It is intended and anticipated<br />

that the <strong>City</strong> and <strong>Redevelopment</strong> Agency will continuously cooperate and<br />

coordinate updates to said policies and regulations on their own initiative, or at<br />

the request <strong>of</strong> the <strong>Mall</strong> owner/developer, to the extent necessary to implement<br />

the <strong>Redevelopment</strong> <strong>Plan</strong>.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 15


Review <strong>of</strong> Existing <strong>Plan</strong>s & Studies<br />

<strong>The</strong> following is a summary <strong>of</strong> plans and studies related to the <strong>Redevelopment</strong><br />

Area and its surrounding neighborhoods. <strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Concept <strong>Plan</strong><br />

builds upon the recommendations contained in previous plans, in particular the<br />

U.S. 1 Corridor Master <strong>Plan</strong> (adopted in August, 2006) and the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

Finding <strong>of</strong> Necessity Study (completed in January, 2007).<br />

U.S. 1 Corridor Master <strong>Plan</strong><br />

<strong>The</strong> U.S. 1 Corridor Master <strong>Plan</strong> was developed through a community-driven<br />

planning process. <strong>The</strong> <strong>Plan</strong> presents a vision for neighborhoods, located south <strong>of</strong><br />

Downtown <strong>Titusville</strong> and north <strong>of</strong> SR 50, and provides general objectives and<br />

specific strategies to enhance the quality <strong>of</strong> life in the U.S. 1 Corridor Study Area.<br />

Its primary purpose is to serve as a guiding document for community leaders, <strong>City</strong><br />

agencies, residents, and stakeholders to pursue opportunities for neighborhood<br />

improvements, redevelopment, and environmental restoration within the U.S.<br />

1 Corridor Study Area. <strong>The</strong> <strong>Plan</strong> identifies the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site as a key<br />

redevelopment opportunity that is envisioned to serve as a catalyst for promoting<br />

high quality development and improving local economic conditions within the<br />

designated area. It also identifies the intersection <strong>of</strong> Harrison Street and U.S. 1<br />

as a gateway opportunity that should be designed to create a sense <strong>of</strong> arrival into<br />

the neighborhoods located within the area. In addition, the document contains<br />

urban design guidelines that provide a framework for future development based<br />

on the community’s desired vision for preserving and enhancing its unique<br />

neighborhood character.<br />

<strong>The</strong> <strong>Plan</strong> recommends the following action strategies directly related to<br />

the redevelopment <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site and the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong>’s<br />

waterfront parks and trails network:<br />

• Work with the <strong>Mall</strong> developer to incorporate public realm improvements<br />

and create a financing structure to ensure that the community’s desired<br />

vision for the future character <strong>of</strong> the area is respected and fulfilled.<br />

• Encourage a mix <strong>of</strong> uses, including residential, specialty retail,<br />

destination restaurants, and urban plazas, as an integral component <strong>of</strong><br />

the development.<br />

• Develop regulations and performance incentives that assure a reasonable<br />

return on the developer’s investment but not at the expense <strong>of</strong> the<br />

community’s desired vision.<br />

• Capitalize on redevelopment activities to connect neighborhoods<br />

through the extension <strong>of</strong> the street grid through the site.<br />

• Manage and contain stormwater run<strong>of</strong>f within the <strong>Redevelopment</strong> Area<br />

boundaries.<br />

• Ensure that desired architectural and urban design guidelines are adopted<br />

as part <strong>of</strong> land development regulations negotiated with the developer.<br />

• Explore the potential for connecting future water-related activities at<br />

the recently acquired <strong>City</strong>-owned property on the waterfront (southeast<br />

corner <strong>of</strong> Harrison Avenue and U.S. 1) with the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

redevelopment.<br />

• Create a site-specific, time-limited Community <strong>Redevelopment</strong> Agency<br />

for the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> redevelopment project. Resources generated<br />

from the fund could be used for the continuation <strong>of</strong> public realm<br />

improvements within the defined area.<br />

• Support rezoning the <strong>Mall</strong> site from Regional Commercial to a new<br />

mixed-use district.<br />

Additionally, the <strong>Plan</strong> recommends the following action strategies for corridor<br />

improvements to U.S. 1 and Hopkins Avenue:<br />

• Provide business owners and developers with incentives such as tax<br />

breaks to upgrade existing properties and/or redevelop properties in<br />

order to maintain control <strong>of</strong> the architectural and design character <strong>of</strong><br />

infill development.<br />

• Create gateways at primary intersections to define the Study Area’s<br />

character and identity (U.S. 1 and Harrison Street)<br />

<strong>Titusville</strong> Waterfront Recreation Master <strong>Plan</strong><br />

This Master <strong>Plan</strong>, currently ongoing, identifies opportunities to create a network<br />

<strong>of</strong> waterfront trails and parks system and shoreline restoration activities for 3.4<br />

miles <strong>of</strong> South <strong>Titusville</strong> waterfront, including the three publicly owned waterfront<br />

parcels that are part <strong>of</strong> the U.S. 1 Corridor Community <strong>Redevelopment</strong> Area. <strong>The</strong><br />

design for the <strong>City</strong>-owned waterfront properties, located in the southeast corner<br />

<strong>of</strong> the <strong>Redevelopment</strong> Area, will be addressed as part <strong>of</strong> this Master <strong>Plan</strong>.<br />

<strong>The</strong> following objectives form the foundation for the design recommendations<br />

contained in the Master <strong>Plan</strong>:<br />

• Ensure the connection <strong>of</strong> isolated parks with a continuous trail and<br />

greenway system along the waterfront.<br />

• Coordinate the location <strong>of</strong> active waterfront recreation areas in the<br />

vicinity <strong>of</strong> neighborhood anchors, including <strong>Titusville</strong> High School, the<br />

two mall sites, and historic neighborhoods.<br />

• Connect neighborhoods to the open space system through pedestrian<br />

and vehicular street extensions to the waterfront at strategic locations<br />

(Harrison Street, Country Club Drive, Olmstead Drive, and Knox<br />

McRae Drive).<br />

• Emphasize the importance <strong>of</strong> view corridors from the roadway during<br />

the design phase <strong>of</strong> the waterfront parks and trail system.<br />

• Devise incentives to encourage property owners and developers to<br />

maintain the views <strong>of</strong> the shoreline through the provision <strong>of</strong> breezeways<br />

and clearing <strong>of</strong> invasive vegetation.<br />

• Seek to eliminate pollutant discharges and stormwater run<strong>of</strong>f into the<br />

Indian River Lagoon.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Finding <strong>of</strong> Necessity Study<br />

<strong>The</strong> Finding <strong>of</strong> Necessity Study elected to determine presence <strong>of</strong> blight, according<br />

to Chapter 163, Part III, <strong>of</strong> the <strong>Florida</strong> Statutes, based on three particular criteria:<br />

property value trends, retail occupancy trends, and physical site conditions. After<br />

a comprehensive examination <strong>of</strong> these criteria, it was conclusively determined<br />

that the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site and adjacent properties included in the Study Area<br />

exhibit characteristics <strong>of</strong> blight. A summary is provided below:<br />

• Aggregate assessed values <strong>of</strong> real property in the area for ad valorem<br />

tax purposes have failed to show any appreciable increase over the 5<br />

years prior to the finding <strong>of</strong> such conditions. Brevard County as a whole,<br />

between 2000 and 2005, showed almost 17% growth while the <strong>City</strong> <strong>of</strong><br />

<strong>Titusville</strong> showed almost 11% growth. <strong>The</strong> <strong>Redevelopment</strong> Area only<br />

managed 1.5% growth in the same time period.<br />

• Deterioration <strong>of</strong> site or other improvements is leading to a lowered<br />

investment image. A comprehensive review <strong>of</strong> building conditions<br />

showed that extensive damage is present in two <strong>of</strong> the four main<br />

<strong>Mall</strong> buildings, while the other two buildings exhibit deteriorating<br />

conditions.<br />

• High commercial vacancy rates and significant declining sales revenue<br />

point to decreased investment interest in the <strong>Redevelopment</strong> Area.<br />

Between 2001 and 2005, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> lost 94% <strong>of</strong> its sales<br />

revenue, while vacancy rates increased to almost 40% <strong>of</strong> total available<br />

leasable space in the <strong>Mall</strong>.<br />

<strong>The</strong> combination <strong>of</strong> these factors makes a strong case for an assessment <strong>of</strong> blight<br />

in the <strong>Redevelopment</strong> Area. Structural conditions in the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

buildings are declining to the point that the <strong>Mall</strong> cannot compete effectively<br />

in the current consumer market environment. Declining sales revenues are an<br />

indication <strong>of</strong> economic distress that makes it difficult for property management<br />

to invest in renovations or support current configurations or solely commercial<br />

uses. In fact, infrastructure in many places is deficient to the point where<br />

renovation may not be cost-effective.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 16


Chapter 3<br />

Concept <strong>Plan</strong><br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 17


<strong>Plan</strong> Philosophy<br />

This chapter presents a descriptive narrative <strong>of</strong> the conceptual elements<br />

proposed in the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong>. <strong>The</strong> <strong>Redevelopment</strong><br />

<strong>Plan</strong> has been developed as a guideline for promoting the sound development<br />

and redevelopment <strong>of</strong> the properties within the <strong>Redevelopment</strong> Area boundaries.<br />

Opportunities for public improvements, redevelopment activities and proposed<br />

future land use composition are identified and graphically illustrated on the<br />

Concept <strong>Plan</strong>. <strong>The</strong> Concept <strong>Plan</strong> illustrative graphic represents the foundation<br />

<strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> and is based on a synthesis <strong>of</strong><br />

existing conditions, community’s expressed goals and objectives for the future<br />

development <strong>of</strong> the <strong>Mall</strong> site and waterfront properties, as well as a preliminary<br />

analysis <strong>of</strong> prevailing market opportunities.<br />

<strong>The</strong> <strong>Plan</strong> builds upon the recommendations <strong>of</strong> the approved U.S. 1 Corridor<br />

Master <strong>Plan</strong> as it relates to redevelopment activities, waterfront development,<br />

public improvements and proposed future land use composition. <strong>The</strong> <strong>Plan</strong><br />

elements were conceived based on the community’s desired vision for the<br />

redevelopment <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> identified during the public workshops<br />

that were conducted during the U.S. 1 Corridor master planning process.<br />

<strong>The</strong> following principles illustrate the overall goals and objectives <strong>of</strong> the <strong>Miracle</strong><br />

<strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong>, as represented by the <strong>Mall</strong> owner/developer and<br />

community residents:<br />

• <strong>The</strong> <strong>Plan</strong> identifies, in general, where primary land uses (public space,<br />

mixed-use, residential, commercial, and <strong>of</strong>fice) and activity centers will<br />

be located in order to enhance the quality <strong>of</strong> life for the community and<br />

create a development pattern that attracts businesses and residents to<br />

South <strong>Titusville</strong>.<br />

• <strong>The</strong> <strong>Plan</strong> provides a tool for the U.S. 1 Corridor Community<br />

<strong>Redevelopment</strong> Agency to promote economic development by showing<br />

prospective private entities’ locations that have been designated for their<br />

purpose, thereby reducing the developer’s risk and permitting hurdles<br />

when coming to the area.<br />

• <strong>The</strong> <strong>Plan</strong> provides a holistic means for the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong>, the <strong>Mall</strong><br />

owners, and the U.S. 1 Corridor Community <strong>Redevelopment</strong> Agency to<br />

facilitate the proposed development based on an agreed-upon strategy.<br />

• <strong>The</strong> <strong>Plan</strong> provides the <strong>City</strong> with a broad range <strong>of</strong> strategies for approving<br />

new developments in a consistent manner through a streamlined<br />

process.<br />

• <strong>The</strong> <strong>Plan</strong> allows the <strong>City</strong> to make capital improvements projections<br />

based upon known future, public project needs, demands and proposed<br />

locations.<br />

• <strong>The</strong> <strong>Plan</strong> promotes nodal development patterns with higher densities<br />

located at specific sites, such as the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site, with lower<br />

heights, building masses and residential uses in surrounding areas.<br />

• <strong>The</strong> <strong>Plan</strong> facilitates the preparation <strong>of</strong> new land development regulations<br />

that provide a higher standard <strong>of</strong> urban and residential design.<br />

• <strong>The</strong> <strong>Plan</strong> takes advantage <strong>of</strong> the Indian River Lagoon, existing and<br />

proposed parks, and the regional trail system by introducing opportunities<br />

for increased linkages to all three.<br />

• <strong>The</strong> <strong>Plan</strong> embraces transportation and pedestrian mobility strategies<br />

contained in the U.S. 1 Corridor Master <strong>Plan</strong> as well as anticipated needs<br />

that will be generated by public realm waterfront improvements and the<br />

development <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site.<br />

• <strong>The</strong> <strong>Plan</strong> anticipates destination-based retail development and activities<br />

serving the regional market alongside needs-based commercial<br />

development that will provide goods and services for residents located<br />

in surrounding neighborhoods and the wider community.<br />

• <strong>The</strong> <strong>Plan</strong> suggests attracting a vibrant mix <strong>of</strong> uses in the<br />

<strong>Redevelopment</strong> Area, including but not limited to, diverse housing<br />

opportunities, restaurants and cafés, specialty retail, new <strong>of</strong>fice uses,<br />

artist studios and galleries, and hotel or tourist accommodations.<br />

• <strong>The</strong> <strong>Plan</strong> supports the following social, environmental, physical,<br />

and economic development objectives expressed by community<br />

representatives during the U.S. 1 Corridor master planning process:<br />

• Improve physical and visual access to the Indian River<br />

Lagoon.<br />

• Preserve ecological habitat and improvement <strong>of</strong> the<br />

environmental conditions <strong>of</strong> the shoreline.<br />

• Employ innovative techniques to treat and contain run<strong>of</strong>f<br />

within a well-designed stormwater management system.<br />

• Enhance the aesthetic character <strong>of</strong> U.S. 1, Harrison Street and<br />

Hopkins Avenue.<br />

• Ensure continuity between planning objectives in the U.S. 1<br />

Corridor Master <strong>Plan</strong> and the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong><br />

<strong>Plan</strong>.<br />

• Provide adequate landscape buffering to preserve the singlefamily<br />

residential neighborhoods surrounding the U.S. 1<br />

Corridor Community <strong>Redevelopment</strong> Area, to maintain the<br />

existing neighborhood scale in future redevelopment, and to<br />

prevent commercial encroachment into residential areas.<br />

• Support for public-oriented, water-related uses.<br />

• Strengthen and expand cultural heritage and ecotourism<br />

opportunities.<br />

• Promote development patterns that ensure compact and<br />

pedestrian scaled activities through restricted heights, building<br />

masses and encourage low-impact development.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 18


Fig. 16: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Conceptual <strong>Plan</strong><br />

Source: RMPK Group, Inc.


Mixed-Use: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

<strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> redevelopment program builds on the strategies<br />

recommended in the U.S. 1 Corridor Master <strong>Plan</strong> by introducing a mixed-use<br />

project that is compatible with the existing neighborhood character, while<br />

at the same time reinforcing connections to its surrounding neighborhoods.<br />

<strong>The</strong> conceptual development program supports the community’s vision<br />

for revitalizing the deteriorated <strong>Mall</strong> property and provides momentum for<br />

redevelopment efforts and public improvement projects identified in the U.S.<br />

1 Corridor Master <strong>Plan</strong>. <strong>The</strong> <strong>Plan</strong> is embedded in the reconfiguration <strong>of</strong> the<br />

<strong>Mall</strong> property to accommodate a diverse mix <strong>of</strong> residential, commercial, <strong>of</strong>fice,<br />

and public open space. <strong>The</strong> conceptual site plan and development program is<br />

intended to depict a framework for future development and is flexible in nature.<br />

<strong>The</strong> <strong>Mall</strong> site is redesigned with an overarching goal to reconnect the<br />

neighborhoods, located to the north and south <strong>of</strong> the <strong>Mall</strong> site with each other,<br />

while at the same time creating a distinctive sense <strong>of</strong> place and destinationoriented<br />

uses attracting a regional consumer base. <strong>Redevelopment</strong> <strong>of</strong> the <strong>Mall</strong><br />

property is also intended to achieve broader public objectives for economic<br />

development and revitalization. It is expected that redevelopment will help<br />

improve the area’s investment image, enhance the area’s aesthetic character,<br />

create a compact neighborhood development pattern, and contribute to improving<br />

the environmental conditions <strong>of</strong> the area’s natural resources.<br />

• Buildings oriented parallel to the internal street axis that help reinforce<br />

the visual axis established to the waterfront;<br />

• Building heights increase from lower heights for the outparcels to three<br />

stories along the street edges and a maximum <strong>of</strong> five stories in the mixeduse<br />

buildings, creating a pedestrian-scale environment and maintaining<br />

relationships to existing neighborhood structures;<br />

• On-street parking located on internal streets to create convenient<br />

parking spaces for retail traffic in addition to three centrally-located<br />

parking structures to accommodate residents’ parking needs; and<br />

• Containment and treatment within a closed stormwater management<br />

system with all stormwater collected in and around the site.<br />

<strong>The</strong> following planning principles serve as guidelines to ensure that the<br />

redevelopment <strong>of</strong> the <strong>Mall</strong> fulfills the goals <strong>of</strong> compact development,<br />

neighborhood compatibility, and sustainability set forth by the adopted U.S. 1<br />

Corridor Master <strong>Plan</strong> and the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> Comprehensive <strong>Plan</strong>.<br />

OBJECTIVE<br />

Create a vibrant mixed-use district designed as a compact and walkable town<br />

center that provides the social, cultural and commercial focus for existing and<br />

future residents in the entire <strong>City</strong>.<br />

<strong>The</strong> “urban-village” theme reflected in the site design is intended to create a<br />

network <strong>of</strong> internal streets aligned on a diagonal axis (northwest to southeast)<br />

that visually connects the proposed development to the Kennedy Space Center<br />

across the Indian River Lagoon. An urban plaza forms the focal point <strong>of</strong> the<br />

development and is proposed at the intersection <strong>of</strong> an internal street and a<br />

pedestrian walkway that serves as the extension to the <strong>City</strong>’s sidewalk system<br />

along U.S. 1 and Harrison Street (see Fig. 17, this page).<br />

This plaza, designed around a landscaped roundabout feature, also serves as<br />

a traffic calming element separating vehicular and pedestrian traffic. Vertical<br />

mixed-use buildings, with ground-level retail and upper-level residential uses,<br />

are set back from the plaza and provide a space for outdoor seating for street cafés<br />

and restaurants. As illustrated in Fig. 17, the internal streets will be developed<br />

to include sidewalks, on-street parallel parking spaces, and landscaped areas.<br />

<strong>The</strong> residential uses consist <strong>of</strong> a mix <strong>of</strong> housing types including townhomes,<br />

condominiums, and apartments.<br />

<strong>The</strong> proposed development program for the mixed-use project also includes the<br />

following elements:<br />

• Smaller scale residential townhomes, combined with a 25-foot landscape<br />

buffer, that help transition into the single-family neighborhoods to the<br />

north and south <strong>of</strong> the <strong>Mall</strong> site;<br />

Fig. 17: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong><br />

Source: CPH Architects, Inc.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 20


PLANNING PRINCIPLES:<br />

Total Site Area (Conceptual)<br />

30.86 ac<br />

Urban Village (UV)<br />

• Provide physical and visual connectivity to adjacent neighborhoods and<br />

development employing a combination <strong>of</strong> strategies such as forming<br />

connections to the existing sidewalk network, waterfront parks and trails<br />

system, and surrounding commercial development; placing well-defined<br />

public access points along existing public streets; etc.<br />

• Design elements that accentuate the views to the Indian River Lagoon<br />

and improve connectivity to the <strong>City</strong>-owned property planned to be<br />

developed as a waterfront park.<br />

• Accommodate a mix <strong>of</strong> uses including residential, specialty retail, and<br />

hotel uses with adequate parking facilities. Retail activities should be<br />

oriented towards the street and have direct access to the streetscape<br />

areas through storefront entries.<br />

• Create an opportunity for a public open space or plaza that serves as a<br />

gathering space for the entire community.<br />

• Ensure consistency with site planning principles and architectural<br />

guidelines expressed by the community-oriented commercial<br />

development to the street, integrate architectural elements to add visual<br />

interest, shared parking facilities.<br />

• Identify multiple vehicular and pedestrian circulation routes and<br />

access points to avoid traffic congestion on major streets and promote<br />

pedestrian use <strong>of</strong> the site.<br />

• Maintain density requirements to 15 dwelling units per acre, in<br />

accordance with the Urban Village zoning district requirements for<br />

maximum density.<br />

• Incorporate sustainable site design and innovative run<strong>of</strong>f treatment<br />

strategies with respect to the design <strong>of</strong> stormwater management<br />

systems.<br />

Total Pervious Area<br />

Open Space and Pedestrian Amenities<br />

Stormwater Area<br />

Total Impervious Area<br />

Roads and Surface Parking<br />

Buildings and Parking Structures<br />

Density<br />

Maximum Building Height<br />

Total Parking<br />

Surface Parking<br />

Parking Structure 1<br />

Parking Structure 2<br />

Parking Structure 3<br />

Total Outparcel Area<br />

Outparcel 1<br />

Outparcel 2<br />

Outparcel 3A<br />

Outparcel 3B<br />

Outparcel 4<br />

12.96 ac<br />

10.19 ac<br />

2.77 ac<br />

17.9 ac<br />

7.72 ac<br />

10.18 ac<br />

15 dwelling units/ac<br />

60 ft<br />

1,610 spaces<br />

299 spaces<br />

387 spaces<br />

462 spaces<br />

462 spaces<br />

40,939.5 sq. ft.<br />

13,358.5 sq. ft.<br />

6,718.5 sq. ft.<br />

6,678 sq. ft.<br />

12,509.5 sq. ft.<br />

1,675 sq. ft.<br />

Maximum Residential Density<br />

Townhouse Projects<br />

Maximum Allowable Height<br />

Table 2:<br />

Conceptual Development Requirements by the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong><br />

Urban Village Special District<br />

Source: <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> Land Development Regulations<br />

Table 1:<br />

Conceptual Site data for <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

(Parcels 1 - 7)<br />

Source: CPH Architects<br />

Exception:<br />

Conditional Situation:<br />

Maximum Building Height<br />

Retail Space<br />

Land Use Buffers<br />

Open Space<br />

15 dwelling units/acre<br />

No more than 10 d.u./bldg<br />

50 ft<br />

60 ft if ground floor is >75% retail<br />

Up to 100 ft by conditional approval<br />

60 ft<br />

40,000 sq. ft. or less per bldg<br />

25 ft. min. btw Commercial and<br />

Residential<br />

Must represent 25% <strong>of</strong> UV gross<br />

acreage<br />

Building Land Use Retail SF Units Stories Required<br />

Parking<br />

Provided<br />

Parking<br />

A Comm/Res 28,500 77 3, 4, & 5 368 376<br />

B Comm/Res 37,500 88 3, 4, & 5 404 412<br />

C Residential - 80 5 200 208<br />

D Residential - 20 3 50 59<br />

E Comm/Res 19,600 109 4 255 263<br />

F Residential - 19 3 48 56<br />

G Residential - 48 3 144 144<br />

H Comm/Res 19,600 33 4 63 92<br />

Parcel 5 Commercial 2,000 5 1 30 90<br />

Parcel 6 Commercial 2,000 1 1 20 20<br />

Parcel 7 Commercial 5,000 10 1 15 15<br />

Total 114,200 490 1,597 1,735<br />

Table 3:<br />

Conceptual Building program for <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

(Parcels 1 - 7)<br />

Source: CPH Architects<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 21


Open Space<br />

<strong>The</strong> U.S. 1 Corridor master planning process recommended establishing<br />

connections between the <strong>City</strong>’s planned waterfront improvements and new<br />

developments along the western edge <strong>of</strong> U.S. 1. <strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong><br />

intends to continue strengthening and expanding the <strong>City</strong>’s existing and planned<br />

system <strong>of</strong> parks, open space and trails and to provide clear linkages between the<br />

area’s recreational facilities and the surrounding neighborhoods. <strong>The</strong> proposed<br />

<strong>City</strong>-owned waterfront park (located at the southeast corner <strong>of</strong> Harrison Street<br />

and U.S. 1) and the proposed central plaza (part <strong>of</strong> the proposed <strong>Miracle</strong> <strong>City</strong><br />

<strong>Mall</strong> development program) will provide additional open space destinations for<br />

mixed-use patrons, employees, and area residents.<br />

<strong>City</strong>-owned waterfront properties located across from the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site<br />

<strong>of</strong>fer an opportunity to introduce uses that support recreation and ecotourism,<br />

as well as improve access and views to the Indian River Lagoon. <strong>The</strong> <strong>City</strong> is<br />

currently preparing a Waterfront Recreation Master <strong>Plan</strong> for all public-owned<br />

waterfront properties and right-<strong>of</strong>-ways. <strong>The</strong> recommended improvements,<br />

when combined with on-going streetscape and trail improvements, will provide<br />

a well-integrated open space network that enhances public access to the area’s<br />

natural resources and recreational facilities.<br />

PLANNING PRINCIPLES:<br />

• Create opportunities to develop strong visual linkages between the<br />

proposed central plaza, perimeter greenways and the <strong>City</strong>’s planned<br />

U.S. 1 trail network and proposed waterfront park (southeast corner <strong>of</strong><br />

Harrison Street and U.S. 1);<br />

• Incorporate open space amenities for area residents and visitors to the<br />

development, including pedestrian lighting, seating areas, planters, bike<br />

racks, and trash receptacles;<br />

• Ensure views to parking and service areas are screened from all internal<br />

and perimeter streets primarily through tree planting;<br />

• Integrate improvements to the proposed waterfront park with the <strong>Miracle</strong><br />

<strong>City</strong> <strong>Mall</strong> site open space network and streetscape improvements to<br />

provide a continuity <strong>of</strong> streetscape elements;<br />

• Locate interior plazas adjacent to retail or <strong>of</strong>fice uses defined by using<br />

building edges and landscape elements;<br />

• Provide safe and inviting pedestrian access to the plaza from street<br />

frontage;<br />

• Design internal walkways, trails and promenades to direct pedestrians<br />

to area destinations such as building entrances, the central plaza, the<br />

waterfront park, and parking access locations.<br />

Proposed open space improvements recommended by the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site<br />

conceptual plan are expected to result in creating new open space and recreational<br />

opportunities for residents and visitors. <strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site’s proposed<br />

program incorporates a diverse range <strong>of</strong> open space elements such as a central<br />

open space plaza, a continuous landscaped buffer along the perimeter <strong>of</strong> the<br />

site, stormwater ponds that include passive recreation elements, and streetscape<br />

elements. <strong>The</strong> open space system, comprising nearly 40% <strong>of</strong> the property, or<br />

approximately 13 acres, is designed to accentuate the <strong>City</strong>-wide network <strong>of</strong> trails<br />

and open spaces serving the area residents.<br />

OBJECTIVE:<br />

Create an interconnected system <strong>of</strong> open spaces and walkways<br />

promoting pedestrian traffic while strengthening links with surrounding<br />

neighborhoods and providing readily accessible recreational opportunities<br />

for the residents.<br />

Fig. 18:<br />

Waterfront Park Section; southeast corner <strong>of</strong><br />

U.S. 1 and Harrison Street.<br />

Source: RMPK Group, Inc.<br />

Fig. 19:<br />

Examples <strong>of</strong> Urban Plazas<br />

<strong>City</strong> Place, West Palm Beach, FL<br />

Source: RMPK Group, Inc.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 22


Streetscape Improvements<br />

In accordance with the recommendations <strong>of</strong> the U.S. 1 Corridor Master <strong>Plan</strong><br />

and the <strong>City</strong>’s Land Development Regulations, the roadways and streets in<br />

the <strong>Redevelopment</strong> <strong>Plan</strong> are intended to serve as extensions <strong>of</strong> public open<br />

space (streetscape, parks, and urban plazas) designed to create a traffic<br />

circulation pattern that minimizes the impacts on adjacent residential areas.<br />

<strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong> envisions creating a hierarchy <strong>of</strong> streets that provide<br />

efficient vehicular circulation and pedestrian movement patterns between internal<br />

streets within the redeveloped <strong>Mall</strong> site and the surrounding arterial roadways.<br />

Pedestrian connections to the surrounding neighborhoods, located north and<br />

south <strong>of</strong> the <strong>Mall</strong> site, will be accentuated to provide convenient access to the<br />

new community without generating excessive traffic on local streets.<br />

PLANNING PRINCIPLES:<br />

• Design streets to accommodate minimum required<br />

pavement based on traffic volume and speed limits.<br />

Utilize available right-<strong>of</strong>-way widths to maintain a<br />

clear unobstructed pedestrian network.<br />

• Separate sidewalks from the curb with a planting<br />

strip, when possible. Use tree grates in retail streets<br />

to provide ample space for pedestrian circulation on<br />

sidewalks.<br />

Before<br />

<strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong> provides additional pedestrian area to the public streets<br />

adjacent to the property. Internal walkways, walking trails and promenades<br />

provided on the east portion <strong>of</strong> the development will connect the central plaza<br />

with the <strong>City</strong>’s sidewalks located on the west edge <strong>of</strong> U.S. 1, the north edge<br />

<strong>of</strong> Harrison Street, and the east edge <strong>of</strong> Hopkins Avenue. Coordinating public<br />

realm improvements on the opposite side <strong>of</strong> these roadways with the planned<br />

<strong>Mall</strong> site improvements will be a critical factor in establishing a continuity <strong>of</strong><br />

streetscape elements, including streetscape design and sidewalk design. <strong>The</strong><br />

proposed improvements will not adversely impact the capacity <strong>of</strong> the roadways.<br />

Rather, they will improve bicycle and pedestrian access increasing the level <strong>of</strong><br />

activity along the street, which, in turn, will promote a healthy environment for<br />

local businesses.<br />

OBJECTIVE:<br />

Develop a unified system <strong>of</strong> streetscape improvements that enhances the<br />

visual character <strong>of</strong> existing roadways while at the same time promoting a<br />

pedestrian-friendly environment with increased visibility to the waterfront.<br />

• Design sidewalks to accommodate handicap<br />

accessibility requirements as set forth in the Americans<br />

with Disabilities Act.<br />

• Place all utility lines underground to ensure that<br />

sightlines to the waterfront are unobstructed and<br />

to lessen the impacts <strong>of</strong> hurricanes and storms on<br />

residents.<br />

• Separate pedestrian and vehicular traffic through<br />

a well-designed system <strong>of</strong> internal streets and<br />

strategically located access points to and from the<br />

site. <strong>The</strong> exact location and design <strong>of</strong> the access<br />

improvements shall be determined in accordance<br />

with pr<strong>of</strong>essional traffic studies conducted by the<br />

developer/owner.<br />

• Provide on-street parking along internal streets as a<br />

buffer between pedestrian and vehicular traffic, and<br />

increase retail traffic along streets accommodating<br />

storefronts at ground level.<br />

After<br />

• Locate wayfinding signage, directional signage to<br />

pedestrian destinations (waterfront parks and trails,<br />

central plaza, parking areas), near intersection entry<br />

points, designed in a consistent and easily identifiable<br />

manner.<br />

Figs. 20-21:<br />

Before-and-After Photo Simulation <strong>of</strong> U.S. 1 Corridor<br />

Source: RMPK Group, Inc.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 23


Streetscape Improvements:<br />

U.S. 1<br />

U.S. 1 is the primary transportation corridor through <strong>Titusville</strong>. <strong>The</strong> roadway<br />

is designed primarily to carry high volumes <strong>of</strong> traffic and lacks pedestrian<br />

amenities. <strong>The</strong>re are four travel lanes, two in each direction, a center turn lane and<br />

two unmarked bike lanes. In order to create a pedestrian-oriented corridor, the<br />

streetscape along U.S. 1 needs to be reoriented to cater to the pedestrian as well<br />

as to the automobile. <strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong> does not anticipate any changes<br />

to the existing travel lanes, although improvements to the center median lane are<br />

recommended. Street trees, such as live oaks and palms, are recommended along<br />

the street edge as well as the center median with low-lying shrubs and ground<br />

cover to enhance the landscape. Improvements to this corridor from an aesthetic<br />

and user comfort perspective will increase its appeal for pedestrian users and<br />

increase the highway’s scenic qualities.<br />

Fig. 22 shows improvements to the highway medians and boulevards, particularly<br />

in the way <strong>of</strong> shade trees and visually pleasing landscaping. <strong>The</strong> intersection<br />

<strong>of</strong> U.S. 1 and Harrison Street is considered an important area because it is<br />

the primary link between <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> and the public-owned waterfront<br />

parcels across the highway. In the plan at right, the intersection is provided with a<br />

pavement treatment to create a sense <strong>of</strong> arrival into the <strong>Redevelopment</strong> Area. <strong>The</strong><br />

<strong>Plan</strong> recommends expanding the available pedestrian spaces to accommodate<br />

wider sidewalks and increase pedestrian connectivity, whenever possible.<br />

Fig. 22:<br />

Top: U.S. 1 Streetscape Improvement <strong>Plan</strong><br />

Source: RMPK Group, Inc.<br />

Fig. 23:<br />

Bottom: U.S. 1 Streetscape Section (Harrison St. and U.S. 1)<br />

Source: RMPK Group, Inc.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 24


Streetscape Improvements:<br />

Harrison Street<br />

Harrison Street is the main east-west collector connecting the <strong>Redevelopment</strong><br />

Area to the residential neighborhoods west <strong>of</strong> the U.S. 1 Corridor Study Area.<br />

<strong>The</strong> road consists <strong>of</strong> two travel lanes, one in each direction, with a 4-foot-wide<br />

sidewalk on both sides <strong>of</strong> the street. <strong>The</strong> street lacks pedestrian amenities such as<br />

benches, trash receptacles, and landscaping.<br />

Existing land use differences will be expanded even further upon completion <strong>of</strong><br />

the redevelopment effort at the <strong>Mall</strong>. In addition to serving an important role as<br />

a circulation route for traffic, Harrison Street will also serve as a transition area<br />

between the two land uses.<br />

Along Harrison Street, the plan recommends retaining the two travel lanes,<br />

widening the sidewalks, marking crosswalks, and planting street trees, ground<br />

cover and shrubs along the street’s edge. Proposed streetscape improvements<br />

along Harrison Street are intended to create an attractive path along the southern<br />

edge <strong>of</strong> the redeveloped <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> area, intersecting at U.S. 1 and<br />

Hopkins Avenue with well-developed gateways. This street ranks as a high<br />

priority for the next phase <strong>of</strong> streetscape improvements.<br />

In the before-and-after simulations below, Harrison Street is given an extensive<br />

landscaping and urban design upgrade, including widened sidewalks for pedestrian<br />

use.<br />

Fig. 24:<br />

Harrison Street Section<br />

Source: RMPK Group, Inc.<br />

After<br />

Before<br />

Figs. 25-26:<br />

Harrison Street Before-and-After Photo Simulation<br />

(Intersection <strong>of</strong> Harrison St. and U.S. 1)<br />

Source: RMPK Group, Inc.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 25


Streetscape Improvements:<br />

Hopkins Avenue<br />

Although not as busy as U.S. 1, Hopkins Avenue remains an essential northsouth<br />

route in South <strong>Titusville</strong>, and, upon completion <strong>of</strong> the redevelopment <strong>of</strong><br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>, this street will become even more important for circulation<br />

management in and around the <strong>Mall</strong> area. In response to a probable increase in<br />

traffic on Hopkins Avenue, streetscape improvement efforts on a scale similar to<br />

U.S. 1 are proposed for Hopkins Avenue.<br />

It is recommended that the streetscape includes street trees along the entire<br />

length on both the west and east sides <strong>of</strong> Hopkins Avenue. <strong>The</strong> street trees may<br />

include a mix <strong>of</strong> canopy trees, such as live oaks and palms, and a mix <strong>of</strong> shrubs<br />

and ground cover. Other amenities <strong>of</strong> the streetscape may include pedestrianscale<br />

lighting, banners, wayfinding signage, directional signage, benches, bus<br />

stops, trash receptacles, bike racks, and newspaper stands. <strong>The</strong> streetscape is<br />

anticipated to provide opportunities for extending the sidewalk network that<br />

is located within the redeveloped <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> and bringing it into the<br />

residential neighborhoods. <strong>The</strong> sidewalk network is expected to connect to<br />

adjacent residential areas.<br />

Figs. 27-28:<br />

Top: Hopkins Avenue Streetscape Improvement <strong>Plan</strong><br />

Bottom: Hopkins Ave./Harrison St. Section<br />

Source: RMPK Group, Inc.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 26


Gateways and Signage<br />

Stormwater Management<br />

Gateways are visual landmarks that reinforce the entrance into a geographic area<br />

and employ a combination <strong>of</strong> elements, including landscaping, paving materials<br />

and patterns, signage, structures, and more. <strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong> identifies<br />

several opportunities for establishing gateways to create a coherent identity for<br />

the neighborhoods and the primary commercial corridors. Accentuating primary<br />

intersections through a combination <strong>of</strong> streetscape elements (signature trees,<br />

landscaped sidewalk edges, median landscaping, brick pavers, colored concrete,<br />

etc.) and a well-designed directional signage system will create a sense <strong>of</strong> arrival<br />

into the area.<br />

Gateway opportunities include the areas <strong>of</strong> transition into the area’s activity nodes<br />

as well as entrances into identified destination areas. Gateway improvements<br />

should be prioritized in conjunction with planned streetscape improvements.<br />

<strong>The</strong> intersections <strong>of</strong> Harrison Street with U.S. 1 and Hopkins Avenue are prime<br />

locations for gateways.<br />

PLANNING PRINCIPLES:<br />

• A major entry statement should include landscaping and signage<br />

directing people to the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> project and the waterfront<br />

parks and trails network.<br />

• U.S. 1 should be landscaped and signed as a major entrance to the<br />

<strong>Redevelopment</strong> Area, signifying arrival from the communities located to<br />

the south.<br />

• Harrison Street south <strong>of</strong> the <strong>Redevelopment</strong> Area should be redeveloped<br />

as a canopy roadway.<br />

Stormwater management is an essential component <strong>of</strong> any urban development<br />

project. Extensive impervious coverage <strong>of</strong> the ground reduces the amount<br />

<strong>of</strong> absorption <strong>of</strong> rainfall, resulting in run<strong>of</strong>f that can pose dangers and<br />

inconveniences to motorists and pedestrians. To avoid these problems, paved<br />

surfaces are typically designed to collect run<strong>of</strong>f into drainage systems that<br />

convey stormwater away from the area. In much <strong>of</strong> South <strong>Titusville</strong>, that system<br />

is a closed drainage system that carries run<strong>of</strong>f directly into the Indian River<br />

Lagoon.<br />

<strong>The</strong> stormwater management system at <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> and elsewhere in<br />

South <strong>Titusville</strong> does not reflect advances in technology or best practices<br />

developed in recent decades. Run<strong>of</strong>f is presently collected from the extensively<br />

paved site into closed underground storm sewer channels and discharged into<br />

the Indian River Lagoon via a shallow, poorly maintained stormwater retention<br />

pond on one <strong>of</strong> the <strong>City</strong>-owned waterfront parcels across U.S. 1. <strong>Redevelopment</strong><br />

efforts at <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> must take into account the need for a redesigning <strong>of</strong><br />

the existing stormwater management system.<br />

Controlling and treating stormwater run<strong>of</strong>f on-site is an important element <strong>of</strong> the<br />

<strong>Redevelopment</strong> <strong>Plan</strong> for the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site. On the <strong>Mall</strong> site, stormwater<br />

management provides an opportunity for the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> and the private<br />

sector to work together in establishing innovative and creative solutions to<br />

address stormwater run<strong>of</strong>f. Additionally, the <strong>City</strong> has an opportunity to access<br />

substantial funding from various state and federal programs and agencies in<br />

order to implement new stormwater management features.<br />

<strong>The</strong> master stormwater retention system for the redevelopment <strong>of</strong> the <strong>Miracle</strong><br />

<strong>City</strong> <strong>Mall</strong> site will be designed as a wet retention system and will include<br />

passive recreation features such as walkways, gazebos, fountains and benches.<br />

<strong>The</strong> stormwater retention system for the property is expected to accommodate,<br />

control and treat <strong>of</strong>f-site stormwater that has traditionally been transmitted<br />

through the property and discharged directly into the Indian River Lagoon.<br />

A total <strong>of</strong> 2.77 acres <strong>of</strong> stormwater pond are proposed for just the four <strong>Miracle</strong><br />

<strong>City</strong> <strong>Mall</strong> parcels alone. <strong>The</strong>se are expected to contain run<strong>of</strong>f from within the<br />

entire site and the surrounding areas in an innovative and physically appealing<br />

manner. Upon completion, the new stormwater management system could serve<br />

as a model for the rest <strong>of</strong> the <strong>City</strong>.<br />

Fig. 30:<br />

Existing Stormwater Pond Area on Parcel 8<br />

Source: RMPK Group, Inc.<br />

Fig. 29:<br />

Example <strong>of</strong> a Gateway in Kissimmee, FL<br />

Source: RMPK Group, Inc.<br />

Fig. 31:<br />

Conceptual Rendering <strong>of</strong> Open Space and Landscaping: Stormwater Retention<br />

Ponds as Open Areas<br />

Source: RMPK Group, Inc.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 27


Circulation and Parking<br />

Parking is the most influential element in designing an efficient automobile<br />

and pedestrian traffic circulation system. A combination <strong>of</strong> on-street parking,<br />

public parking surface lots, and shared parking provisions should be provided to<br />

address the parking needs <strong>of</strong> the proposed improvements. <strong>The</strong> <strong>Redevelopment</strong><br />

<strong>Plan</strong> for the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site provides 58 spaces more than the required<br />

parking spaces, in accordance with the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> Land Development<br />

Regulations. <strong>The</strong> three parking structures are wrapped with mixed-use buildings<br />

serving as the primary façade and mitigating their visual dominance. Parking<br />

areas for residential units are located to the northwest section <strong>of</strong> the site and<br />

will be buffered from adjacent roadways and residential areas through adequate<br />

landscaping.<br />

Internal streetscape design serving ground-level retail uses accommodates<br />

on-street parallel parking spaces to serve as a buffer between pedestrians and<br />

vehicular traffic. <strong>The</strong> following guidelines should be taken into consideration<br />

during the design and configuration <strong>of</strong> parking facilities in the <strong>Redevelopment</strong><br />

Area:<br />

GUIDELINES:<br />

• Design parking structures as an integral part <strong>of</strong> the mixed-use structures<br />

and as an extension <strong>of</strong> the adjacent buildings consistent with the design<br />

guidelines for mixed-use development.<br />

• Provide pedestrian linkages and directional signage to parking areas<br />

that are designed with landscaping and well-lit active ground level<br />

uses.<br />

• Ensure vehicular access to the garage from side streets and that ingress<br />

and egress points are designed in a manner that minimizes pedestrian<br />

conflicts.<br />

• Locate on-street parking in accordance with <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> parking<br />

regulations.<br />

• Internal access drives should join together existing public streets and<br />

should line up with adjacent private drives.<br />

• Internal parking lots should connect with adjacent parking lots where<br />

possible.<br />

Fig. 32:<br />

Conceptual Rendering <strong>of</strong> a Mixed-Use Parking Structure<br />

Source: RMPK Group, Inc.<br />

Figs. 34-36:<br />

Parking Management in Mixed-Use Settings<br />

Source: RMPK Group, Inc.<br />

Fig. 33:<br />

Conceptual Perspective <strong>of</strong> an Internal Street in Redeveloped <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>;<br />

On-street Parking Arrangement Shown<br />

Source: CPH Architects, Inc.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 28


Neighborhood Connectivity<br />

During the U.S. 1 Corridor master planning process, the community supported<br />

the <strong>Plan</strong>’s recommendations to redevelop the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site as a<br />

mixed-use development in conjunction with improvements to the <strong>City</strong>-owned<br />

waterfront property. In addition, the residents expressed the need to ensure<br />

that broader community goals are attained through the redevelopment process,<br />

including improving the pedestrian environment, creating opportunities for<br />

owner-occupied housing, developing a community focal point and gathering<br />

space, establishing architectural guidelines consistent with the area’s existing<br />

character, and introducing more pedestrian-oriented retail uses.<br />

<strong>The</strong> recommendations outlined in this <strong>Plan</strong> meet the community’s desired<br />

vision for the redevelopment <strong>of</strong> the properties within the <strong>Redevelopment</strong> Area.<br />

<strong>Redevelopment</strong> <strong>of</strong> the <strong>Mall</strong> site and the <strong>City</strong>-owned waterfront property is<br />

intended to achieve broader public objectives for neighborhood revitalization and<br />

economic development: improving streetscape conditions along the peripheral<br />

corridors, creating a town center with public gathering areas, mitigating impacts<br />

<strong>of</strong> stormwater run<strong>of</strong>f into the Indian River Lagoon from surrounding areas, and<br />

improving public access to the waterfront.<br />

<strong>The</strong> character <strong>of</strong> the proposed development is intended to reflect the qualities <strong>of</strong><br />

<strong>Titusville</strong>’s distinctive neighborhoods by incorporating appropriate architectural<br />

styles, creating tree canopies, and extending the area’s street network.<br />

<strong>The</strong> density <strong>of</strong> neighborhoods within the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> redevelopment<br />

project will be greater than the existing single-family residential neighborhoods<br />

surrounding them, adding to the diversity <strong>of</strong> housing options available to area<br />

residents. <strong>The</strong> following planning principles support the area’s unique sense <strong>of</strong><br />

place in accordance with the findings and strategies <strong>of</strong> the U.S. 1 Corridor Master<br />

<strong>Plan</strong>.<br />

OBJECTIVE:<br />

Develop an activity center designed with contextually sensitive urban<br />

design principles that <strong>of</strong>fer significant benefits to the community, create a<br />

harmonious visual setting, and enhance the livability <strong>of</strong> the surrounding<br />

neighborhoods and the entire <strong>City</strong>.<br />

PLANNING GUIDELINES:<br />

• Ensure that proposed development is compatible in scale and character<br />

to the <strong>City</strong>’s architectural and cultural heritage.<br />

• Maintain a sense <strong>of</strong> connection to traditional single-family<br />

neighborhoods in the surrounding areas while accommodating a mix <strong>of</strong><br />

residential, <strong>of</strong>fice and neighborhood retail uses.<br />

• Design the mixture <strong>of</strong> residential and commercial uses within the<br />

building so as to minimize, to the greatest extent practical, the potential<br />

After<br />

detrimental influence <strong>of</strong> commercial uses on the residential uses,<br />

including the location <strong>of</strong> entranceways and the use <strong>of</strong> soundpro<strong>of</strong>ing<br />

materials to minimize noise intervention between uses, when possible.<br />

• Provide adequate landscape buffers to separate parking and service<br />

areas from single-family neighborhoods adjoining the property line<br />

located in the northern section <strong>of</strong> the site.<br />

• Establish well-defined pedestrian connections from and to the proposed<br />

<strong>Mall</strong> site redevelopment project and the existing sidewalks, trails and<br />

open space network.<br />

• Built spaces should promote and enhance a comfortable pedestrian<br />

scale and orientation.<br />

• Locate access points along the main corridors to alleviate traffic<br />

problems and increase pedestrian accessibility.<br />

Before<br />

Figs. 38-39:<br />

Massing Arrangements for Adjacent Buildings<br />

Source: RMPK Group, Inc.<br />

Figs. 40-41:<br />

Before-and-After Photo Simulation <strong>of</strong> Hopkins Avenue<br />

Source: RMPK Group, Inc.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 29


Urban Design<br />

<strong>The</strong> purpose <strong>of</strong> the <strong>Redevelopment</strong> <strong>Plan</strong>’s Urban Design Guidelines is to provide<br />

a guide for making decisions about public and private improvements within the<br />

proposed <strong>Redevelopment</strong> Area boundaries. Through the use <strong>of</strong> the Guidelines,<br />

both private and public projects shall endeavor to preserve and enhance the form,<br />

scale, and visual character that make the <strong>Redevelopment</strong> Area unique within the<br />

<strong>City</strong> and the region. <strong>The</strong> Guidelines will assist to ensure that each incremental<br />

site design, architectural and streetscape project contribute to a positive image<br />

for the <strong>City</strong>. <strong>The</strong> intent <strong>of</strong> the recommended Urban Design Guidelines is to cause<br />

future corridor development to occur in a manner that establishes a pedestrian<br />

setting that <strong>of</strong>fers connections between the waterfront and surrounding residential<br />

neighborhoods within an aesthetically pleasing environment.<br />

In particular, the Guidelines are designed to support the following objectives in<br />

accordance with the U.S. 1 Corridor Master <strong>Plan</strong>, the Urban Village mixed-use<br />

special district regulations and the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong>’s Comprehensive <strong>Plan</strong>:<br />

• Create a vibrant mixed-use urban environment.<br />

• Create aesthetically pleasing and vibrant pedestrian oriented areas.<br />

• Provide improved visual and physical connectivity between the<br />

<strong>Redevelopment</strong> Area and its surrounding neighborhoods.<br />

• Encourage the creation <strong>of</strong> exciting and inviting public urban spaces.<br />

• Develop an architectural character that is unique to the <strong>City</strong> <strong>of</strong><br />

<strong>Titusville</strong>.<br />

• Provide interesting architectural design diversity within a continuity <strong>of</strong><br />

urban design principals.<br />

• Provide safe, efficient, and aesthetically pleasing accommodations for<br />

vehicular access and parking.<br />

BUILDING DESIGN:<br />

<strong>The</strong> built environment is vital in maintaining an area’s visual<br />

integrity and unique character. Traditionally sized and smaller<br />

scaled buildings help to establish a pedestrian scale and also<br />

maintain the existing neighborhood character.<br />

<strong>Plan</strong>ning Guidelines:<br />

• All new development, additions and/or renovations<br />

should reflect the traditional development patterns and<br />

strive to encourage an efficient pedestrian-oriented<br />

environment.<br />

• New buildings should incorporate a clear division<br />

between street level and upper floors through a change<br />

<strong>of</strong> architectural elements, materials, and/or color.<br />

• Use elements to accentuate the neighborhood’s<br />

architectural styles in the U.S. 1 Corridor Master<br />

<strong>Plan</strong>, when possible. Relate to adjoining residential<br />

neighborhoods with scale, detail and use <strong>of</strong> appropriate<br />

materials.<br />

Building Placement Guidelines:<br />

• Locate buildings and site elements in relationship to<br />

existing neighborhood structures and create a coherent<br />

street edge reinforcing the established visual axis to the<br />

waterfront.<br />

• Create public plazas as significant corners.<br />

• Maximize the street-frontage for the building.<br />

• Orient buildings and landscape elements to define the<br />

pedestrian space edges.<br />

• Provide safe and inviting pedestrian access to public<br />

plazas from U.S. 1 and Harrison Street.<br />

• Service, refuse, and delivery areas should be located<br />

to the rear <strong>of</strong> the buildings with convenient vehicular<br />

access, unless facing a single-family residence or the<br />

front <strong>of</strong> another building in which case service areas<br />

should be shielded from view <strong>of</strong> adjacent buildings.<br />

Fig. 42:<br />

Conceptual Perspective; <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong><br />

Source: CPH Architects, Inc.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 30


Massing Guidelines:<br />

• Buildings that appear similar in mass and scale to other buildings<br />

in the surrounding areas will help to maintain the area’s unique<br />

character. It is important to maintain a variety <strong>of</strong> heights to create<br />

visual interest.<br />

• In order to minimize the perceived size <strong>of</strong> a building, step down its<br />

height toward the street, neighboring structures and the rear <strong>of</strong> the<br />

lot.<br />

• In order to break up the perceived mass <strong>of</strong> structure, divide it into<br />

modules that are similar in size to buildings seen traditionally.<br />

Buffer Guidelines:<br />

Two types <strong>of</strong> buffers are utilized to separate mixed-use buildings from<br />

residential areas. <strong>The</strong>se include landscape buffers and townhomes /<br />

condominium building façades. Landscape buffers will be used if the<br />

lot on which the mixed-use buildings is to be placed does not have any<br />

portion <strong>of</strong> the rear or side <strong>of</strong> its lot facing another roadway.<br />

• A landscape buffer will be used to separate the residential areas<br />

from the parking facilities or the building’s rear façade.<br />

• Townhomes/building façades will be used as transitions between<br />

the residential neighborhood and mixed-use buildings if the lot on<br />

which a mixed-use building is to be placed does have a portion <strong>of</strong><br />

the rear or side <strong>of</strong> its lot facing another roadway. Neighborhoods<br />

that face these mixed-use facilities will have views <strong>of</strong> townhomes<br />

instead <strong>of</strong> parking lots or the rear <strong>of</strong> the mixed-use facilities.<br />

Figs. 43-44:<br />

Above and Right: Conceptual Perspectives; <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

<strong>Redevelopment</strong> <strong>Plan</strong><br />

Source: CPH Architects, Inc.<br />

Fig. 45:<br />

Internal Plaza Design<br />

Source: RMPK Group, Inc.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 31


Architectural Character<br />

<strong>The</strong> selection <strong>of</strong> an appropriate architectural character that is compatible with<br />

the historic buildings in the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> will be one <strong>of</strong> the key factors<br />

in developing a harmonious relationship between the new development and<br />

existing neighborhoods. <strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong> anticipates that, due to<br />

the variation <strong>of</strong> the types <strong>of</strong> housing and commercial uses, there will be a<br />

combination <strong>of</strong> architectural styles within the development. However, the new<br />

development is expected to emulate either one <strong>of</strong> the four main architectural<br />

styles or a combination <strong>of</strong> architectural styles recommended in the U.S. 1<br />

Corridor Master <strong>Plan</strong>. <strong>The</strong> following guidelines are intended to establish<br />

minimum design standards for architects and designers involved in future<br />

development <strong>of</strong> properties on the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site and the <strong>City</strong>-owned<br />

waterfront property.<br />

Guidelines:<br />

• Design residential and commercial spaces as an expression <strong>of</strong> the<br />

established architectural styles, including <strong>Florida</strong> Frame Vernacular,<br />

Spanish Eclectic, Bungalow, Classic Revival (see Appendix D).<br />

• Encourage building forms that will define high quality and ensure<br />

compatible relationships to adjoining neighborhoods.<br />

• Discourage buildings from orienting blank wall façades or service areas<br />

towards a public street.<br />

• Use materials and façade elements complementary to those found in the<br />

<strong>City</strong>’s traditional architectural styles.<br />

• Incorporate various architectural elements such as balconies, railings,<br />

awnings, canopies, and cornices to create visual interest.<br />

• Provide transparent glazing and windows in retail uses along sidewalks<br />

to accentuate pedestrian environment.<br />

• Encourage developer to include green building practices in proposed<br />

developments.<br />

Fig. 46:<br />

Proposed Architectural Character<br />

Source: CPH Architects, Inc.<br />

Fig. 47:<br />

Bungalow Style Elevation<br />

Source: RMPK Group, Inc., U.S. 1 Corridor Master <strong>Plan</strong><br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 32


Chapter 4<br />

Implementation Strategies


Program Management and Implementation<br />

Implementation <strong>of</strong> the <strong>Redevelopment</strong> <strong>Plan</strong> will require the coordinated efforts<br />

<strong>of</strong> the <strong>City</strong>, the <strong>Redevelopment</strong> Agency, other government agencies, and the<br />

developer. It will involve the support <strong>of</strong> local businesses and area residents.<br />

<strong>The</strong>se efforts will be coupled with the employment <strong>of</strong> various, legal, funding and<br />

promotional techniques to successfully implement the program. This section <strong>of</strong><br />

the <strong>Redevelopment</strong> <strong>Plan</strong> sets forth a process and actions required to realize the<br />

economic development, planning and design objectives that have been devised<br />

for the <strong>Redevelopment</strong> Area.<br />

It must be understood that the elements <strong>of</strong> the <strong>Redevelopment</strong> <strong>Plan</strong> will not occur<br />

all at once and within the time sequence described herein. <strong>The</strong> <strong>Redevelopment</strong><br />

<strong>Plan</strong> is intended to be a guiding document for local government actions designed<br />

to overcome deterrents that inhibit desired future growth and development. <strong>The</strong><br />

<strong>Plan</strong> is not intended to be static and should be evaluated in light <strong>of</strong> changes in<br />

the economy and market demands, relevant public concerns and opportunities<br />

associated with private development proposals.<br />

Organizational Roles and Relationships<br />

It is recommended that the U.S. 1 Corridor Community <strong>Redevelopment</strong> Agency<br />

Board should consist <strong>of</strong> all five members <strong>of</strong> the <strong>City</strong> Council. <strong>The</strong>y should be<br />

designated to carry out community redevelopment activities pursuant to Part<br />

III, Chapter 163 <strong>of</strong> the <strong>Florida</strong> Statutes and must assume this role with vitality<br />

and enthusiasm. <strong>The</strong> Agency, in cooperation with <strong>City</strong> leaders, must support<br />

the program’s activities and provide a well-devised management system to<br />

carry out the <strong>Redevelopment</strong> <strong>Plan</strong>. <strong>The</strong>y will be responsible for establishing the<br />

administrative, financial and programmatic mechanisms necessary to achieve<br />

the goals and objectives <strong>of</strong> the <strong>Redevelopment</strong> <strong>Plan</strong>. <strong>The</strong> Agency will establish<br />

policies that support the principles described in this <strong>Plan</strong> and concentrate on the<br />

following actions throughout the redevelopment process:<br />

• Provide commitment <strong>of</strong> public policy and resources for the<br />

redevelopment effort.<br />

• Support the redevelopment mission and ensure implementation <strong>of</strong><br />

scheduled projects.<br />

• Commit to making the necessary public improvements identified in<br />

the <strong>Plan</strong>.<br />

• Provide necessary staffing and administrative support to properly<br />

implement the <strong>Redevelopment</strong> <strong>Plan</strong>.<br />

<strong>The</strong> <strong>City</strong> Council, serving as the Community <strong>Redevelopment</strong> Agency, must<br />

develop the organizational framework and institutional relationships to facilitate<br />

effective redevelopment activities in cooperation with the developer, area<br />

businesses, residents and community representatives. <strong>The</strong> Agency shall have<br />

all <strong>of</strong> the powers granted under the Community <strong>Redevelopment</strong> Act <strong>of</strong> 1969<br />

in order to have the maximum flexibility and tools necessary to implement the<br />

<strong>Redevelopment</strong> <strong>Plan</strong>.<br />

Adopt the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong><br />

<strong>The</strong> <strong>Titusville</strong> <strong>City</strong> Council should adopt the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong><br />

<strong>Plan</strong> to utilize the tools made available by the <strong>Florida</strong> Statutes as it relates to<br />

overcoming obstacles to economic development and neighborhood revitalization<br />

cited in this <strong>Plan</strong>.<br />

Establish the <strong>Redevelopment</strong> Trust Fund<br />

Program funding and accounting is administered through the <strong>Redevelopment</strong><br />

Trust Fund, which is created by ordinance <strong>of</strong> the governing authority.<br />

Subsequent to adoption <strong>of</strong> the <strong>Redevelopment</strong> <strong>Plan</strong>, the Trust Fund is<br />

established and, according to the Statute, provides for the collection <strong>of</strong> tax<br />

increment revenues to finance capital improvements identified in the <strong>Plan</strong>. Upon<br />

adoption, the ordinance freezes the tax base and establishes the base valuation<br />

<strong>of</strong> the property located within the established boundaries <strong>of</strong> the <strong>Redevelopment</strong><br />

Area. <strong>The</strong>reafter, all taxes assessed by qualified taxing authorities on future<br />

increases in the value <strong>of</strong> properties contained in the <strong>Redevelopment</strong> Area are<br />

diverted to the <strong>Redevelopment</strong> Trust Fund. All taxes assessed on the value <strong>of</strong><br />

property determined prior to the adoption <strong>of</strong> the ordinance continue to flow to<br />

the general revenue accounts <strong>of</strong> local taxing authorities. A separate account must<br />

be established in the <strong>City</strong> Budget to track the allocation and disbursement <strong>of</strong><br />

Agency revenues.<br />

Finance and Management<br />

Community redevelopment will not be successful without funding through tax<br />

increment financing. <strong>The</strong>refore the ultimate goal <strong>of</strong> the redevelopment program is<br />

to increase the tax base to generate additional revenue for capital improvements<br />

and services through implementation <strong>of</strong> projects and programs, as described<br />

in this <strong>Plan</strong>. Managed effectively, tax increment resources can be leveraged to<br />

enable the undertaking <strong>of</strong> substantial public and private sector improvements.<br />

With this in mind, the following finance and management practices should be<br />

employed.<br />

• Coordinate with the <strong>City</strong> Manager, Finance Director and other<br />

department heads to strategically devise annual operating and capital<br />

improvements budgets to maximize the use <strong>of</strong> anticipated tax increment<br />

revenues.<br />

• Coordinate with appropriate County, State and other public <strong>of</strong>ficials,<br />

which may be sponsoring capital improvements in the District to<br />

maximize the leveraging <strong>of</strong> financial resources.<br />

• Through the use <strong>of</strong> tax increment financing and other funding sources,<br />

infrastructure improvements such as water, sanitary sewer, electrical,<br />

telephone, cable, internet and stormwater conveyance systems should be<br />

designed and constructed with the capacity to meet future demand based<br />

on the future land use activities identified in the <strong>Redevelopment</strong> <strong>Plan</strong>.<br />

• <strong>The</strong> Agency should leverage tax increment revenues through grants,<br />

commercial loans, or other financial mechanisms to expedite the<br />

completion <strong>of</strong> projects.<br />

• Based on revenue projections contained in the <strong>Redevelopment</strong> <strong>Plan</strong>,<br />

the Agency should consider short-term interim project financing with<br />

anticipation <strong>of</strong> long-term bond financing.<br />

• <strong>The</strong> Agency should work with area banks and bond counsels to research<br />

bond feasibility for financing major public facilities. <strong>The</strong> <strong>City</strong> should<br />

conduct a grant feasibility analysis to match any federal, state and local<br />

grant programs with projects contained in the <strong>Plan</strong>.<br />

Finalize Development Agreement<br />

<strong>The</strong> success <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> ultimately relies<br />

on close coordination <strong>of</strong> the various activities between the public and private<br />

sectors. Pursuant to the authority granted under the Community <strong>Redevelopment</strong><br />

Act <strong>of</strong> 1969 including, but not limited to, Sections 163.370 and 163.400,<br />

<strong>Florida</strong> Statutes, and other applicable provisions <strong>of</strong> the law, the <strong>City</strong> and the<br />

<strong>Redevelopment</strong> Agency shall negotiate and enter into a development agreement<br />

with the <strong>Mall</strong> owner/developer for the purpose <strong>of</strong> implementing the provisions<br />

for the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> and such other agreements that<br />

may be necessary. Through these agreements, the <strong>City</strong>, <strong>Redevelopment</strong> Agency,<br />

and the <strong>Mall</strong> owner/developer should clearly delineate their respective roles and<br />

obligations regarding the design, development, construction, operation, timing,<br />

phasing, and financial contributions relative to the redevelopment <strong>of</strong> the <strong>Miracle</strong><br />

<strong>City</strong> <strong>Mall</strong> property. Further, the <strong>City</strong> and the <strong>Redevelopment</strong> Agency should<br />

address such other issues that may aid in planning, undertaking, or carrying out<br />

the provisions <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong>.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 34


Chapter 5<br />

Capital Improvements Strategy


Capital Improvements Strategy<br />

This section shows how the Concept <strong>Plan</strong> translates to a phased series <strong>of</strong> capital<br />

improvements and breaks down anticipated costs for further plans and activities.<br />

<strong>The</strong> community should understand that the <strong>Redevelopment</strong> Agency, working<br />

closely with the <strong>City</strong> and other government entities, will be pursuing multiple<br />

elements <strong>of</strong> the <strong>Plan</strong> at all times. It is important to note that the following<br />

summary <strong>of</strong> capital projects and programs is flexible in nature and should be<br />

evaluated in light <strong>of</strong> changing market demands. It is the best estimate <strong>of</strong> project<br />

costs based on a measure <strong>of</strong> the order <strong>of</strong> magnitude <strong>of</strong> the project in relation to<br />

anticipated revenues. As a matter <strong>of</strong> practice the Agency should prepare annual<br />

budgets as well as establish one, three and five-year work programs for budgetary<br />

and administrative purposes. Ultimately project costs will be refined during the<br />

design and construction phase <strong>of</strong> any given project.<br />

<strong>The</strong> proposed <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> contains several major<br />

projects consisting <strong>of</strong> public, private, and joint public/private efforts that will<br />

take at least ten years for completion. It is critical that the Agency incorporates<br />

a sound project implementation strategy when identifying priorities. This<br />

will ensure the most effective results in terms <strong>of</strong> addressing the community’s<br />

needs while stimulating private sector activity to obtain a favorable return<br />

on the public sector’s financial investment. <strong>The</strong> following phasing plan sets<br />

forth recommendations concerning project priorities and funding sources. To<br />

streamline the process and simplify the presentation, project priorities have been<br />

reduced to the following three phases:<br />

• Short-Term Projects - Projects that should be implemented immediately<br />

and completed within one to three years.<br />

• Mid-Term Projects – Projects that should be implemented and completed<br />

within three to five years.<br />

• Long-Term Projects - Projects that will likely be implemented and<br />

completed in more than five years.<br />

Short-Term Capital Budget (FY 2008 - FY 2010)<br />

Project Cost Source Year<br />

Reimbursement for Previous <strong>Plan</strong>s and Studies $75,000 TIF 2008<br />

Stormwater Master <strong>Plan</strong> Study (Joint Participation) $75,000 TIF, SWIM Grant 2008<br />

Demolition & Disposal Expenses (Joint Participation) $250,000 TIF, DEP Grant 2008<br />

Stormwater Retention & Amenities (Joint Participation) $2,250,000 TIF, SWIM Grant 2008<br />

On-Site Park & Open-Space Amenities (Joint Participation) $750,000 Private Sector,TIF 2008<br />

Mid-Term Capital Budget (FY 2010 - FY 2012)<br />

Project Cost Source Year<br />

On-site Pedestrian Amenities (Joint Participation)<br />

(Hardscape, Lighting, Sidewalks, Landscape, etc.)<br />

Structured Parking (Joint Participation)<br />

$2,000,000 Private Sector,TIF 2010<br />

Approx. 1,300 @ $10,000 per space $13,000,000 Private Sector, TIF, Fee Revenues 2010-2011<br />

Long-Term Capital Budget (2012 - 2017)<br />

Project Cost Source Year<br />

Joint Participation Projects Subject to TIF Availability<br />

Waterfront Park & Trail Amenities @ U.S.1 & Harrison $1,750,000 TIF, FCT, FRDAP, DEP Grants 2012<br />

Streetscape Improvements U.S.1, Harrison, Hopkins $3,000,000 TIF, FDOT, Gas Tax 2014-2017<br />

It is expected that the majority <strong>of</strong> the capital improvements will be phased as part<br />

<strong>of</strong> the planned redevelopment <strong>of</strong> the <strong>Mall</strong> and jointly funded through anticipated<br />

tax increment revenues that will be generated as a result <strong>of</strong> the project. Basic<br />

infrastructure improvements such as stormwater retention, internal and external<br />

pedestrian systems, landscaping and lighting will be undertaken as part <strong>of</strong> the<br />

proposed <strong>Mall</strong> redevelopment project. Other, more costly public improvements,<br />

such as roadway improvements to Harrison Street, Hopkins Avenue and U.S. 1,<br />

will likely take place during the latter phases <strong>of</strong> development and may require<br />

additional sources <strong>of</strong> funding, including grants and other revenue sources.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 36


Chapter 6<br />

Tax Increment Financing


Tax Increment Financing<br />

Type <strong>of</strong> Expenses Allowed<br />

<strong>The</strong>re are five major types <strong>of</strong> expenses allowed under <strong>Florida</strong> Statues 163.387(6) for<br />

tax increment revenues.<br />

1. Establishment and Operations - they can first be used for the<br />

implementation and administrative expenses <strong>of</strong> the Community<br />

<strong>Redevelopment</strong> Agency<br />

2. <strong>Plan</strong>ning and Analysis - they can then be used to develop the<br />

necessary engineering, architectural, and financial plans<br />

3. Financing - the revenues may be used to issue and repay debt<br />

for proposed capital improvements contained in the Community<br />

<strong>Redevelopment</strong> <strong>Plan</strong><br />

4. Acquisition - the revenues may be used to acquire real property<br />

5. Preparation - finally, the revenues may be used for site preparation,<br />

including the relocation <strong>of</strong> existing residents<br />

According to F.S. 163.370(2), however, the funds may not be used for the<br />

following purposes:<br />

1. To construct or expand administration buildings for public<br />

bodies, unless each taxing authority involved agrees,<br />

2. Any publicly-owned capital improvements which are not an<br />

integral part <strong>of</strong> the redevelopment if the improvements are<br />

normally financed by user fees, and if the improvements would<br />

have otherwise been made without the <strong>Redevelopment</strong> Agency<br />

within three years, or<br />

3. General government operating expenses unrelated to the<br />

<strong>Redevelopment</strong> Agency.<br />

Tax increment revenue is typically the major source <strong>of</strong> funding for redevelopment<br />

projects under the State <strong>of</strong> <strong>Florida</strong> Community <strong>Redevelopment</strong> Act.<br />

Tax Increment Projections<br />

<strong>The</strong> following spreadsheet provides tax increment revenue projections for the<br />

U.S. 1 Corridor <strong>Redevelopment</strong> Area. Revenue estimates are based on anticipated<br />

taxable property values to be generated upon the phased completion <strong>of</strong> the proposed<br />

redevelopment <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>. <strong>The</strong> revenue projections are based on<br />

anticipated total development construction costs and are based generally on the<br />

order <strong>of</strong> magnitude <strong>of</strong> costs for similar projects including the Winter Park <strong>Mall</strong><br />

redevelopment project and the Mizner Park project developed in Boca Raton. It<br />

has been assumed that total construction value will be approximately $100-million.<br />

To then determine the taxable value <strong>of</strong> the redeveloped site it is assumed that the<br />

taxable value would be established at approximately 70% <strong>of</strong> the construction value.<br />

<strong>The</strong>se values are used only for preliminary planning, budgeting and management<br />

purposes. <strong>The</strong>se estimates have been determined without a fixed, approved<br />

development program to provide specific project costs and must account for the<br />

fact that final costs will not be determined until the project has been designed and<br />

bid for construction. Final revenues will be determined by the property appraiser<br />

annually based on the completion <strong>of</strong> the taxable elements <strong>of</strong> the project.<br />

<strong>The</strong> model contains assumptions that increase the property values in the second<br />

and fourth years based on the anticipated completion <strong>of</strong> certain phases <strong>of</strong> the<br />

proposed redevelopment project. <strong>The</strong>se calculations anticipate nearly $24.5-million<br />

in increased value on the 2008 tax roll based on completion <strong>of</strong> the first phase,<br />

estimated at 35% <strong>of</strong> the entire project <strong>of</strong> $70-million. <strong>The</strong> tax base grows again in<br />

2009, adding another $24.5-million and again by $21-million in 2010 based on final<br />

completion.<br />

U.S. 1 Corridor Community <strong>Redevelopment</strong> Area Tax Increment Revenue Projections<br />

Years<br />

Annual Increase in Taxable<br />

Value<br />

Annual Incremental<br />

Increase County <strong>City</strong><br />

Gross Incremental CRA<br />

Revenue<br />

Net (95%) Incremental CRA<br />

Revenue<br />

2006 (Base) $5,653,920 $0 $0 $0<br />

2007 $5,653,920 $0 $0 $0 $0 $0<br />

2008 $29,653,920 $24,500,000 $94,467 $127,398 $221,865 $210,771<br />

2009 $54,653,920 $49,000,000 $188,934 $254,795 $443,729 $421,543<br />

2010 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />

2011 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />

2012 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />

2013 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />

2014 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />

2015 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />

2016 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />

2017 $75,653,920 $70,000,000 $269,906 $363,993 $633,899 $602,204<br />

$2,442,649 $3,294,137 $5,736,786 $5,449,947<br />

Because <strong>of</strong> the value <strong>of</strong> this project, the <strong>Miracle</strong> <strong>City</strong> redevelopment program is<br />

well positioned for successfully completing the public improvements identified<br />

in the <strong>Redevelopment</strong> <strong>Plan</strong>. <strong>The</strong> Agency has several options for obtaining initial<br />

financing and grants to enable immediate planning and design <strong>of</strong> their projects. <strong>The</strong><br />

Agency can obtain interim financing through a bond anticipation note, commercial<br />

loan or commercial line <strong>of</strong> credit based on projected revenues. <strong>The</strong>se funds,<br />

combined with other funding sources and programs identified in this <strong>Plan</strong>, should<br />

enable the <strong>City</strong> and the Agency to embark on an aggressive public improvement<br />

program that will serve as a catalyst for additional private sector investment along<br />

the U.S. 1 Corridor.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 38


Appendix A<br />

Finding <strong>of</strong> Necessity Study for<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>


Finding <strong>of</strong> Necessity Study<br />

For the creation <strong>of</strong> a<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

Community <strong>Redevelopment</strong> Area<br />

<strong>City</strong> <strong>of</strong> <strong>Titusville</strong>, Brevard County, <strong>Florida</strong><br />

Prepared for:<br />

<strong>City</strong> <strong>of</strong> <strong>Titusville</strong>,<br />

Brevard County, <strong>Florida</strong><br />

Sunrise Properties & Investments, LLC<br />

January 2007<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 40


Table <strong>of</strong> Contents<br />

Introduction 43<br />

Community <strong>Redevelopment</strong> Act <strong>of</strong> 1969 44<br />

Definition <strong>of</strong> Blight (Chapter 163.340(8), F.S.)<br />

<strong>Redevelopment</strong> District Boundaries 45<br />

Definition <strong>of</strong> Study Area<br />

Study Area Boundary Description<br />

Study Maps<br />

Inventory <strong>of</strong> Blighted Conditions 46<br />

Tax Base Trends<br />

Deterioration <strong>of</strong> Site or Other Improvements<br />

Commercial Vacancy Rates<br />

Conclusions 50<br />

Recommendations 50<br />

Table 3<br />

Establish a Community <strong>Redevelopment</strong> Agency<br />

Prepare a <strong>Redevelopment</strong> <strong>Plan</strong><br />

Establish a <strong>Redevelopment</strong> Trust Fund<br />

Table <strong>of</strong> Assessed Values 51<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 41


Introduction<br />

<strong>The</strong> <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> undertook a master planning effort, completed in July<br />

2006, for a segment <strong>of</strong> U.S. Route 1 traversing through South <strong>Titusville</strong>. During<br />

this project, redevelopment <strong>of</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> was identified by community<br />

residents as a project pivotal to the revitalization <strong>of</strong> the highway corridor. In<br />

recognition <strong>of</strong> this, and upon purchase <strong>of</strong> the four <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> parcels<br />

in 2006, Sunrise Properties & Investments, LLC, retained the RMPK Group<br />

in August, 2006, to conduct a finding-<strong>of</strong>-necessity study for the <strong>Miracle</strong> <strong>City</strong><br />

<strong>Mall</strong> site to determine the need for a site-specific community redevelopment<br />

agency (CRA) pursuant to requirements established in the Statutes <strong>of</strong> the State<br />

<strong>of</strong> <strong>Florida</strong>.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>, located at 2500 South Washington Avenue (U.S. 1), is one<br />

<strong>of</strong> South <strong>Titusville</strong>’s major shopping centers. <strong>The</strong> <strong>Mall</strong> building is a 44-unit,<br />

310,000-square-foot complex on a 30.8-acre property, with three outparcels at<br />

the northwest, southwest, and southeast corners <strong>of</strong> the property. Today, the Study<br />

Area further includes three small lots; two <strong>of</strong> which were developed in the 1970s<br />

and one (the northernmost parcel) that was developed in the 1950s. <strong>The</strong>se lots<br />

(Parcels 5, 6, and 7 on Map 2, page 45) are lined in a row at the northeast end <strong>of</strong><br />

the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> property. <strong>The</strong> northernmost lot is 0.7 acres in size, while<br />

the middle lot is 0.62 acres, and the southernmost lot is 1.27 acres. <strong>The</strong>se lots<br />

are currently occupied by retail businesses. In addition to these lots, the recent<br />

3.2-acre waterfront acquisition by the <strong>City</strong> across Harrison Street (Parcels 8,<br />

9, and 10) are included in the Study Area to ensure continuity between future<br />

redevelopment activities along the waterfront and the <strong>Mall</strong> site.<br />

Opened in 1969, the <strong>Mall</strong> was capable <strong>of</strong> accommodating close to 50 tenants<br />

and featured two major retail “anchor” stores—JCPenney and Belks. Until the<br />

early 1990s it was popular as a retail destination and featured numerous retail<br />

uses and entertainment attractions, including a small movie theater in the north<br />

side ouparcel. But from the beginning, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> has been engaged in<br />

competition with Searstown <strong>Mall</strong>, built within the same year as <strong>Miracle</strong> <strong>City</strong><br />

<strong>Mall</strong> and a few blocks to the south. Searstown <strong>Mall</strong>’s construction <strong>of</strong> a movie<br />

theater in the 1990s drew shopping patrons away from <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>, but it<br />

was with the opening <strong>of</strong> a Wal-Mart Supercenter at SR 50 and SR 405 in 1995,<br />

along with regional growth <strong>of</strong> state-<strong>of</strong>-the-art shopping centers in Orlando, that<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> began facing an compounding level <strong>of</strong> retail competition<br />

against which it could not compete. Belks closed in 2004, creating a void filled<br />

by S<strong>of</strong>as Direct furniture store. Unfortunately, this new anchor store is expected<br />

to be closing shortly as well.<br />

Today, despite its central and accessible location, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> is facing the<br />

economic decline experienced by numerous other shopping centers across North<br />

America. Declining malls are characterized by high retail unit vacancy rates,<br />

low customer traffic levels, and deteriorating physical conditions in its vacant<br />

buildings and units. Changes in local demographic or economic conditions may<br />

lead to the slow decline <strong>of</strong> a shopping mall. <strong>Mall</strong>s anchored by department or<br />

large chain stores are <strong>of</strong>ten susceptible to decline if one or more <strong>of</strong> their anchor<br />

stores close. Popularity in recent years for power centers and freestanding<br />

“category killer” megastores (e.g., Wal-Mart Supercenters) has reduced the<br />

appeal <strong>of</strong> department stores and the traditional mall as a shopping experience.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> has become one <strong>of</strong> innumerable malls in North America<br />

victim to this shift in shopping culture.<br />

Fig. 1: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> signage and parking lot on a weekday afternoon.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 42


Community <strong>Redevelopment</strong> Act <strong>of</strong> 1969<br />

<strong>The</strong> Community <strong>Redevelopment</strong> Act <strong>of</strong> 1969, in Chapter 163, Part III, <strong>of</strong><br />

the <strong>Florida</strong> Statutes, authorizes local governments to establish community<br />

redevelopment agencies (CRAs) to improve blighted areas within their<br />

jurisdictions. <strong>The</strong> Act sets forth the legal process by which local governments<br />

may establish CRAs and provides financing and regulatory tools to accomplish<br />

the goal <strong>of</strong> improving selected areas.<br />

Chapter 163.355, F.S., requires local governments desiring the establishment <strong>of</strong> a<br />

CRA to adopt by resolution a finding that one or more blighted areas exist within<br />

their jurisdiction and that the rehabilitation, conservation, or redevelopment (or<br />

a combination there<strong>of</strong>) <strong>of</strong> such areas is necessary in the interest <strong>of</strong> the public<br />

health, safety, morals, or welfare <strong>of</strong> area residents. <strong>The</strong> purpose <strong>of</strong> this study is<br />

to provide information to Sunrise Properties & Investments, LLC and <strong>Titusville</strong><br />

<strong>City</strong> Council that will serve as a factual basis for a finding that the <strong>Miracle</strong> <strong>City</strong><br />

<strong>Mall</strong> site meets the statutory criteria for blight.<br />

Statutory Definition <strong>of</strong> Blight (Chapter 163.340(8), F.S.)<br />

A blighted area means an area in which there are a substantial number <strong>of</strong><br />

deteriorated, or deteriorating structures, in which conditions, as indicated by<br />

government-maintained statistics or other studies, are leading to economic<br />

distress or endanger life or property, and in which two or more <strong>of</strong> the following<br />

factors are present:<br />

(a) Predominance <strong>of</strong> defective or inadequate street layout, parking<br />

facilities, roadways, bridges, or public<br />

transportation facilities;<br />

(b) Aggregate assessed values <strong>of</strong> real property in the area for ad valorem<br />

tax purposes failing to show any<br />

appreciable increase over the 5 years prior to the finding <strong>of</strong> such<br />

conditions;<br />

(c) Faulty lot layout in relation to size, adequacy, accessibility, or<br />

usefulness;<br />

(d) Unsanitary or unsafe conditions;<br />

(e) Deterioration <strong>of</strong> site or other improvements;<br />

(f) Inadequate and outdated building density patterns;<br />

(g) Falling lease rates per square foot <strong>of</strong> <strong>of</strong>fice, commercial, or<br />

industrial space compared to the remainder <strong>of</strong> the<br />

county or municipality;<br />

(h) Tax or special assessment delinquency exceeding the fair value <strong>of</strong> the<br />

land;<br />

(i) Residential and commercial vacancy rates higher in the area than in<br />

the remainder <strong>of</strong> the county or municipality;<br />

(j) Incidence <strong>of</strong> crime in the area higher than in the remainder <strong>of</strong> the<br />

county or municipality;<br />

(k) Fire and emergency medical service calls to the area proportionately<br />

higher than in the remainder <strong>of</strong> the county or municipality;<br />

(l) A greater number <strong>of</strong> violations <strong>of</strong> the <strong>Florida</strong> Building Code in the<br />

area than the number <strong>of</strong> violations recorded in the remainder <strong>of</strong> the<br />

county or municipality;<br />

(m) Diversity <strong>of</strong> ownership or defective or unusual conditions <strong>of</strong> title<br />

which prevent the free alienability <strong>of</strong> land within the deteriorated or<br />

hazardous area; or<br />

(n) Governmentally owned property with adverse environmental<br />

conditions caused by a public or private entity.<br />

<strong>The</strong> methodology for data collection and analysis utilizes a breakdown <strong>of</strong> the<br />

criteria described in the <strong>Florida</strong> Statutes to determine the existence <strong>of</strong> blight.<br />

Each <strong>of</strong> the statutory criteria is examined to determine the presence or absence<br />

<strong>of</strong> that condition. For those conditions existing in the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site, a<br />

more detailed analysis is undertaken. <strong>The</strong> study presents detailed information on<br />

the following conditions indicative <strong>of</strong> blight:<br />

(b Aggregate assessed values <strong>of</strong> real property in the area for ad valorem<br />

tax purposes failing to show any appreciable increase over the 5<br />

years prior to the finding <strong>of</strong> such conditions;<br />

(e Deterioration <strong>of</strong> site or other improvements;<br />

(i Residential and commercial vacancy rates higher in the area than in<br />

the remainder <strong>of</strong> the county or municipality.<br />

Note: An additional criterion, faulty lot layout in relation to size, adequacy,<br />

accessibility, or usefulness, qualifies in relation to the three northeastern lots<br />

(Parcels 5, 6, and 7). <strong>The</strong>se lots do not conform to standards for the <strong>City</strong> <strong>of</strong><br />

<strong>Titusville</strong>’s Regional Commercial Zoning District, particularly in regard to<br />

minimum lot size (2 acres).<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 43


TEZ<br />

CONDOS<br />

PINECREST<br />

PINECREST<br />

<strong>Redevelopment</strong> District Boundaries<br />

ROOSEVELT<br />

ROOSEVELT<br />

Study Area Definition<br />

Creation <strong>of</strong> the proposed CRA will be determined after a thorough evaluation <strong>of</strong><br />

the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building and immediately adjacent properties (Parcels 1<br />

through 7 on Map 2, this page). Final determination for parcels to be included in<br />

the Study Area is based on the following criteria:<br />

• Statutory criteria pertaining to site conditions<br />

• Consideration <strong>of</strong> future development or redevelopment potential<br />

• Consideration <strong>of</strong> sound planning principles for continuity <strong>of</strong> future<br />

land use based on adjacent land uses or land attributes, transportation<br />

systems, and the efficient provision <strong>of</strong> government utilities and services<br />

• Consideration <strong>of</strong> adjacent parcels along the frontage <strong>of</strong> U.S. 1 that may,<br />

at a future time, be combined with the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site for a more<br />

efficient use <strong>of</strong> land<br />

• Presence <strong>of</strong> areas providing a logical terminus for Study Area boundaries<br />

such as adjacent road right-<strong>of</strong>-ways and the riverfront<br />

• Ιntent to eventually promote development on a contiguous property<br />

under single ownership to improve the functional characteristics <strong>of</strong> the<br />

site<br />

• Ιnclusion <strong>of</strong> two waterfront properties across Harrison Street recently<br />

acquired by the <strong>City</strong> in order to ensure continuity for future planning and<br />

design efforts along the waterfront<br />

Study Area Description<br />

<strong>The</strong> Study Area is found within the city limit <strong>of</strong> <strong>Titusville</strong>. <strong>The</strong> boundary <strong>of</strong> the<br />

Study Area can be described by vertices at the southeast corner <strong>of</strong> Washington<br />

Avenue and Harrison Street (including two city-owned parcels at 2611 and 2655<br />

Washington Ave.), the southwest corner <strong>of</strong> Harrison St. and Hopkins Ave., and<br />

the northern boundary <strong>of</strong> the <strong>Mall</strong> property. <strong>The</strong> proposed redevelopment area<br />

contains 10 parcels—4 <strong>of</strong> which are owned by Sunrise Properties & Investments,<br />

LLC—that combined represent approximately 36 acres <strong>of</strong> land. <strong>The</strong> <strong>Mall</strong> building<br />

is the largest site structure at 310,293 square feet, followed in order by the<br />

outparcel on the north end (36,940 sq. ft.), a former restaurant on the southwest<br />

corner (10,000 sq. ft.), and the existing Firestone building on the southeast corner<br />

(7,650 sq. ft.). <strong>The</strong> <strong>Mall</strong> building contains approximately 44 leasable units, while<br />

the north end outparcel contains 7 units and the other two structures<br />

are single unit entities. Parcels 5, 6, and 7 contain small structures.<br />

Parcel 5 is occupied by a 4,716 square-foot building, while Parcel 6<br />

has only a 1,200 square-foot building. Parcel 7 has a 3,164 squarefoot<br />

building. Of the city-owned parcels, 8 through 10, only Parcel<br />

8 is occupied by a building (a Goodyear tire center). This building<br />

will be removed when redevelopment plans for Parcels 8 through<br />

10 are prepared.<br />

Maps 1 and 2 illustrate the Study Area boundary and property lines<br />

for the 10 parcels <strong>of</strong> the Study Area. <strong>The</strong>se parcels are identified by<br />

numbered circles. Parcel 1 contains the north side outparcel, Parcel<br />

2 is a strip <strong>of</strong> land with no recognized address comprising some<br />

<strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building. Parcel 3 is occupied largely by<br />

the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building and the existing Firestone building.<br />

Parcel 4 contains the former restaurant building (Morrison’s Café)<br />

on the southwest corner <strong>of</strong> the Study Area. Three parcels (5, 6,<br />

and 7) on the northeast corner <strong>of</strong> the Study Area are not owned<br />

by Sunrise Properties & Investments, LLC, but will be included<br />

in any future development plans for the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site.<br />

Parcel 5 is identified by the Brevard County Property Appraiser<br />

Office as a multiple-unit retail center. Parcel 6 is a retail branch <strong>of</strong><br />

Colonial Bank, and Parcel 7 is now vacant but formerly a Burger<br />

King restaurant. Parcels 8 through 10 are city-owned waterfront<br />

acquisitions. For the purposes <strong>of</strong> this study, the Study Area<br />

considers all 10 parcels as a single entity.<br />

HAMILTON<br />

LA CITA<br />

HOPKINS AVE<br />

HOPKINS AVE.<br />

VILLAGE<br />

2<br />

JACKSON ST<br />

FORMER<br />

RESTAURANT<br />

(VACANT)<br />

MIRACLE CITY MALL<br />

NORTH SIDE OUTPARCEL<br />

(VACANT)<br />

HOPKINS<br />

JACKSON<br />

ALHAMBRA<br />

ST.<br />

1<br />

ROOSEVELT ST.<br />

MIRACLE CITY MALL<br />

HARRISON ST.<br />

SEVILLE WAY<br />

LADO<br />

5<br />

6<br />

RETAIL<br />

OUTPARCEL<br />

COLONIAL<br />

BANK<br />

FORMER<br />

BURGER KING<br />

(VACANT)<br />

3<br />

4<br />

ALAMANDA<br />

SEVILLE<br />

LADO<br />

ALHAMBRA<br />

OJIBWAY<br />

ROYAL PALM<br />

HARRISON ST<br />

SEMINOLE<br />

7<br />

FLAMINGO<br />

OJIBWAY<br />

U.S. 1 (WASHINGTON AVE)<br />

Map 1: Aerial view <strong>of</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site. Boundary outlined in red.<br />

FIRESTONE<br />

PINEAPPLE BAY<br />

RESTAURANT<br />

U.S. 1 / WASHINGTON AVE.<br />

CITRUS<br />

SEMINOLE<br />

PELICAN POINT<br />

CONDOS<br />

WENDY'S<br />

WACHOVIA BANK<br />

USPS<br />

DISTRIBUTION<br />

CENTER<br />

COURT<br />

8<br />

9<br />

10<br />

Map 2: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> parcels are shown in yellow. <strong>The</strong> Study Area boundary is outlined in<br />

red. Parcel numbers are described in the narrative.<br />

CITRUS<br />

COURT<br />

BAY TOWERS<br />

WASHINGTON<br />

WASHINGTON<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 44<br />

VILLAGE<br />

KRYSTAL<br />

RESTAURANT<br />

BERMUDA


Inventory <strong>of</strong> Blighted Conditions<br />

This section presents the inventory <strong>of</strong> the various elements constituting a blighting<br />

condition identified in the proposed redevelopment area. Characteristics <strong>of</strong> three<br />

elements were examined to determine whether a condition <strong>of</strong> blight exists:<br />

1. Τax base trends<br />

2. Physical conditions <strong>of</strong> the site and buildings<br />

3. Commercial vacancy rates<br />

<strong>The</strong> characteristics <strong>of</strong> these elements will help determine the presence <strong>of</strong> bligh as<br />

established in the <strong>Florida</strong> Statutes.<br />

• Tax Base Trends (2000-2005):<br />

Between 2000 and 2005, assessed taxable values for the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Study<br />

Area (Parcels 1 through 7), minus the waterfront properties acquired by the city<br />

(Parcels 8, 9, and 10), grew at a slower rate than the assessed values for the<br />

<strong>City</strong> <strong>of</strong> <strong>Titusville</strong> or the assessed values for Brevard County (see Table 1 below<br />

and Table 3, page 51). Parcels 8, 9, and 10 are not included in this evaluation<br />

because they are tax-exempt as publicly-owned properties. Table 1 demonstrates<br />

that compared to <strong>Titusville</strong>’s or Brevard County’s steady growth in assessed<br />

property value, the properties <strong>of</strong> the Study Area have not experienced similar<br />

growth patterns. In fact, between 2002 and 2003, the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Study<br />

Area actually lost almost 8% <strong>of</strong> its taxable value—a situation caused largely by<br />

a significant drop in the <strong>Mall</strong> tenancy rate.<br />

Growth in property values is considered a significant indicator <strong>of</strong> investment<br />

worth. <strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Study Area has gained less than 8% in value<br />

between 2000 and 2005, while <strong>Titusville</strong> as a whole has grown by over 54%<br />

and Brevard County’s total growth rate is almost 83%. <strong>The</strong> Study Area’s annual<br />

growth rate is only 1.5% compared to 10.8% as seen in the rest <strong>of</strong> <strong>Titusville</strong> and<br />

16.6% growth as witnessed in Brevard County. Total percent change rates for<br />

the Study Area are only approximately one-seventh <strong>of</strong> those for <strong>Titusville</strong> and<br />

approximately one-eleventh <strong>of</strong> those for Brevard County. <strong>The</strong>se rates indicate<br />

the taxable value <strong>of</strong> the Study Area has not kept pace with the rest <strong>of</strong> the <strong>City</strong> or<br />

County.<br />

• Deterioration <strong>of</strong> Site or Other Improvements:<br />

1. Structural Conditions <strong>of</strong> Buildings<br />

A strong indicator <strong>of</strong> blight is the presence <strong>of</strong> deteriorated building conditions,<br />

which point to a lack <strong>of</strong> interest or capability in maintaining existing investment<br />

value. Buildings in poor structural condition can negatively affect the values <strong>of</strong><br />

adjacent buildings and properties enjoying better investment in their structural<br />

condition.<br />

Meteorological events specific to the subtropical <strong>Florida</strong> climate can also<br />

negatively affect the structural integrity <strong>of</strong> buildings; <strong>of</strong>ten drastically. Hurricanes<br />

may cause damage to the exterior and/or interior <strong>of</strong> buildings and accelerate the<br />

progression <strong>of</strong> existing structural problems. Hurricane seasons characterized by<br />

multiple storms, as in 2004, for example, exacerbate the problem; the building<br />

stock <strong>of</strong> entire communities can be devastated repeatedly.<br />

For the purpose <strong>of</strong> establishing the condition <strong>of</strong> the buildings in the Study Area,<br />

a field survey was conducted by Advanced Imaging Services Company (AIS) in<br />

January 2006. AIS, a division <strong>of</strong> Speur Corporation and based in Merritt Island,<br />

<strong>Florida</strong>, is a consulting firm specializing in building imaging, energy auditing,<br />

and mechanical and structural engineering inspection. <strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

building, north end outparcel, former restaurant building, and existing Firestone<br />

building were externally and internally inspected by AIS and rated according to<br />

the following criteria:<br />

1. Good: Satisfactory with normal wear and tear.<br />

2. Fair: Satisfactory but declining in usefulness.<br />

3. Poor: Unsatisfactory and in need <strong>of</strong> immediate repair.<br />

Note: AIS did not perform any inspection on the buildings occupying<br />

Parcels 5, 6, 7, or 8. Except for the now-closed Burger King on Parcel 7,<br />

these structures are currently occupied and buildings are in good or fair<br />

condition. Parcel 5, occupied by a multi-unit retail center, is understood<br />

to have been recently renovated.<br />

Area 2000-2001<br />

% Change<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

Study Area<br />

2001-2002<br />

% Change<br />

Source: Brevard County Property Appraiser, 2006<br />

2002-2003<br />

% Change<br />

2003-2004<br />

% Change<br />

2004-2005<br />

% Change<br />

2000-2005<br />

Total %<br />

Change<br />

2000-2005<br />

Annual %<br />

Change<br />

+


<strong>The</strong> following is a summary <strong>of</strong> building conditions observed during the AIS<br />

field survey.<br />

*RMPK Group conducted a similar field study in September, 2006, from<br />

a customer-oriented perspective and observed habitable conditions in<br />

Walls: Exterior walls exhibit structural cracking in the first-floor masonry.<br />

Potential exists for undermining and/or load stress caused by wind on north<br />

side for a series <strong>of</strong> units in the north end outparcel building. North end and<br />

southwest corner outparcels are considered to be in poor condition.<br />

the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building but not <strong>of</strong> a quality that could attract a<br />

customer base or tenants able to compete in the current retail market.<br />

<strong>The</strong> AIS report does not mention interior conditions observable from<br />

customer-accessible locations (e.g., central corridor). Access to other<br />

buildings or to ro<strong>of</strong>s, back rooms, maintenance areas, etc., was not<br />

Doors & Windows: Main entry doors are serviceable and in good<br />

condition. Cracked windows, sills, and lintels observed in some areas, notably<br />

the concourse area and on the north end outparcel. Trim on all units <strong>of</strong> the<br />

north end outparcel are in poor condition.<br />

Fig. 2: Deteriorating foundation and<br />

door conditions (AIS, January, 2006).<br />

attempted by RMPK Group.<br />

Age plays a significant role in the condition <strong>of</strong> buildings. While older buildings<br />

can be maintained in excellent condition, they are generally more costly to<br />

maintain and more susceptible to neglect than newer buildings. Older buildings<br />

Fig. 6: Damaged wall, JCPenney<br />

building (AIS, January, 2006).<br />

Ro<strong>of</strong>ing: Many ro<strong>of</strong> drains are not operating as expected. <strong>The</strong><br />

Firestone building ro<strong>of</strong> was replaced in October, 2005, but all other ro<strong>of</strong> areas<br />

require either minor patching or complete replacement (some ro<strong>of</strong>s require<br />

replacement within 3 to 5 years). Water intrusion occurs over Unit #100.<br />

may also have hidden structural problems that may go undetected until an event<br />

such as a severe storm causes structural damage or failure. <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>,<br />

now 36 years old, is ready for investment in major renovations, as evidenced<br />

by the replacement in October, 2005, <strong>of</strong> the ro<strong>of</strong> over JCPenney.<br />

Flashing needs to be adjusted in over 10 locations to maintain proper seals. No<br />

valleys are present. Overall ro<strong>of</strong>ing condition is fair on the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong><br />

building but fair to poor on the north end outparcel building.<br />

Foundation: Concrete slab floors contain cracks caused by settlement<br />

in all property structures, although commercial grade slabs are capable <strong>of</strong><br />

Fig. 3: Dilapidated interior in <strong>Miracle</strong><br />

<strong>City</strong> <strong>Mall</strong> building (AIS, January,<br />

2006).<br />

Fig. 7: Damaged HVAC equipment,<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building (AIS,<br />

January, 2006).<br />

withstanding considerable stresses.<br />

HVAC:<br />

Inlet and outlet lines are leaking into one <strong>of</strong> the two 500-ton<br />

chillers on the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building (second chiller was not operating<br />

at the time <strong>of</strong> inspection). Five evaporator units are leaking condensation into<br />

emergency overflow pans. Of 24 air handler units throughout the <strong>Mall</strong> building,<br />

only 5 were not operating as designed. Routine maintenance is required to<br />

keep evaporator coils free <strong>of</strong> dust. Overall condition for HVAC in <strong>Miracle</strong><br />

<strong>City</strong> <strong>Mall</strong> is considered fair. On north end outparcel building and former<br />

restaurant building, no HVAC units were operating due to lack <strong>of</strong> power and<br />

Fig. 4: Collapsing ceiling in north<br />

side outparcel (AIS, January, 2006).<br />

Fig. 8: Aging HVAC equipmnt, north<br />

side outparcel (AIS, January, 2006).<br />

water. Existing machinery appears to require immediate replacement. Overall<br />

conditions here are poor.<br />

Interiors*:<br />

Interior conditions are uniformly poor throughout the entire<br />

north end outparcel. Water damage from leaking ro<strong>of</strong>s is evident in a number<br />

<strong>of</strong> units. Other structural damage includes exposed insulation, missing ceiling<br />

tile, damaged sheetrock, and damaged floors. Overall conditions are poor.<br />

In <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>, a few retail units exhibit similar conditions, but these<br />

conditions appear to be outside <strong>of</strong> customer view (i.e., observable only from<br />

back room or places where mall customers do not typically have access).<br />

Fig. 5: Dilapidated interior in north<br />

side outparcel (AIS, January, 2006).<br />

Fig. 9: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> ro<strong>of</strong> (AIS,<br />

January, 2006).<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 46


2. Site Conditions<br />

Building conditions are an important element in determining the presence <strong>of</strong><br />

blight but do not describe the overall conditions <strong>of</strong> blighted parcels. Blight can<br />

also be characterized by deteriorated site conditions not related to buildings, e.g.,<br />

paving conditions, landscaping, signage and lighting infrastructure, and more.<br />

<strong>The</strong> deterioration <strong>of</strong> site and building are factors that can be precipitated by<br />

sudden and damaging storm events and worsened by neglect following building<br />

vacancy. While reversible, a large number <strong>of</strong> such site/building deterioration<br />

examples contribute strongly to a finding <strong>of</strong> blight.<br />

RMPK Group conducted a field survey <strong>of</strong> site conditions for <strong>Miracle</strong> <strong>City</strong><br />

<strong>Mall</strong> buildings in September 2006 (Parcels 5, 6, and 7 were observed to be in<br />

Fig. 10: Deteriorating parking lot, northeast corner<br />

<strong>of</strong> Study Area (RMPK Group, September, 2006).<br />

Fig. 13: Rear side <strong>of</strong> vacant north side outparcel<br />

(RMPK Group, September, 2006).<br />

Fig. 14: Damaged rear wall <strong>of</strong> north side outparcel<br />

(RMPK Group, September, 2006).<br />

satisfactory conditions):<br />

Parking lots:<br />

Pavement is deteriorating at numerous locations throughout<br />

Parcels 1 through 4, and weeds are growing through cracks and spalled areas<br />

in Parcel 1. Potholes are evident behind the north end outparcel. Pavement<br />

markings are still recognizable but have not been painted in many months. Curb<br />

cuts are numerous. Conditions are fair to poor.<br />

Landscaping conditions:<br />

Minimal numbers <strong>of</strong> healthy but small trees<br />

provide little shade on the parking lots. Some aesthetic landscaping exists at and<br />

near <strong>Mall</strong> building entrances, but, overall, adequate landscaping on the property<br />

is lacking and therefore considered in poor condition.<br />

Drainage: No turf areas or stormwater retention facilities are present on Parcels 1<br />

Fig. 11: Potholes behind north side outparcel (RMPK<br />

Group, September, 2006).<br />

Fig. 15: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> front façade (RMPK<br />

Group, September, 2006).<br />

Fig. 16: JCPenney near-empty parking lot (RMPK<br />

Group, September, 2006).<br />

through 4. Over 95% <strong>of</strong> the Study Area is imperviable to stormwater. Stormwater<br />

is handled by a closed system <strong>of</strong> grates and culverts that channels run<strong>of</strong>f directly<br />

into the Indian River Lagoon. This situation is highly unsatisfactory according to<br />

current stormwater management practices and is therefore a strong indication <strong>of</strong><br />

blight. Poor condition.<br />

Signage:<br />

Curbside <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> entry signs are functional yet<br />

exhibit dated aesthetics and show little evidence <strong>of</strong> continued maintentance.<br />

Fair to poor condition.<br />

Building façades and entries: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> façades and entryways are<br />

aesthetically dated. Fair condition.<br />

Fig. 12: Rear side <strong>of</strong> vacant north side outparcel<br />

(RMPK Group, September, 2006).<br />

Fig. 17: Vacant retail unit, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> (RMPK<br />

Group, September, 2006).<br />

Fig. 18: Vacant retail unit, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> (RMPK<br />

Group, September, 2006).<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 47


• Commercial vacancy rates<br />

Currently, 17 out <strong>of</strong> 44 units in <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> are unoccupied, and one anchor<br />

store (S<strong>of</strong>as Direct) is closing. Six <strong>of</strong> 7 units in the north end outparcel building<br />

are not occupied by leasing tenants. <strong>The</strong> former Morrison’s Café outparcel on<br />

the southwest corner <strong>of</strong> the Study Area is entirely unoccupied. <strong>The</strong> freestanding<br />

Firestone building (southeast corner <strong>of</strong> the Study Area) is currently occupied but<br />

the tenant is understood to be considering relocating to a newer facility. At this<br />

time, the Study Area vacancy rate on a per-unit basis is 32%, and on a squarefootage<br />

basis is 24%. In the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> building alone, the vacancy rate<br />

is 39% on a per-unit basis and 13.8% on a square-footage basis. Once S<strong>of</strong>as<br />

Direct has closed, sometime before the end <strong>of</strong> 2006, the <strong>Mall</strong> building vacancy<br />

rate will increase to about 25% on a square-footage basis. This is an excessive<br />

vacancy rate, particularly compared to the current 6% retail vacancy rate for<br />

all <strong>of</strong> <strong>Titusville</strong> (as determined by the Economic Development Commission <strong>of</strong><br />

<strong>Florida</strong>’s Space Coast).<br />

Vacancy rates have been increasing over the past few years. In 2001, both<br />

anchor stores were occupied and they, along with the rest <strong>of</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>,<br />

produced sales <strong>of</strong> over $16-million. In 2002, sales dropped to about $9.7-million,<br />

a loss <strong>of</strong> almost 40%. By 2005, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> had lost one <strong>of</strong> its primary<br />

anchors, over a dozen <strong>of</strong> its retail tenants, and almost 95% <strong>of</strong> its 2001 sales<br />

volume—a precipitous decline in only four years (see Table 2 below). This is<br />

strongly evident <strong>of</strong> the progressively growing failure <strong>of</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> in its<br />

current condition to maintain a customer or tenant base.<br />

Figs. 19 (top) & 20: Deserted central corridor <strong>of</strong><br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> (RMPK Group, September, 2006).<br />

Year<br />

Sales Figures<br />

2001 $16-million<br />

2002 $9.7-million<br />

% change -39.2%<br />

2003 $4.2-million<br />

% change -56.3%<br />

2004 $1.5-million<br />

% change -35.7%<br />

2005 < $1-million<br />

% change > -33.3%<br />

01-’05 % change > -94%<br />

Fig. 21: For Lease sign, <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> (RMPK<br />

Group, September, 2006).<br />

* figures are estimates and do not include all <strong>Mall</strong> tenants<br />

Source: <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Property Management Office<br />

Table 2: Sales trends for <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong>, 2001-2005.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 48


Conclusions and Recommendations<br />

<strong>The</strong> <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site and adjacent properties included in this study exhibit<br />

characteristics <strong>of</strong> blight. Specifically, this report documents evidence for three<br />

criteria that substantiate a Finding <strong>of</strong> Necessity for a blighted area according to<br />

Chapter 163, Part III, <strong>of</strong> the <strong>Florida</strong> Statutes. <strong>The</strong>se criteria assert the following:<br />

1. Aggregate assessed values <strong>of</strong> real property in the area for ad<br />

valorem tax purposes have failed to show<br />

any appreciable increase over the 5 years prior to the finding <strong>of</strong><br />

such conditions<br />

2. Deterioration <strong>of</strong> site or other improvements is leading to a<br />

lowered investment image<br />

3. High commercial vacancy rates are pointing to decreased<br />

investment interest in the Study Area<br />

<strong>The</strong> culmination <strong>of</strong> these factors makes a strong case for an assessment <strong>of</strong> blight<br />

in the Study Area. Structural conditions in the <strong>Miracle</strong> Ciy <strong>Mall</strong> buildings are<br />

declining to the point that the <strong>Mall</strong> cannot compete effectively in the current<br />

consumer market environment. Declining sales revenues are an indication <strong>of</strong><br />

economic distress that makes it difficult for property management to invest in<br />

renovations or support current configurations or solely commercial uses. In fact,<br />

infrastructure in many places is deficient to the point where renovation is not<br />

worthwhile. As indicated in the U.S. 1 Corridor Master <strong>Plan</strong>, redevelopment<br />

<strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> area has been identified by community residents as a<br />

priority project. On the basis <strong>of</strong> this finding report, complete redevelopment <strong>of</strong><br />

the Study Area, introducing a new mix <strong>of</strong> commercial, residential, and <strong>of</strong>fice uses<br />

in a more modernized manner, is the strongly recommended course <strong>of</strong> action.<br />

According to Chapter 163, Part III, F.S., the next step following a determination<br />

<strong>of</strong> existence <strong>of</strong> blight is adoption <strong>of</strong> a finding <strong>of</strong> necessity by the <strong>Titusville</strong> <strong>City</strong><br />

Council, which will allow the creation <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> Community<br />

<strong>Redevelopment</strong> Area.<br />

As determined in relevant court cases regarding findings <strong>of</strong> necessity, a finding<br />

<strong>of</strong> blight will be upheld if there is “competent substantial evidence” presented on<br />

the record for the governing body’s decision to be based. <strong>The</strong> <strong>Florida</strong> Supreme<br />

Court has defined the term “competent substantial evidence” as follows:<br />

Substantial evidence has been described as such evidence as will<br />

establish a substantial basis <strong>of</strong> fact from which the fact at issue can be<br />

reasonably inferred. We have stated it to be such relevant evidence, as a<br />

reasonable mind would accept as adequate to support a conclusion... We<br />

are <strong>of</strong> the view ... that the evidence relied upon to sustain the ultimate<br />

finding should be sufficiently relevant to sustain the ultimate finding<br />

and should be sufficiently relevant and material that a reasonable mind<br />

would accept it as adequate to the conclusion reached. To this extent the<br />

‘substantial’ should also be ‘competent’.<br />

Recommendations are as follows:<br />

1. Establish a Community <strong>Redevelopment</strong> Area<br />

Based on the results <strong>of</strong> this study, the <strong>City</strong> <strong>of</strong> <strong>Titusville</strong> should proceed to create<br />

a community redevelopment area for the Study Area in accordance with the<br />

provisions <strong>of</strong> the State Community <strong>Redevelopment</strong> Act. <strong>The</strong> <strong>City</strong> must work<br />

with Brevard County to obtain the authority to create a CRA based on the charter<br />

County provisions set forth in <strong>Florida</strong> Statutes.<br />

Briefly, the process for creating a CRA is as follows:<br />

1. <strong>City</strong> Council accepts the findings <strong>of</strong> the study and moves to request that<br />

the County adopt a resolution delegating<br />

authorities contained in Chapter 163 <strong>of</strong> the <strong>Florida</strong> Statutes.<br />

2. <strong>City</strong> staff meet with County Commissioners and request placement <strong>of</strong><br />

the item on the Board <strong>of</strong> County<br />

Commissioners agenda.<br />

3. <strong>The</strong> County Attorney, in coordination with the <strong>City</strong>, prepares a draft<br />

resolution.<br />

4. <strong>The</strong> County provides written notice to the applicable taxing authorities<br />

<strong>of</strong> the upcoming meeting and<br />

resolution.<br />

5. <strong>The</strong> Board <strong>of</strong> County Commissioners acts upon the resolution.<br />

6. <strong>City</strong> Council prepares a resolution to adopt the finding <strong>of</strong> blight and<br />

create a redevelopment district.<br />

7. <strong>City</strong> Council provides written notice to the applicable taxing authorities<br />

<strong>of</strong> the upcoming action.<br />

8. <strong>City</strong> Council adopts the resolution.<br />

2. Prepare a <strong>Redevelopment</strong> <strong>Plan</strong><br />

Chapter 163.362, F.S., provides a detailed description <strong>of</strong> the required contents <strong>of</strong><br />

a <strong>Redevelopment</strong> <strong>Plan</strong>. A <strong>Redevelopment</strong> <strong>Plan</strong> is intended to address the issues<br />

identified in a finding-<strong>of</strong>-necessity study, define community redevelopment<br />

goals and objectives, and establish specific Community <strong>Redevelopment</strong> Agency<br />

policies and actions. <strong>The</strong> <strong>Redevelopment</strong> <strong>Plan</strong> will provide a framework for<br />

oversight <strong>of</strong> the land development process and improve the marketability <strong>of</strong><br />

the CRA. It can also provide a strategy for obtaining economic incentives that<br />

encourage private sector investment and capital improvements that ensure<br />

infrastructure is in place to support future growth and development.<br />

Working with the three adjacent property owners, a master plan for the<br />

redevelopment <strong>of</strong> the <strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> site should be the primary element <strong>of</strong> the<br />

redevelopment plan for the Study Area that will meet the requirements established<br />

for such plans in the <strong>Florida</strong> Statutes. <strong>The</strong> redevelopment plan will establish the<br />

framework for a developer agreement between the <strong>City</strong> and the property owners<br />

that sets forth specific expectations, roles, relationships, and participation by the<br />

public and private sector to ensure the successful redevlopment <strong>of</strong> the site.<br />

3. Establish a <strong>Redevelopment</strong> Trust Fund<br />

Program funding and accounting is administered through a CRA trust fund that<br />

may be created by ordinance <strong>of</strong> the governing authority. <strong>The</strong> trust fund can be<br />

established subsequent to adoption <strong>of</strong> a Community <strong>Redevelopment</strong> <strong>Plan</strong> that<br />

will, according to <strong>Florida</strong> Statutes, provide for the collection <strong>of</strong> tax increment<br />

revenues to finance capital improvements identified in the <strong>Redevelopment</strong> <strong>Plan</strong>.<br />

Upon creation <strong>of</strong> a trust fund, the trust fund ordinance freezes the tax base and<br />

establishes the base valuation <strong>of</strong> the property located within the boundaries <strong>of</strong><br />

the redevelopment area. From that point, all taxes assessed on future increases<br />

in the value <strong>of</strong> properties within the redevelopment area are appropriated to<br />

the <strong>Redevelopment</strong> Trust Fund. All taxes assessed on the value <strong>of</strong> property<br />

determined prior to adoption <strong>of</strong> the ordinance will continue to generate revenues<br />

for local taxing authorities.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 49


Year Parcel 1:<br />

2505<br />

Hopkins Ave<br />

Parcel 2<br />

No address<br />

Parcel 3:<br />

2500 S.<br />

Washington<br />

Ave<br />

Parcel 4:<br />

250<br />

Harrison St<br />

Sunrise<br />

Properties<br />

parcels:<br />

1 thru 4<br />

Parcel 5:<br />

2412 S.<br />

Washington<br />

Ave<br />

Parcel 6:<br />

2460 S.<br />

Washington<br />

Ave<br />

Parcel 7:<br />

2480 S.<br />

Washington<br />

Ave<br />

<strong>City</strong> <strong>of</strong> <strong>Titusville</strong><br />

Brevard County**<br />

2000 $698,210 $900,000 $3,800,000 $500,000 $5,798,210 $410 $201,020 $403,450 $1,070,919,481 $17,000,000,000<br />

2001 $698,210 $675,000 $3,900,000 $500,000 $5,773,210 $410 $201,420 $442,670 $1,098,461,024 $18,300,000,000<br />

% change 0% -25% +2.6% 0% -


Appendix B<br />

Funding Sources


Table <strong>of</strong> Funding Sources for <strong>Redevelopment</strong> Activities<br />

Program Name Description Sponsor More Information<br />

Land and Water Conservation Fund (LWCF)<br />

<strong>The</strong> LWCF program provides matching grants to states and local governments for the acquisition and development <strong>of</strong> public outdoor<br />

recreation areas and facilities. <strong>The</strong> program is intended to create and maintain a nationwide legacy <strong>of</strong> high quality recreation<br />

areas and facilities and to stimulate non-federal investments in the protection and maintenance <strong>of</strong> recreation resources across the<br />

United States. <strong>The</strong> funding that is allocated to each state, or “stateside” funding, is administered by that state. Through the LWCF,<br />

the <strong>Florida</strong> Department <strong>of</strong> Parks and Recreation provides funds for statewide planning, and for acquiring and developing outdoor<br />

recreation areas and facilities LWCF grant funds may be used for the acquisition and development <strong>of</strong> state and local facilities that<br />

provide active and/or passive recreation opportunities.<br />

US Department <strong>of</strong> the<br />

Interior, National Park<br />

Service<br />

Federal funding <strong>of</strong> this program varies from<br />

year to year depending on appropriations. For<br />

program information, visit: http:// www.nps.gov/<br />

ncrc/programs/flp/index.html<br />

<strong>Florida</strong> Recreational Trails Program (RTP)<br />

RTP is a competitive program which provides grants for projects that provide, renovate or maintain recreational trails, trailhead and<br />

trailside facilities. <strong>The</strong> Intermodal Surface Transportation Efficiency Act (ISTEA) <strong>of</strong> 1991 included the National Recreational Trails<br />

Fund Act (NRTFA) and established the National Recreational Trails Funding Program (NRTFP). <strong>The</strong> National Highway System<br />

Designation Act (NHS Act) <strong>of</strong> 1995 amended and revived the NRTFA. <strong>The</strong> Transportation Equity Act for the 21st Century (TEA-21)<br />

amended the previous legislation and provided for six years <strong>of</strong> funding. <strong>The</strong> current maximum grant amount for mixed-use projects<br />

and non-motorized projects is $200,000. <strong>The</strong> maximum grant award amount for motorized projects is $437,420 annually.<br />

<strong>Florida</strong> Department <strong>of</strong><br />

Environmental Protection<br />

<strong>Florida</strong> Inland Navigation District Waterway<br />

Assistance Program (WAP)<br />

<strong>The</strong> Waterway Assistance Program is a grant program established by the <strong>Florida</strong> Legislature and the District for the purpose<br />

<strong>of</strong> financially cooperating with local governments to alleviate problems associated with the Atlantic Intracoastal Waterway and<br />

associated waterways within the District. <strong>The</strong> maximum grant award amount for eligible projects is $300,000 annually.<br />

<strong>Florida</strong> Inland Navigation<br />

District<br />

http://www.aicw.org/wap.htm<br />

<strong>Florida</strong> Urban Forestry Grant<br />

As part <strong>of</strong> the federal government’s Urban and Community Forestry Matching Grant Program, funds will be available to<br />

organizations to develop or enhance their urban and community forestry programs. <strong>The</strong> maximum grant award available is $25,000<br />

on an annual basis.<br />

<strong>Florida</strong> Department<br />

<strong>of</strong> Agriculture and<br />

Consumer Services<br />

http://www.fl-d<strong>of</strong>.com/forest_management/cfa_<br />

urban_grants.html<br />

<strong>Florida</strong> Boating Improvement Program (FBIP)<br />

<strong>The</strong> <strong>Florida</strong> Boating Improvement Program provides funding through competitive grants for boating access projects and other<br />

boating-related activities on coastal and/or inland waters <strong>of</strong> <strong>Florida</strong>. Eligible program participants include county governments,<br />

municipalities and other governmental entities <strong>of</strong> the State <strong>of</strong> <strong>Florida</strong><br />

<strong>Florida</strong> Fish and<br />

Wildlife Conservation<br />

Commission<br />

http://myfwc.com/boating/grants/fbip.htm<br />

Keep American Beautiful (KAB) Grant<br />

Keep America Beautiful is a national nonpr<strong>of</strong>it public education organization dedicated since 1953 to engaging individuals to take<br />

greater responsibility for improving their local community environments. Annual landscaping grant program administered through the<br />

State Department <strong>of</strong> Agriculture. With a $20,000 limit, projects may be phased.<br />

<strong>Florida</strong> Department <strong>of</strong><br />

Agriculture<br />

http://www.kab.org/aboutus.aspid=32&rid=38<br />

Cultural Facilities Grant<br />

This grant, requiring a 50% cash match, <strong>of</strong>fers funding assistance for the construction <strong>of</strong> cultural facilities, including arts, historical,<br />

and science centers up to a maximum <strong>of</strong> $500,000.<br />

State <strong>of</strong> <strong>Florida</strong><br />

http://www.florida-arts.org/grants/facilities/<br />

index.htm<br />

<strong>Florida</strong> Department <strong>of</strong> Transportation’s Local<br />

Agency Program<br />

<strong>The</strong> program is designed to provide funding and technical assistance to local governments interested in implementing federal aid<br />

transportation projects. <strong>Florida</strong> Highway Beautification Council. Based on the results <strong>of</strong> this annual review process, the Secretary <strong>of</strong><br />

the Department <strong>of</strong> Transportation may award up to a total <strong>of</strong> $3 million in Grants to eligible applicants.<br />

<strong>Florida</strong> Department <strong>of</strong><br />

Transportation<br />

River Restoration Grants<br />

$5,000 to $25,000 per project. Non-federal match not required. But encouraged. Grants provided to projects that are using dam<br />

removal or fish passage to restore and protect the ecological integrity <strong>of</strong> rivers and improve freshwater habitats for anadromous fish.<br />

State, local, and tribal governments, conservation groups, and other non-pr<strong>of</strong>its.<br />

American Rivers<br />

(partner with National<br />

Oceanic & Atmospheric<br />

Administration (NOAA)<br />

http://www.amrivers.org/dam removal/<br />

grantguidelines.htm<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 52


Name Description Sponsor More Information<br />

<strong>Florida</strong> Community’s Trust (FCT) Fund Grant<br />

This grant program was established for environmental land acquisition. <strong>Florida</strong> Communities Trust (FCT) is a state land acquisition<br />

grant program that provides funding to local governments and eligible non-pr<strong>of</strong>it environmental organizations for acquisition <strong>of</strong><br />

community-based parks, open space and greenways that further outdoor recreation and natural resource protection needs identified<br />

in local government comprehensive plans.<br />

<strong>Florida</strong> Department <strong>of</strong><br />

Community Affairs<br />

<strong>Florida</strong> Greenways and Trails Program<br />

<strong>The</strong> <strong>Florida</strong> Department <strong>of</strong> Environmental Protection administers this grant, which can be used for acquisition <strong>of</strong> property for linear<br />

corridors, open space connectors and trails. <strong>The</strong>re is a cap <strong>of</strong> $5,500,000 with no match required.<br />

<strong>Florida</strong> Department <strong>of</strong><br />

Environmental Protection<br />

Coastal Partnership Initiative<br />

This initiative is designed to support innovative local-level coastal management projects in four program areas: public access,<br />

remarkable coastal places, working waterfronts, and community stewardship. Governmental, educational, and non-pr<strong>of</strong>it entities<br />

can apply, and the <strong>Florida</strong> Coastal Management Program <strong>of</strong>fers technical assistance and training along with the more traditional<br />

funding support. Financial awards are limited to no more than $50,000 and no less than $15,000 and may be used for planning<br />

and coordination activities, land acquisition, small construction, or capital improvement projects. If the type <strong>of</strong> assistance provided<br />

through the grant contract is financial assistance, the recipient will be required to provide 100% matching funding, which may be<br />

cash or in-kind.<br />

<strong>Florida</strong> Department <strong>of</strong><br />

Environmental Protection<br />

<strong>Florida</strong> Recreation Development Assistance<br />

Program (FRDAP)<br />

This annual, state recreation assistance program may be used for recreational land acquisition, park design and construction. Active<br />

park amenities are normally afforded a higher priority than passive parks. With a limit <strong>of</strong> $150,000, projects may be phased over<br />

several years. Grants under $50,000 require no match. Grants over $50,000 require a 50% match. <strong>The</strong> maximum grant amount is<br />

$200,000<br />

<strong>Florida</strong> Department <strong>of</strong><br />

Environmental Protection<br />

East Central <strong>Florida</strong> Water Management<br />

District (ECFWMD)<br />

ECFWMD funding is available for assistance in stormwater improvement projects, which is beneficial for redevelopment projects that<br />

contain areas identified as having drainage deficiencies.<br />

East Central <strong>Florida</strong> Water<br />

Management District<br />

(ECFWMD)<br />

North American Wetlands Conservation Act<br />

(NAWCA) - Standard Grants<br />

$51,000-$1.0M to fund a 4-year plan <strong>of</strong> action supported by a NAWCA grant and partner funds to conserve wetlands and wetlandsdependent<br />

fish and wildlife through acquisition (including easements and title donations), restoration, and/or enhancement. Match<br />

must be non-Federal and at least equal to the grant request.<br />

US Fish & Wildlife Service<br />

http://northamerican.fws.gov/NA<br />

Community-Based Restoration Project:<br />

National and Regional Partnerships<br />

Grassroots, community-based projects for restoring and conserving marine resources and their habitats. Typical grants range from $<br />

100,000 to $ 600,000.<br />

National Oceanic<br />

and Atmospheric<br />

Administration (NOAA)<br />

Community-Based<br />

Restoration Program<br />

http://www.nmfs.noaa.gov/habitat/restoration/<br />

projects_programs/progras.html<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 53


Appendix C<br />

Legal Description <strong>of</strong> <strong>Miracle</strong><br />

<strong>City</strong> <strong>Mall</strong> CRA Boundaries


Legal Description for the U.S. 1 Corridor Community<br />

<strong>Redevelopment</strong> Area<br />

Parcel “A”<br />

<strong>The</strong> South 413 feet <strong>of</strong> lot 9 East <strong>of</strong> Hopkins Avenue and West <strong>of</strong> U.S. Highway<br />

No.1, Plat <strong>of</strong> Bayview Subdivision, according to the plat there<strong>of</strong>, as recorded in<br />

Plat Book 1, Page 64, <strong>of</strong> the Public Records <strong>of</strong> Brevard County, <strong>Florida</strong>.<br />

Along with;<br />

All <strong>of</strong> lot 10 East <strong>of</strong> Hopkins Avenue and West <strong>of</strong> U.S. Highway No.1, Plat <strong>of</strong><br />

Bayview Subdivision, according to the plat there<strong>of</strong>, as recorded in Plat Book 1,<br />

Page 64, <strong>of</strong> the Public Records <strong>of</strong> Brevard County, <strong>Florida</strong>.<br />

Along with;<br />

All <strong>of</strong> lots 1, 2, 3, 4 and 5 East <strong>of</strong> Hopkins Avenue and West <strong>of</strong> U.S. Highway No.1,<br />

Bayview Estates Subdivision, according to the plat there<strong>of</strong>, as recorded in Plat Book 2,<br />

Page 76, <strong>of</strong> the Public Records <strong>of</strong> Brevard County, <strong>Florida</strong>.<br />

Parcel “B”<br />

All <strong>of</strong> lots 5, 6, and the North 14.5 feet <strong>of</strong> the vacated Right-<strong>of</strong>-Way <strong>of</strong> Delespine<br />

Avenue, Block “A”, Boye’s Subdivision, according to the plat there<strong>of</strong>, as recorded in<br />

Plat Book 2, Page 40, less and except the Right-<strong>of</strong>-Way <strong>of</strong> U.S. Highway No. 1, <strong>of</strong> the<br />

Public Records<br />

<strong>of</strong> Brevard County, <strong>Florida</strong>.<br />

Along with;<br />

All <strong>of</strong> lot 7, the North 10 feet <strong>of</strong> lot 8, and the South 14.5 feet <strong>of</strong> the vacated Right-<strong>of</strong>-<br />

Way <strong>of</strong> Delespine Avenue, Block “B”, Boye’s Subdivision, according to the plat there<strong>of</strong>,<br />

as recorded in Plat Book 2, Page 40, less and except the Right-<strong>of</strong>-Way <strong>of</strong> U.S. Highway<br />

No.1, <strong>of</strong> the Public Records <strong>of</strong> Brevard County, <strong>Florida</strong>.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 55


Appendix D<br />

Architectural Guidelines from<br />

U.S. 1 Corridor Master <strong>Plan</strong>


Architectural Guidelines<br />

Architectural Styles<br />

This section illustrates a conceptual approach to establish minimum architectural standards for<br />

future development projects. <strong>The</strong> primary goal <strong>of</strong> the Architectural Guidelines is to ensure that<br />

each individual site design, architectural and streetscape project contribute to the positive image<br />

<strong>of</strong> the U.S.1 Corridor Study Area.<br />

<strong>The</strong> building elements outlined are inspired from the study <strong>of</strong> historic buildings in the <strong>City</strong> <strong>of</strong><br />

<strong>Titusville</strong> and should be incorporated to enhance the area’s unique and authentic character. <strong>The</strong><br />

architect/ developer is encouraged to provide innovative design solutions which may not meet<br />

the exact details <strong>of</strong> the guidelines. However, it is the responsibility <strong>of</strong> the architect to convince the<br />

<strong>City</strong> that the proposed design solutions are compatible with the traditional architectural character<br />

<strong>of</strong> the adjacent properties.<br />

Appropriate Architectural Styles<br />

While the Architectural Requirements do not recommend a specific design theme for buildings,<br />

it is encouraged that projects proposed in the Study Area must have either one <strong>of</strong> the four main<br />

architectural styles or a combination <strong>of</strong> the styles listed below as appropriate for use in each<br />

Character District.<br />

• <strong>Florida</strong> Frame Vernacular<br />

• Spanish Eclectic<br />

• Bungalow Style<br />

• Classical Revival<br />

Historic Architectural Examples in <strong>Titusville</strong><br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 57


DESIGN GUIDELINES<br />

Louvered Vent<br />

Cupola<br />

Ro<strong>of</strong> Slope<br />

(Gable/ Hipped)<br />

Projecting Eaves<br />

Porch Ro<strong>of</strong> Slope<br />

Cornice<br />

Lintel<br />

Double Hung<br />

Windows<br />

Raised Porch<br />

Fig 8.16 Frame Vernacular Elevation<br />

SIMPLE WOOD RAILING<br />

<strong>Florida</strong> Frame Vernacular Building Elements<br />

Characteristics<br />

• <strong>Plan</strong>: Regular, rectangular<br />

• Foundation: Concrete block<br />

• Material: Horizontal wood siding, Brick or smooth masonry<br />

• Ro<strong>of</strong> Type: Steep gable ro<strong>of</strong>, less common hip<br />

• Ro<strong>of</strong> surfacing: Metal or composition asbestos shingles<br />

• Details: Simple, jig-sawn patterns around porches and eaves, large attached front porch, revealed fireplace, double hung<br />

vertical windows.<br />

<strong>The</strong> façade should contain a minimum <strong>of</strong> five <strong>of</strong> the following façade design elements for the <strong>Florida</strong> Vernacular Style (Refer to<br />

Fig. 8.15-8.17 for illustrations):<br />

1. Metal Ro<strong>of</strong>ing materials<br />

2. Steep pitched gabled and hipped ro<strong>of</strong>s<br />

3. Exposed Truss work<br />

4. Simple Wood Cornice<br />

5. Double Hung Windows<br />

6. Simple wood railings<br />

7. Low-pitched ro<strong>of</strong> porches<br />

8. Wood Frame Construction<br />

9. Dormer Windows<br />

CORNICE<br />

(without ornamentation)<br />

SIMPLE BRACKETS/<br />

EXPOSED TRUSS WORK<br />

DORMER WINDOW<br />

STEEP PITCHED GABLE ROOF<br />

LOW-PITCHED PORCH ROOF<br />

DOUBLE HUNG WINDOWS<br />

Fig 8.17 Architectural Details<br />

Railing, Cornice and Brackets<br />

Fig 8.18 Architectural Details<br />

Ro<strong>of</strong> Elements, Windows<br />

Source: RMPK Group, Inc.<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 58


Spanish Eclectic Style<br />

Characteristics<br />

• <strong>Plan</strong>: Irregular<br />

• Foundation: Concrete block<br />

• Material: Stucco Exterior Wall Surfacing<br />

• Ro<strong>of</strong> Type: Low- Pitched Ro<strong>of</strong><br />

• Ro<strong>of</strong> surfacing: Red Tile Ro<strong>of</strong>ing; Flat with curvilinear parapet<br />

Fig 8.19 Spanish Eclectic Examples: Study Area<br />

<strong>The</strong> façade should contain a minimum <strong>of</strong> five <strong>of</strong> the following façade design elements for the Spanish Eclectic Style (Refer to Fig.<br />

8.19-8.20 for illustrations):<br />

1. Little or no eave overhang<br />

2. Prominent Arch over Door or Window or Porch<br />

3. Columns, Window Surrounds, Wrought Iron Grilles;<br />

4. Balconies and balconettes<br />

5. Red clay tile ro<strong>of</strong>ing<br />

6. Decorative ironwork<br />

7. Stucco walls<br />

8. Low-Pitched Ro<strong>of</strong>s<br />

9. Double-hung windows<br />

Fig 8.20 Spanish Eclectic Elevation<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 59


Bungalow Style<br />

Characteristics<br />

• <strong>Plan</strong>: Regular, Rectangular, usually oriented with narrow side facing the street<br />

• Foundation: Brick Pier or Continuous Brick or Concrete Block<br />

• Material: Horizontal wood siding, shingles<br />

• Ro<strong>of</strong> Type: Gable Main ro<strong>of</strong> over gable porch ro<strong>of</strong><br />

• Ro<strong>of</strong> surfacing: Shingles/ Metal<br />

Fig 8.21 Bungalow Style Elevation<br />

<strong>The</strong> façade should contain a minimum <strong>of</strong> three <strong>of</strong> the following façade design elements for the Bungalow Style (Refer to Fig. 8.20<br />

for illustrations):<br />

1. Simple, exposed structural elements, knees braces,<br />

2. Tapered chimneys<br />

3. Exposed rafter ends with carved decorative patterns to combine structure and ornament<br />

4. Shingles/ Metal ro<strong>of</strong><br />

5. Horizontal wood siding<br />

Classic Revival<br />

Characteristics<br />

• <strong>Plan</strong>: Regular, Rectangular<br />

• Foundation: Brick Pier or Continuous Brick<br />

• Material: Horizontal wood siding, Brick, Smooth Masonry<br />

• Ro<strong>of</strong> Type: Low-Pitched Hip, Flat Ro<strong>of</strong><br />

• Ro<strong>of</strong> surfacing: Embossed sheet metal or metal shingles; composition, asbestos shingles<br />

<strong>The</strong> façade should contain a minimum <strong>of</strong> three <strong>of</strong> the following façade design elements for the Classic Revival Style (Refer to<br />

Fig. 8.22 for illustrations):<br />

1. Columns, Balustrades, Medallions and French Doors<br />

2. Entrance Detailing- Transom, Sidelights, Ornamental Woodwork<br />

3. Embossed sheet metal or metal shingles; asbestos shingles<br />

4. Low pitched hip ro<strong>of</strong><br />

5. Horizontal wood siding<br />

Fig 8.22 Classic Revival Elevation<br />

<strong>Miracle</strong> <strong>City</strong> <strong>Mall</strong> <strong>Redevelopment</strong> <strong>Plan</strong> · May 2007 Page 60


Prepared by:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!